CN108545621A - A kind of precast stand slab hanging apparatus - Google Patents

A kind of precast stand slab hanging apparatus Download PDF

Info

Publication number
CN108545621A
CN108545621A CN201810649212.0A CN201810649212A CN108545621A CN 108545621 A CN108545621 A CN 108545621A CN 201810649212 A CN201810649212 A CN 201810649212A CN 108545621 A CN108545621 A CN 108545621A
Authority
CN
China
Prior art keywords
hanging apparatus
stand slab
precast stand
slab hanging
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810649212.0A
Other languages
Chinese (zh)
Inventor
谭启厚
李果
高长玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810649212.0A priority Critical patent/CN108545621A/en
Publication of CN108545621A publication Critical patent/CN108545621A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B66C5/04Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods with runways or tracks supported for movements relative to bridge or gantry

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of precast stand slab hanging apparatus, including:Door frame, the door frame has ceiling mounted tracks, the ceiling mounted tracks both sides setting is respectively arranged with long stent and short holder, the long stent and short holder are in contact with next step surface of grandstand to be installed and a upper step surface respectively, it is provided with jack machinism on the ceiling mounted tracks, the jack machinism is used to wait for the vertical and straight movement that platen is seen in lifting, there is travelling bogie on the grandstand to be installed, the travelling bogie is used to wait for the planar movement that platen is seen in lifting, by being moved horizontally in across the gating frame in grandstand both sides to be installed and using travelling bogie solution, see that platen is installed to realize that large scale is heavy weight.

Description

A kind of precast stand slab hanging apparatus
Technical field
The present invention relates to construction and installation fields, more particularly to a kind of precast stand slab hanging apparatus.
Background technology
See that platen is designed as precast concrete in the prior art, precast stand slab quantity is more, is divided into upper layer and lower layer pond Seat, monolithic precast stand slab length about 2.4 ~ 3.7m, width about 0.88m ~ 1.5m, height about 0.25 ~ 0.55m, thickness 0.1m, weight Measure about 1t ~ 1.5t.Since precast stand slab haves the characteristics that monomer weight is big, quantity is more.And general duration and construction plan Arrangement is tighter, and before precast stand slab installation, venue steel truss roof has bound sometimes, and precast stand slab can not use The mode of outdoor tower crane lifting is completed to install.It cannot be satisfied using equipment such as the truck cranes that disclosure satisfy that basement requirement for bearing capacity See 35 meters of platen or more sling height, the lifting requirements of 55 meters or more large spans.So existing, there are many key technology difficulties, such as Precast stand slab installation of circumferential about 50 meters of ranges etc. how is solved after being lifted into specified altitude assignment.
Invention content
It is an object of the invention to:Overcome the above-mentioned problems in the prior art, proposes a kind of precast stand slab lifting Device, by being moved horizontally in across the gating frame in grandstand both sides to be installed and using travelling bogie solution, to realize large scale It is heavy weight to see that platen is installed.
The purpose of the present invention is realized by following technical proposals:
A kind of precast stand slab hanging apparatus, including:Door frame, the door frame have ceiling mounted tracks, and the ceiling mounted tracks both sides are set Set and be respectively arranged with long stent and short holder, the long stent and short holder respectively with next step surface of grandstand to be installed and upper One step surface is in contact, and jack machinism is provided on the ceiling mounted tracks, and the jack machinism is used to wait for that the perpendicular of platen to be seen in lifting It is straight to move, there is travelling bogie, the travelling bogie to be used to wait for the planar movement that platen is seen in lifting on the grandstand to be installed.
A kind of precast stand slab hanging apparatus of the present invention, the long stent bottom have idler wheel, the short frame bottom With directive wheel.
A kind of precast stand slab hanging apparatus of the present invention, the directive wheel lower section have guide rail.
A kind of precast stand slab hanging apparatus of the present invention, the directive wheel are sheave, and the guide rail is upward convex The triangle track risen.
A kind of precast stand slab hanging apparatus of the present invention, the travelling bogie bottom has trolley directive wheel, described small Vehicle directive wheel bottom has the trolley guide rail of cooperation installation.
A kind of precast stand slab hanging apparatus of the present invention, the trolley guide rail are moveable structure.
A kind of precast stand slab hanging apparatus of the present invention, the ceiling mounted tracks top has plus powerful truss.
A kind of precast stand slab hanging apparatus of the present invention, truss length direction top both ends have door frame lifting lug.
A kind of precast stand slab hanging apparatus of the present invention is equipped with safety rope, the safety rope on the door frame lifting lug It is stretched between fixed column.
According to above-mentioned technical proposal, the beneficial effects of the invention are as follows:It is proposed that a kind of precast stand slab hanging apparatus can increase Add use scope, by being moved horizontally in across the gating frame in grandstand both sides to be installed and using travelling bogie solution, to realize Large scale is heavy weight to see that platen is installed, and movable pulley is arranged below door frame, facilitates door frame to move, one is in movable pulley Freewheel, another is rail-guided, so as to convenient and practical annular movement, and safety rope is arranged can prevent from using It turns on one's side in the process, and does not influence planar movement, and combine travelling bogie, be adapted to the extreme position that a variety of door frames can not reach See platen transport.
Description of the drawings
Fig. 1 is a kind of precast stand slab hanging apparatus schematic diagram of the present invention;
Fig. 2 is a kind of side figure of precast stand slab hanging apparatus of the present invention;
Fig. 3 is a kind of work diagram of precast stand slab hanging apparatus of the present invention.
Specific implementation mode
With reference to specific embodiments and the drawings, the present invention is further illustrated.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
If Fig. 1-3 is a kind of embodiment of precast stand slab hanging apparatus of the present invention, a kind of precast stand slab hanging apparatus, Including:There are ceiling mounted tracks 14, the setting of 14 both sides of the ceiling mounted tracks to be respectively arranged with 11 He of long stent for door frame 1, the door frame 1 Short holder 12, the long stent 11 and short holder 12 connect with next step surface of grandstand to be installed and a upper step surface respectively It touching, jack machinism 4 is provided on the ceiling mounted tracks 14, the jack machinism 4 is used to wait for the vertical and straight movement that platen 7 is seen in lifting, There is travelling bogie 5, the travelling bogie 5 to be used to wait for the planar movement that platen 7 is seen in lifting, the length on the grandstand to be installed There is 11 bottom of holder idler wheel 111,12 bottom of short holder to have directive wheel 121, and 121 lower section of the directive wheel, which has, to be oriented to Track 3, the directive wheel 121 are sheave, and the guide rail 3 is the triangle track to raise up, 5 bottom of the travelling bogie With trolley directive wheel 51, there is the trolley guide rail 6 of cooperation installation, the trolley to be oriented to for 51 bottom of trolley directive wheel Track 6 is moveable structure, and 14 top of the ceiling mounted tracks has plus powerful truss 13,13 length direction of the truss Top both ends have door frame lifting lug 16, are equipped with safety rope 2 on the door frame lifting lug 16, the safety rope 2 is stretched in fixed column Between.
According to above-mentioned technical proposal, the beneficial effects of the invention are as follows:It is proposed that a kind of precast stand slab hanging apparatus can increase Add use scope, by being moved horizontally in across the gating frame in grandstand both sides to be installed and using travelling bogie solution, to realize Large scale is heavy weight to see that platen is installed, and movable pulley is arranged below door frame, facilitates door frame to move, one is in movable pulley Freewheel, another is rail-guided, so as to convenient and practical annular movement, and safety rope is arranged can prevent from using It turns on one's side in the process, and does not influence planar movement, and combine travelling bogie, be adapted to the extreme position that a variety of door frames can not reach See platen transport.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (9)

1. a kind of precast stand slab hanging apparatus, which is characterized in that including:Door frame(1), the door frame(1)With ceiling mounted tracks (14), the ceiling mounted tracks(14)Both sides setting is respectively arranged with long stent(11)With short holder(12), the long stent(11) With short holder(12)It is in contact respectively with next step surface of grandstand to be installed and a upper step surface, the ceiling mounted tracks(14)On It is provided with jack machinism(4), the jack machinism(4)For waiting for that platen is seen in lifting(7)Vertical and straight movement, the grandstand to be installed It is upper that there is travelling bogie(5), the travelling bogie(5)For waiting for that platen is seen in lifting(7)Planar movement.
2. a kind of precast stand slab hanging apparatus according to claim 1, it is characterised in that:The long stent(11)Bottom With idler wheel(111), the short holder(12)Bottom has directive wheel(121).
3. a kind of precast stand slab hanging apparatus according to claim 2, it is characterised in that:The directive wheel(121)Under Side has guide rail(3).
4. a kind of precast stand slab hanging apparatus according to claim 3, it is characterised in that:The directive wheel(121)For Sheave, the guide rail(3)For the triangle track to raise up.
5. a kind of precast stand slab hanging apparatus according to claim 1, it is characterised in that:The travelling bogie(5)Bottom Portion has trolley directive wheel(51), the trolley directive wheel(51)Bottom has the trolley guide rail of cooperation installation(6).
6. a kind of precast stand slab hanging apparatus according to claim 5, it is characterised in that:The trolley guide rail (6)For moveable structure.
7. a kind of precast stand slab hanging apparatus according to claim 1, it is characterised in that:The ceiling mounted tracks(14)On Side has plus powerful truss(13).
8. a kind of precast stand slab hanging apparatus according to claim 7, it is characterised in that:The truss(13)Length side There is door frame lifting lug to top both ends(16).
9. a kind of precast stand slab hanging apparatus according to claim 8, it is characterised in that:The door frame lifting lug(16)On It is equipped with safety rope(2), the safety rope(2)It is stretched between fixed column.
CN201810649212.0A 2018-06-22 2018-06-22 A kind of precast stand slab hanging apparatus Pending CN108545621A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810649212.0A CN108545621A (en) 2018-06-22 2018-06-22 A kind of precast stand slab hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810649212.0A CN108545621A (en) 2018-06-22 2018-06-22 A kind of precast stand slab hanging apparatus

Publications (1)

Publication Number Publication Date
CN108545621A true CN108545621A (en) 2018-09-18

Family

ID=63493845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810649212.0A Pending CN108545621A (en) 2018-06-22 2018-06-22 A kind of precast stand slab hanging apparatus

Country Status (1)

Country Link
CN (1) CN108545621A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space
CN116161559A (en) * 2023-03-27 2023-05-26 成都建工第三建筑工程有限公司 Construction device for assembled building shock insulation foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203143966U (en) * 2013-02-26 2013-08-21 天津二十冶建设有限公司 Movable simple hoisting device
CN103935900A (en) * 2014-04-14 2014-07-23 中交第二航务工程局有限公司 Synchronous construction equipment for upper-layer precast carriageway plate of double-layer tunnel
CN106760684A (en) * 2017-02-28 2017-05-31 中国五冶集团有限公司 See platen installation system and installation method
CN106865421A (en) * 2017-04-17 2017-06-20 中国水利水电第十二工程局有限公司 transporting and hoisting device
CN207434897U (en) * 2017-11-29 2018-06-01 浙江艾荣达健康科技有限公司 The automatic hanging apparatus of massage armchair

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203143966U (en) * 2013-02-26 2013-08-21 天津二十冶建设有限公司 Movable simple hoisting device
CN103935900A (en) * 2014-04-14 2014-07-23 中交第二航务工程局有限公司 Synchronous construction equipment for upper-layer precast carriageway plate of double-layer tunnel
CN106760684A (en) * 2017-02-28 2017-05-31 中国五冶集团有限公司 See platen installation system and installation method
CN106865421A (en) * 2017-04-17 2017-06-20 中国水利水电第十二工程局有限公司 transporting and hoisting device
CN207434897U (en) * 2017-11-29 2018-06-01 浙江艾荣达健康科技有限公司 The automatic hanging apparatus of massage armchair

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space
CN115818418B (en) * 2022-11-28 2024-01-16 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space
CN116161559A (en) * 2023-03-27 2023-05-26 成都建工第三建筑工程有限公司 Construction device for assembled building shock insulation foundation
CN116161559B (en) * 2023-03-27 2024-05-28 成都建工第三建筑工程有限公司 Construction device for assembled building shock insulation foundation

Similar Documents

Publication Publication Date Title
RU2381326C1 (en) Device for lifting and erecting units of superstructure
CN101899905A (en) Hoisting slide devices and hoisting slide equipment
CN108545621A (en) A kind of precast stand slab hanging apparatus
CN201962607U (en) Movable elevating device for hoisting elevated bridge cantilever arm
CN203452009U (en) Self-walking device for mounting steel beam
CN109837837A (en) Mounting device and method for concrete-steel Beam prefabricated bridge
CN205575428U (en) Component hoist and mount system
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN208980205U (en) A kind of precast stand slab hanging apparatus
CN201857761U (en) Hoisting and sliding device and hoisting and sliding equipment
CN203834353U (en) Beam bottom operating device
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN211775632U (en) Movable operating platform for roof structure
CN205934730U (en) Installation device of wave form steel web
CN205419434U (en) Heavy elevator well layout structure of compact broadside on
CN101717048A (en) Hoist for mounting bridge shield plate
CN201587815U (en) Double-main-beam multi-point hoist gantry
CN212895958U (en) Lower hanging movable bridge floor crane
JPH033616Y2 (en)
CN207792530U (en) A kind of system for transporting prefabricated components in subway station
CN202152441U (en) Bridge deck lifting station
CN209442557U (en) The semi-automatic self-balance lifting device of bus duct vertical state temperature rise test
CN207619857U (en) Bailey beam erection crane horizontal sliding device
CN209383344U (en) A kind of steel column horizontal transport and lifting device
CN102587678B (en) Device for slipping node of steel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180918