CN204343153U - Multiplex sequential production just girder construction - Google Patents

Multiplex sequential production just girder construction Download PDF

Info

Publication number
CN204343153U
CN204343153U CN201420792505.1U CN201420792505U CN204343153U CN 204343153 U CN204343153 U CN 204343153U CN 201420792505 U CN201420792505 U CN 201420792505U CN 204343153 U CN204343153 U CN 204343153U
Authority
CN
China
Prior art keywords
girder
sequential production
girder construction
fixed
sleeper beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420792505.1U
Other languages
Chinese (zh)
Inventor
闫利明
房士杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ji tie Engineering Construction Group Co., Ltd.
Original Assignee
房士杰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 房士杰 filed Critical 房士杰
Priority to CN201420792505.1U priority Critical patent/CN204343153U/en
Application granted granted Critical
Publication of CN204343153U publication Critical patent/CN204343153U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of multiplex sequential production just girder construction, comprise the multistage girder and sleeper beam that link together, also comprise and be arranged on the horizontal of girder lower end and lift beam, adjacent two sections of girders are connected and fixed by junction plate, every section of described girder is divided into multiple casing by internal partition, upper by level of described casing, lower cover and a vertical left side, right web and a left side, right floor surrounds, the width of described upper cover plate is less than lower cover, the cross section of described sleeper beam is I-shaped, described sleeper beam is connected and fixed by bracket and girder, described sleeper beam is provided with the buckle of trapped orbit and arc securing member, described horizontal beam section of lifting also is I-shaped, centre is two vertical webs, multiple horizontal beam composition of lifting horizontally lifts beam group.The lateral stiffness of the multiplex sequential production that the utility model provides just girder construction is large, and stability is high, and when electrified section is manually set a roof beam in place, security risk is little, and is applicable to large span and makes somebody a mere figurehead hardened link, and little to transport interference, circuit is stablized.

Description

Multiplex sequential production just girder construction
Technical field
The utility model relates to railway, particularly the multiplex sequential production of one just girder construction.
Background technology
The built on stilts reinforcing present stage of existing railway in operation has mainly adopted three kinds of technology.
(1), horizontally the empty reinforcing method of vertical builder's jack is lifted: namely adopt rail beam to do longeron, 40H shaped steel does the built on stilts hardened link method that crossbeam lifts take-up road.The component that the method needs are more, complex structure and unstable, and safety factor is little, requires train speed limit 25km/h, can not meet movement requirement, now do not advised use.
(2), D type construction beam makes somebody a mere figurehead reinforcing method: namely adopt the D type construction beam of sizing to make somebody a mere figurehead hardened link, existing has D12, D16, D20, D24 tetra-kinds of spans, and the method structure is simple, safety and stability.Shortcoming is: 1. maximum span is only 24 meters, can not meet longspan structure and passes through needs; 2. cannot use when double track railway section distance between centers of tracks is less and when sweep is less; 3. cannot use at switch section; 4. monomer mass is large, lifting, transport and erection inconvenience, and interference on the road is large, and cost is high, particularly cannot use Large-scale Hoisting equipment in electrified sections, adopts to there is beam body when manually setting a roof beam in place and to topple the significant security risk such as unstability.
(3), the sequential production just empty reinforcing method of roof beam structure: the continuous beam of the method composition long span that the large-scale steel I-beam being about to fixing modulus adopts equal strength to connect, centre establishes one or more fulcrum to define statically-indeterminate structure, and the method can meet longspan structure and pass through needs.Shortcoming is: 1. also cannot use when double track railway section distance between centers of tracks is less and when sweep is less; 2. large-scale steel I-beam lateral stiffness is not enough, and less stable is unfavorable to traffic safety; 4. monomer mass is comparatively large, lifting, transport and erection inconvenience, and interference on the road is comparatively large, and cost is higher, cannot use Large-scale Hoisting equipment in electrified sections, adopts also to there is beam body when manually setting a roof beam in place and to topple the significant security risk such as unstability.
Utility model content
For existing multiplex sequential production just girder construction exist above-mentioned defect and problem, the object of the utility model embodiment is to provide a kind of multiplex sequential production just girder construction.
In order to achieve the above object, the utility model is implemented to provide following technical scheme:
Multiplex sequential production just girder construction, comprise the multistage girder and sleeper beam that link together, also comprise and be arranged on the horizontal of girder lower end and lift beam, adjacent two sections of girders are connected and fixed by junction plate, every section of described girder is divided into multiple casing by internal partition, upper by level of described casing, lower cover and a vertical left side, right web and a left side, right floor surrounds, the width of described upper cover plate is less than lower cover, the cross section of described sleeper beam is I-shaped, described sleeper beam is connected and fixed by bracket and girder, described sleeper beam is provided with the buckle of trapped orbit and arc securing member, described horizontal beam section of lifting also is I-shaped, centre is two vertical webs, multiple horizontal beam composition of lifting horizontally lifts beam group.
Further technical scheme, described left and right floor is positioned at the outside of left and right web, is welded and fixed between adjacent described left and right web by described internal partition.
Further technical scheme, the end of described upper cover plate is concordant with the outside of left and right floor, and described lower cover stretches out the outside of left and right floor.
Further technical scheme, is filled with the light material of high strength in the casing of adjacent two sections of girder junctions.
Further technical scheme, one end of described bracket is fixed on the floor of girder, and the other end is fixed on sleeper beam.
Further technical scheme, described bracket is the junction plate of inclination 45 degree, and two end is respectively equipped with mutually perpendicular fixed head, and described two fixed heads are level and vertically setting respectively, all has bolt hole above.
Further technical scheme, described buckle lays respectively at the left and right sides of track, described buckle comprises base and buckle body, described base is bolted on sleeper beam, described base has chute, and described buckle body is positioned at chute and can horizontally slips, and the outer end of described buckle body is against the bolt having a degree of tightness buckle body, the inner of described buckle body has arc groove down, and the bottom of described track is stuck in arc groove.
Further technical scheme, the material of described buckle is plastics.
Further technical scheme, described arc securing member is S shape, is resisted against the top of described buckle by bolt.
The utility model tool has the following advantages: the lateral stiffness of multiplex sequential production just girder construction is large, stability is high, less at distance between centers of tracks, sweep is less and track switch circuit also can be constructed, when electrified section is manually set a roof beam in place, security risk is little, and be applicable to large span and make somebody a mere figurehead hardened link, little to transport interference, circuit is stablized.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The overlooking of the girder that Fig. 1 provides for the utility model, face and look up structural representation;
The A-A sectional structure schematic diagram of the girder that Fig. 2 provides for the utility model;
The B-B sectional structure schematic diagram of the girder that Fig. 3 provides for the utility model;
The C-C sectional structure schematic diagram of the girder that Fig. 4 provides for the utility model;
The bracket that Fig. 5 provides for the utility model face structural representation;
The bracket that Fig. 6 provides for the utility model look up structural representation;
The overlooking and face structural representation of the sleeper beam that Fig. 7 provides for the utility model;
The sleeper beam that Fig. 8 provides for the utility model and rail connecting structure schematic diagram;
What Fig. 9 provided for the utility model horizontally lifts the overlooking of beam, faces and look up structural representation;
The horizontal D-D sectional structure schematic diagram lifting beam that Figure 10 provides for the utility model.
In figure: 1, casing; 2, upper cover plate; 3, lower cover; 4, left and right floor; 5, left and right web; 6, bracket; 7, fixed head; 8, arc securing member; 9, buckle body; 10, track; 11, base.
Detailed description of the invention
Below in conjunction with accompanying drawing of the present utility model, be clearly and completely described the technical solution of the utility model, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As Figure 1-10 shows, the utility model is multiplex sequential production just girder construction, comprises the multistage girder and sleeper beam that link together, also comprises being arranged on the horizontal of girder lower end and lifting beam.Adjacent two sections of girders are connected and fixed by junction plate, every section of girder is divided into multiple casing by internal partition, casing is surrounded by the upper and lower cover plate of level and vertical left and right web and left and right floor, the width of upper cover plate is less than lower cover, and the cross section of sleeper beam is I-shaped, and sleeper beam is connected and fixed by bracket and girder, sleeper beam is provided with the buckle of trapped orbit and arc securing member, horizontally lift beam section also for I-shaped, centre is two vertical webs, multiplely horizontally lifts that beam composition is horizontal lifts beam group.
Left and right floor is positioned at the outside of left and right web, is welded and fixed between adjacent left and right web by internal partition.The end of upper cover plate is concordant with the outside of left and right floor, and lower cover stretches out the outside of left and right floor.The light material of high strength is filled with in the casing of adjacent two sections of girder junctions.
One end of bracket is fixed on the floor of girder, and the other end is fixed on sleeper beam.Bracket is the junction plate of inclination 45 degree, and two end is respectively equipped with mutually perpendicular fixed head, and two fixed head level and vertically settings respectively, all have bolt hole above.
Buckle lays respectively at the left and right sides of track, buckle comprises base and buckle body, base is bolted on sleeper beam, base has chute, buckle body is positioned at chute and can horizontally slips, the outer end of buckle body is against the bolt having a degree of tightness buckle body, and the inner of buckle body has arc groove down, and the bottom of track is stuck in arc groove.In present embodiment, the material of buckle is plastics.Arc securing member is S shape, is resisted against the top of buckle by bolt.
Girder of the present utility model adopts the entity girder structure by steel plate combination, the box section closed is formed by upper and lower cover plate and two pieces of vertical web, the sleeper beam of bearing track is fixed on girder lower cover or is linked mutually by the floor of bracket with girder, and the intensity of structure and rigidity ensure by box girder.
Sleeper beam also adopts the entity girder structure of steel plate combination, forms drum cross section by upper and lower cover plate and one block of web, and subsidiary fastener fixing device, makes track be fixed on sleeper beam and do not produce movement.
Rail fastening adopts arc securing member buckle and sleeper beam to be fixed, and buckle adopts PAT highstrenghtpiston to make, and avoids track circuit to join electricity.
Horizontal beam of lifting adopts two web special steel beam, coordinates jointly to complete to indulge choose the horizontal operation of lifting and stealing the beams and changing the pillars with girder.
The utility model technical characteristics is:
A. main beam is connected to form the overall structure of long span by junction plate equal strength, meets LONG-SPAN RAILWAY fixed track usage plan and reinforces;
B. beam body adopts two web design, adds the lateral stiffness of structure, makes structure have good lateral stability ability;
C. according to the mechanical characteristic of flexural member, main beam section adopts up-narrow and down-wide type to design, and have employed low clearance design simultaneously, strengthens its stability, improve safety, achieve girder and have higher bearing capacity and the larger scope of application;
D. the connection of girder and sleeper beam adopts inside suspension formula and bottom hang type, according to different line condition, the standard sleeper beam of L=496cm and L=396cm two kinds of length can be used, also can do sleeper beam with the shaped steel of larger supporting capacity at the complex section such as track switch, station, achieve its versatility;
E. adopt novel high-strength light material to fill in girder connecting portion web, thus alleviate the monomer mass of component, convenient construction;
F. rail fastening adopts novel high-strength insulating plastics material, avoids work progress and uses middle orbit connection electrical phenomena.
The construction method of the multiplex sequential production that the utility model provides just girder construction comprises following operation successively:
S1. indulge and choose horizontal lifting: rail track is gone slowly, excavation pile construction, sets up girder fulcrum, takes off quarrel, wears sleeper beam, block circuit, erection girder, installs junction plate, girder and sleeper beam is connect, install rail clip and arc securing member, penetrate and horizontally lift beam group, track strengthening is complete
S2. steal the beams and change the pillars: after fixed track usage plan, roadbed starts to cut the earth, Framed underpass bridge, when frame front end arrives at first row fulcrum stake limit, the horizontal framework lifted below beam group arranges sliding fulcrum, then by fulcrum stake top, the horizontal chock lifted under beam group removes, now load of roadway is carried on a shoulder pole by horizontal joist support of lifting, break hole digging pile, continue shoveling jacking, repeat process above, until frame in place.
The utility model is devoted to solve the built on stilts reinforcement means to existing railway circuit safety and stability when passing through the works of any span under any rail track.The problem mainly solved has: 1. D type construction beam limits by span, is not suitable for large span and makes somebody a mere figurehead hardened link; 2. the horizontal beam method road speed of lifting of hanger rail is low, large to transport interference, the unstable problem of circuit; 3. just beam lateral stiffness is not enough for i iron, the problem of poor stability; 4., sweep less and track switch circuit cannot construct problem less at distance between centers of tracks; 5. just beam monomer mass is comparatively large for D type beam and work, and lifting, transport and erection cost are high, the problem that when electrified section is manually set a roof beam in place, security risk is large.
The above; be only detailed description of the invention of the present utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; change can be expected easily or replace, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should described be as the criterion with the protection domain of claim.

Claims (9)

1. multiplex sequential production just girder construction, comprise the multistage girder and sleeper beam that link together, also comprise and be arranged on the horizontal of girder lower end and lift beam, it is characterized in that, adjacent two sections of girders are connected and fixed by junction plate, every section of described girder is divided into multiple casing by internal partition, upper by level of described casing, lower cover and a vertical left side, right web and a left side, right floor surrounds, the width of described upper cover plate is less than lower cover, the cross section of described sleeper beam is I-shaped, described sleeper beam is connected and fixed by bracket and girder, described sleeper beam is provided with the buckle of trapped orbit and arc securing member, described horizontal beam section of lifting also is I-shaped, centre is two vertical webs, multiple horizontal beam composition of lifting horizontally lifts beam group.
2. multiplex sequential production according to claim 1 just girder construction, is characterized in that: described left and right floor is positioned at the outside of left and right web, is welded and fixed between adjacent described left and right web by described internal partition.
3. multiplex sequential production according to claim 1 just girder construction, is characterized in that: the end of described upper cover plate is concordant with the outside of left and right floor, and described lower cover stretches out the outside of left and right floor.
4. multiplex sequential production according to claim 1 just girder construction, is characterized in that: the light material being filled with high strength in the casing of adjacent two sections of girder junctions.
5. multiplex sequential production according to claim 1 just girder construction, is characterized in that: one end of described bracket is fixed on the floor of girder, and the other end is fixed on sleeper beam.
6. multiplex sequential production according to claim 1 just girder construction, it is characterized in that: described bracket is the junction plate of inclination 45 degree, two end is respectively equipped with mutually perpendicular fixed head, and described two fixed heads are level and vertically setting respectively, all has bolt hole above.
7. multiplex sequential production according to claim 1 just girder construction, it is characterized in that: described buckle lays respectively at the left and right sides of track, described buckle comprises base and buckle body, described base is bolted on sleeper beam, described base has chute, described buckle body is positioned at chute and can horizontally slips, the outer end of described buckle body is against the bolt having a degree of tightness buckle body, the inner of described buckle body has arc groove down, and the bottom of described track is stuck in arc groove.
8. multiplex sequential production according to claim 1 just girder construction, is characterized in that: the material of described buckle is plastics.
9. multiplex sequential production according to claim 1 just girder construction, is characterized in that: described arc securing member is S shape, is resisted against the top of described buckle by bolt.
CN201420792505.1U 2014-12-16 2014-12-16 Multiplex sequential production just girder construction Expired - Fee Related CN204343153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420792505.1U CN204343153U (en) 2014-12-16 2014-12-16 Multiplex sequential production just girder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420792505.1U CN204343153U (en) 2014-12-16 2014-12-16 Multiplex sequential production just girder construction

Publications (1)

Publication Number Publication Date
CN204343153U true CN204343153U (en) 2015-05-20

Family

ID=53226431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420792505.1U Expired - Fee Related CN204343153U (en) 2014-12-16 2014-12-16 Multiplex sequential production just girder construction

Country Status (1)

Country Link
CN (1) CN204343153U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887658A (en) * 2014-12-16 2016-08-24 房士杰 Multi-purpose continuous construction temporary beam structure and construction method thereof
CN106012878A (en) * 2016-08-03 2016-10-12 长沙楚泰建筑劳务有限公司 Construction method for continuous type construction auxiliary girder in jacking of railway box culvert and device for implementing construction method
CN110219250A (en) * 2019-07-03 2019-09-10 房明贤 The continuous combined overhead beam of multilayer
CN112176785A (en) * 2020-09-28 2021-01-05 房明贤 Side hanging type insulating rail fastener

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887658A (en) * 2014-12-16 2016-08-24 房士杰 Multi-purpose continuous construction temporary beam structure and construction method thereof
CN106012878A (en) * 2016-08-03 2016-10-12 长沙楚泰建筑劳务有限公司 Construction method for continuous type construction auxiliary girder in jacking of railway box culvert and device for implementing construction method
CN110219250A (en) * 2019-07-03 2019-09-10 房明贤 The continuous combined overhead beam of multilayer
CN112176785A (en) * 2020-09-28 2021-01-05 房明贤 Side hanging type insulating rail fastener

Similar Documents

Publication Publication Date Title
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
CN203855866U (en) Large-span frame bridge overhead roof with beams convenient to construct
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN105887658A (en) Multi-purpose continuous construction temporary beam structure and construction method thereof
CN203487475U (en) Line suspending and reinforcing structure for existing line jacking bridge and culvert construction
CN204343153U (en) Multiplex sequential production just girder construction
CN106284109B (en) On across both wired bridge main beam method for dismounting
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN204676374U (en) A kind of strengthening mechanism of rail track
CN206800173U (en) Floorings Prestressed Concrete I Beams are poured after a kind of railway
CN205382425U (en) Railway T type bridge adds builds sound barrier beam mold plate girder unwheeling
CN202220400U (en) Lap-joint type formwork support beam
CN108342980B (en) Railway suspension bridge upper bearing type steel truss bridge deck structure
CN207293981U (en) The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
CN210174677U (en) Hard crossing for changing electrified railway into moving
CN201647844U (en) Beam lifting station without abutments
CN109024306A (en) Mountain terrain place Gao Dun rides pier formula door frame bridge lifting construction method
CN104164838A (en) Light combined type beam moving trolley
CN204875397U (en) Empty structure of railway line long distance reinforcing frame
CN110626943B (en) Special chassis of inverted gantry crane for single-line T-beam bridge and mounting method
CN209759904U (en) integral broken line overhead device for small radius curve railway
CN201330365Y (en) Bench formwork trolley for construction of two-course pavement structure in tunnel
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN202865708U (en) Railway aerial fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180831

Address after: 250000 107 Station Street, Tianqiao District, Ji'nan, Shandong

Patentee after: Shandong Ji tie Engineering Construction Group Co., Ltd.

Address before: 257300 Shandong Guangrao town and Wang Cun 194

Patentee before: Fang Shijie

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20191216