CN108510248A - A kind of construction project environment approval system of overall monitor - Google Patents

A kind of construction project environment approval system of overall monitor Download PDF

Info

Publication number
CN108510248A
CN108510248A CN201810306426.8A CN201810306426A CN108510248A CN 108510248 A CN108510248 A CN 108510248A CN 201810306426 A CN201810306426 A CN 201810306426A CN 108510248 A CN108510248 A CN 108510248A
Authority
CN
China
Prior art keywords
project
information
approval
construction
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810306426.8A
Other languages
Chinese (zh)
Other versions
CN108510248B (en
Inventor
杨小剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xin Kang Bo Si Information Technology Co Ltd
Original Assignee
Guangdong Xin Kang Bo Si Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xin Kang Bo Si Information Technology Co Ltd filed Critical Guangdong Xin Kang Bo Si Information Technology Co Ltd
Priority to CN201810306426.8A priority Critical patent/CN108510248B/en
Publication of CN108510248A publication Critical patent/CN108510248A/en
Application granted granted Critical
Publication of CN108510248B publication Critical patent/CN108510248B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The invention discloses a kind of construction project environment approval systems of overall monitor, including electronic monitoring system, the electronic monitoring system is directly docked with electronic monitoring platform with the examination & approval of functional department management system, the automatic management module of acquisition routine monitoring in real time, the project information of project information management module, emergency monitoring management module and user feedback module, carry out synchronous complete monitoring, government(Approval function department)The progress of construction project can be monitored in real time, know risk caused by construction project at the first time, the controllability of construction project is continuously improved, and user can propose feedback opinion by user feedback module to approval system, it pinpoints the problems in time convenient for relevant department, the electronic disposal that departments of examination and approval can be fast implemented with construction project is of great significance to control environmental pollution and ecological disruption, the important information for implementing overall control, guarantee scientific development.

Description

A kind of construction project environment approval system of overall monitor
Technical field
The present invention relates to urban construction technical field, more particularly to the construction project environment examination & approval system of a kind of overall monitor System.
Background technology
In recent years, urban construction focus is constantly transferred in people's livelihood engineering project, agent-construction organization range More and more wider, scale of investment also increasingly increases, and how effectively control project risk becomes pendulum one in face of agent-construction organization Item important and pressing task.Existing project risk includes mainly project feasibility risk, construction risk, environment passivity shadow Ring and four aspects such as burst accident, therefore, it is necessary to design a kind of collection construction project examination & approval, environmental impact assessment is analyzed, The construction project approval system that electronic map utilizes and integrated service management is integrated, passes through the system, prefectures and cities of the whole province, counties and districts Environmentally friendly unit can fast implement the electronic disposal of construction project, to control environmental pollution and ecological disruption, implement total amount control System, the important information for ensureing scientific development, are of great significance.
Invention content
The present invention is in view of the above-mentioned problems of the prior art, provide a kind of construction project environment examination & approval of overall monitor System.
In order to achieve the above purpose, the present invention uses following technical measures:
A kind of construction project environment approval system of overall monitor, including electronic monitoring system, the electronic monitoring system use Electronic monitoring platform is directly docked with the examination & approval of functional department management system, the automatic management module of acquisition routine monitoring in real time, item The project information of mesh information management module, emergency monitoring management module and user feedback module carries out synchronous complete monitoring;
It is operation information progress preliminary hearing that electronic monitoring system is submitted by the examination & approval management system, environmental impact assessment, examination, right Task performance, executive condition and the workload of handler carries out whole tracking and supervision, to each subordinate's function portion The examination & approval situation real-time tracking of door, by approval results communication transfer to person in charge of the project's unit, and is announced by information announcement platform Approval results;
The routine monitoring management module will analyze the priority pollutants reply amount such as COD, SO2 real-time tracking, calculating, analysis As a result it is uploaded to the electronic monitoring system;
The project dynamic that project information management module collection person in charge of the project's unit reports, unites to the construction project of construction Meter summarizes and generates report, and the contents such as progress, the problem to be solved of record reflection current project can be with stored items All historical records of progress;
The user feedback module collection, filtering, sorted users feedback information, to feedback information carry out statistics and analysis, and It is sent to the electronic monitoring system.
Preferably, the examination & approval management system includes first order examination & approval platform, second level examination & approval platform and the third level Platform is examined, the first order is examined platform and managed concentratedly to the project information being collected into, and carries out preliminary hearing, environment shadow to construction project Assessment and current project result acceptance are rung, review result reports the second level to examine platform;The second level examination & approval platform is collected pre- The approval information in the stage of examining, including approver, examination & approval time, approval results, and the examination & approval situation of each subordinate unit is answered It examines, review project includes:Formality, project feasibility examining report, building engineering construction license, construction speed are permitted in project planning Six contents such as record sheet, pollutant monitoring report and environment remediation scheme, review result report the third level to examine platform;Institute It states the case where third level examination & approval platform is further audited to criticizing information again, integrates each regional construction project examination and makes rule It draws and final review to the problem of construction project as a result, proposes that solution, approval results at different levels are published to institute automatically State person in charge of the project's unit and information announcement platform.
Preferably, the routine monitoring management module includes generalized information system, data storage subsystem, dangerous situation monitoring system With Online monitoring of pollution sources system, the generalized information system checks the distributing position of construction project by GIS-Geographic Information System, for defeated Enter, store, inquire, analyze and show the geodata of construction project;The Online monitoring of pollution sources system includes the discharge of sewage Monitor, COD concentration monitors, flue gas flow and total emission volumn monitor, flue dust, CO, SO2, Nox concentration monitor, use In the pollution index of detection construction project environment;The dangerous situation monitoring system includes seismic detector and infrared flame detector, is used for Monitor the security risk of construction project;The data storage subsystem is to the generalized information system, Online monitoring of pollution sources subsystem Monitoring data are collected, store, calculate, analyze, and analysis result is uploaded to the electronic monitoring system.
It is imported and verification system, project data storage management preferably, the project information management module includes data Module and construction project supervisory systems, the construction project supervisory systems are used for specifying the construction site of construction project environment to believe The construction behavior of breath, the storage of building materials, storage and service condition, construction progress, construction personnel carries out remote supervisory, And can each construction project of real time inspection video monitoring picture;The project data memory management module to the data import with Verification system, the monitoring data of construction project supervisory systems are collected, store, summarize, and generation actually accomplishes value, passes through comparison Internal control index and value is actually accomplished, in systems real-time record index completeness, by analysis result synchronized upload to the electronics Observation system;The data import the construction project information for being used to record project responsible institution with verification system, and the person in charge of the project is single Position is added the content of project information according to construction project progress, changes, and according to permission typing project dynamic, for described Examination & approval management system is called at any time.
Preferably, the construction project information include construction material information, construction equipment information, construction detection information, The elements such as construction essential information, every settlement information, every environmental protection tests result.
Preferably, the emergency monitoring management module includes emergency plan bulletin platform, panic alarm system and answers Anxious rescue system, the emergency plan bulletin platform are used to announce the different of the current project of the project information management module reflection Reason condition, the construction contents such as hidden danger and problem to be solved, and announce the examination & approval management system and be directed to the construction project There are the problem of proposed solution;The panic alarm system carries out alarm operation to exceeding the status of criterion, and to danger Exceeded situation carries out force start emergency rescue system operation;The emergency rescue system includes signal help-asking system, fire-fighting system System and ventilating system, the signal help-asking system communication connect relevant dangerous situation and rescue department, and dangerous situation rescue department sends rescue Personnel carry out dangerous situation rescue work.
