CN204282185U - A kind of armful rail magnetic levitation track traffic bridge - Google Patents
A kind of armful rail magnetic levitation track traffic bridge Download PDFInfo
- Publication number
- CN204282185U CN204282185U CN201420736130.7U CN201420736130U CN204282185U CN 204282185 U CN204282185 U CN 204282185U CN 201420736130 U CN201420736130 U CN 201420736130U CN 204282185 U CN204282185 U CN 204282185U
- Authority
- CN
- China
- Prior art keywords
- rail
- bridge
- base plate
- magnetic levitation
- case beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of armful of rail magnetic levitation track traffic bridge, rail beam is docked vertically by multiple described case beam and forms, and have rail beam that described case beam is formed except having above-mentioned advantage, its beam body scale of construction is less, adopt the construction of fabrication and erection method, the transport of beam body and erection are conveniently.The needs that the utility model runs for adapting to " embrace rail " formula rail transit train, meeting under the prerequisite that on structural strength and rigidity requirement and bridge, space place function requires, take into account economy, convenient construction, landscape effect.
Description
Technical field
The utility model relates to bridge construction technical field, and specific design one embraces rail magnetic levitation track traffic bridge.
Background technology
Existing magnetic levitation track traffic and straddle-seat type single traffic rail beam beam type mainly contain two kinds: single line case beam scheme and double line box girder scheme.
Single line case beam scheme, take in unique " embracing rail " method of operation at magnetic levitation track traffic and cross-saddle single-track traffic etc., the single line case beam meeting vehicle gauge requirement is most economical beam type.Program beam structure is travelled by vehicle track, and the juxtaposed mode process of two panels single line case beam is taked in two-wire location, and domestic built magnetic is floating all adopts this beam type with straddle-seat type single traffic rail beam.Fig. 1 is Shanghai high speed Maglev rail beam sectional view, Tu2Shi Chongqing City straddle-seat type single traffic rail beam sectional view, and Fig. 3 is certain medium-and low-speed maglev traffic experiment line rail beam sectional view." embrace rail " because of vehicle to run, single line box girder bridge can utilize limited space, case top surface of the beam can only meet track and arrange needs, power rail, cable can be hung on outward case beam sides and bottom surface, passage when circuit regular maintenance and vehicle generation accident needed for passenger's emergency evacuation cannot be arranged, and the ancillary facility such as railing, noise barrier is also installed nowhere.For meeting circuit regular maintenance and rescue run needs, Chongqing City is when building Article 2 cross-saddle single-track traffic line-Rail Transit Line 3, complete the cable laying along circuit by rail beam side erection girder steel, on it, grid coverage steel plate forms maintenance and rescue run passage.This processing mode solves the access issues of daily line upkeep and passenger's emergency evacuation, but investment increases more, and girder steel later maintenance workload is also larger.Formula track traffic belongs to urban track traffic category " to embrace rail ", and require higher to the view of bridge, the domestic single line case beam taked all not can solve the Landscape of elevated bridge at present.
Double line box girder scheme beam structure is divided into two-layer, and lower floor's double line box girder is main part of the force, it is arranged the little support rail beam of twice, as the track that vehicle is out of shape, forms " beam upper beam " structure.As shown in Fig. 4 double line box girder sectional view, double line box girder bridge floor is wider, and sufficient space can be provided to carry out the setting of cable laying and maintenance, rescue run passage.But its shortcoming is also more outstanding, first, support rail beam is as travelled by vehicle track, and participation structure is not stressed substantially, and waste of material is less economical; Secondly, support rail beam need after double line box girder has been constructed cast-in-place construction, operation is loaded down with trivial details, and the duration is longer; 3rd, the textural association height of double line box girder and support rail beam is higher, and landscape effect is also bad.
The aspects such as collateral security construction quality, reduction of erection time, reduction construction investment are considered, the general location of elevated bridge adopts simply supported beam, fabrication and erection method to construct usually.
Magnetic levitation track traffic and cross-saddle single-track traffic all belong to urban track traffic, and circuit exists the feature that sharp radius curve is many, continuous beam Controlling vertex is many.Double line box girder beam field is prefabricated complete after, utilize the bridge of having constructed as transport channel, be transported to bridge location rear frame member with Beam transportation vehicle in place.The double line box girder scale of construction is comparatively large, and beam body transportation rack device is by sharp radius curve difficulty, and Controlling vertex also may hinder beam transporting passage through, causes Bridge Erector repeatedly transition, and investment significantly increases, and affects the duration.The single line case beam scale of construction is less, and beam body can ground transport, adopts the methods such as automobile crane, crawler crane, gantry crane to set a roof beam in place, and beam body transport erection is more flexible, and constructing aims more easily realizes.
