Invention content
The present invention is in view of the above-mentioned problems of the prior art, provide a kind of construction project environment examination & approval of overall monitor
System.
In order to achieve the above purpose, the present invention uses following technical measures:
A kind of construction project environment approval system of overall monitor, including electronic monitoring system, the electronic monitoring system use
Electronic monitoring platform is directly docked with the examination & approval of functional department management system, the automatic management module of acquisition routine monitoring in real time, item
The project information of mesh information management module, emergency monitoring management module and user feedback module carries out synchronous complete monitoring;
It is operation information progress preliminary hearing that electronic monitoring system is submitted by the examination & approval management system, environmental impact assessment, examination, right
Task performance, executive condition and the workload of handler carries out whole tracking and supervision, to each subordinate's function portion
The examination & approval situation real-time tracking of door, by approval results communication transfer to person in charge of the project's unit, and is announced by information announcement platform
Approval results;
The routine monitoring management module will analyze the priority pollutants reply amount such as COD, SO2 real-time tracking, calculating, analysis
As a result it is uploaded to the electronic monitoring system;
The project dynamic that project information management module collection person in charge of the project's unit reports, unites to the construction project of construction
Meter summarizes and generates report, and the contents such as progress, the problem to be solved of record reflection current project can be with stored items
All historical records of progress;
The user feedback module collection, filtering, sorted users feedback information, to feedback information carry out statistics and analysis, and
It is sent to the electronic monitoring system.
Preferably, the examination & approval management system includes first order examination & approval platform, second level examination & approval platform and the third level
Platform is examined, the first order is examined platform and managed concentratedly to the project information being collected into, and carries out preliminary hearing, environment shadow to construction project
Assessment and current project result acceptance are rung, review result reports the second level to examine platform;The second level examination & approval platform is collected pre-
The approval information in the stage of examining, including approver, examination & approval time, approval results, and the examination & approval situation of each subordinate unit is answered
It examines, review project includes:Formality, project feasibility examining report, building engineering construction license, construction speed are permitted in project planning
Six contents such as record sheet, pollutant monitoring report and environment remediation scheme, review result report the third level to examine platform;Institute
It states the case where third level examination & approval platform is further audited to criticizing information again, integrates each regional construction project examination and makes rule
It draws and final review to the problem of construction project as a result, proposes that solution, approval results at different levels are published to institute automatically
State person in charge of the project's unit and information announcement platform.
Preferably, the routine monitoring management module includes generalized information system, data storage subsystem, dangerous situation monitoring system
With Online monitoring of pollution sources system, the generalized information system checks the distributing position of construction project by GIS-Geographic Information System, for defeated
Enter, store, inquire, analyze and show the geodata of construction project;The Online monitoring of pollution sources system includes the discharge of sewage
Monitor, COD concentration monitors, flue gas flow and total emission volumn monitor, flue dust, CO, SO2, Nox concentration monitor, use
In the pollution index of detection construction project environment;The dangerous situation monitoring system includes seismic detector and infrared flame detector, is used for
Monitor the security risk of construction project;The data storage subsystem is to the generalized information system, Online monitoring of pollution sources subsystem
Monitoring data are collected, store, calculate, analyze, and analysis result is uploaded to the electronic monitoring system.
It is imported and verification system, project data storage management preferably, the project information management module includes data
Module and construction project supervisory systems, the construction project supervisory systems are used for specifying the construction site of construction project environment to believe
The construction behavior of breath, the storage of building materials, storage and service condition, construction progress, construction personnel carries out remote supervisory,
And can each construction project of real time inspection video monitoring picture;The project data memory management module to the data import with
Verification system, the monitoring data of construction project supervisory systems are collected, store, summarize, and generation actually accomplishes value, passes through comparison
Internal control index and value is actually accomplished, in systems real-time record index completeness, by analysis result synchronized upload to the electronics
Observation system;The data import the construction project information for being used to record project responsible institution with verification system, and the person in charge of the project is single
Position is added the content of project information according to construction project progress, changes, and according to permission typing project dynamic, for described
Examination & approval management system is called at any time.
Preferably, the construction project information include construction material information, construction equipment information, construction detection information,
The elements such as construction essential information, every settlement information, every environmental protection tests result.
Preferably, the emergency monitoring management module includes emergency plan bulletin platform, panic alarm system and answers
Anxious rescue system, the emergency plan bulletin platform are used to announce the different of the current project of the project information management module reflection
Reason condition, the construction contents such as hidden danger and problem to be solved, and announce the examination & approval management system and be directed to the construction project
There are the problem of proposed solution;The panic alarm system carries out alarm operation to exceeding the status of criterion, and to danger
Exceeded situation carries out force start emergency rescue system operation;The emergency rescue system includes signal help-asking system, fire-fighting system
System and ventilating system, the signal help-asking system communication connect relevant dangerous situation and rescue department, and dangerous situation rescue department sends rescue
Personnel carry out dangerous situation rescue work.
Preferably, the fire-fighting system includes multigroup fire extinguishing unit, the fire extinguishing unit includes extinguishing device, solenoid valve
And water inlet line, the extinguishing device connects the water inlet line, and is electrically connected with the solenoid valve being installed on water inlet line,
Solenoid valve starts, and extinguishing device is opened, and water inlet line is discharged water by extinguishing device;The ventilating system includes multigroup concatenated row
Gas fan, driving device, the driving device are connected with the exhaust fan, and driving device starts, and multigroup exhaust fan is driven to be dissipated
Heat and exhaust ventilation operation.
Preferably, the user feedback module includes that Cloud Server and multiple data receivers being connect with Cloud Server are whole
End;The Cloud Server includes information extraction modules, information filtering module, information sort module and database module, described
Database module include key data library unit and basic data library unit, the information sort module includes similarity
Computing unit and result taxon;The output end of the data receiving terminal is connect with information extraction modules, information extraction
The output end of module is connect with information filtering module, and the output end of information filtering module is connect with similarity calculated, similar
The output end of degree computing unit is connect with result taxon;The key data library unit connects with information filtering module
It connects, the basic data library unit is connect with similarity calculated.
Preferably, the user feedback module also includes result statistical analysis unit, as a result statistical analysis unit is used for
The classification information acquired to result taxon analyzes and counts, and the statistical analysis unit includes that public sentiment figure generates mould
Block, report generation module, trend analysis module and profile analysis module.
Preferably, the public sentiment figure generation module generates task public sentiment figure, including letter according to class condition and keyword
Cease quantity statistics, acceptance of the bid keyword quantity statistics and user feedback number statistic of classification;The report generation module is used for basis
Feedback result information generates report;The trend analysis module is for generating increment graph;The profile analysis module is for generating
Task list, website distribution map and media distribution figure.
The beneficial effects of the present invention are:
The approval process of project is combined by the construction project environment approval system of overall monitor of the present invention with electronic monitoring system,
Various project examination materials, which are provided, from traditional person in charge of the project's unit knows that the form of development of projects is changed into government(Approval function
Department)The progress for monitoring construction project in real time, risk government caused by construction project(Approval function department)It can be at first
Between know, prevented the possibility of person in charge of the project's unit concealment, the controllability of construction project be continuously improved, and user can pass through
User feedback module proposes feedback opinion to approval system, pinpoints the problems in time convenient for relevant department, reduces government(Approval function
Department)To the information channel dependence of person in charge of the project's unit, and approval information is to push to person in charge of the project's unit instant messaging
The mode of system interface carries out project examination, can improve project examination efficiency in this way, can be fast implemented to departments of examination and approval
The electronic disposal of construction project to control environmental pollution and ecological disruption, implements overall control, ensures the important of scientific development
Informationization is of great significance.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, a kind of construction project environment approval system of overall monitor, including electronic monitoring system 10, it is described
Electronic monitoring system 10 is directly docked with electronic monitoring platform with the examination & approval of functional department management system 20, automatic acquisition in real time
The item of routine monitoring management module 30, project information management module 40, emergency monitoring management module 50 and user feedback module 60
Mesh information carries out synchronous complete monitoring;
The operation information that electronic monitoring system 10 is submitted is carried out preliminary hearing, environmental impact assessment, tested by the examination & approval management system 20
It receives, whole tracking and supervision is carried out to the task performance, executive condition and workload of handler, to each subordinate's duty
The examination & approval situation real-time tracking of energy department, by approval results communication transfer to person in charge of the project's unit 80, and it is flat by information announcement
Platform 70 announces approval results;
The routine monitoring management module 30 will divide the priority pollutants reply amount such as COD, SO2 real-time tracking, calculating, analysis
Analysis result is uploaded to the electronic monitoring system 10;
Project that 40 assembled item responsible institution 80 of the project information management module reports dynamic, to the construction project of construction into
Row statistics summarizes and generates report, and the contents such as progress, the problem to be solved of record reflection current project can store
All historical records of development of projects;
The collection of user feedback module 60 is filtered, the feedback information of sorted users, and statistics and analysis is carried out to feedback information,
And it is sent to the electronic monitoring system 10.
Wherein, the effect of the user feedback module 60 is anti-from third-party project to the offer of electronic monitoring system 10
Feedforward information, the examination & approval management system 20 of the functional department can obtain this by the electronic monitoring platform of electronic monitoring system 10 and build
If the project examination information of project, the dynamic and problem to be solved of project are supervised in real time, it can be flat by information announcement
Platform 70, emergency monitoring management module 50 announce monitoring result and solution, and by monitoring result communication transfer to project master
Pipe unit 80.Wherein, person in charge of the project's unit 80 can be come from by project information management module 40 to the examination & approval offer of management system 20
The construction project information of second party feedback carries out statistics and analysis convenient for examination & approval management system 20, is conducive to functional department(Political affairs
Mansion)It concentrates and examines, reduce the possibility that project information is faked and occur, while also reducing the potential risk of construction project.
The user feedback module 60 can be mobile terminal, service terminal, the network terminal or communicating terminal, and the user is anti-
It can be mobile terminal, service terminal, the network terminal or communicating terminal to present module 60, and user feedback module 60 can be using object
The crowds such as construction project user, construction project construction personnel, the supervision unit of construction project or eye witness;The project information
The application of management module 40 is person in charge of the project's unit 80, such as item cost accounting team, enterprise or individual.
It, can be by the approval process of project in net by means of the above-mentioned construction project environment approval system of the embodiment of the present invention
The various approval informations completed, and can provided by means of examining the approval process of management system 20 on network terminal platform, examination & approval
Various notices the mobile terminal of person in charge of the project's unit 80 is sent in a manner of short message or phone, and conventional prison can be passed through
Survey management module 30 to the priority pollutants reply amount real-time tracking such as the flue dust of construction project environment, COD, SO2, Nox, calculating,
Analysis arrives at construction project place casing without dispatch personnel and obtains the pollution monitoring of construction project environment as a result, functional department
Examination & approval management system 20 can to person in charge of the project's unit 80 send examination & approval instruction, simplify approval function department to construction project
Approach is known in environmental assessment, can effectively improve the efficiency of the regulation of construction project environment.
On the basis of the above embodiments, the present embodiment is discussed further the construction project environment approval system of the present invention.
Optionally, in one embodiment, the examination & approval management system 20 includes that the first order examines platform 21, the second level is examined
Criticize flat platform 22 and the third level examine platform 23, and the first order is examined platform 21 and managed concentratedly to the project information being collected into, and right
Construction project carries out preliminary hearing, environmental impact assessment and current project result acceptance, and review result reports the second level to examine platform 22;
The second level examination & approval platform 22 collects the approval information of preparatory examination stage, including approver, examination & approval time, approval results, and right
The examination & approval situation of each subordinate unit carries out review, and review project includes:Formality, project feasibility detection report are permitted in project planning
Six contents such as announcement, building engineering construction license, construction speed record sheet, pollutant monitoring report and environment remediation scheme,
Review result reports the third level to examine platform 23;The third level examination & approval platform 23 is further audited to criticizing information again,
The case where comprehensive each regional construction project examination, makes planning and final review as a result, being proposed to the problem of construction project
Solution, approval results at different levels are published to person in charge of the project's unit 80 and information announcement platform 70 automatically.
The first order examination & approval platform 21 is responsible for examination & approval by grade functional department of counties and districts, and platform 22 is examined by city in the second level
Grade functional department is responsible for examination & approval, and the third level examination & approval platform 23 is responsible for examination & approval by provincial functional department, and the functional department relates to
And environmental protection administration, auditing department and quality monitoring department, provide comprehensive solution party by province, city, multistage approval function department of counties and districts
Case and approval results meet various informatization situations, and regional construction project examination comprehensive management and supervision are realized in perfection, can
Realize different situations under local all subordinate units examination and approval project centralized management and report, and with province office construction project
Data reporting system Seamless integration-.
Optionally, in one embodiment, the routine monitoring management module 30 includes generalized information system 31, data storage
System 32, dangerous situation monitoring system 33 and Online monitoring of pollution sources system 34, the generalized information system 31 are checked by GIS-Geographic Information System
The distributing position of construction project, the geodata for inputting, storing, inquire, analyze and showing construction project, the examination & approval pipe
Reason system 20 can be by the distribution situation of each regional construction project of 31 real time inspection of generalized information system, can be by construction type, construction area
The various ways such as domain, building time, project type are for statistical analysis, grasp the construction situation in region in real time, are convenient for state-owned soil
The pool and planning on ground can also spot-check specified construction project environment, grasp the current dynamic for specifying construction project in real time;The dirt
Dye source on-line monitoring system 34 is arranged in construction project place, the pollutant for detecting hazard program environment, the pollution sources
On-line monitoring system 34 include discharge of sewage monitor, COD concentration monitors, flue gas flow and total emission volumn monitor, flue dust,
CO、SO2, Nox concentration monitor, the priority pollutant reply amount for detecting construction project environment is dirty convenient for real time monitoring
Situation is contaminated, departments of examination and approval is also allowed for and carries out environmental impact assessment in real time;Dangerous situation monitoring system 33 includes seismic detector and infrared
Flame detector, the security risk for monitoring construction project;The data storage subsystem 32 is to the generalized information system 31, danger
Feelings monitoring system 33, the monitoring data of Online monitoring of pollution sources subsystem 34 are collected, store, calculate, analyze, and analysis is tied
Fruit is uploaded to the electronic monitoring system 10.
In practice, every environment protection index is set up in routine monitoring management module 30, wherein including polluted-water
Emission limit value, dangerous gas concentration limit value and gas turbidity coefficient standard value etc., pass through Online monitoring of pollution sources
System 34.
Optionally, in one embodiment, the project information management module 40 include data import with verify system 41,
Project data memory management module 42 and construction project supervisory systems 43, the construction project supervisory systems 43 are used to build to specified
If the construction site information of project environment, the storage of building materials, storage and service condition, construction progress, construction personnel
Construction behavior carry out remote supervisory, and can each construction project of real time inspection video monitoring picture;The project data storage
Management module 42, which imports the data, to be collected with the monitoring data of verification system 41, construction project supervisory systems 43, deposits
It stores up, summarize, generation actually accomplishes value, and by comparing internal control index and actually accomplishing value, real-time record index is completed in systems
Degree, by analysis result synchronized upload to the electronic monitoring system;The data are imported with verification system 41 for recording project
The construction project information of responsible institution, person in charge of the project's unit 80 add the content of project information according to construction project progress
Add, change, and according to permission typing project dynamic, is called at any time for the examination & approval management system 20.
During the project implementation, as the actually accomplishing of projects amount, new procurement contract are signed and are come into force, constantly
The data by project management related service make a report on, examine, being aggregated into project information management module 40, generation actually accomplishes value.
By comparing internal control index and actually accomplishing value, index completeness is monitored in real time in systems, so as to project examination functional department
Grasp project totality business circumstance, and can pinpoint the problems, make a policy in time.
Specifically, the construction project information includes construction material information, construction equipment information, construction detection information, applies
The elements such as work essential information, every settlement information, every environmental protection tests result.The construction material information includes that material cost is pre-
Calculation, shopping list, project material expenditure planning chart, storage inventory etc.;The construction equipment information includes equipment fault and repair
Record, equipment purchasing inventory, equipment leasing contract etc.;The construction detection information includes project quality examining report, construction inspection
Survey contract, construction behavioural norm model etc.;The construction essential information includes construction speed report, construction personnel's quantity, construction
Plan, construction contract, builder's diary etc.;The items settlement information pays proof, adopts expenditure comprising wages advice of settlement, social security
Proof, project income proof etc., by the typing and update of these project information, convenient for approval function, department grasps project in real time
Progress situation is convenient for the planning and management in later stage.
Optionally, in one embodiment, the emergency monitoring management module 50 includes emergency plan bulletin platform 51, answers
Anxious warning system 52 and emergency rescue system 53, the emergency plan bulletin platform 51 is for announcing the project information management
Abnormal conditions, the construction contents such as hidden danger and problem to be solved for the current project that module 40 reflects, and announce described examine
Batch management system 20 for the construction project there are the problem of proposed solution;The panic alarm system 52 includes alarm
Device carries out alarm operation to exceeding the status of criterion, and carries out force start emergency rescue system 53 to dangerous exceeded situation and operate;
The emergency rescue system 53 includes signal help-asking system 54, fire-fighting system 55 and ventilating system 56, the signal help-asking system
54 communications connect relevant dangerous situation and rescue department, and dangerous situation rescue department sends rescue personnel to carry out dangerous situation rescue work.
The fire-fighting system 55 include multigroup fire extinguishing unit, the fire extinguishing unit include extinguishing device, solenoid valve and into
Waterpipe, the extinguishing device connects the water inlet line, and is electrically connected with the solenoid valve being installed on water inlet line, solenoid valve
Start, extinguishing device is opened, and water inlet line is discharged water by extinguishing device, and the extinguishing device is fire water spray nozzle;It is described logical
Wind system 56 includes multigroup concatenated exhaust fan, driving device, and the driving device is connected with the exhaust fan, and driving device opens
It is dynamic, drive multigroup exhaust fan to be radiated and be vented ventilation operation.
The infrared flame detector of the dangerous situation monitoring system 33 detects flame signal and transmits a signal to emergent prison
Management module 50,50 force start panic alarm system 52 of emergency monitoring management module and emergency rescue system 53 are surveyed, and will
The automatic danger signal that uploads is to electronic monitoring system 10 so that approval function department when dangerous situation occurs, project management unit 80 can
Knowing at the first time, the examination & approval management system 20 is for the proposed solution of dangerous situation and announces flat in emergency plan bulletin
Platform 51 is read for construction project construction personnel, so that construction personnel takes corresponding emergency measure to reduce dangerous situation risk in time.
Optionally, in one embodiment, the user feedback module 60 includes Cloud Server 61 and multiple and cloud service
The data receiving terminal 62 that device 61 connects;The Cloud Server 61 includes information extraction modules 63, information filtering module 64, letter
Sort module 65 and database module 66 are ceased, the database module 66 includes key data library unit 661 and basic number
According to library unit 662, the information sort module 65 includes similarity calculated 651 and result taxon 652;Described
The output end of data receiving terminal 62 is connect with information extraction modules 63, output end and the information filtering mould of information extraction modules 63
Block 64 connects, and the output end of information filtering module 64 connect with similarity calculated 651, similarity calculated 651 it is defeated
Outlet is connect with result taxon 652;The key data library unit 661 is connect with information filtering module 64, described
Basic data library unit 662 connect with similarity calculated 651.
Data receiving terminal 62 receives information input by user, includes the information sended over by wireless terminal and wired
The information that terminal sends over, information extraction modules 63 carry out keyword extraction, information mistake to the information of data receiving terminal 62
Filter module 64 is filtered processing to keyword, by making comparisons with the data of key data library unit 661, will contain key
The information of word is classified, and the information for completing filtration treatment is carried out similarity with basic data library unit 662 to be compared, and will be extracted
Go out the information containing keyword and be merged into a set, will be stored in the information storage classified to basic data library unit 662,
Calculate the frequency of occurrences for the keyword that basic data library unit 662 is calculated by result taxon 652 in the set.
More preferably, the user feedback module 60 also includes result statistical analysis unit 67, as a result statistical analysis unit 67
Classification information for being acquired to result taxon 652 analyzes and counts, and the statistical analysis unit 67 includes carriage
Feelings figure generation module 671, report generation module 672, trend analysis module 673 and profile analysis module 674.The public sentiment figure life
Task public sentiment figure, including information content statistics, acceptance of the bid keyword quantity system are generated according to class condition and keyword at module 671
Meter and user feedback number statistic of classification;The report generation module 672 is used to generate report according to feedback result information;It is described
Trend analysis module 673 is for generating increment graph;The profile analysis module 674 is for generating task list, website distribution map
With media distribution figure.It is by the result statistical analysis unit 67 that the information of user feedback is for statistical analysis, generate analysis
Figure obtains frequency, number, type and the trend of user feedback problem convenient for approval function department, real-time convenient for functional department
Grasp project situation, convenient for management.
In conclusion the construction project environment approval system of the application overall monitor supervises the approval process of project and electronics
The system of examining is combined, and providing various project examination materials from traditional person in charge of the project's unit knows that the form of development of projects is changed into
Government(Approval function department)The progress for monitoring construction project in real time, risk government caused by construction project(Approval function portion
Door)It can know at the first time, prevent the possibility of person in charge of the project's unit concealment, the controllability of construction project is constantly carried
Height, and user can propose feedback opinion by user feedback module to approval system, pinpoint the problems, drop in time convenient for relevant department
Low government(Approval function department)To the information channel dependence of person in charge of the project's unit, and approval information is to push to project master
The mode at pipe unit instant communicating system interface carries out project examination, project examination efficiency can be improved in this way, to examination & approval portion
Door can fast implement the electronic disposal of construction project, to control environmental pollution and ecological disruption, implement overall control, guarantee
The important information of scientific development, is of great significance.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that
The specific implementation of the present invention is confined to these explanations.For those of ordinary skill in the art to which the present invention belongs, exist
Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the present invention's
Protection domain.