Preferably, the fire-fighting system includes multigroup fire extinguishing unit, the fire extinguishing unit includes extinguishing device, solenoid valve And water inlet line, the extinguishing device connects the water inlet line, and is electrically connected with the solenoid valve being installed on water inlet line, Solenoid valve starts, and extinguishing device is opened, and water inlet line is discharged water by extinguishing device;The ventilating system includes multigroup concatenated row Gas fan, driving device, the driving device are connected with the exhaust fan, and driving device starts, and multigroup exhaust fan is driven to be dissipated Heat and exhaust ventilation operation.
Preferably, the user feedback module includes that Cloud Server and multiple data receivers being connect with Cloud Server are whole End;The Cloud Server includes information extraction modules, information filtering module, information sort module and database module, described Database module include key data library unit and basic data library unit, the information sort module includes similarity Computing unit and result taxon;The output end of the data receiving terminal is connect with information extraction modules, information extraction The output end of module is connect with information filtering module, and the output end of information filtering module is connect with similarity calculated, similar The output end of degree computing unit is connect with result taxon;The key data library unit connects with information filtering module It connects, the basic data library unit is connect with similarity calculated.
Preferably, the user feedback module also includes result statistical analysis unit, as a result statistical analysis unit is used for The classification information acquired to result taxon analyzes and counts, and the statistical analysis unit includes that public sentiment figure generates mould Block, report generation module, trend analysis module and profile analysis module.
Preferably, the public sentiment figure generation module generates task public sentiment figure, including letter according to class condition and keyword Cease quantity statistics, acceptance of the bid keyword quantity statistics and user feedback number statistic of classification;The report generation module is used for basis Feedback result information generates report;The trend analysis module is for generating increment graph;The profile analysis module is for generating Task list, website distribution map and media distribution figure.
The beneficial effects of the present invention are:
The approval process of project is combined by the construction project environment approval system of overall monitor of the present invention with electronic monitoring system, Various project examination materials, which are provided, from traditional person in charge of the project's unit knows that the form of development of projects is changed into government(Approval function Department)The progress for monitoring construction project in real time, risk government caused by construction project(Approval function department)It can be at first Between know, prevented the possibility of person in charge of the project's unit concealment, the controllability of construction project be continuously improved, and user can pass through User feedback module proposes feedback opinion to approval system, pinpoints the problems in time convenient for relevant department, reduces government(Approval function Department)To the information channel dependence of person in charge of the project's unit, and approval information is to push to person in charge of the project's unit instant messaging The mode of system interface carries out project examination, can improve project examination efficiency in this way, can be fast implemented to departments of examination and approval The electronic disposal of construction project to control environmental pollution and ecological disruption, implements overall control, ensures the important of scientific development Informationization is of great significance.
Description of the drawings
Fig. 1 is the block diagram of the construction project environment approval system of overall monitor of the present invention;
Fig. 2 is the block diagram of the examination & approval management system of the construction project environment approval system of overall monitor of the embodiment of the present invention;
Fig. 3 is the block diagram of the routine monitoring management module of the construction project environment approval system of overall monitor of the embodiment of the present invention;
Fig. 4 is the block diagram of the project information management module of the construction project environment approval system of overall monitor of the embodiment of the present invention;
Fig. 5 is the block diagram of the emergency monitoring management module of the construction project environment approval system of overall monitor of the embodiment of the present invention;
Fig. 6 is the block diagram of the user feedback module of the construction project environment approval system of overall monitor of the embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, a kind of construction project environment approval system of overall monitor, including electronic monitoring system 10, it is described Electronic monitoring system 10 is directly docked with electronic monitoring platform with the examination & approval of functional department management system 20, automatic acquisition in real time The item of routine monitoring management module 30, project information management module 40, emergency monitoring management module 50 and user feedback module 60 Mesh information carries out synchronous complete monitoring;
The operation information that electronic monitoring system 10 is submitted is carried out preliminary hearing, environmental impact assessment, tested by the examination & approval management system 20 It receives, whole tracking and supervision is carried out to the task performance, executive condition and workload of handler, to each subordinate's duty The examination & approval situation real-time tracking of energy department, by approval results communication transfer to person in charge of the project's unit 80, and it is flat by information announcement Platform 70 announces approval results;
The routine monitoring management module 30 will divide the priority pollutants reply amount such as COD, SO2 real-time tracking, calculating, analysis Analysis result is uploaded to the electronic monitoring system 10;
Project that 40 assembled item responsible institution 80 of the project information management module reports dynamic, to the construction project of construction into Row statistics summarizes and generates report, and the contents such as progress, the problem to be solved of record reflection current project can store All historical records of development of projects;
The collection of user feedback module 60 is filtered, the feedback information of sorted users, and statistics and analysis is carried out to feedback information, And it is sent to the electronic monitoring system 10.
Wherein, the effect of the user feedback module 60 is anti-from third-party project to the offer of electronic monitoring system 10 Feedforward information, the examination & approval management system 20 of the functional department can obtain this by the electronic monitoring platform of electronic monitoring system 10 and build If the project examination information of project, the dynamic and problem to be solved of project are supervised in real time, it can be flat by information announcement Platform 70, emergency monitoring management module 50 announce monitoring result and solution, and by monitoring result communication transfer to project master Pipe unit 80.Wherein, person in charge of the project's unit 80 can be come from by project information management module 40 to the examination & approval offer of management system 20 The construction project information of second party feedback carries out statistics and analysis convenient for examination & approval management system 20, is conducive to functional department(Political affairs Mansion)It concentrates and examines, reduce the possibility that project information is faked and occur, while also reducing the potential risk of construction project.
The user feedback module 60 can be mobile terminal, service terminal, the network terminal or communicating terminal, and the user is anti- It can be mobile terminal, service terminal, the network terminal or communicating terminal to present module 60, and user feedback module 60 can be using object The crowds such as construction project user, construction project construction personnel, the supervision unit of construction project or eye witness;The project information The application of management module 40 is person in charge of the project's unit 80, such as item cost accounting team, enterprise or individual.
It, can be by the approval process of project in net by means of the above-mentioned construction project environment approval system of the embodiment of the present invention The various approval informations completed, and can provided by means of examining the approval process of management system 20 on network terminal platform, examination & approval Various notices the mobile terminal of person in charge of the project's unit 80 is sent in a manner of short message or phone, and conventional prison can be passed through Survey management module 30 to the priority pollutants reply amount real-time tracking such as the flue dust of construction project environment, COD, SO2, Nox, calculating, Analysis arrives at construction project place casing without dispatch personnel and obtains the pollution monitoring of construction project environment as a result, functional department Examination & approval management system 20 can to person in charge of the project's unit 80 send examination & approval instruction, simplify approval function department to construction project Approach is known in environmental assessment, can effectively improve the efficiency of the regulation of construction project environment.
On the basis of the above embodiments, the present embodiment is discussed further the construction project environment approval system of the present invention.
Optionally, in one embodiment, the examination & approval management system 20 includes that the first order examines platform 21, the second level is examined Criticize flat platform 22 and the third level examine platform 23, and the first order is examined platform 21 and managed concentratedly to the project information being collected into, and right Construction project carries out preliminary hearing, environmental impact assessment and current project result acceptance, and review result reports the second level to examine platform 22; The second level examination & approval platform 22 collects the approval information of preparatory examination stage, including approver, examination & approval time, approval results, and right The examination & approval situation of each subordinate unit carries out review, and review project includes:Formality, project feasibility detection report are permitted in project planning Six contents such as announcement, building engineering construction license, construction speed record sheet, pollutant monitoring report and environment remediation scheme, Review result reports the third level to examine platform 23;The third level examination & approval platform 23 is further audited to criticizing information again, The case where comprehensive each regional construction project examination, makes planning and final review as a result, being proposed to the problem of construction project Solution, approval results at different levels are published to person in charge of the project's unit 80 and information announcement platform 70 automatically.
The first order examination & approval platform 21 is responsible for examination & approval by grade functional department of counties and districts, and platform 22 is examined by city in the second level Grade functional department is responsible for examination & approval, and the third level examination & approval platform 23 is responsible for examination & approval by provincial functional department, and the functional department relates to And environmental protection administration, auditing department and quality monitoring department, provide comprehensive solution party by province, city, multistage approval function department of counties and districts Case and approval results meet various informatization situations, and regional construction project examination comprehensive management and supervision are realized in perfection, can Realize different situations under local all subordinate units examination and approval project centralized management and report, and with province office construction project Data reporting system Seamless integration-.
Optionally, in one embodiment, the routine monitoring management module 30 includes generalized information system 31, data storage System 32, dangerous situation monitoring system 33 and Online monitoring of pollution sources system 34, the generalized information system 31 are checked by GIS-Geographic Information System The distributing position of construction project, the geodata for inputting, storing, inquire, analyze and showing construction project, the examination & approval pipe Reason system 20 can be by the distribution situation of each regional construction project of 31 real time inspection of generalized information system, can be by construction type, construction area The various ways such as domain, building time, project type are for statistical analysis, grasp the construction situation in region in real time, are convenient for state-owned soil The pool and planning on ground can also spot-check specified construction project environment, grasp the current dynamic for specifying construction project in real time;The dirt Dye source on-line monitoring system 34 is arranged in construction project place, the pollutant for detecting hazard program environment, the pollution sources On-line monitoring system 34 include discharge of sewage monitor, COD concentration monitors, flue gas flow and total emission volumn monitor, flue dust, CO、SO2, Nox concentration monitor, the priority pollutant reply amount for detecting construction project environment is dirty convenient for real time monitoring Situation is contaminated, departments of examination and approval is also allowed for and carries out environmental impact assessment in real time;Dangerous situation monitoring system 33 includes seismic detector and infrared Flame detector, the security risk for monitoring construction project;The data storage subsystem 32 is to the generalized information system 31, danger Feelings monitoring system 33, the monitoring data of Online monitoring of pollution sources subsystem 34 are collected, store, calculate, analyze, and analysis is tied Fruit is uploaded to the electronic monitoring system 10.
In practice, every environment protection index is set up in routine monitoring management module 30, wherein including polluted-water Emission limit value, dangerous gas concentration limit value and gas turbidity coefficient standard value etc., pass through Online monitoring of pollution sources System 34.
Optionally, in one embodiment, the project information management module 40 include data import with verify system 41, Project data memory management module 42 and construction project supervisory systems 43, the construction project supervisory systems 43 are used to build to specified If the construction site information of project environment, the storage of building materials, storage and service condition, construction progress, construction personnel Construction behavior carry out remote supervisory, and can each construction project of real time inspection video monitoring picture;The project data storage Management module 42, which imports the data, to be collected with the monitoring data of verification system 41, construction project supervisory systems 43, deposits It stores up, summarize, generation actually accomplishes value, and by comparing internal control index and actually accomplishing value, real-time record index is completed in systems Degree, by analysis result synchronized upload to the electronic monitoring system;The data are imported with verification system 41 for recording project The construction project information of responsible institution, person in charge of the project's unit 80 add the content of project information according to construction project progress Add, change, and according to permission typing project dynamic, is called at any time for the examination & approval management system 20.
During the project implementation, as the actually accomplishing of projects amount, new procurement contract are signed and are come into force, constantly The data by project management related service make a report on, examine, being aggregated into project information management module 40, generation actually accomplishes value. By comparing internal control index and actually accomplishing value, index completeness is monitored in real time in systems, so as to project examination functional department Grasp project totality business circumstance, and can pinpoint the problems, make a policy in time.
Specifically, the construction project information includes construction material information, construction equipment information, construction detection information, applies The elements such as work essential information, every settlement information, every environmental protection tests result.The construction material information includes that material cost is pre- Calculation, shopping list, project material expenditure planning chart, storage inventory etc.;The construction equipment information includes equipment fault and repair Record, equipment purchasing inventory, equipment leasing contract etc.;The construction detection information includes project quality examining report, construction inspection Survey contract, construction behavioural norm model etc.;The construction essential information includes construction speed report, construction personnel's quantity, construction Plan, construction contract, builder's diary etc.;The items settlement information pays proof, adopts expenditure comprising wages advice of settlement, social security Proof, project income proof etc., by the typing and update of these project information, convenient for approval function, department grasps project in real time Progress situation is convenient for the planning and management in later stage.
Optionally, in one embodiment, the emergency monitoring management module 50 includes emergency plan bulletin platform 51, answers Anxious warning system 52 and emergency rescue system 53, the emergency plan bulletin platform 51 is for announcing the project information management Abnormal conditions, the construction contents such as hidden danger and problem to be solved for the current project that module 40 reflects, and announce described examine Batch management system 20 for the construction project there are the problem of proposed solution;The panic alarm system 52 includes alarm Device carries out alarm operation to exceeding the status of criterion, and carries out force start emergency rescue system 53 to dangerous exceeded situation and operate; The emergency rescue system 53 includes signal help-asking system 54, fire-fighting system 55 and ventilating system 56, the signal help-asking system 54 communications connect relevant dangerous situation and rescue department, and dangerous situation rescue department sends rescue personnel to carry out dangerous situation rescue work.
The fire-fighting system 55 include multigroup fire extinguishing unit, the fire extinguishing unit include extinguishing device, solenoid valve and into Waterpipe, the extinguishing device connects the water inlet line, and is electrically connected with the solenoid valve being installed on water inlet line, solenoid valve Start, extinguishing device is opened, and water inlet line is discharged water by extinguishing device, and the extinguishing device is fire water spray nozzle;It is described logical Wind system 56 includes multigroup concatenated exhaust fan, driving device, and the driving device is connected with the exhaust fan, and driving device opens It is dynamic, drive multigroup exhaust fan to be radiated and be vented ventilation operation.
The infrared flame detector of the dangerous situation monitoring system 33 detects flame signal and transmits a signal to emergent prison Management module 50,50 force start panic alarm system 52 of emergency monitoring management module and emergency rescue system 53 are surveyed, and will The automatic danger signal that uploads is to electronic monitoring system 10 so that approval function department when dangerous situation occurs, project management unit 80 can Knowing at the first time, the examination & approval management system 20 is for the proposed solution of dangerous situation and announces flat in emergency plan bulletin Platform 51 is read for construction project construction personnel, so that construction personnel takes corresponding emergency measure to reduce dangerous situation risk in time.
Optionally, in one embodiment, the user feedback module 60 includes Cloud Server 61 and multiple and cloud service The data receiving terminal 62 that device 61 connects;The Cloud Server 61 includes information extraction modules 63, information filtering module 64, letter Sort module 65 and database module 66 are ceased, the database module 66 includes key data library unit 661 and basic number According to library unit 662, the information sort module 65 includes similarity calculated 651 and result taxon 652;Described The output end of data receiving terminal 62 is connect with information extraction modules 63, output end and the information filtering mould of information extraction modules 63 Block 64 connects, and the output end of information filtering module 64 connect with similarity calculated 651, similarity calculated 651 it is defeated Outlet is connect with result taxon 652;The key data library unit 661 is connect with information filtering module 64, described Basic data library unit 662 connect with similarity calculated 651.
Data receiving terminal 62 receives information input by user, includes the information sended over by wireless terminal and wired The information that terminal sends over, information extraction modules 63 carry out keyword extraction, information mistake to the information of data receiving terminal 62 Filter module 64 is filtered processing to keyword, by making comparisons with the data of key data library unit 661, will contain key The information of word is classified, and the information for completing filtration treatment is carried out similarity with basic data library unit 662 to be compared, and will be extracted Go out the information containing keyword and be merged into a set, will be stored in the information storage classified to basic data library unit 662, Calculate the frequency of occurrences for the keyword that basic data library unit 662 is calculated by result taxon 652 in the set.
More preferably, the user feedback module 60 also includes result statistical analysis unit 67, as a result statistical analysis unit 67 Classification information for being acquired to result taxon 652 analyzes and counts, and the statistical analysis unit 67 includes carriage Feelings figure generation module 671, report generation module 672, trend analysis module 673 and profile analysis module 674.The public sentiment figure life Task public sentiment figure, including information content statistics, acceptance of the bid keyword quantity system are generated according to class condition and keyword at module 671 Meter and user feedback number statistic of classification;The report generation module 672 is used to generate report according to feedback result information;It is described Trend analysis module 673 is for generating increment graph;The profile analysis module 674 is for generating task list, website distribution map With media distribution figure.It is by the result statistical analysis unit 67 that the information of user feedback is for statistical analysis, generate analysis Figure obtains frequency, number, type and the trend of user feedback problem convenient for approval function department, real-time convenient for functional department Grasp project situation, convenient for management.
In conclusion the construction project environment approval system of the application overall monitor supervises the approval process of project and electronics The system of examining is combined, and providing various project examination materials from traditional person in charge of the project's unit knows that the form of development of projects is changed into Government(Approval function department)The progress for monitoring construction project in real time, risk government caused by construction project(Approval function portion Door)It can know at the first time, prevent the possibility of person in charge of the project's unit concealment, the controllability of construction project is constantly carried Height, and user can propose feedback opinion by user feedback module to approval system, pinpoint the problems, drop in time convenient for relevant department Low government(Approval function department)To the information channel dependence of person in charge of the project's unit, and approval information is to push to project master The mode at pipe unit instant communicating system interface carries out project examination, project examination efficiency can be improved in this way, to examination & approval portion Door can fast implement the electronic disposal of construction project, to control environmental pollution and ecological disruption, implement overall control, guarantee The important information of scientific development, is of great significance.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that The specific implementation of the present invention is confined to these explanations.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the present invention's Protection domain.

Claims (10)

1. a kind of construction project environment approval system of overall monitor, it is characterised in that:Including electronic monitoring system, the electronics Observation system is directly docked with electronic monitoring platform with the examination & approval of functional department management system, automatic acquisition routine monitoring in real time The project information of management module, project information management module, emergency monitoring management module and user feedback module, implementation synchronize complete Range monitoring;
It is operation information progress preliminary hearing that electronic monitoring system is submitted by the examination & approval management system, environmental impact assessment, examination, right Task performance, executive condition and the workload of handler carries out whole tracking and supervision, to each subordinate's function portion The examination & approval situation real-time tracking of door, by approval results communication transfer to person in charge of the project's unit, and is announced by information announcement platform Approval results;
The routine monitoring management module is to COD, SO2Equal priority pollutants reply amount real-time tracking, calculating, analysis, analysis is tied Fruit is uploaded to the electronic monitoring system;
The project dynamic that project information management module collection person in charge of the project's unit reports, unites to the construction project of construction Meter summarizes and generates report, and the contents such as progress, the problem to be solved of record reflection current project can be with stored items All historical records of progress;
The user feedback module collection, filtering, sorted users feedback information, to feedback information carry out statistics and analysis, and It is sent to the electronic monitoring system.
2. a kind of construction project environment approval system of overall monitor according to claim 1, which is characterized in that described to examine It includes that first order examination & approval platform, second level examination & approval platform and third level examination & approval platform, the first order examine platform to criticize management system Project information centralized management to being collected into, and preliminary hearing, environmental impact assessment and current project achievement are carried out to construction project and tested It receives, review result reports the second level to examine platform;The second level examination & approval platform collects the approval information of preparatory examination stage, including examines People, examination & approval time, approval results are criticized, and review is carried out to the examination & approval situation of each subordinate unit, review project includes:Project planning Permit formality, project feasibility examining report, building engineering construction license, construction speed record sheet, pollutant monitoring report with And six contents such as environment remediation scheme, review result report the third level to examine platform;The third level examines platform to criticizing again The case where information is further audited, comprehensive each regional construction project examination makes planning and final review as a result, to building If the problem of project proposes solution, approval results at different levels are published to person in charge of the project's unit automatically and information is public Cloth platform.
3. a kind of construction project environment approval system of overall monitor according to claim 1, which is characterized in that described normal Rule monitoring management module includes generalized information system, data storage subsystem, dangerous situation monitoring system and Online monitoring of pollution sources system, institute The distributing position that generalized information system checks construction project by GIS-Geographic Information System is stated, for inputting, storing, inquiring, analyzing and showing The geodata of construction project;The Online monitoring of pollution sources system includes discharge of sewage monitor, COD concentration monitors, cigarette Throughput and total emission volumn monitor, flue dust, CO, SO2, Nox concentration monitor, the pollution for detecting construction project environment Index;The dangerous situation monitoring system includes seismic detector and infrared flame detector, the security risk for monitoring construction project;Institute Data storage subsystem is stated to be collected the monitoring data of the generalized information system, Online monitoring of pollution sources subsystem, store, count It calculates, analysis, analysis result is uploaded to the electronic monitoring system.
4. a kind of construction project environment approval system of overall monitor according to claim 1, which is characterized in that the item Mesh information management module include data import with verification system, project data memory management module and construction project supervisory systems, The construction project supervisory systems is used for construction site information, the storage of building materials, storage to specifying construction project environment Construction behavior with service condition, construction progress, construction personnel carries out remote supervisory, and can each construction project of real time inspection Video monitoring picture;The project data memory management module imports the data and is supervised with the system of verification, construction project The monitoring data of system are collected, store, summarize, and generation actually accomplishes value, by comparing internal control index and actually accomplishing value, Real-time record index completeness in systems, by analysis result synchronized upload to the electronic monitoring system;The data import It is used to record the construction project information of project responsible institution with verification system, person in charge of the project's unit is in progress according to construction project to item The content of mesh information is added, changes, and according to permission typing project dynamic, is called at any time for the examination & approval management system.
5. a kind of construction project environment approval system of overall monitor according to claim 4, which is characterized in that described to build If project information includes construction material information, construction equipment information, construction detection information, construction essential information, every clearing letter The elements such as breath, every environmental protection tests result.
6. a kind of construction project environment approval system of overall monitor according to claim 1, which is characterized in that described to answer Anxious monitoring management module includes emergency plan bulletin platform, panic alarm system and emergency rescue system, the emergency plan Bulletin platform is used to announce abnormal conditions, construction hidden danger and the needs of the current project of the project information management module reflection The contents such as solve the problem of and announce the examination & approval management system there is proposed solution party for the construction project Case;The panic alarm system carries out alarm operation to exceeding the status of criterion, and carries out force start to dangerous exceeded situation and answer System operatio is helped in first aid;The emergency rescue system includes signal help-asking system, fire-fighting system and ventilating system, and the signal is asked It rescues system communication and connects relevant dangerous situation rescue department, dangerous situation rescue department sends rescue personnel to carry out dangerous situation rescue work.
7. a kind of construction project environment approval system of overall monitor according to claim 6, which is characterized in that described to disappear Anti- system includes multigroup fire extinguishing unit, and the fire extinguishing unit includes extinguishing device, solenoid valve and water inlet line, the fire extinguishing dress The connection water inlet line is set, and is electrically connected with the solenoid valve being installed on water inlet line, solenoid valve starts, and extinguishing device is opened It opens, water inlet line is discharged water by extinguishing device;The ventilating system includes multigroup concatenated exhaust fan, driving device, the drive Dynamic device is connected with the exhaust fan, driving device startup, and multigroup exhaust fan is driven to be radiated and be vented ventilation operation.
8. a kind of construction project environment approval system of overall monitor according to claim 1, which is characterized in that the use Family feedback module includes Cloud Server and multiple data receiving terminals being connect with Cloud Server;The Cloud Server includes letter It includes number of keyword to cease extraction module, information filtering module, information sort module and database module, the database module According to library unit and basic data library unit, the information sort module includes similarity calculated and result taxon; The output end of the data receiving terminal is connect with information extraction modules, output end and the information filtering mould of information extraction modules Block connects, and the output end of information filtering module is connect with similarity calculated, the output end and result of similarity calculated Taxon connects;The key data library unit is connect with information filtering module, the basic data library unit with Similarity calculated connects.
9. a kind of construction project environment approval system of overall monitor according to claim 8, which is characterized in that the use Family feedback module also includes result statistical analysis unit, and as a result statistical analysis unit is used to acquire result taxon Classification information analyzes and counts, and the statistical analysis unit includes public sentiment figure generation module, report generation module, trend analysis Module and profile analysis module.
10. a kind of construction project environment approval system of overall monitor according to claim 9, which is characterized in that described Public sentiment figure generation module generates task public sentiment figure, including information content statistics, acceptance of the bid keyword according to class condition and keyword Quantity statistics and user feedback number statistic of classification;The report generation module is used to generate report according to feedback result information; The trend analysis module is for generating increment graph;The profile analysis module for generate task list, website distribution map and Media distribution figure.
CN201810306426.8A 2018-04-08 2018-04-08 Construction project environment approval system capable of achieving comprehensive monitoring Active CN108510248B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810306426.8A CN108510248B (en) 2018-04-08 2018-04-08 Construction project environment approval system capable of achieving comprehensive monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810306426.8A CN108510248B (en) 2018-04-08 2018-04-08 Construction project environment approval system capable of achieving comprehensive monitoring

Publications (2)

Publication Number Publication Date
CN108510248A true CN108510248A (en) 2018-09-07
CN108510248B CN108510248B (en) 2022-04-29

Family

ID=63380737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810306426.8A Active CN108510248B (en) 2018-04-08 2018-04-08 Construction project environment approval system capable of achieving comprehensive monitoring

Country Status (1)

Country Link
CN (1) CN108510248B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109542959A (en) * 2018-11-30 2019-03-29 广州净松软件科技有限公司 Business datum display methods, device and the computer equipment of observation system
CN109829088A (en) * 2019-01-15 2019-05-31 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project detection system
CN109961268A (en) * 2019-02-25 2019-07-02 政和科技股份有限公司 A kind of supervision of project and case study feedback system and its method
CN110363373A (en) * 2019-04-29 2019-10-22 兰州环境能源交易中心有限公司 A kind of investment projects of capital assets carbon assessment system
CN110570112A (en) * 2019-09-03 2019-12-13 中冶赛迪重庆环境咨询有限公司 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system
CN111967856A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Government affair project management method and device
CN111967857A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN113313472A (en) * 2021-06-15 2021-08-27 海南君麟环境科技有限公司 Intelligent environmental control platform establishing method and system based on big data
CN113409027A (en) * 2021-07-22 2021-09-17 国网浙江浙电招标咨询有限公司 Power grid material storage management system
CN113469652A (en) * 2021-06-30 2021-10-01 上海市建筑科学研究院有限公司 Existing building damage recording system based on cloud platform
CN113610511A (en) * 2021-09-28 2021-11-05 航天宏图信息技术股份有限公司 Project information matching synchronization method and device of water and soil conservation system
CN114528314A (en) * 2022-04-20 2022-05-24 四川省大数据中心 Engineering construction project supervision system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101676932A (en) * 2008-09-16 2010-03-24 深圳市红旗信息技术有限公司 Electronic monitoring method and system of government-invested construction project
CN101706889A (en) * 2009-11-17 2010-05-12 深圳市监察局 Method and system for electronic supervising of administrative examination and approval
CN102521685A (en) * 2011-11-30 2012-06-27 陕西东显永益机电技术有限公司 Electronic monitoring system
US20140052643A1 (en) * 2012-08-15 2014-02-20 International Business Machines Corporation Managing multiple approvals for projects
CN205626823U (en) * 2016-05-13 2016-10-12 绵竹市鑫圣龙通风设备制造有限公司 Fire control system for tunnel
CN107527155A (en) * 2017-09-06 2017-12-29 北京北控建设发展有限公司 Construction project supervisory systems

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101676932A (en) * 2008-09-16 2010-03-24 深圳市红旗信息技术有限公司 Electronic monitoring method and system of government-invested construction project
CN101706889A (en) * 2009-11-17 2010-05-12 深圳市监察局 Method and system for electronic supervising of administrative examination and approval
CN102521685A (en) * 2011-11-30 2012-06-27 陕西东显永益机电技术有限公司 Electronic monitoring system
US20140052643A1 (en) * 2012-08-15 2014-02-20 International Business Machines Corporation Managing multiple approvals for projects
CN205626823U (en) * 2016-05-13 2016-10-12 绵竹市鑫圣龙通风设备制造有限公司 Fire control system for tunnel
CN107527155A (en) * 2017-09-06 2017-12-29 北京北控建设发展有限公司 Construction project supervisory systems

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109542959B (en) * 2018-11-30 2020-07-17 广州净松软件科技有限公司 Service data display method and device of monitoring system and computer equipment
CN109542959A (en) * 2018-11-30 2019-03-29 广州净松软件科技有限公司 Business datum display methods, device and the computer equipment of observation system
CN109829088A (en) * 2019-01-15 2019-05-31 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project detection system
CN109961268A (en) * 2019-02-25 2019-07-02 政和科技股份有限公司 A kind of supervision of project and case study feedback system and its method
CN110363373B (en) * 2019-04-29 2021-10-08 兰州环境能源交易中心有限公司 Carbon assessment system for fixed asset investment project
CN110363373A (en) * 2019-04-29 2019-10-22 兰州环境能源交易中心有限公司 A kind of investment projects of capital assets carbon assessment system
CN110570112A (en) * 2019-09-03 2019-12-13 中冶赛迪重庆环境咨询有限公司 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system
CN111967856A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Government affair project management method and device
CN111967857A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN111967857B (en) * 2020-08-27 2024-03-22 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN113313472A (en) * 2021-06-15 2021-08-27 海南君麟环境科技有限公司 Intelligent environmental control platform establishing method and system based on big data
CN113469652A (en) * 2021-06-30 2021-10-01 上海市建筑科学研究院有限公司 Existing building damage recording system based on cloud platform
CN113409027B (en) * 2021-07-22 2023-10-13 国网浙江浙电招标咨询有限公司 Power grid material reserve management system
CN113409027A (en) * 2021-07-22 2021-09-17 国网浙江浙电招标咨询有限公司 Power grid material storage management system
CN113610511A (en) * 2021-09-28 2021-11-05 航天宏图信息技术股份有限公司 Project information matching synchronization method and device of water and soil conservation system
CN114528314A (en) * 2022-04-20 2022-05-24 四川省大数据中心 Engineering construction project supervision system and method
CN114528314B (en) * 2022-04-20 2022-07-08 四川省大数据中心 Engineering construction project supervision system and method

Also Published As

Publication number Publication date
CN108510248B (en) 2022-04-29

Similar Documents

Publication Publication Date Title
CN108510248A (en) A kind of construction project environment approval system of overall monitor
CN103116825B (en) Intelligent city management
CN113313387B (en) Intelligent management and control method and system for major security risk classification of enterprise
CN108229777A (en) A kind of petrochemical enterprise Environmental protection management information system
CN108931970A (en) A kind of industrial park wisdom environment supervisory systems based on cloud platform technology
CN102201076A (en) Gridding digital community management system and method
CN104766158A (en) Environment protection full-process monitoring system
CN109377095A (en) Management system after pollutant discharging license card
CN105046392A (en) IC card-based pollutant discharge total amount monitoring system
CN114841660A (en) Enterprise intelligent safety management and control cloud platform based on field information
CN103077437A (en) System for checking and reforming hidden dangers of safety production
CN109801416A (en) A kind of total dimension computer lab management method of building together based on big data analysis
CN110070233B (en) Emergency data processing method and system
CN114186765A (en) Household garbage end disposal monitoring system and server with same
CN107808238A (en) A kind of management method and system for equipping assets
CN111932113A (en) Environment supervision and management method, platform and storage medium
CN115586304A (en) Environmental area air monitoring system
CN111352953A (en) Enterprise environment-friendly management and reporting system
CN109636563A (en) A kind of financial revenue and expenditure data dynamic supervision platform
CN114358439A (en) Wisdom supervisory systems
CN113141275A (en) Intelligent integrated operation and maintenance system based on cloud service platform
CN112583792A (en) Daily monitoring system and method for network station group
CN205540200U (en) VOC clarification plant operation condition monitoring system
CN116112646B (en) Intelligent operation and maintenance management system of pollution source monitoring equipment
CN113063900B (en) Oil smoke monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510000 room 3501, No. 30, tianhezhi street, Tianhe District, Guangzhou City, Guangdong Province (office only)

Applicant after: Guangdong yingzhitong Technology Co.,Ltd.

Address before: 510630 No. 1-14, south of floor 16, building a, No. 89, Zhongshan Avenue, Tianhe District, Guangzhou, Guangdong

Applicant before: GUANGDONG SCPS INFORMATION TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Comprehensive Monitoring Environmental Approval System for Construction Projects

Effective date of registration: 20230605

Granted publication date: 20220429

Pledgee: Bank of China Limited by Share Ltd. Guangzhou Tianhe branch

Pledgor: Guangdong yingzhitong Technology Co.,Ltd.

Registration number: Y2023980042896