In sum, in current magnetic levitation track traffic and the existing beam type of cross-saddle single-track traffic, single line box girder construction is convenient, good economy performance, but there is the shortcomings such as circuit regular maintenance and rescue run difficulty, landscape effect be poor; Although double line box girder meets the needs of cable laying and maintenance, rescue run channel setting, circuit regular maintenance is fairly simple, there is constructional difficulties, duration longer, less economical problem.
So, find a kind of pattern rationally, easy construction, economy is good, landscape effect is good " embracing rail " formula track traffic track beam structure tool be of great significance.
Summary of the invention:
The utility model for above-mentioned background technology Problems existing, will provide a kind of and embraces rail magnetic levitation track traffic bridge, make it have construction simple, circuit regular maintenance feature easily.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of armful rail magnetic levitation track traffic bridge, comprise bridge pier and rail beam, described rail beam is docked vertically by multiple case beam and forms, adjacent two described case beam joints are placed on bridge pier, the base plate bottom surface being positioned at described case beam two ends is provided with horizontal support face, and the horizontal support face at described case beam two ends is placed on bridge pier by bearing; Described case beam comprises top board, base plate and the web between described top board and described base plate, described top board, base plate and web are the shaping reinforced concrete structure of monobloc cast, described top board two side ends is provided with the boss for the evagination installing magnetic levitation track, and described base plate both sides are provided with the wing plate stretched out obliquely upward.
Preferably, described armful of rail rail traffic bridge is two-wire bridge, two juxtaposed modes of described case beam are adopted to arrange, the bridge pier being positioned at described two single line case beam two ends is that two bridge piers along circuit lateral arrangement are formed, and the horizontal support face at described every bar case beam two ends is placed on described bridge pier by bearing.
Preferably, the height of described wing plate is no more than top board surface.
Preferably, the top of described wing plate is provided with mounting platform, and described mounting platform is the boss structure that stretches out of horizontal direction laterally.
Preferably, described web is in tilted layout the both sides between described top board and described base plate respectively.
Preferably, described web is arranged vertically on the both sides between described top board and described base plate respectively.
Preferably, described wing plate is arc.
Preferably, described wing plate and described base plate are the shaping reinforced concrete structure of monobloc cast, described in be positioned at case beam two ends base plate bottom surface be provided with horizontal support face, described base plate bottom surface between case beam two ends and described wing plate external surface are in the arc be communicated with.
The beneficial effects of the utility model are:
The rail beam embracing rail magnetic levitation track traffic bridge is docked vertically by multiple described case beam and forms, and the rail beam be made up of described case beam is except having above-mentioned advantage, and its beam body scale of construction is less, adopts the construction of fabrication and erection method, and it is convenient that beam body transports and sets up.The needs that the utility model runs for adapting to " embrace rail " formula rail transit train, meeting under the prerequisite that on structural strength and rigidity requirement and bridge, space place function requires, take into account economy, convenient construction, landscape effect.
Be provided with in the base plate both sides of case beam and outer choose and be highly no more than the wing plate of top board surface, can as cable laying passage inside wing plate, wing plate is set to arc, can be the arc of convex or concave, adapts to the needs of different place and engineering-environment.
The two ends of case beam base plate bottom surface are respectively arranged with horizontal support face, in order to by pile equipment on the bearing of bridge pier.
Wing plate top is provided with mounting platform, mounting platform is set to the boss structure that horizontal direction is laterally stretched out, can be used for arranging human nature pavement, fire escape, allow passenger by fire escape emergency evacuation when vehicle generation accident, improve the ability that circuit tackles urgent emergency situations.Mounting platform can also be used for arranging the track traffic ancillary facilities such as access path, railing, noise barrier, semaphore, AP antenna, is of value to the regular maintenance of circuit.The wing plate of case beam gets on the right track to bridge, trackside equipment, cable etc. cover, and landscape effect obviously improves.
Base plate is communicated with wing plate curvedly makes moulding more attractive in appearance, and web alternative is arranged, and is set to one block of web, or two blocks of webs, and two blocks of webs can be set to straight web or skew web plate, and three kinds of modes can adapt to different engineering demands.
Accompanying drawing explanation
Fig. 1 is Shanghai high speed Maglev rail beam sectional view,
Fig. 2 is Chongqing City's straddle-seat type single traffic rail beam sectional view,
Fig. 3 is certain medium-and low-speed maglev traffic experiment line rail beam sectional view,
Fig. 4 is double line box girder sectional view,
Fig. 5 is the cross-sectional view of a Cell beam between the utility model embodiment one or two bridge pier,
Fig. 6 is the cross-sectional view that the utility model embodiment one case beam fine strain of millet end is installed on bridge pier place,
Fig. 7 is the utility model embodiment one bridge construction schematic diagram,
Fig. 8 is the cross-sectional view of a Cell beam between the utility model embodiment 2 two bridge piers,
Fig. 9 is the cross-sectional view that the utility model embodiment two casees beam fine strain of millet ends are installed on bridge pier place.
In figure:
1, top board, 2, base plate, 3, web, 4, wing plate, 5, horizontal support face, 6, bearing,
7, bridge pier, 8, boss, 9, mounting platform.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described further.
The one of the present embodiment embraces rail magnetic levitation track traffic bridge, comprise bridge pier 7 and rail beam as shown in Figure 7, rail beam is docked vertically by multiple case beam and forms, adjacent two casees beam joints are placed on bridge pier 7, base plate 2 bottom surface being positioned at case beam two ends is provided with horizontal support face 5, and the horizontal support face 5 at case beam two ends is placed on bridge pier 7 by bearing 6.
Embracing rail rail traffic bridge is two-wire bridge, two juxtaposed modes of case beam are adopted to arrange, the bridge pier 7 being positioned at two single line case beam two ends is that two bridge piers 7 along circuit lateral arrangement are formed, and the horizontal support face 5 at every bar case beam two ends is placed on bridge pier by bearing 6.
As shown in Figure 5 and Figure 6, case beam comprises top board 1, base plate 2 and the web between top board 1 and base plate 23 to described case beam.The present embodiment arranges two blocks of webs 3, two blocks of webs 3 are arranged vertically on the both sides between top board 1 and base plate 2 respectively, two blocks of webs 3 are symmetrical arranged along the axis between top board 1 and base plate 2, and two blocks of webs 3 are rectangular with top board 1 junction, form the cavity of a cubic in the middle part of case beam.
Top board 1 two side ends is provided with the boss 8 for the evagination installing magnetic levitation track, and base plate 2 both sides are provided with the wing plate 4 stretched out obliquely upward, and the height of wing plate 4 is no more than top board 1 surface.
The cross section of wing plate 4 is arc, it is outer convex in the present embodiment, wing plate 4 and base plate 2 are the shaping reinforced concrete structure of monobloc cast, and base plate 2 bottom surface being positioned at case beam two ends is provided with horizontal support face 5, and base plate 2 bottom surface between case beam two ends and wing plate 4 external surface are in the arc be communicated with.In practice, wing plate 4 can also be the arc of indent, or linear pattern, but should be and hold the trackside equipment such as cable and leave spatial accommodation.
The top of wing plate 4 is provided with mounting platform 9, and mounting platform 9 is horizontal direction boss 8 structure of stretching out laterally.Here mounting platform 9 can be used for arranging human nature pavement, fire escape, allows passenger by fire escape emergency evacuation when vehicle generation accident, improves the ability that circuit tackles urgent emergency situations.Mounting platform 9 can also be used for arranging the track traffic ancillary facilities such as access path, railing, noise barrier, semaphore, AP antenna, is of value to the regular maintenance of circuit.
Between wing plate 4 and web 3, reinforcing rib, stiffening girder can also be set, in order to strengthen the weight capacity of wing plate 4, but various reinforcement structure should be simultaneously hold trackside equipment leave enough spaces or space.Top board 1, base plate 2 and web 3 is the shaping reinforced concrete structure of monobloc cast.The bottom surface of top board 1 can also arrange top board 1 crossbeam and base plate 2 crossbeam, in order to strengthen the intensity of top board 1, strengthens case beam to the supporting capacity of track and safety factor.
Embodiment two as shown in Fig. 8 to Fig. 9, the case beam that the present embodiment embraces rail magnetic levitation track traffic bridge comprises two blocks of webs 3, the both sides be in tilted layout respectively between top board 1 and base plate 2, two blocks of webs 3 are symmetrical arranged along the axis between top board 1 and base plate 2, between web 3 and top board 1 in obtuse angle, in the middle part of case beam, a ladder cavity is formed.Embracing other of rail magnetic levitation track traffic bridge arranges all identical with embodiment one.
The of the present utility model armful of rail magnetic levitation track traffic bridge beam body scale of construction is less, adopts the construction of fabrication and erection method, and the transport of beam body and erection are conveniently.For adapting to the needs that " embrace rail " formula rail transit train runs, meeting under the prerequisite that on structural strength and rigidity requirement and bridge, space place function requires, take into account economy, convenient construction, landscape effect.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection domain that all should belong to the utility model claims.
Claims (8)
1. embrace rail magnetic levitation track traffic bridge for one kind, comprise bridge pier (7) and rail beam, it is characterized in that: described rail beam is docked vertically by multiple case beam and forms, adjacent two described case beam joints are placed on bridge pier (7), base plate (2) bottom surface being positioned at described case beam two ends is provided with horizontal support face (5), and the horizontal support face (5) at described case beam two ends is placed on bridge pier (7) by bearing (6); The web (3) that described case beam comprises top board (1), base plate (2) and is positioned between described top board (1) and described base plate (2), described top board (1), base plate (2) and web (3) are the shaping reinforced concrete structure of monobloc cast, described top board (1) two side ends is provided with the boss (8) for the evagination installing magnetic levitation track, and described base plate (2) both sides are provided with the wing plate (4) stretched out obliquely upward.
2. according to claim 1 armful of rail magnetic levitation track traffic bridge, it is characterized in that: described armful of rail rail traffic bridge is two-wire bridge, two juxtaposed modes of described case beam are adopted to arrange, the bridge pier (7) being positioned at described two single line case beam two ends is that two bridge piers along circuit lateral arrangement (7) are formed, and the horizontal support face (5) at described every bar case beam two ends is placed on bridge pier by bearing (6).
3. according to claim 1 armful of rail magnetic levitation track traffic bridge, is characterized in that: the height of described wing plate (4) is no more than top board (1) surface.
4. according to claim 1 armful of rail magnetic levitation track traffic bridge, it is characterized in that: the top of described wing plate (4) is provided with mounting platform (9), described mounting platform (9) is the boss structure that stretches out of horizontal direction laterally.
5. according to claim 1 armful of rail magnetic levitation track traffic bridge, is characterized in that: described web (3) is in tilted layout the both sides between described top board (1) and described base plate (2) respectively.
6. according to claim 1 armful of rail magnetic levitation track traffic bridge, is characterized in that: described web (3) is arranged vertically on the both sides between described top board (1) and described base plate (2) respectively.
7. armful rail magnetic levitation track traffic bridge according to claim arbitrary in claim 1-6, is characterized in that: described wing plate (4) is arc.
8. according to claim 7 armful of rail magnetic levitation track traffic bridge, it is characterized in that: described wing plate (4) and described base plate (2) are the shaping reinforced concrete structure of monobloc cast, described base plate (2) bottom surface being positioned at case beam two ends is provided with horizontal support face (5), and described base plate (2) bottom surface between case beam two ends and described wing plate (4) external surface are in the arc be communicated with.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420736130.7U CN204282185U (en) | 2014-11-28 | 2014-11-28 | A kind of armful rail magnetic levitation track traffic bridge |
PCT/CN2015/094751 WO2016082689A1 (en) | 2014-11-28 | 2015-11-17 | Rail holding type magnetic levitation track transit box girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420736130.7U CN204282185U (en) | 2014-11-28 | 2014-11-28 | A kind of armful rail magnetic levitation track traffic bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204282185U true CN204282185U (en) | 2015-04-22 |
Family
ID=52865365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420736130.7U Active CN204282185U (en) | 2014-11-28 | 2014-11-28 | A kind of armful rail magnetic levitation track traffic bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204282185U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544322A (en) * | 2015-12-30 | 2016-05-04 | 中铁第四勘察设计院集团有限公司 | Discrete type column type rail bridge system for intra-garage overhaul of maglev train |
CN105568789A (en) * | 2015-12-17 | 2016-05-11 | 中铁第四勘察设计院集团有限公司 | Two-line rail girder of maglev rail-holding rail transit |
WO2016082689A1 (en) * | 2014-11-28 | 2016-06-02 | 中铁第四勘察设计院集团有限公司 | Rail holding type magnetic levitation track transit box girder |
CN109137642A (en) * | 2018-09-03 | 2019-01-04 | 北京交通大学 | A kind of light-duty straddle-type monorail transportation system |
CN110106783A (en) * | 2019-05-31 | 2019-08-09 | 中铁第四勘察设计院集团有限公司 | Bridge structure and construction method on a kind of cable |
CN110258203A (en) * | 2019-06-28 | 2019-09-20 | 上海交通大学 | π type track girder on a kind of beam applied to large span high speed magnetically suspended train line |
CN110258298A (en) * | 2019-06-06 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | Bridge packet pier on a kind of urban track traffic cable |
-
2014
- 2014-11-28 CN CN201420736130.7U patent/CN204282185U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016082689A1 (en) * | 2014-11-28 | 2016-06-02 | 中铁第四勘察设计院集团有限公司 | Rail holding type magnetic levitation track transit box girder |
CN105568789A (en) * | 2015-12-17 | 2016-05-11 | 中铁第四勘察设计院集团有限公司 | Two-line rail girder of maglev rail-holding rail transit |
CN105544322A (en) * | 2015-12-30 | 2016-05-04 | 中铁第四勘察设计院集团有限公司 | Discrete type column type rail bridge system for intra-garage overhaul of maglev train |
CN105544322B (en) * | 2015-12-30 | 2017-11-14 | 中铁第四勘察设计院集团有限公司 | A kind of discrete type pillar track bridge system of maintenance in magnetic suspension train storehouse |
CN109137642A (en) * | 2018-09-03 | 2019-01-04 | 北京交通大学 | A kind of light-duty straddle-type monorail transportation system |
CN110106783A (en) * | 2019-05-31 | 2019-08-09 | 中铁第四勘察设计院集团有限公司 | Bridge structure and construction method on a kind of cable |
CN110106783B (en) * | 2019-05-31 | 2023-12-15 | 中铁第四勘察设计院集团有限公司 | Cable upper bridge structure and construction method |
CN110258298A (en) * | 2019-06-06 | 2019-09-20 | 中铁第四勘察设计院集团有限公司 | Bridge packet pier on a kind of urban track traffic cable |
CN110258203A (en) * | 2019-06-28 | 2019-09-20 | 上海交通大学 | π type track girder on a kind of beam applied to large span high speed magnetically suspended train line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204282185U (en) | A kind of armful rail magnetic levitation track traffic bridge | |
CN104594173B (en) | One kind embraces rail magnetic levitation track traffic box beam | |
CN102926299B (en) | Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device | |
CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
CN201907505U (en) | Double-layered and two-way rail compatible green public transit | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN201501747U (en) | Beam lifting machine with novel structure | |
CN203452009U (en) | Self-walking device for mounting steel beam | |
CN103552800B (en) | Large-scale can-like equipment shift method | |
CN202991063U (en) | Large-section tunnel hydraulic trolley | |
CN206873495U (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN201087323Y (en) | Mobile integral construction platform | |
CN205805572U (en) | A kind of buttress type subway station section of track well | |
CN206233099U (en) | A kind of Collison fence for bridge construction and security protection platform | |
CN205329518U (en) | Embrace rail formula metro bridge system | |
CN104533114B (en) | A kind of seashore flexible direct current converter station valve Room joint architectural structure system | |
CN201390928Y (en) | Support rail continuous beam in double track railway | |
CN204343153U (en) | Multiplex sequential production just girder construction | |
CN107642010A (en) | Medium-and low-speed maglev traffic system straightway support rail beam | |
WO2016082689A1 (en) | Rail holding type magnetic levitation track transit box girder | |
CN205276138U (en) | Novel roof beam car is transported to tire formula U type roof beam by oneself | |
CN107311047A (en) | The steel box-girder lift structure and method for improving of large span bondbeam | |
CN105464000B (en) | A kind of cast-in-situ box girder moving die plate | |
CN202766936U (en) | Multifunctional transporting device for ballastless track base plate construction | |
CN202913362U (en) | Bridging vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |