CN107311047B - The steel box-girder lift structure and method for improving of large span bondbeam - Google Patents

The steel box-girder lift structure and method for improving of large span bondbeam Download PDF

Info

Publication number
CN107311047B
CN107311047B CN201710713823.2A CN201710713823A CN107311047B CN 107311047 B CN107311047 B CN 107311047B CN 201710713823 A CN201710713823 A CN 201710713823A CN 107311047 B CN107311047 B CN 107311047B
Authority
CN
China
Prior art keywords
support column
girder
bondbeam
steel box
large span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710713823.2A
Other languages
Chinese (zh)
Other versions
CN107311047A (en
Inventor
宋林
杨诚
徐国友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710713823.2A priority Critical patent/CN107311047B/en
Publication of CN107311047A publication Critical patent/CN107311047A/en
Application granted granted Critical
Publication of CN107311047B publication Critical patent/CN107311047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of steel box-girder lift structure of large span bondbeam and method for improving, including gantry hoisting frame and be arranged bridge top and along bridge move towards be arranged In Reinforced Concrete Box Girder, gantry hoisting frame includes crossbeam and two support columns, it is provided with crane trolley on the crossbeam, the upper end of two support column is supported respectively to the both ends head of crossbeam and lower end is both provided with walking carriage, two upper end of support column is concordant, lower end has difference in height to form high support column and low support column, the walking carriage of the lower end of the high support column is arranged in In Reinforced Concrete Box Girder upper surface, the walking carriage of the lower end of the low support column is arranged on ground.Track laying face of the cast-in-place good In Reinforced Concrete Box Girder as the high support column walking carriage of gantry hoisting frame is utilized in conjunction with this method for improving in this structure, reduces gantry hoisting frame and takes up an area width, grading expense, good economy performance when saving track laying.

Description

The steel box-girder lift structure and method for improving of large span bondbeam
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of steel box-girder lift structure of large span bondbeam and Method for improving.
Background technology
With the quick steady-state growth of national economic development, infrastructure construction is greatly developed, in recent years long-span bridge Beam is built quantity and is continuously increased.The bondbeam of steel box-girder and In Reinforced Concrete Box Girder composition can obtain more superior structure at present The advantages of mechanical characteristic and rational structure type, it takes full advantage of steel member and reinforced concrete member, compensates for respectively again Deficiency(Steel member has good tensile strength and deformability in tensile zone, but easy tos produce surrender, steel in compressive region Reinforced concrete component is then very good on the contrary, compression strength is big, and clean steel construction weight is lighter than pure reinforced concrete member, but reinforcing bar is mixed Solidifying soil component cost is more cheap than steel.).Therefore, in Longspan Bridge construction, steel box-girder is formed with In Reinforced Concrete Box Girder Application of the bondbeam in China it is also more and more extensive.
Since current conventional two side leg of gantry hoisting frame is mounted on bridge both sides, occupation of land width is larger, track laying When grading it is costly, and then overall cost is higher.In bridge construction process, such as in city narrow space, mountain area Etc. under bad or MODEL OVER COMPLEX TOPOGRAPHY, place setting that may be not enough conventional gantry hoisting frame promotes large-span steel It is more difficult to promote Large-span Steel Box Beam at this time for box beam.
Invention content
For deficiencies of the prior art, it is an object of the invention to propose a kind of steel case of large span bondbeam Beam lift structure and method for improving, this structure combine this method for improving to reduce gantry hoisting frame occupation of land width, save track Grading expense when laying, good economy performance.
To achieve the above object, the technical solution adopted by the present invention is as follows:
In a first aspect, a kind of steel box-girder lift structure of large span bondbeam, including gantry hoisting frame, described gantry are promoted Frame includes crossbeam and two support columns, crane trolley is provided on the crossbeam, the upper end of two support column is respectively to crossbeam Both ends head is supported and lower end is both provided with walking carriage, it is characterised in that:Further include being arranged on bridge top and along bridge Beam moves towards the In Reinforced Concrete Box Girder of setting, and two upper end of support column is concordant, lower end has difference in height to form high support column It is arranged in In Reinforced Concrete Box Girder upper surface, the low support with the walking carriage of low support column, the lower end of the high support column The walking carriage of the lower end of column is arranged on ground.
This structure is using cast-in-place good In Reinforced Concrete Box Girder as the rail of the high support column walking carriage of gantry hoisting frame Road paved surface reduces gantry hoisting frame and takes up an area width, solves that city narrow space, mountain area etc. be bad or complicated landform item Bridge problem in the promotion of the steel box-girder of large span bondbeam under part.
Further, In Reinforced Concrete Box Girder upper surface of the present invention is equipped with high support column walking rail along bridge trend Road, the high support column walking track are adapted with the walking carriage of the lower end of high support column;Ground is equipped with along bridge trend Low support column walking track, the low support column walking track are adapted with the walking carriage of the lower end of low support column;The height Support column walk track and low support column walking track height difference it is always consistent and lateral distance is always consistent.
Further, beam surface upper of the present invention is provided with crane trolley track, the lifting platform along its length Vehicle is run along crane trolley track.Crane trolley lifts steel box-girder along bridge width direction along crane trolley track.
Further, low support column side of the present invention is provided with lifting equipment operation room, the lifting equipment operation Between highly be higher than In Reinforced Concrete Box Girder upper surface.Operating personnel control the fortune of walking carriage and crane trolley between equipment operation Row.Promotion state in higher position personal observations' steel box-girder easy to operation is set between equipment operation.
Further, crossbeam of the present invention and two support columns are all made of square steel tube and angle steel is welded.
A kind of second aspect, steel box-girder method for improving of large span bondbeam, includes the following steps:
1)When bridge construction is to the steel box-girder lift structure for meeting setting large span bondbeam, large span knot is set Close the steel box-girder lift structure of beam;
2)Utilize step 1)Crane trolley in the steel box-girder lift structure of the large span bondbeam of setting plays steel box-girder It hangs corresponding position and is accordingly constructed, until the steel box-girder lifting of the position finishes;
3)After In Reinforced Concrete Box Girder in front of the steel box-girder lift structure of large span bondbeam is routed to setting length, The steel box-girder lift structure of large span bondbeam is moved along certain distance by the walking carriage on height support column, then Steel box-girder lifting and corresponding construction are carried out again;
4)Repeat step 3), until the lifting of all steel box-girders finishes.
Further, step 1 of the present invention)The detailed process of the steel box-girder lift structure of the large span bondbeam of middle setting For:
1.1)Construction bridges move towards laying In Reinforced Concrete Box Girder on bridge top along bridge;
1.2)The In Reinforced Concrete Box Girder upper surface that setting is moved towards along bridge to bridge top is cleared up, to bridge side Ground carry out cure process;
1.3)In Reinforced Concrete Box Girder upper surface after the cleaning is laid with high support column walking track, ground after curing It is upper to be laid with low support column walking track;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
Compared with prior art, the beneficial effects are mainly as follows:
1, this structure combines this method for improving using cast-in-place good In Reinforced Concrete Box Girder as gantry hoisting frame high branch The track laying face of dagger walking carriage reduces gantry hoisting frame and takes up an area width, solves city narrow space, mountain area etc. no Bridge problem in the promotion of the steel box-girder of large span bondbeam under good or MODEL OVER COMPLEX TOPOGRAPHY, grading when saving track laying Expense, good economy performance.
2, gantry hoisting frame can integrally be run along bridge length side, and the crane trolley of beam surface upper setting can be along bridge Steel box-girder is transported in beam width direction, and constructing operation is flexible, and construction efficiency is high.
Description of the drawings
Fig. 1 is the steel box-girder lift structure schematic diagram of the large span bondbeam of the embodiment of the present invention.
In attached drawing:The gantry 1- hoisting frame;2- bridges;The ground 3-;
11- high support columns;The low support columns of 12-;13- crossbeams;14- walking carriages;15- crane trolleys;16- lifting equipments are grasped Between work;21- In Reinforced Concrete Box Girders;22- steel box-girders.
Specific implementation mode
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, a kind of steel box-girder lift structure of large span bondbeam of the present embodiment, including gantry hoisting frame 1 With In Reinforced Concrete Box Girder 21, gantry hoisting frame 1 includes crossbeam 13 and two support columns, two upper end of support column is concordant, Lower end has difference in height to form high support column 11 and low support column 12, the crossbeam 13, high support column 11 and low support column 12 It is all made of square steel tube and angle steel is welded.Crane trolley 15, the high support column 11 and low support column are provided on crossbeam 13 12 upper end is supported respectively to the both ends head of crossbeam 13 and lower end is both provided with walking carriage 14.The armored concrete The setting of box beam 21 moves towards setting on 2 top of bridge and along bridge 2, and the setting of walking carriage 14 of the lower end of the high support column 11 exists The walking carriage 14 of 21 upper surface of In Reinforced Concrete Box Girder, the lower end of the low support column 12 is arranged on ground 3.
This structure is using cast-in-place good In Reinforced Concrete Box Girder 21 as the walking platform of 1 high support column 11 of gantry hoisting frame The track laying face of vehicle 14, reduce gantry hoisting frame 1 take up an area width, solve city narrow space, mountain area etc. it is bad or Bridge problem in the promotion of the steel box-girder of large span bondbeam under MODEL OVER COMPLEX TOPOGRAPHY, saves the walking platform of 11 lower end of high support column Grading expense, good economy performance when the track laying of vehicle 14.Gantry hoisting frame 1 can integrally be run along 2 length side of bridge, horizontal The crane trolley 15 of 13 upper surface of beam setting can transport steel box-girder 22 along 2 width direction of bridge, and constructing operation is flexible, construction effect Rate is high.
As shown in Figure 1, in this structure, 21 upper surface of In Reinforced Concrete Box Girder is equipped with high support column row along the trend of bridge 2 Track is walked, the high support column walking track is adapted with the walking carriage 14 of the lower end of high support column;It is walked along bridge 2 on ground 3 It walks track to low support column is equipped with, the low support column walking track and 14 phase of walking carriage of the lower end of low support column are fitted Match;The height difference of the high support column walking track and low support column walking track is always consistent and lateral distance remains Unanimously.13 upper surface of crossbeam is provided with crane trolley track along its length, and the crane trolley 15 is transported along crane trolley track Row(Steel box-girder 22 is lifted along bridge width direction).
As shown in Figure 1, in this structure, 12 side of low support column is provided with lifting equipment operation room 16, the lifting equipment 16 height of operation room is higher than 21 upper surface of In Reinforced Concrete Box Girder;Operating personnel's 16 control 14 He of walking carriage between equipment operation The operation of crane trolley 15,16 are arranged the promotion shape in higher position personal observations' steel box-girder 22 easy to operation between equipment operation State.Specifically, it in practical operation, needs to carry out clearly 21 upper surface of In Reinforced Concrete Box Girder before being laid with high support column walking track Reason;It needs to carry out cure process to ground before being laid with low support column walking track, to ensure the operational safety of walking carriage.It is promoted to The steel box-girder 22 of 21 upper surface of In Reinforced Concrete Box Girder is moved to by the tripod for being arranged in 21 upper surface of In Reinforced Concrete Box Girder Designated position.
A kind of steel box-girder method for improving of large span bondbeam, includes the following steps:
1)When the construction of bridge 2 is to the steel box-girder lift structure for meeting setting large span bondbeam, large span is set The steel box-girder lift structure of bondbeam;
2)Utilize step 1)Crane trolley 15 in the steel box-girder lift structure of the large span bondbeam of setting is by steel box-girder 22 are lifted to corresponding position and are accordingly constructed, until the lifting of steel box-girder 22 of the position finishes;
3)In Reinforced Concrete Box Girder 21 in front of the steel box-girder lift structure of large span bondbeam is routed to setting length Afterwards, the steel box-girder lift structure of large span bondbeam is moved along by a spacing by the walking carriage 14 on height support column From then carrying out the lifting of steel box-girder 22 and corresponding construction again;
4)Repeat step 3), until the lifting of all steel box-girders 22 finishes.
Step 1 of the present invention)The detailed process of the steel box-girder lift structure of the large span bondbeam of middle setting is:
1.1)Construction bridges 2 move towards laying In Reinforced Concrete Box Girder 21 on bridge top along bridge 2;
1.2)21 upper surface of In Reinforced Concrete Box Girder that setting is moved towards along bridge 2 to 2 top of bridge is cleared up, to bridge The ground 3 of 2 sides carries out cure process;
1.3)21 upper surface of In Reinforced Concrete Box Girder after the cleaning is laid with high support column walking track, ground after curing Low support column walking track is laid on face 3;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
Finally, it should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although Shen It asks someone to describe the invention in detail with reference to preferred embodiment, it will be understood by those of ordinary skill in the art that, to this hair Bright technical solution is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered at this In the right of invention.

Claims (6)

1. a kind of steel box-girder method for improving of large span bondbeam, it is characterised in that:Include the following steps:
1)When bridge construction is to the steel box-girder lift structure for meeting setting large span bondbeam, large span bondbeam is set Steel box-girder lift structure;
The steel box-girder lift structure of the large span bondbeam includes gantry hoisting frame, and gantry hoisting frame includes crossbeam and two Support column is provided with crane trolley on the crossbeam, and the both ends head of crossbeam is respectively propped up in the upper end of two support column Support and lower end be both provided with walking carriage, further include be arranged bridge top and along bridge move towards be arranged reinforced concrete box Beam, two upper end of support column is concordant, lower end has difference in height to form high support column and low support column, the high support column The walking carriage setting of lower end is arranged in In Reinforced Concrete Box Girder upper surface, the walking carriage of the lower end of the low support column on ground Face;
2)Utilize step 1)Steel box-girder is lifted to by the crane trolley in the steel box-girder lift structure of the large span bondbeam of setting Corresponding position is simultaneously accordingly constructed, until the steel box-girder lifting of the position finishes;
3)After In Reinforced Concrete Box Girder in front of the steel box-girder lift structure of large span bondbeam is routed to setting length, pass through The steel box-girder lift structure of large span bondbeam is moved along certain distance by the walking carriage on height support column, then again into Row steel box-girder lifts by crane and corresponding construction;
4)Repeat step 3), until the lifting of all steel box-girders finishes.
2. the steel box-girder method for improving of large span bondbeam according to claim 1, it is characterised in that:The reinforced concrete Native box beam upper surface is equipped with high support column walking track, the high support column walking track and high support column along bridge trend The walking carriage of lower end is adapted;Ground is equipped with low support column walking track, the low support column walking rail along bridge trend Road is adapted with the walking carriage of the lower end of low support column;The height of the high support column walking track and low support column walking track Poor always consistent and lateral distance is always consistent.
3. the steel box-girder method for improving of large span bondbeam according to claim 1 or 2, it is characterised in that:The crossbeam Upper surface is provided with crane trolley track along its length, and the crane trolley is run along crane trolley track.
4. the steel box-girder method for improving of large span bondbeam according to claim 1 or 2, it is characterised in that:The low branch Dagger side is provided with lifting equipment operation room, and the lifting equipment operation room height is higher than In Reinforced Concrete Box Girder upper surface.
5. the steel box-girder method for improving of large span bondbeam according to claim 1, it is characterised in that:The crossbeam and two Support column is all made of square steel tube and angle steel is welded.
6. the steel box-girder method for improving of large span bondbeam according to claim 1 or 2, it is characterised in that:Step 1)If The detailed process for setting the steel box-girder lift structure of large span bondbeam is:
1.1)Construction bridges move towards laying In Reinforced Concrete Box Girder on bridge top along bridge;
1.2)The In Reinforced Concrete Box Girder upper surface that setting is moved towards along bridge to bridge top is cleared up, to the ground of bridge side Face carries out cure process;
1.3)In Reinforced Concrete Box Girder upper surface after the cleaning is laid with high support column walking track, ground upper berth after curing The track if low support column is walked;
1.4)The steel box-girder lift structure of large span bondbeam is installed.
CN201710713823.2A 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam Active CN107311047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710713823.2A CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710713823.2A CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Publications (2)

Publication Number Publication Date
CN107311047A CN107311047A (en) 2017-11-03
CN107311047B true CN107311047B (en) 2018-09-28

Family

ID=60176739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710713823.2A Active CN107311047B (en) 2017-08-18 2017-08-18 The steel box-girder lift structure and method for improving of large span bondbeam

Country Status (1)

Country Link
CN (1) CN107311047B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056541A (en) * 2018-08-28 2018-12-21 中国二十冶集团有限公司 Transportation resources from ground transport I-beam to bridge floor
CN110331672A (en) * 2019-08-14 2019-10-15 中交一公局第一工程有限公司 Across the pier bale handle holder device in bridge side position and its simple and fast construction method
CN110878530B (en) * 2019-12-27 2021-06-11 中交二公局东萌工程有限公司 Installation and construction method of steel box girder of steel structure bridge

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04116011A (en) * 1990-09-05 1992-04-16 Oriental Kensetsu Kk Horizontal pick-up for precast concrete column equipment
CN201961992U (en) * 2011-03-31 2011-09-07 四川川交路桥有限责任公司 High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns
CN203877780U (en) * 2014-05-15 2014-10-15 中交四公局第三工程有限公司 High-leg and low-leg handle gantry crane for road
CN205257790U (en) * 2015-12-30 2016-05-25 中铁十二局集团有限公司 Fixed high -low leg handle portal crane
CN205772854U (en) * 2016-05-31 2016-12-07 北京市政建设集团有限责任公司 The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN106760684B (en) * 2017-02-28 2024-01-09 中国五冶集团有限公司 Reading board installation system and installation method
CN207078928U (en) * 2017-08-18 2018-03-09 中冶建工集团有限公司 A kind of steel box-girder lift structure of large span bondbeam

Also Published As

Publication number Publication date
CN107311047A (en) 2017-11-03

Similar Documents

Publication Publication Date Title
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN104727227B (en) A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN102433844B (en) Method for erecting prefabricated beam of bridge deck
CN107311047B (en) The steel box-girder lift structure and method for improving of large span bondbeam
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN102943440A (en) Method for constructing bridges
CN100497833C (en) High-altitude framework type simple plate supporting machine
CN105648908A (en) Decorating trolley used for crossing existing lines or crossing bridges and construction method
CN205711757U (en) Section assembling truss double beam girder erecting machine
CN108004931B (en) Using the method for mixing drag-line construction steel reinforced concrete combination beam
CN207078928U (en) A kind of steel box-girder lift structure of large span bondbeam
CN204023336U (en) A kind of subway track-laying machine
CN102409612A (en) Beam erecting process of cantilever gantry crane conversion platform crossing existing railway line
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN207987749U (en) Ride cable-styled erection crane
CN214737765U (en) Prefabricated assembly component erecting equipment capable of walking by means of front and rear inverted rails
CN104370217B (en) Portal crane for paving bridge decks
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN205874987U (en) Simply put up bridge crane
CN107604825A (en) The bridging method of T-shaped beam bridge
CN209384613U (en) Soft platform for mounting daylighting roof steel structure
CN208702215U (en) Overhead station
CN203382408U (en) Portal crane for paving bridge decks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant