CN107311047A - The steel box-girder lift structure and method for improving of large span bondbeam - Google Patents

The steel box-girder lift structure and method for improving of large span bondbeam Download PDF

Info

Publication number
CN107311047A
CN107311047A CN201710713823.2A CN201710713823A CN107311047A CN 107311047 A CN107311047 A CN 107311047A CN 201710713823 A CN201710713823 A CN 201710713823A CN 107311047 A CN107311047 A CN 107311047A
Authority
CN
China
Prior art keywords
girder
support column
bondbeam
steel box
large span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710713823.2A
Other languages
Chinese (zh)
Other versions
CN107311047B (en
Inventor
宋林
杨诚
徐国友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710713823.2A priority Critical patent/CN107311047B/en
Publication of CN107311047A publication Critical patent/CN107311047A/en
Application granted granted Critical
Publication of CN107311047B publication Critical patent/CN107311047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of steel box-girder lift structure of large span bondbeam and method for improving, including gantry hoisting frame and the In Reinforced Concrete Box Girder for being arranged on bridge top and moving towards to set along bridge, gantry hoisting frame includes crossbeam and two support columns, crane trolley is provided with the crossbeam, the two ends head of crossbeam is supported respectively for the upper end of two support column and lower end is provided with walking carriage, the two support columns upper end is concordant, lower end has difference in height to form high support column and low support column, the walking carriage of the lower end of the high support column is arranged on In Reinforced Concrete Box Girder upper surface, the walking carriage of the lower end of the low support column is arranged on ground.This structure make use of cast-in-place good In Reinforced Concrete Box Girder as the track laying face of the high support column walking carriage of gantry hoisting frame with reference to this method for improving, reduces gantry hoisting frame and takes up an area width, grading expense, good economy performance when saving track laying.

Description

The steel box-girder lift structure and method for improving of large span bondbeam
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of steel box-girder lift structure of large span bondbeam and Method for improving.
Background technology
With the quick steady-state growth of national economic development, infrastructure construction is greatly developed, in recent years long-span bridge Beam is built quantity and is continuously increased.The bondbeam that current steel box-girder is constituted with In Reinforced Concrete Box Girder can obtain more superior structure Mechanical characteristic and rational structure type, it takes full advantage of steel member and the advantage of reinforced concrete member compensate for each again Deficiency(Steel member has good tensile strength and deformability in tensile zone, but easily produces surrender, steel in compressive region Reinforced concrete component is then very good on the contrary, compression strength is big, and clean steel construction weight is lighter than pure reinforced concrete member, but reinforcing bar is mixed Solidifying soil component cost is more cheap than steel.).Therefore, in Longspan Bridge construction, steel box-girder is constituted with In Reinforced Concrete Box Girder Bondbeam it is also more and more extensive in the application of China.
Because the current conventional side leg of gantry hoisting frame two is arranged on bridge both sides, occupation of land width is larger, track laying When grading it is costly, and then integrated cost is higher.In bridge construction process, such as in city narrow space, mountain area Etc. under bad or MODEL OVER COMPLEX TOPOGRAPHY, without enough places conventional gantry hoisting frame may be set to lift large-span steel Box beam, now lifts Large-span Steel Box Beam more difficult.
The content of the invention
For deficiencies of the prior art, it is an object of the invention to propose a kind of steel case of large span bondbeam Beam lift structure and method for improving, this structure, which combines this method for improving, reduces gantry hoisting frame occupation of land width, saves track Grading expense during laying, good economy performance.
To achieve the above object, the technical solution adopted by the present invention is as follows:
In a first aspect, a kind of steel box-girder lift structure of large span bondbeam, including gantry hoisting frame, gantry hoisting frame bag Include and crane trolley is provided with crossbeam and two support columns, the crossbeam, the two ends of the upper end of two support column respectively to crossbeam Head is supported and lower end is provided with walking carriage, it is characterised in that:Also include being arranged on bridge top and walking along bridge To the In Reinforced Concrete Box Girder of setting, the two support columns upper end is concordant, lower end has difference in height to form high support column and low Support column, the walking carriage of the lower end of the high support column is arranged on In Reinforced Concrete Box Girder upper surface, the low support column The walking carriage of lower end is arranged on ground.
Rail of this structure by the use of cast-in-place good In Reinforced Concrete Box Girder as the high support column walking carriage of gantry hoisting frame Road paved surface, reduces gantry hoisting frame and takes up an area width, solves that city narrow space, mountain area etc. be bad or complicated landform bar Bridge problem in the lifting of the steel box-girder of large span bondbeam under part.
Further, In Reinforced Concrete Box Girder upper surface of the present invention is equipped with high support column walking rail along bridge trend Road, the high support column walking track is adapted with the walking carriage of the lower end of high support column;Ground is equipped with along bridge trend Low support column walking track, the low support column walking track is adapted with the walking carriage of the lower end of low support column;The height Support column walk track and low support column walking track the discrepancy in elevation it is always consistent and lateral separation is always consistent.
Further, beam surface upper of the present invention is provided with crane trolley track, the lifting platform along its length Car is run along crane trolley track.Crane trolley lifts steel box-girder along bridge width direction along crane trolley track.
Further, low support column side of the present invention is provided with crane gear operation room, the crane gear operation Between highly be higher than In Reinforced Concrete Box Girder upper surface.Operating personnel control the fortune of walking carriage and crane trolley between equipment operation OK.The lifting state that higher position is easy to operating personnel to observe steel box-girder is arranged between equipment operation.
Further, crossbeam of the present invention and two support columns are welded using square steel tube and angle steel.
A kind of second aspect, steel box-girder method for improving of large span bondbeam, comprises the following steps:
1)In bridge construction to when meeting the steel box-girder lift structure for setting large span bondbeam, large span bondbeam is set Steel box-girder lift structure;
2)Utilize step 1)Steel box-girder is lifted to by the crane trolley in the steel box-girder lift structure of the large span bondbeam of setting Correspondence position is simultaneously accordingly constructed, until the steel box-girder lifting of the position is finished;
3)After In Reinforced Concrete Box Girder in front of the steel box-girder lift structure of large span bondbeam is routed to setting length, pass through The steel box-girder lift structure of large span bondbeam is moved along certain distance by the walking carriage on height support column, is then entered again Row steel box-girder is lifted by crane and corresponding construction;
4)Repeat step 3), until the lifting of all steel box-girders is finished.
Further, step 1 of the present invention)The detailed process of the steel box-girder lift structure of the large span bondbeam of middle setting For:
1.1)Construction bridges, move towards to lay In Reinforced Concrete Box Girder on bridge top along bridge;
1.2)Bridge top is cleared up along the In Reinforced Concrete Box Girder upper surface that bridge moves towards to set, to the ground of bridge side Face carries out cure process;
1.3)Lay high support column walking track, ground upper berth after curing in In Reinforced Concrete Box Girder upper surface after the cleaning The track if low support column is walked;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
Compared with prior art, the beneficial effects are mainly as follows:
1st, this structure is used as the high support column of gantry hoisting frame with reference to this method for improving by the use of cast-in-place good In Reinforced Concrete Box Girder The track laying face of walking carriage, reduces gantry hoisting frame and takes up an area width, solve city narrow space, mountain area etc. it is bad or Bridge problem in the lifting of the steel box-girder of large span bondbeam under person's MODEL OVER COMPLEX TOPOGRAPHY, grading expense when saving track laying With good economy performance.
2nd, gantry hoisting frame integrally can be run along bridge length side, and the crane trolley that beam surface upper is set can be along bridge Steel box-girder is transported in beam width direction, and flexibly, efficiency of construction is high for constructing operation.
Brief description of the drawings
Fig. 1 is the steel box-girder lift structure schematic diagram of the large span bondbeam of the embodiment of the present invention.
In accompanying drawing:1- gantry hoisting frame;2- bridges;3- ground;
The high support columns of 11-;The low support columns of 12-;13- crossbeams;14- walking carriages;15- crane trolleys;16- crane gears are operated Between;21- In Reinforced Concrete Box Girders;22- steel box-girders.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
As shown in figure 1, a kind of steel box-girder lift structure of large span bondbeam of the present embodiment, including gantry hoisting frame 1 With In Reinforced Concrete Box Girder 21, gantry hoisting frame 1 includes the support column of crossbeam 13 and two, the two support columns upper end is concordant, Lower end has difference in height to form high support column 11 and low support column 12, the crossbeam 13, high support column 11 and low support column 12 It is welded using square steel tube and angle steel.Crane trolley 15, the high support column 11 and low support column are provided with crossbeam 13 The two ends head of crossbeam 13 is supported respectively for 12 upper end and lower end is provided with walking carriage 14.The armored concrete Box beam 21 is arranged on the top of bridge 2 and moves towards to set along bridge 2, and the walking carriage 14 of the lower end of the high support column 11 is arranged on The upper surface of In Reinforced Concrete Box Girder 21, the walking carriage 14 of the lower end of the low support column 12 is arranged on ground 3.
Walking platform of this structure by the use of cast-in-place good In Reinforced Concrete Box Girder 21 as the high support column 11 of gantry hoisting frame 1 The track laying face of car 14, reduce gantry hoisting frame 1 take up an area width, solve city narrow space, mountain area etc. it is bad or Bridge problem in the lifting of the steel box-girder of large span bondbeam under MODEL OVER COMPLEX TOPOGRAPHY, saves the walking platform of the high lower end of support column 11 Grading expense, good economy performance during the track laying of car 14.Gantry hoisting frame 1 integrally can be run along the length side of bridge 2, horizontal The crane trolley 15 that the upper surface of beam 13 is set can transport steel box-girder 22 along the width of bridge 2, and constructing operation flexibly, imitate by construction Rate is high.
As shown in figure 1, in this structure, the upper surface of In Reinforced Concrete Box Girder 21 is equipped with high support column row along the trend of bridge 2 Track is walked, the high support column walking track is adapted with the walking carriage 14 of the lower end of high support column;Walked along bridge 2 on ground 3 To low support column walking track is equipped with, low the support column walking track and the walking carriage 14 of the lower end of low support column are mutually fitted Match somebody with somebody;The discrepancy in elevation of the high support column walking track and low support column walking track is always consistent and lateral separation is remained Unanimously.The upper surface of crossbeam 13 is provided with crane trolley track along its length, and the crane trolley 15 is transported along crane trolley track OK(Steel box-girder 22 is lifted along bridge width direction).
As shown in figure 1, in this structure, the low side of support column 12 is provided with crane gear operation room 16, the crane gear The height of operation room 16 is higher than the upper surface of In Reinforced Concrete Box Girder 21;Operating personnel's 16 control He of walking carriage 14 between equipment operation 16 are arranged on the lifting shape that higher position is easy to operating personnel to observe steel box-girder 22 between the operation of crane trolley 15, equipment operation State.Specifically, in practical operation, need to carry out clearly the upper surface of In Reinforced Concrete Box Girder 21 before laying high support column walking track Reason;Lay needs to carry out cure process to ground before low support column walking track, to ensure the operation safety of walking carriage.It is promoted to The steel box-girder 22 of the upper surface of In Reinforced Concrete Box Girder 21 is moved to by the tripod for being arranged on the upper surface of In Reinforced Concrete Box Girder 21 Specified location.
A kind of steel box-girder method for improving of large span bondbeam, comprises the following steps:
1)Constructed in bridge 2 to when meeting the steel box-girder lift structure for setting large span bondbeam, set large span to combine The steel box-girder lift structure of beam;
2)Utilize step 1)Crane trolley 15 in the steel box-girder lift structure of the large span bondbeam of setting is by steel box-girder 22 Hang correspondence position and accordingly constructed, until the lifting of steel box-girder 22 of the position is finished;
3)After In Reinforced Concrete Box Girder 21 in front of the steel box-girder lift structure of large span bondbeam is routed to setting length, lead to The steel box-girder lift structure of large span bondbeam is moved along certain distance by the walking carriage 14 crossed on height support column, then The lifting of steel box-girder 22 and corresponding construction are carried out again;
4)Repeat step 3), until the lifting of all steel box-girders 22 is finished.
Step 1 of the present invention)The detailed process of the steel box-girder lift structure of the large span bondbeam of middle setting is:
1.1)Construction bridges 2, move towards to lay In Reinforced Concrete Box Girder 21 on bridge top along bridge 2;
1.2)The top of bridge 2 is cleared up along the upper surface of In Reinforced Concrete Box Girder 21 that bridge 2 moves towards to set, to bridge 2 one The ground 3 of side carries out cure process;
1.3)Lay high support column walking track, ground 3 after curing in the upper surface of In Reinforced Concrete Box Girder 21 after the cleaning The upper low support column walking track of laying;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
It is last it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although Shen Ask someone that the present invention is described in detail with reference to preferred embodiment, it will be understood by those within the art that, to this hair Bright technical scheme is modified or equivalent substitution, without departing from the objective and scope of the technical program, all should be covered at this Among the right of invention.

Claims (7)

1. a kind of steel box-girder lift structure of large span bondbeam, including gantry hoisting frame, gantry hoisting frame include crossbeam With two support columns, crane trolley is provided with the crossbeam, the upper end of two support column is entered to the two ends head of crossbeam respectively Row is supported and lower end is provided with walking carriage, it is characterised in that:Also include being arranged on bridge top and move towards to set along bridge In Reinforced Concrete Box Girder, the two support columns upper end is concordant, lower end has difference in height to form high support column and low support column, The walking carriage of the lower end of the high support column is arranged on In Reinforced Concrete Box Girder upper surface, the row of the lower end of the low support column Walk chassis and be arranged on ground.
2. the steel box-girder lift structure of large span bondbeam according to claim 1, it is characterised in that:The reinforced concrete Native box beam upper surface is equipped with high support column walking track, the high support column walking track and high support column along bridge trend The walking carriage of lower end is adapted;Ground is equipped with low support column walking track, the low support column walking rail along bridge trend Road is adapted with the walking carriage of the lower end of low support column;The height of the high support column walking track and low support column walking track Difference is always consistent and lateral separation is always consistent.
3. the steel box-girder lift structure of large span bondbeam according to claim 1 or 2, it is characterised in that:The crossbeam Upper surface is provided with crane trolley track along its length, and the crane trolley is run along crane trolley track.
4. the steel box-girder lift structure of large span bondbeam according to claim 1 or 2, it is characterised in that:The low branch Dagger side is provided with crane gear operation room, and the crane gear operation room is highly higher than In Reinforced Concrete Box Girder upper surface.
5. the steel box-girder lift structure of large span bondbeam according to claim 1, it is characterised in that:The crossbeam and two Support column is welded using square steel tube and angle steel.
6. a kind of steel box-girder method for improving of large span bondbeam, it is characterised in that:Comprise the following steps:
1)Bridge construction to meet set claim 1 or 2 described in large span bondbeam steel box-girder lift structure when Wait, the steel box-girder lift structure of large span bondbeam is set;
2)Utilize step 1)Steel box-girder is lifted to by the crane trolley in the steel box-girder lift structure of the large span bondbeam of setting Correspondence position is simultaneously accordingly constructed, until the steel box-girder lifting of the position is finished;
3)After In Reinforced Concrete Box Girder in front of the steel box-girder lift structure of large span bondbeam is routed to setting length, pass through The steel box-girder lift structure of large span bondbeam is moved along certain distance by the walking carriage on height support column, is then entered again Row steel box-girder is lifted by crane and corresponding construction;
4)Repeat step 3), until the lifting of all steel box-girders is finished.
7. the steel box-girder method for improving of large span bondbeam according to claim 6, it is characterised in that:Step 1)Power is set Profit requires that the detailed process of the steel box-girder lift structure of the large span bondbeam described in 1 or 2 is:
1.1)Construction bridges, move towards to lay In Reinforced Concrete Box Girder on bridge top along bridge;
1.2)Bridge top is cleared up along the In Reinforced Concrete Box Girder upper surface that bridge moves towards to set, to the ground of bridge side Face carries out cure process;
1.3)Lay high support column walking track, ground upper berth after curing in In Reinforced Concrete Box Girder upper surface after the cleaning The track if low support column is walked;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
CN201710713823.2A 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam Active CN107311047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710713823.2A CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710713823.2A CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Publications (2)

Publication Number Publication Date
CN107311047A true CN107311047A (en) 2017-11-03
CN107311047B CN107311047B (en) 2018-09-28

Family

ID=60176739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710713823.2A Active CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Country Status (1)

Country Link
CN (1) CN107311047B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056541A (en) * 2018-08-28 2018-12-21 中国二十冶集团有限公司 Transportation resources from ground transport I-beam to bridge floor
CN110331672A (en) * 2019-08-14 2019-10-15 中交一公局第一工程有限公司 Across the pier bale handle holder device in bridge side position and its simple and fast construction method
CN110878530A (en) * 2019-12-27 2020-03-13 中交二公局东萌工程有限公司 Installation and construction method of steel box girder of steel structure bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04116011A (en) * 1990-09-05 1992-04-16 Oriental Kensetsu Kk Horizontal pick-up for precast concrete column equipment
CN201961992U (en) * 2011-03-31 2011-09-07 四川川交路桥有限责任公司 High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns
CN203877780U (en) * 2014-05-15 2014-10-15 中交四公局第三工程有限公司 High-leg and low-leg handle gantry crane for road
CN205257790U (en) * 2015-12-30 2016-05-25 中铁十二局集团有限公司 Fixed high -low leg handle portal crane
CN205772854U (en) * 2016-05-31 2016-12-07 北京市政建设集团有限责任公司 The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN106760684A (en) * 2017-02-28 2017-05-31 中国五冶集团有限公司 See platen installation system and installation method
CN207078928U (en) * 2017-08-18 2018-03-09 中冶建工集团有限公司 A kind of steel box-girder lift structure of large span bondbeam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04116011A (en) * 1990-09-05 1992-04-16 Oriental Kensetsu Kk Horizontal pick-up for precast concrete column equipment
CN201961992U (en) * 2011-03-31 2011-09-07 四川川交路桥有限责任公司 High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns
CN203877780U (en) * 2014-05-15 2014-10-15 中交四公局第三工程有限公司 High-leg and low-leg handle gantry crane for road
CN205257790U (en) * 2015-12-30 2016-05-25 中铁十二局集团有限公司 Fixed high -low leg handle portal crane
CN205772854U (en) * 2016-05-31 2016-12-07 北京市政建设集团有限责任公司 The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN106760684A (en) * 2017-02-28 2017-05-31 中国五冶集团有限公司 See platen installation system and installation method
CN207078928U (en) * 2017-08-18 2018-03-09 中冶建工集团有限公司 A kind of steel box-girder lift structure of large span bondbeam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056541A (en) * 2018-08-28 2018-12-21 中国二十冶集团有限公司 Transportation resources from ground transport I-beam to bridge floor
CN110331672A (en) * 2019-08-14 2019-10-15 中交一公局第一工程有限公司 Across the pier bale handle holder device in bridge side position and its simple and fast construction method
CN110878530A (en) * 2019-12-27 2020-03-13 中交二公局东萌工程有限公司 Installation and construction method of steel box girder of steel structure bridge
CN110878530B (en) * 2019-12-27 2021-06-11 中交二公局东萌工程有限公司 Installation and construction method of steel box girder of steel structure bridge

Also Published As

Publication number Publication date
CN107311047B (en) 2018-09-28

Similar Documents

Publication Publication Date Title
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN100482891C (en) Method for building railway bridge and simple support T beam bridge
CN204282185U (en) A kind of armful rail magnetic levitation track traffic bridge
CN107761571A (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN107100074A (en) A kind of lower bearing arch bridge concrete bridge deck construction method
CN107311047B (en) The steel box-girder lift structure and method for improving of large span bondbeam
CN110130937B (en) Tunnel construction trolley
CN102943440A (en) Method for constructing bridges
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN207078928U (en) A kind of steel box-girder lift structure of large span bondbeam
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN207987749U (en) Ride cable-styled erection crane
CN207498835U (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system
CN201627144U (en) Double-beam transportation and erection integrated bridge girder erection machine
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN107604825A (en) The bridging method of T-shaped beam bridge
CN102071641A (en) Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN107642010A (en) Medium-and low-speed maglev traffic system straightway support rail beam
CN205329518U (en) Embrace rail formula metro bridge system
CN208702215U (en) Overhead station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant