CN106760684A - See platen installation system and installation method - Google Patents
See platen installation system and installation method Download PDFInfo
- Publication number
- CN106760684A CN106760684A CN201710111051.5A CN201710111051A CN106760684A CN 106760684 A CN106760684 A CN 106760684A CN 201710111051 A CN201710111051 A CN 201710111051A CN 106760684 A CN106760684 A CN 106760684A
- Authority
- CN
- China
- Prior art keywords
- supporting leg
- platen
- guide rail
- gate frame
- hoisting gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 12
- 230000007246 mechanism Effects 0.000 claims abstract description 45
- 229910000838 Al alloy Inorganic materials 0.000 claims description 4
- 235000019994 cava Nutrition 0.000 claims description 2
- 230000032258 transport Effects 0.000 description 19
- 230000008901 benefit Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/10—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
- E04H3/12—Tribunes, grandstands or terraces for spectators
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses seeing platen installation system and installation method, the installation system includes hoisting gate frame and transport establishment, also include the first guide rail and the second guide rail that coordinate with hoisting gate frame, hoisting gate frame includes transverse slat, the both sides of transverse slat are respectively arranged with the first supporting leg and the second supporting leg, the bottom of the first supporting leg is provided with the first coasting mechanism coordinated with the first guide rail, the bottom of the second supporting leg is provided with the second coasting mechanism coordinated with the second guide rail, the vertical drop of the first supporting leg and the second supporting leg is 2 height of step, electric block is provided with the transverse slat, the end of electric block is provided with fixed mechanism.The present invention is by setting hoisting gate frame and transport establishment, realize the reach of hoisting gate frame, realize seeing the reach of platen by transport establishment, and will see that platen moves to the underface of hoisting gate frame, realize seeing the lifting of platen and installing by electric block and the cooperation of fixed mechanism again, the present invention does not use jumbo, and cost is relatively low, and easy to operate.
Description
Technical field
The present invention relates to see platen mounting technique field, and in particular to see platen installation system and installation method.
Background technology
In engineering construction, can be related to see the installation of platen.Platen usually ring-shaped step structure is seen, platen is just looked at
Route is more long, using manually installed not only laborious and time-consuming more long, therefore would generally carry out seeing platen using plant equipment
Install.
At present, see that the usual tower crane of installation, crane of platen etc. can move the jumbo for seeing platen.Machine installed above
Structure is not only relatively costly, and does not allow easy to operate.
The content of the invention
It is an object of the invention to provide platen installation system is seen, solve existing use jumbo installation and see that platen causes
High cost, not easy-operating problem.
Moreover, it relates to a kind of installation method.
The present invention is achieved through the following technical solutions:
See platen installation system, including hoisting gate frame and transport establishment, also the first guide rail including coordinating with hoisting gate frame
With the second guide rail, the hoisting gate frame includes transverse slat, and the both sides of transverse slat are respectively arranged with the first supporting leg and the second supporting leg, described the
The bottom of one supporting leg is provided with the first coasting mechanism coordinated with the first guide rail, and the bottom of second supporting leg is provided with and second
The second coasting mechanism that guide rail coordinates, the vertical drop of first supporting leg and the second supporting leg is 2 height of step, described
Electric block is provided with transverse slat, the end of the electric block is provided with fixed mechanism.
The electric block be prior art, for the lifting of object, the vertical height specifically refer to the first supporting leg or
The bottom of the second supporting leg and the vertical range of level ground.
The present invention by setting hoisting gate frame and transport establishment, also including the first guide rail coordinated with hoisting gate frame and second
Guide rail, by laying the first guide rail and the second guide rail, realizes the reach of hoisting gate frame, before realizing seeing platen by transport establishment
Move, and will see that platen moves to the underface of hoisting gate frame, then realize seeing platen with the cooperation of fixed mechanism by electric block
Lifting with install, the present invention do not use jumbo, cost is relatively low, and easy to operate.
Further, the bottom of the first supporting leg and the second supporting leg is provided with horizontal mounting plate, the lower end of horizontal mounting plate
2 risers are symmetrically arranged with, first coasting mechanism, the second coasting mechanism are arranged between 2 risers.
Further, the bottom of the first supporting leg and the second supporting leg is provided with the first connector, the horizontal mounting plate
Upper end is provided with the second connector, and bolt detachable connection is passed through between first connector and the second connector.
Said structure realizes that the first coasting mechanism, the second coasting mechanism are detachable and is arranged on the first supporting leg and the second supporting leg
Bottom, be easy to the first coasting mechanism, second to slide the replacing of machine.
Further, the second guide rail is channel-shaped slide rail, and second coasting mechanism is roller, and first guide rail includes branch
Pier, is provided with the arc track for raising up on buttress, the bottom of first coasting mechanism caves inward to be formed and curved track
The arc groove that road coordinates, the difference in height between first supporting leg and the second supporting leg is that 2 height of step add buttress
Highly.
Specifically, in the arc track insertion arc groove, it is ensured that hoisting gate frame will not derail in moving process.
Further, the bottom of transverse slat is provided with fix bar, and the electric block is arranged in fix bar.
The setting of fix bar can improve the structural stability that electric block is connected with hoisting gate frame.
Further, it is equipped with safety rope on the hanger at least provided with 2 hangers on transverse slat.
Further, the angle between the first supporting leg and the second supporting leg is 45-60 °.
Specifically, because hoisting gate frame is unequal leg structure, in order to meet the structural stability of hoisting gate frame, to first
The angle of leg and the second supporting leg has is strict with, and the angle of the first supporting leg and the second supporting leg is unsuitable excessive, be not easy to it is too small,
The 45-60 ° of structural stability that disclosure satisfy that hoisting gate frame, also, in the range of 45-60 °, the folder of the first supporting leg and the second supporting leg
Difference in height between angle and the angle of the first supporting leg and the second supporting leg is directly proportional.
Further, horizontal connecting plate, horizontal connecting plate and the first supporting leg are provided between the first supporting leg and the second supporting leg
Supporting plate, the length of the length more than the first supporting leg of second supporting leg are provided between one end of connection and the second supporting leg.
Further, hoisting gate frame is made of hard aluminium alloy.
Specifically, the hard aluminium alloy is prior art, and with hardness is big, intensity is high, the advantage of light weight is ensuring
On the premise of hoisting gate frame structural stability, its quality is reduced, be easy to the movement of hoisting gate frame.
A kind of installation method, comprises the following steps:
1) the second guide rail, the first guide rail, are laid respectively in lower step and upper step;
2), hoisting gate frame is installed:First supporting leg is arranged in the first guide rail, the second supporting leg is arranged on the second guide rail
It is interior;
3) ring conveying track, is laid on the first paragraph grandstand on middle bench, and transport establishment is arranged on ring
On conveying track, will see that platen is placed in transport establishment;
4), shifting of conveyer structure is fixed with fixed mechanism and sees platen to the underface of hoisting gate frame, then using electric block
Platen is seen in lifting, will see that platen is installed to specified location;
5), hoisting gate frame reach, extends ring conveying track, installs next piece and sees platen;
6), repeat step 5), complete the installation that a ladder sees platen;
7), repeat step 1)-step 6), complete the installation exercise that follow-up all ladders see platen.
The present invention compared with prior art, has the following advantages and advantages:
The present invention by setting hoisting gate frame and transport establishment, also including the first guide rail coordinated with hoisting gate frame and second
Guide rail, by laying the first guide rail and the second guide rail, realizes the reach of hoisting gate frame, before realizing seeing platen by transport establishment
Move, and will see that platen moves to the underface of hoisting gate frame, then realize seeing platen with the cooperation of fixed mechanism by electric block
Lifting with install, the present invention do not use jumbo, cost is relatively low, and easy to operate.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes of the application
Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is installation system structural representation;
Fig. 2 is the structural representation that the first guide rail and the first supporting leg coordinate;
Fig. 3 is the structural representation of hoisting gate frame;
Fig. 4 is that installation system installs the top view for seeing platen.
Mark and corresponding parts title in accompanying drawing:
1- hoisting gate frames, 2- transport establishments, the guide rails of 3- first, the guide rails of 4- second, 5- electric blocks, 6- fixed mechanisms, 7-
Connect horizontal connecting plate, 8- supporting plates, 9- sees platen, 10- bolts, the supporting legs of 11- first, the supporting legs of 12- second, 13- transverse slats, 14- water
Flat installing plate, 15- risers, the coasting mechanisms of 16- first, the coasting mechanisms of 17- second, the connectors of 18- first, the connectors of 19- second,
20- safety ropes, 31- buttresses, 32- arc tracks, 131- hangers.
Specific embodiment
To make the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
It is limitation of the invention.
Embodiment 1:
As Figure 1 and Figure 4, platen installation system, including hoisting gate frame 1 and transport establishment 2 are seen, also including with lifting door
The first guide rail 3 and the second guide rail 4 that frame 1 coordinates, the hoisting gate frame 1 include transverse slat 13, and the both sides of transverse slat 13 are respectively arranged with
First supporting leg 11 and the second supporting leg 12, the bottom of first supporting leg 11 are provided with first coordinated with the first guide rail 3 and slide machine
Structure 16, the bottom of second supporting leg 12 is provided with the second coasting mechanism 17 coordinated with the second guide rail 4, first supporting leg 11
It is 2 height of step with the vertical drop of the second supporting leg 12, electric block 5 is provided with the transverse slat 13, it is described electronic
The end of cucurbit 5 is provided with fixed mechanism 6, and the fixed mechanism 6 is used for fixation and sees platen 9, and the fixed mechanism 6 includes 2 groups
Static line or 2 groups of steel chains;Angle between the supporting leg 12 of first supporting leg 11 and second is 60 °;The hoisting gate frame 1 is using hard
Matter aluminium alloy is made, and the transport establishment 2 is transport trolley, and first supporting leg 11 can be slided in the first guide rail 3, described
Second supporting leg 12 can be slided in the second guide rail 4.
The operation principle of the present embodiment:Second guide rail 4 is laid on into bottom to be mounted with to see on the step of platen 9, will
First guide rail 3 is laid on top and does not install on the step for seeing platen 9, hoisting gate frame 1 is installed on track using cable crane, i.e.,
In first coasting mechanism 16 is placed on, the second coasting mechanism 17 is arranged in the second guide rail 4, transport establishment 2 is placed on
On the step for seeing platen 9 to be installed of middle part, ring travelling bogie track is equipped with the step, the transport establishment 2 is placed with
Platen 9 is seen, transport establishment 2 will see that platen 9 transports the underface of hoisting gate frame 1, fixed with fixed mechanism 6 and see platen 9, utilized
Electric block 5 on door frame will see that platen 9 is lifted and be installed in place that then hoisting gate frame 1 moves forward, and extend travelling bogie rail
Road, installs next piece and sees platen 9, and circulation reach the first guide rail 3 and the second guide rail 4 and the hoisting gate frame 1 that moves forward repeat above-mentioned work
Make, complete the installation that a ladder sees platen 9, with same method and steps, complete the installation that follow-up all ladders see platen 9
Operation, until used seeing, platen is installed.
The present embodiment is by setting hoisting gate frame 1 and transport establishment 2, also the first guide rail 3 including coordinating with hoisting gate frame 1
With the second guide rail 4, by laying the first guide rail 3 and the second guide rail 4, the reach of hoisting gate frame 1 is realized, it is real by transport establishment 2
The reach of platen 9 is now seen, and will see that platen 9 moves to the underface of hoisting gate frame 1, then by electric block and fixed mechanism
Coordinate and realize the lifting for seeing platen 9 and install, the present embodiment does not use jumbo, and cost is relatively low, and easy to operate.
Embodiment 2:
As shown in Figure 1 and Figure 2, the present embodiment is based on embodiment 1, and the bottom of the supporting leg 12 of first supporting leg 11 and second is equal
It is provided with horizontal mounting plate 14, the lower end of horizontal mounting plate 14 is symmetrically arranged with 2 risers 15, first coasting mechanism 16,
Second coasting mechanism 17 is arranged between 2 risers 15;The bottom of the supporting leg 12 of first supporting leg 11 and second is provided with
A connection piece 18, the upper end of the horizontal mounting plate 14 is provided with the second connector 19, and first connector 18 and second connects
Pass through the detachable connection of bolt 10 between fitting 19.
In the present embodiment, first coasting mechanism 16, the second coasting mechanism 17 is detachable respectively is arranged on first
The bottom of the supporting leg 12 of supporting leg 11 and second, is conveniently replaceable, also, is all provided with by the bottom of the first supporting leg 11 and the second supporting leg 12
Horizontal mounting plate 14 is equipped with, the first coasting mechanism 16, the second coasting mechanism 17 and the first supporting leg 11 and the second supporting leg can be increased
The contact area of 12 bottoms, improves structural stability.
Embodiment 3:
As shown in Figure 1 and Figure 2, the present embodiment is based on embodiment 1 or embodiment 2, and second guide rail 4 is channel-shaped slide rail, institute
It is roller to state the second coasting mechanism 17, and first guide rail 3 includes buttress 31, the curved track for raising up is provided with buttress 31
Road 32, the bottom of first coasting mechanism 16 cave inward to be formed with arc track 32 coordinate arc groove, described first
Difference in height between the supporting leg 12 of supporting leg 11 and second is height of 2 height of step plus buttress 31, and the buttress 31 is work
Character form structure.
It is mattess because top regulation there is not also installation to see platen 9, to be mounted directly to uneven to guide rail can be caused
Weighing apparatus, and then causes the unstable of hoisting gate frame 1, and in the present embodiment, the setting of buttress 31 can avoid the mattess from causing
The unbalanced problem of guide rail, also, the second supporting leg 12 of hoisting gate frame 1 is engaged with channel-shaped slide rail using roller and slided
Dynamic, the first supporting leg 11 realizes movement by the mutual cooperation between arc track 32 and arc groove, can not only realize lifting
The reach of door frame 1, and arc track 32 can improve structure of the hoisting gate frame 1 in moving process with the cooperation of arc groove
Stability.
Embodiment 4:
As shown in Figure 1 to Figure 3, the present embodiment is based on embodiment 1 or embodiment 2 or embodiment 3, the bottom of the transverse slat 13
Fix bar is provided with, the electric block 5 is arranged in fix bar;2 hangers 131 are provided with the transverse slat 13, it is described to hang
Safety rope 20 is equipped with ear 131;Horizontal connecting plate 7 is provided between the supporting leg 12 of first supporting leg 11 and second, level connects
Supporting plate 8, the length of second supporting leg 12 are provided between one end of the connection of 7 and first supporting leg of fishplate bar 11 and the second supporting leg 12
More than the length of the first supporting leg 11.
Specifically, the two ends of the safety rope 20 are fixed on the steelframe at two ends.
In the present embodiment, it is unequal leg because the length of the first supporting leg 11 and the second supporting leg 12 is inconsistent, to prevent hanging
Dress door frame 1 is tumbled, and in two hangers 131 of welded top of hoisting gate frame 1, is drawn along door frame direction on Elements of Space Grid Truss and is set safety rope 20
Through hanger 131, as safety stock, the structural stability of hoisting gate frame 1 is improved.
Further, because the length of the second supporting leg 12 is more long, easy disequilibrium in use, the present embodiment passes through
The horizontal connecting plate 7 and supporting plate 8 for cooperating, shape between the horizontal connecting plate 7, the supporting leg 12 of supporting plate 8 and second are set
Into the triangular structure of stabilization, the structural stability of hoisting gate frame 1 is further improved.
A kind of installation method, comprises the following steps:
1) the second guide rail 4, the first guide rail 3, are laid respectively in lower step and upper step;
2), hoisting gate frame 1 is installed:First supporting leg 11 is arranged in the first guide rail 3, the second supporting leg 12 is arranged on second
In guide rail 4;
3) ring conveying track, is laid on the first paragraph grandstand on middle bench, and transport establishment 2 is arranged on ring
On conveying track, will see that platen 9 is placed in transport establishment 2;
4), shifting of conveyer structure 2 is fixed with fixed mechanism 6 and sees platen 9 to the underface of hoisting gate frame 1, then using electronic
Platen 9 is seen in the lifting of cucurbit 5, will see that platen 9 is installed to specified location;
5), hoisting gate frame 1 moves forward, and extends ring conveying track, installs next piece and sees platen 9;
6), repeat step 5), complete the installation that a ladder sees platen 9;
7), repeat step 1)-step 6), complete the installation exercise that follow-up all ladders see platen 9.
Above-described specific embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect
Describe in detail, should be understood that and the foregoing is only specific embodiment of the invention, be not intended to limit the present invention
Protection domain, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc. all should include
Within protection scope of the present invention.
Claims (10)
1. see platen installation system, it is characterised in that including hoisting gate frame (1) and transport establishment (2), also including with hoisting gate frame
(1) the first guide rail (3) and the second guide rail (4) for coordinating, the hoisting gate frame (1) includes transverse slat (13), the both sides of transverse slat (13)
The first supporting leg (11) and the second supporting leg (12) are respectively arranged with, the bottom of first supporting leg (11) is provided with and the first guide rail
(3) the first coasting mechanism (16) for coordinating, the bottom of second supporting leg (12) is provided with coordinate with the second guide rail (4) second
Coasting mechanism (17), the vertical drop of first supporting leg (11) and the second supporting leg (12) is 2 height of step, the horizontal stroke
Electric block (5) is provided with plate (13), the end of the electric block (5) is provided with fixed mechanism (6).
2. it is according to claim 1 to see platen installation system, it is characterised in that first supporting leg (11) and the second supporting leg
(12) bottom is provided with horizontal mounting plate (14), and the lower end of horizontal mounting plate (14) is symmetrically arranged with 2 risers (15), institute
The first coasting mechanism (16), the second coasting mechanism (17) is stated to be arranged between 2 risers (15).
3. it is according to claim 2 to see platen installation system, it is characterised in that first supporting leg (11) and the second supporting leg
(12) bottom is provided with the first connector (18), and the upper end of the horizontal mounting plate (14) is provided with the second connector
(19) bolt (10) detachable connection, is passed through between first connector (18) and the second connector (19).
4. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that second guide rail (4) is
Channel-shaped slide rail, second coasting mechanism (17) is roller, and first guide rail (3) includes buttress (31), and buttress sets on (31)
The arc track (32) for raising up is equipped with, the bottom of first coasting mechanism (16) caves inward to be formed and arc track
(32) arc groove for coordinating, the difference in height between first supporting leg (11) and the second supporting leg (12) is 2 height of step
Plus the height of buttress (31).
5. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that the bottom of the transverse slat (13)
Portion is provided with fix bar, and the electric block (5) is arranged in fix bar.
6. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that the transverse slat (13) is up to
2 hangers (131) are provided with less, and safety rope (20) is equipped with the hanger (131).
7. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that first supporting leg (11)
And the second angle between supporting leg (12) is 45-60 °.
8. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that first supporting leg (11)
And second be provided with horizontal connecting plate (7) between supporting leg (12), one end that horizontal connecting plate (7) is connected with the first supporting leg (11) with
Supporting plate (8), the length of the length more than the first supporting leg (11) of second supporting leg (12) are provided between second supporting leg (12).
9. platen installation system is seen according to any one of claims 1 to 3, it is characterised in that the hoisting gate frame (1) is adopted
It is made of hard aluminium alloy.
10. a kind of installation method for seeing platen installation system as described in claim any one of 1-9, it is characterised in that including
Following steps:
1) the second guide rail (4), the first guide rail (3), are laid respectively in lower step and upper step;
2) hoisting gate frame (1), is installed:By the first supporting leg (11) in the first guide rail (3), the second supporting leg (12) is arranged on
In second guide rail (4);
3) ring conveying track, is laid on the first paragraph grandstand on middle bench, and transport establishment (2) is transported installed in ring
On defeated track, will see that platen (9) is placed in transport establishment (2);
4), shifting of conveyer structure (2) sees platen (9), then use to the underface of hoisting gate frame (1) with fixed mechanism (6) fixation
Platen (9) is seen in electric block (5) lifting, will see that platen (9) is installed to specified location;
5), hoisting gate frame (1) reach, extends ring conveying track, installs next piece and sees platen (9);
6), repeat step 5), complete the installation that a ladder sees platen (9);
7), repeat step 1)-step 6), complete the installation exercise that follow-up all ladders see platen (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710111051.5A CN106760684B (en) | 2017-02-28 | 2017-02-28 | Reading board installation system and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710111051.5A CN106760684B (en) | 2017-02-28 | 2017-02-28 | Reading board installation system and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760684A true CN106760684A (en) | 2017-05-31 |
CN106760684B CN106760684B (en) | 2024-01-09 |
Family
ID=58958940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710111051.5A Active CN106760684B (en) | 2017-02-28 | 2017-02-28 | Reading board installation system and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760684B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107311047A (en) * | 2017-08-18 | 2017-11-03 | 中冶建工集团有限公司 | The steel box-girder lift structure and method for improving of large span bondbeam |
CN108545621A (en) * | 2018-06-22 | 2018-09-18 | 中国五冶集团有限公司 | A kind of precast stand slab hanging apparatus |
CN115818418A (en) * | 2022-11-28 | 2023-03-21 | 中建八局第三建设有限公司 | Hoisting method for prefabricated stand board in limited space |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117794A (en) * | 2007-08-21 | 2008-02-06 | 中铁大桥局集团第四工程有限公司 | High-altitude framework type simple plate supporting machine |
CN101899905A (en) * | 2010-08-10 | 2010-12-01 | 中建五局工业设备安装有限公司 | Hoisting slide devices and hoisting slide equipment |
CN102659029A (en) * | 2012-04-25 | 2012-09-12 | 汪明霞 | Combined type movable hanger |
CN202729636U (en) * | 2012-08-10 | 2013-02-13 | 中铁十六局集团路桥工程有限公司 | Curve gantry crane device with minor radius |
CN105035967A (en) * | 2015-07-29 | 2015-11-11 | 苏州速腾电子科技有限公司 | Oblique-post type rail-mounted gallows frame |
CN206503390U (en) * | 2017-02-28 | 2017-09-19 | 中国五冶集团有限公司 | See platen installation system |
-
2017
- 2017-02-28 CN CN201710111051.5A patent/CN106760684B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117794A (en) * | 2007-08-21 | 2008-02-06 | 中铁大桥局集团第四工程有限公司 | High-altitude framework type simple plate supporting machine |
CN101899905A (en) * | 2010-08-10 | 2010-12-01 | 中建五局工业设备安装有限公司 | Hoisting slide devices and hoisting slide equipment |
CN102659029A (en) * | 2012-04-25 | 2012-09-12 | 汪明霞 | Combined type movable hanger |
CN202729636U (en) * | 2012-08-10 | 2013-02-13 | 中铁十六局集团路桥工程有限公司 | Curve gantry crane device with minor radius |
CN105035967A (en) * | 2015-07-29 | 2015-11-11 | 苏州速腾电子科技有限公司 | Oblique-post type rail-mounted gallows frame |
CN206503390U (en) * | 2017-02-28 | 2017-09-19 | 中国五冶集团有限公司 | See platen installation system |
Non-Patent Citations (1)
Title |
---|
黄波等: "预制看台板滑移法施工技术研究", 《青岛理工大学学报》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107311047A (en) * | 2017-08-18 | 2017-11-03 | 中冶建工集团有限公司 | The steel box-girder lift structure and method for improving of large span bondbeam |
CN108545621A (en) * | 2018-06-22 | 2018-09-18 | 中国五冶集团有限公司 | A kind of precast stand slab hanging apparatus |
CN115818418A (en) * | 2022-11-28 | 2023-03-21 | 中建八局第三建设有限公司 | Hoisting method for prefabricated stand board in limited space |
CN115818418B (en) * | 2022-11-28 | 2024-01-16 | 中建八局第三建设有限公司 | Hoisting method for prefabricated stand board in limited space |
Also Published As
Publication number | Publication date |
---|---|
CN106760684B (en) | 2024-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760684A (en) | See platen installation system and installation method | |
CN202755635U (en) | Movable-type basket support | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN205653069U (en) | Steady gantry crane rises | |
CN206503390U (en) | See platen installation system | |
CN205527199U (en) | Inorganic tenant ladder sedan -chair frame | |
CN205171288U (en) | Magnetism floats section of track and moves gantry crane | |
CN203767802U (en) | Special device for elevator installation | |
CN206940275U (en) | A kind of steel-structure factory building steel frame roof boarding handling apparatus | |
CN216038052U (en) | Overhead inverted type inclined elevator | |
CN205653063U (en) | Gantry crane of hoist and mount container | |
CN206109992U (en) | Bridge bottom surface construction platform | |
CN205275058U (en) | Monospar gantry crane | |
CN204917589U (en) | Big lifting height automatic escalator hauler base additional strengthening | |
CN211521390U (en) | Bridge sidewalk accessory facility hoisting equipment | |
CN212475866U (en) | Prevent gantry crane that hoist cable rocked | |
CN205275045U (en) | Trolley's cable junction device | |
CN204754176U (en) | A anti -slip bottom plate for inserted lift scaffold | |
CN202609884U (en) | Mobile sit-on-the-fence frame hanging basket suspension mechanism | |
CN104071687B (en) | Power station overhead traveling crane mechanism | |
CN103359661A (en) | Movable wall leaning frame and cradle suspension mechanism | |
CN208182475U (en) | A kind of prefabricated case beam steel strand tension operating platform | |
CN207566756U (en) | Pipeline way moving installation system | |
CN105274914A (en) | Maglev track panel mobile gantry crane | |
CN204959505U (en) | Single line roof beam security platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |