construction project completion environment-friendly acceptance inspection overall process self-checking management method and system Download PDF

Info

Publication number
CN110570112A
CN110570112A CN201910825756.2A CN201910825756A CN110570112A CN 110570112 A CN110570112 A CN 110570112A CN 201910825756 A CN201910825756 A CN 201910825756A CN 110570112 A CN110570112 A CN 110570112A
Authority
CN
China
Prior art keywords
data information
index data
acceptance
construction project
environment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910825756.2A
Other languages
Chinese (zh)
Inventor
王暾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Sadi Chongqing Environmental Consulting Co Ltd
Original Assignee
China Metallurgical Sadi Chongqing Environmental Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Sadi Chongqing Environmental Consulting Co Ltd filed Critical China Metallurgical Sadi Chongqing Environmental Consulting Co Ltd
Priority to CN201910825756.2A priority Critical patent/CN110570112A/en
Publication of CN110570112A publication Critical patent/CN110570112A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

the invention provides a construction project completion environment-friendly acceptance check overall process self-checking management method and system, which comprises collected data information, wherein the data information comprises one-dimensional or multi-dimensional reference index data information of construction project environment-friendly acceptance check information and actual index data information of the construction project environment-friendly acceptance check information; comparing and analyzing the actual index data information and the reference index data information to obtain a comparison and analysis result; and carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result. According to the method, the environmental protection acceptance information of the reference index data and the actual index data of the construction project is input, and the input environmental protection acceptance information is contrasted and analyzed; the method can carry out self-check and management on the preposed flow and the necessary conditions of the environment-friendly acceptance check before the completion environment-friendly acceptance check is formally carried out on the construction project, and can meet the requirements of the construction unit on the self-check and management of the whole process of the project completion environment-friendly acceptance check.

Description

construction project completion environment-friendly acceptance inspection overall process self-checking management method and system
Technical Field
The invention relates to the technical field of environmental management, in particular to a construction project completion environment-friendly acceptance inspection overall process self-checking management method and system.
background
according to the existing regulations, after a construction project is completed, a construction unit needs to automatically organize the environment-friendly acceptance work for completion of the construction project. However, the construction project completion environmental protection acceptance is a professional and programmed system work and relates to the retroactive of the project construction process, so that the construction unit is required to perform self-check and management on the preposed flow and the necessary conditions of the construction project completion environmental protection acceptance work in advance before the construction project completion environmental protection acceptance is formally performed on the construction project. Because construction units lack professional ability and resources, the whole process self-check and management cannot be carried out on the environment-friendly acceptance check of construction project completion, the preposed flow and the indispensable conditions of the environment-friendly acceptance check of construction project completion are not in place, the environment-friendly acceptance check progress of construction project completion is influenced, even the environment-friendly acceptance check of construction project completion cannot be carried out, and further the legal compliance production of the construction project is influenced.
disclosure of Invention
in view of the above-mentioned shortcomings of the prior art, the present invention provides a method and a system for self-checking and managing the whole process of construction project completion and acceptance inspection, which are used for solving the problems in the prior art.
in order to achieve the above objects and other related objects, the present invention provides a method for self-checking and managing the whole process of environment-friendly acceptance check of construction project completion, comprising:
collecting data information, wherein the data information comprises one-dimensional or multidimensional reference index data information of the construction project environment-friendly acceptance information and actual index data information of the construction project environment-friendly acceptance information;
comparing and analyzing the actual index data information and the reference index data information to obtain a comparison and analysis result;
And carrying out overall process management on the construction project completion environment-friendly acceptance according to the comparative analysis result.
Optionally, the comparative analysis comprises:
Checking the completion progress of the environmental protection acceptance pre-flow according to the actual index data information and the reference index data information;
Checking the completeness state of the environmental protection facilities of the construction project according to the actual index data information and the reference index data information;
identifying whether the construction project has first-class variation or not according to the actual index data information and the reference index data information;
and calculating the pollutant emission total amount standard of the construction project according to the actual index data information and the reference index data information.
optionally, if the comparison analysis result includes more than one of the following items, making an acceptance check and a non-passing early warning judgment;
checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the actual index data information and the reference index data information;
Checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
Identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
And the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
Optionally, if the comparison analysis result does not include any one of the following items, making acceptance passing judgment;
Checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the actual index data information and the reference index data information;
Checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
And the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
optionally, the identifying whether the construction project has a first type of variation according to the actual index data information and the reference index data information specifically includes:
If more than one first type change exists in the scale of the construction project, the construction site of the construction project, the production process of the construction project and the environmental protection measures of the construction project, the first type change exists in the construction project.
The invention also provides a construction project completion environment-friendly acceptance inspection overall process self-checking management system, which comprises:
The first information input module is used for inputting one-dimensional or multidimensional reference index data information of the environment-friendly acceptance information of the construction project;
the second information input module is used for inputting actual index data information of the environment-friendly acceptance information of the construction project;
The self-checking module is used for carrying out comparative analysis on the actual index data information and the reference index data information to obtain a comparative analysis result;
and the management module is used for carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result.
Optionally, the self-checking module includes:
The environmental protection acceptance pre-flow unit is used for checking the completion progress of the environmental protection acceptance pre-flow according to the actual index data information and the reference index data information;
the environmental protection facility state unit is used for checking the complete state of the environmental protection facility of the construction project according to the actual index data information and the reference index data information;
a change identification unit for identifying whether the construction project has a first type of change according to the actual index data information and the reference index data information;
and the total amount calculating unit is used for checking whether the total pollutant emission amount of the construction project calculated according to the actual index data information exceeds the total pollutant emission amount preset by the reference index data information.
optionally, the management module further includes:
And the acceptance decision unit is used for making acceptance passing judgment according to the comparison and analysis result.
optionally, the management module further includes:
and the acceptance early warning unit is used for making acceptance and non-passing early warning judgment according to the comparison and analysis result.
Optionally, the management module further includes:
And the acceptance report unit is used for inputting acceptance opinions, acceptance monitoring reports, acceptance monitoring report publicity information and acceptance cautions.
As described above, the method and system for self-checking and managing the whole process of completion and acceptance of construction projects according to the present invention have the following beneficial effects: the environmental protection acceptance information of the reference index data and the actual index data of the construction project is input, the input environmental protection acceptance information is contrastively analyzed, and the preposed flow and the necessary conditions of the environmental protection acceptance work can be self-checked and managed before the completion environmental protection acceptance is officially developed in the construction project according to the contrastive analysis result. According to the invention, the construction unit does not need professional ability and resources, and can perform whole-process self-inspection and management on the construction project completion environment-friendly acceptance check by itself, so that the progress of the construction project completion environment-friendly acceptance check and the construction project legal compliance production is accelerated, and the requirements of the construction unit on the whole-process self-inspection and management of the construction project completion environment-friendly acceptance check can be met.
Drawings
Fig. 1 is a connection schematic diagram of the self-checking management system in the whole process of construction project completion environment-friendly acceptance inspection.
fig. 2 is a flow diagram of the self-checking management method in the whole process of construction project completion environment-friendly acceptance inspection.
Detailed Description
the embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict.
Please refer to fig. 1. It should be noted that the drawings provided in the present embodiment are only for illustrating the basic idea of the present invention, and the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, and the type, quantity and proportion of the components in actual implementation may be changed freely, and the layout of the components may be more complicated. The structures, proportions, sizes, and other dimensions shown in the drawings and described in the specification are for understanding and reading the present disclosure, and are not intended to limit the scope of the present disclosure, which is defined in the claims, and are not essential to the art, and any structural modifications, changes in proportions, or adjustments in size, which do not affect the efficacy and attainment of the same are intended to fall within the scope of the present disclosure. In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
Referring to fig. 1, the present embodiment provides a system for self-checking and managing a whole process of environment-friendly acceptance check of construction project completion, including:
The first information input module is used for inputting one-dimensional or multidimensional reference index data information of the environment-friendly acceptance information of the construction project;
The second information input module is used for inputting actual index data information of the environment-friendly acceptance information of the construction project;
the self-checking module is used for carrying out comparative analysis on the actual index data information and the reference index data information to obtain a comparative analysis result;
And the management module is used for carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result.
in an exemplary embodiment, the self-checking module comprises:
The environmental protection acceptance pre-flow unit is used for checking the completion progress of the environmental protection acceptance pre-flow according to the actual index data information and the reference index data information;
The environmental protection facility state unit is used for checking the complete state of the environmental protection facility of the construction project according to the actual index data information and the reference index data information;
a change identification unit for identifying whether the construction project has a first type of change according to the actual index data information and the reference index data information;
and the total amount calculating unit is used for checking whether the total pollutant emission amount of the construction project calculated according to the actual index data information exceeds the total pollutant emission amount preset by the reference index data information.
in an exemplary embodiment, the management module comprises an acceptance early warning unit, and the acceptance early warning unit is used for making acceptance and non-passing early warning judgment according to the comparison and analysis result. If the acceptance early warning unit does not judge that the acceptance is not passed, the comparison and analysis result at least comprises more than one of the following items:
the environmental protection acceptance pre-flow unit checks that the completion progress of the environmental protection acceptance pre-flow does not reach the preset progress according to the actual index data information and the reference index data information;
The environmental protection facility state unit checks that the environmental protection facility of the construction project is incomplete according to the actual index data information and the reference index data information;
the change identification unit identifies that the construction project has a first type of change according to the actual index data information and the reference index data information;
the total amount calculating unit calculates the pollutant emission total amount according to the actual index data information, and the pollutant emission total amount exceeds the pollutant emission total amount preset by the reference index data information.
In an exemplary embodiment, the management module further includes an acceptance decision unit, and the acceptance decision unit is configured to make an acceptance passing judgment according to the comparison analysis result. If the comparison analysis result does not contain any one of the following items, the acceptance decision unit makes acceptance passing judgment;
the environmental protection acceptance pre-flow unit checks that the completion progress of the environmental protection acceptance pre-flow does not reach the preset progress according to the actual index data information and the reference index data information;
the environmental protection facility state unit checks that the environmental protection facility of the construction project is incomplete according to the actual index data information and the reference index data information;
The change identification unit identifies that the construction project has a first type of change according to the actual index data information and the reference index data information;
the total amount calculating unit calculates the pollutant emission total amount according to the actual index data information, and the pollutant emission total amount exceeds the pollutant emission total amount preset by the reference index data information.
according to the above-described exemplary embodiment, the completion progress index data information of the environmental protection acceptance pre-flow includes project environmental protection facility commissioning conditions, environmental protection facility completion notice information, pollution discharge license information, and environmental protection facility debugging notice information. Specifically, the index data information of the project environmental protection facility commissioning condition indicates whether each item of environmental protection facility can be commissioned with the main project at the same time; the index data information of the environment-friendly facility completion notice information is the completion date, completion certification file and completion date notice material of each environment-friendly facility and is disclosed or disclosed consistently; the index data information of the pollution discharge permit refers to whether the pollution discharge permit is completely declared and whether the content of the pollution discharge permit is published or is consistent; the index data information of the environmental protection facility debugging public information is that the public or public evidence of the materials of each debugging plan, the debugging start and stop date and the debugging start and stop date of the environmental protection facility needing debugging proves whether the materials are public or are consistent. If more than one item of inconsistency occurs between the reference index data information and the actual index data information in the project environmental protection facility application condition, the environmental protection facility completion notice information, the pollution discharge permit information and the environmental protection facility debugging notice information, the completion progress of the environmental protection acceptance pre-flow does not reach the preset progress; and if the condition that any one of the reference index data information and the actual index data information in the project environmental protection facility application condition, the environmental protection facility completion notice information, the pollution discharge permit information and the environmental protection facility debugging notice information is not inconsistent, the completion progress of the environmental protection acceptance pre-flow reaches the preset progress.
according to the above exemplary embodiment, the index data information of the eco facility status unit includes whether the eco facility type, scale, and number are complete. Wherein the environment-friendly facilities specifically comprise a wastewater control measure, a waste gas control measure, a noise control measure, a solid waste control measure, an underground water control measure and an ecological control measure; the scale and the number of the environmental protection facilities can be flexibly set according to the actual situation. And if the environmental protection facility state unit detects that more than one item of inconsistency occurs between the reference index data information and the actual index data information, the environmental protection facility state unit detects that the environmental protection facility of the construction project is incomplete.
According to the above exemplary embodiment, the index data information of the variation identifying unit includes the scale of the construction project, the construction site of the construction project, the production process of the construction project, and the environmental protection measure of the construction project; the change identification unit identifies that the construction project has a first type change if the scale of the construction project, the construction site of the construction project, the production process of the construction project, and the environmental protection measure of the construction project have one or more first type changes. Specifically, the reference index data of the change recognition means is input with a first type of change recognition condition, and the first type of change recognition condition is different for different items.
As an example, taking a certain steel project as an example, the first type of change recognition conditions of the project include: a first class of variable scale recognition conditions includes: the productivity of the sintering, iron-making and steel-making processes is increased by 10 percent or more; the production capacity of the pelletizing and steel rolling processes is increased by 30 percent or more. The first type of change recognition condition occurs at the construction site, and comprises the following steps: the re-addressing and the total flat arrangement change lead to newly adding environmental protection targets in the protection distance. The production process has a first kind of change recognition conditions, which comprise: process changes result in increased new pollutant species or increased pollutant emissions. Environmental protection measures present a first type of change recognition condition, including: the process change of the environmental protection measure causes the newly added pollutant species or the pollutant discharge amount to increase; the height of the sintering machine head waste gas, the sintering machine tail waste gas, the pellet roasting waste gas, the blast furnace ore tank waste gas, the blast furnace casting house waste gas, the converter secondary flue gas and the electric furnace flue gas exhaust funnel is reduced by 10 percent or more; newly adding a waste water discharge port; the waste water discharge direction is changed from indirect discharge to direct discharge; the environmental impact is exacerbated by direct vent position changes.
according to the above exemplary embodiment, the index data information of the total amount control unit includes the pollutant discharge total amount described on the pollution discharge license information. Wherein the preset pollutant emission total amount is the respective allowable emission total amount of all pollutants recorded on the pollution discharge license information.
in an exemplary embodiment, the first information input module is further configured to input basic data information of the construction project. The basic data information of the construction project comprises construction project basic information, construction project progress, construction project construction plan, construction project research report and its replication information, construction project preliminary design and its replication information, environment supervision information and pollution discharge license information. Specifically, the construction project basic information specifically includes a construction unit name, a construction project name, a construction site, an industry category, a project property and a construction scale; the construction project progress specifically comprises the construction progress and the construction completion condition of a main project, a public and auxiliary project and an environmental protection project; the construction plan of the construction project comprises time plans of start-up, completion, acceptance and production of the construction project.
in an exemplary embodiment, the management module further comprises an acceptance report unit, and the acceptance report unit is used for inputting acceptance opinions, acceptance monitoring reports, acceptance monitoring report publicity information, acceptance notices, reporting the environment-friendly administrative department condition and reporting the complete national construction project environment-friendly acceptance information condition according to acceptance judgment made by the acceptance decision unit.
In an exemplary embodiment, the system further comprises an archive module used for performing information arrangement and archiving on the first information input module, the second information input module, the self-checking module and the management module. The file module is also used for establishing project completion environment-friendly acceptance file data; the inspection and acceptance archive data specifically comprises a ring assessment report and a batch thereof, an exploratable report and a batch thereof, a preliminary design and a batch thereof, a construction contract (environmental part), an environment supervision report, an environmental protection inspection and acceptance monitoring report, an inspection and acceptance opinion, other items needing to be explained, an environmental protection facility completion notice proving material, an environmental protection facility debugging notice proving material, an inspection and acceptance report notice proving material and a consignment contract.
in an exemplary embodiment, the system further comprises an update identification unit and an acceptance warning unit for updating, and an update maintenance module for maintaining the system. The updating maintenance module is used for updating the processing scheme of the first type of change in the change identification unit and updating the acceptance early warning unit to ensure that the acceptance does not pass the early warning condition; the updating and maintaining module is mainly used for maintaining the system module architecture, the users and the roles. Through the updating and maintenance of the updating maintenance module, the timeliness and the operation stability of the whole system can be supported.
The construction project completion environment-friendly acceptance inspection overall process self-checking management system provided by the invention inputs environment-friendly acceptance inspection information of construction project reference index data and actual index data, and performs comparative analysis on the input environment-friendly acceptance inspection information; the method can carry out self-check and management on the preposed flow, the necessary conditions and the like of the environment-friendly acceptance work before the completion environment-friendly acceptance is formally carried out on the construction project. By the aid of the system, construction units do not need professional ability and resources, and the whole process self-checking and management can be carried out on the construction project completion environment-friendly acceptance check by themselves, progress of the construction project completion environment-friendly acceptance check and legal compliance production of the construction project is accelerated, and the requirement of the construction units on the whole process self-checking and management of the project completion environment-friendly acceptance check can be met. The system can solve the problem that the current construction unit can not carry out the whole-process dynamic self-checking management on the construction project completion environment-friendly acceptance check, comprehensively analyzes the environment-friendly acceptance check risk and trend through self-checking and dynamic management, sends out early warning, helps the construction unit to timely fulfill the relevant flow procedures, perfect the acceptance check conditions, and assists the construction unit to manage the acceptance check progress and effect. The system automatically establishes a complete construction project completion environment-friendly acceptance information file in the later stage of completion environment-friendly acceptance, completely records the acceptance file in the whole process of project completion environment-friendly acceptance, and provides a complete and traceable electronic file for a construction unit. The system is an informationized, systematized and normalized completion environment-friendly acceptance check whole-process self-checking management system, can standardize completion environment-friendly acceptance check management work of construction units, enhances the legal compliance of the environment-friendly acceptance check management work, and reduces legal risks. The system adopts function modularization development, is convenient to customize and develop according to the actual condition of a construction project, and ensures the stability, adaptability, expandability and module updating convenience of the system.
as shown in fig. 2, the invention also provides a construction project completion environment-friendly acceptance inspection overall process self-checking management method, which comprises the following steps:
Collecting data information, wherein the data information comprises one-dimensional or multidimensional reference index data information of the construction project environment-friendly acceptance information and actual index data information of the construction project environment-friendly acceptance information; specifically, one-dimensional or multi-dimensional reference index data information of the construction project environment-friendly acceptance information is input through a first information input module; inputting actual index data information of the construction project environment-friendly acceptance information through a second information input module;
comparing and analyzing the actual index data information and the reference index data information to obtain a comparison and analysis result;
and carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result.
In an exemplary embodiment, the comparative analysis includes:
the system comprises a data processing module, a data processing module and a data processing module, wherein the data processing module is used for checking the completion progress of the environmental protection acceptance pre-flow according to actual index data information and reference index data information;
The system is used for checking the completeness of the environmental protection facilities of the construction project according to the actual index data information and the reference index data information;
The system comprises a data processing module, a data processing module and a data processing module, wherein the data processing module is used for identifying whether a first type of change exists in a construction project according to actual index data information and reference index data information;
And calculating the pollutant emission total amount standard-reaching performance of the construction project according to the actual index data information and the reference index data information.
In an exemplary embodiment, if the comparison analysis result includes more than one of the following items, the acceptance check is made and the early warning judgment is not passed;
checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the actual index data information and the reference index data information;
checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
and the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
in an exemplary embodiment, if the comparison analysis result does not include any of the following items, an acceptance judgment is made;
checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the actual index data information and the reference index data information;
checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
Identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
And the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
In an exemplary embodiment, a construction project is identified as having a first type of variation if there is more than one of the first type of variation in the size of the construction project, the construction site of the construction project, the production process of the construction project, and the environmental protection measures of the construction project. Specifically, the reference index data of the change recognition means is input with a first type of change recognition condition, and the first type of change recognition condition is different for different items.
as an example, taking a certain steel project as an example, the first type of change recognition conditions of the project include: a first class of variable scale recognition conditions includes: the productivity of the sintering, iron-making and steel-making processes is increased by 10 percent or more; the production capacity of the pelletizing and steel rolling processes is increased by 30 percent or more. The first type of change recognition condition occurs at the construction site, and comprises the following steps: the re-addressing and the total flat arrangement change lead to newly adding environmental protection targets in the protection distance. The production process has a first kind of change recognition conditions, which comprise: process changes result in increased new pollutant species or increased pollutant emissions. Environmental protection measures present a first type of change recognition condition, including: the process change of the environmental protection measure causes the newly added pollutant species or the pollutant discharge amount to increase; the height of the sintering machine head waste gas, the sintering machine tail waste gas, the pellet roasting waste gas, the blast furnace ore tank waste gas, the blast furnace casting house waste gas, the converter secondary flue gas and the electric furnace flue gas exhaust funnel is reduced by 10 percent or more; newly adding a waste water discharge port; the waste water discharge direction is changed from indirect discharge to direct discharge; the environmental impact is exacerbated by direct vent position changes.
according to the above-described exemplary embodiment, the completion progress index data information of the environmental protection acceptance pre-flow includes project environmental protection facility commissioning conditions, environmental protection facility completion notice information, pollution discharge license information, and environmental protection facility debugging notice information. Specifically, the index data information of the project environmental protection facility commissioning condition indicates whether each item of environmental protection facility can be commissioned with the main project at the same time; the index data information of the environment-friendly facility completion notice information is the completion date, completion certification file and completion date notice material of each environment-friendly facility and is disclosed or disclosed consistently; the index data information of the pollution discharge permit refers to whether the pollution discharge permit is completely declared and whether the content of the pollution discharge permit is published or is consistent; the index data information of the environmental protection facility debugging public information is that the public or public evidence of the materials of each debugging plan, the debugging start and stop date and the debugging start and stop date of the environmental protection facility needing debugging proves whether the materials are public or are consistent. If more than one item of inconsistency occurs between the reference index data information and the actual index data information in the project environmental protection facility application condition, the environmental protection facility completion notice information, the pollution discharge permit information and the environmental protection facility debugging notice information, the completion progress of the environmental protection acceptance pre-flow does not reach the preset progress; and if the condition that any one of the reference index data information and the actual index data information in the project environmental protection facility application condition, the environmental protection facility completion notice information, the pollution discharge permit information and the environmental protection facility debugging notice information is not inconsistent, the completion progress of the environmental protection acceptance pre-flow reaches the preset progress.
according to the above exemplary embodiment, the index data information of the eco facility status unit includes whether the eco facility type, scale, and number are complete. Wherein the environment-friendly facilities specifically comprise a wastewater control measure, a waste gas control measure, a noise control measure, a solid waste control measure, an underground water control measure and an ecological control measure; the scale and the number of the environmental protection facilities can be flexibly set according to the actual situation. And if the environmental protection facility state unit detects that more than one item of inconsistency occurs between the reference index data information and the actual index data information, the environmental protection facility state unit detects that the environmental protection facility of the construction project is incomplete.
According to the above exemplary embodiment, the index data information of the variation identifying unit includes the scale of the construction project, the construction site of the construction project, the production process of the construction project, and the environmental protection measure of the construction project; the change identification unit identifies that the construction project has a first type change if the scale of the construction project, the construction site of the construction project, the production process of the construction project, and the environmental protection measure of the construction project have one or more first type changes. Specifically, the reference index data of the change recognition means is input with a first type of change recognition condition, and the first type of change recognition condition is different for different items.
As an example, taking a certain steel project as an example, the first type of change recognition conditions of the project include: a first class of variable scale recognition conditions includes: the productivity of the sintering, iron-making and steel-making processes is increased by 10 percent or more; the production capacity of the pelletizing and steel rolling processes is increased by 30 percent or more. The first type of change recognition condition occurs at the construction site, and comprises the following steps: the re-addressing and the total flat arrangement change lead to newly adding environmental protection targets in the protection distance. The production process has a first kind of change recognition conditions, which comprise: process changes result in increased new pollutant species or increased pollutant emissions. Environmental protection measures present a first type of change recognition condition, including: the process change of the environmental protection measure causes the newly added pollutant species or the pollutant discharge amount to increase; the height of the sintering machine head waste gas, the sintering machine tail waste gas, the pellet roasting waste gas, the blast furnace ore tank waste gas, the blast furnace casting house waste gas, the converter secondary flue gas and the electric furnace flue gas exhaust funnel is reduced by 10 percent or more; newly adding a waste water discharge port; the waste water discharge direction is changed from indirect discharge to direct discharge; the environmental impact is exacerbated by direct vent position changes.
According to the above-described exemplary embodiment, the index data information of the total amount calculation unit includes the pollutant discharge total amount described on the pollution discharge license information. Wherein the preset pollutant emission total amount is the respective allowable emission total amount of all pollutants recorded on the pollution discharge license information.
in an exemplary embodiment, the first information input module is further configured to input basic data information of the construction project. The basic data information of the construction project comprises construction project basic information, construction project progress, construction project construction plan, construction project research report and its replication information, construction project preliminary design and its replication information, environment supervision information and pollution discharge license information. Specifically, the construction project basic information specifically includes a construction unit name, a construction project name, a construction site, an industry category, a project property and a construction scale; the construction project progress specifically comprises the construction progress and the construction completion condition of a main project, a public and auxiliary project and an environmental protection project; the construction plan of the construction project comprises time plans of start-up, completion, acceptance and production of the construction project.
In an exemplary embodiment, the management module further comprises an acceptance report unit for inputting acceptance opinions, acceptance monitoring reports, acceptance monitoring report publicity information, acceptance notices, reporting the environment protection administrative department condition and reporting the complete environment protection acceptance information condition of the national construction project according to the acceptance judgment made by the acceptance decision unit.
in an exemplary embodiment, the system further comprises an archive module used for performing information arrangement and archiving on the first information input module, the second information input module, the self-checking module and the management module. The file module is also used for establishing project completion environment-friendly acceptance file data, wherein the acceptance file data specifically comprises a ring assessment report and a batch reply thereof, an exploitable report and a batch reply thereof, a preliminary design and a batch reply thereof, a construction contract (environment-friendly part), an environment supervision report, an environment-friendly acceptance monitoring report, acceptance opinions, other items needing to be explained, environment-friendly facility completion notice certification material, environment-friendly facility debugging notice certification material, acceptance report notice certification material and a commission contract.
in an exemplary embodiment, the system further comprises an update identification unit and an acceptance warning unit for updating, and an update maintenance module for maintaining the system. The updating maintenance module is used for updating the processing scheme of the first type of change in the change identification unit and updating the acceptance early warning unit to ensure that the acceptance does not pass the early warning condition; the updating and maintaining module is mainly used for maintaining the system module architecture, the users and the roles. Through the updating and maintenance of the updating maintenance module, the timeliness and the operation stability of the whole system can be supported.
the invention provides a construction project completion environment-friendly acceptance inspection overall process self-checking management method, which comprises the steps of inputting environment-friendly acceptance inspection information of construction project reference index data and actual index data, and carrying out comparative analysis on the input environment-friendly acceptance inspection information; the method can carry out self-check and management on the preposed flow, the necessary conditions and the like of the environment-friendly acceptance work before the completion environment-friendly acceptance is formally carried out on the construction project. By the method, the construction unit does not need professional ability and resources, and the whole process self-check and management can be carried out on the environment-friendly acceptance check of construction project completion, the progress of the environment-friendly acceptance check after the construction project completion and the legal compliance production of the construction project is accelerated, and the requirement of the construction unit on the whole process self-check and management of the environment-friendly acceptance check of the project completion can be met. The method can solve the problem that the construction unit can not carry out the whole-process dynamic self-checking management on the environment-friendly acceptance check of construction project completion at present, comprehensively analyzes the environment-friendly acceptance check risk and trend through self-checking and dynamic management, sends out early warning, helps the construction unit to timely fulfill the relevant flow procedures, perfects the acceptance check conditions, and assists the construction unit to manage the acceptance check progress and effect.
In summary, the present invention provides a method and a system for self-checking management of the whole process of completion and environmental acceptance of construction projects, comprising: the first information input module is used for inputting one-dimensional or multidimensional reference index data information of the environment-friendly acceptance information of the construction project; the second information input module is used for inputting actual index data information of the environment-friendly acceptance information of the construction project; the self-checking module is used for comparing and analyzing the actual index data information and the reference index data information to obtain a comparison and analysis result; and the management module is used for carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result. The management module also comprises an acceptance decision unit and an acceptance early warning unit; and the acceptance decision unit is used for making acceptance passing judgment according to the comparison and analysis result. And the acceptance early warning unit is used for making acceptance and non-passing early warning judgment according to the comparison and analysis result. According to the method, the environmental protection acceptance information of the reference index data and the actual index data of the construction project is input, and the input environmental protection acceptance information is contrasted and analyzed; the method can carry out self-check and management on the preposed flow, the necessary conditions and the like of the environment-friendly acceptance work before the completion environment-friendly acceptance is formally carried out on the construction project. According to the invention, the construction unit does not need professional ability and resources, and can perform whole-process self-inspection and management on the environment-friendly acceptance check of construction project completion, so that the progress of the environment-friendly acceptance check after the construction project completion and the legal compliance production of the construction project is accelerated, and the requirements of the construction unit on the whole-process self-inspection and management of the environment-friendly acceptance check of the project completion can be met. The method can solve the problem that the current construction unit can not carry out the whole-process dynamic self-checking management on the environment-friendly acceptance check of construction project completion, comprehensively analyzes the environment-friendly acceptance check risk and trend through the self-checking and dynamic management, sends out early warning, helps the construction unit to timely fulfill the relevant flow procedures, perfects the acceptance check conditions, and assists the construction unit to manage the acceptance check progress and effect. The invention automatically establishes a complete construction project completion environment-friendly acceptance informatization file at the later stage of completion environment-friendly acceptance, completely records the acceptance file in the whole process of project completion environment-friendly acceptance, and provides a complete and traceable electronic file for construction units. The invention is an informationized, invented and normalized self-checking management invention for the whole completion environment-friendly acceptance check process, can standardize the completion environment-friendly acceptance check management work of construction units, enhances the legal compliance of the environment-friendly acceptance check management work, and reduces the legal risk. The invention adopts function modularization development, is convenient to customize and develop according to the actual situation of a construction project, and ensures the stability, adaptability, expandability and module updating convenience of the invention. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
the foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. a construction project completion environment protection acceptance whole-process self-checking management method is characterized by comprising the following steps:
Collecting data information, wherein the data information comprises one-dimensional or multidimensional reference index data information of the construction project environment-friendly acceptance information and actual index data information of the construction project environment-friendly acceptance information;
comparing and analyzing the actual index data information and the reference index data information to obtain a comparison and analysis result;
and carrying out overall process management on the construction project completion environment-friendly acceptance according to the comparative analysis result.
2. the construction project as-built environment-friendly acceptance whole process self-checking management method according to claim 1, wherein the comparative analysis includes:
Checking the completion progress of the environmental protection acceptance pre-flow according to the actual index data information and the reference index data information;
checking the completeness state of the environmental protection facilities of the construction project according to the actual index data information and the reference index data information;
Identifying whether the construction project has first-class variation or not according to the actual index data information and the reference index data information;
and calculating the pollutant emission total amount standard of the construction project according to the actual index data information and the reference index data information.
3. The construction project as-built environment-friendly acceptance inspection whole process self-checking management method according to claim 2, characterized in that: if the comparison analysis result contains more than one of the following items, the acceptance check is carried out and the early warning judgment is not passed;
checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the completion progress of the environmental protection acceptance pre-flow of the actual index data information and the reference index data information;
Checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
and the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
4. The construction project as-built environment-friendly acceptance inspection whole process self-checking management method according to claim 2, characterized in that: if the comparison analysis result does not contain any one of the following items, the acceptance passing judgment is made;
checking that the completion progress of the environmental protection acceptance pre-flow does not reach a preset progress according to the completion progress of the environmental protection acceptance pre-flow of the actual index data information and the reference index data information;
Checking that the environmental protection facilities of the construction project are incomplete according to the actual index data information and the reference index data information;
Identifying that the construction project has a first type of change according to the actual index data information and the reference index data information;
and the pollutant emission total amount calculated according to the actual index data information exceeds the pollutant emission total amount preset by the reference index data information.
5. The construction project as-built environment-friendly acceptance overall process self-checking management method according to any one of claims 2 to 4, wherein the identifying whether the construction project has the first type of change according to the actual index data information and the reference index data information specifically comprises:
if more than one first type change exists in the scale of the construction project, the construction site of the construction project, the production process of the construction project and the environmental protection measures of the construction project, the first type change exists in the construction project.
6. a construction project completion environment-friendly acceptance whole-process self-checking management system is characterized by comprising:
The first information input module is used for inputting one-dimensional or multidimensional reference index data information of the environment-friendly acceptance information of the construction project;
The second information input module is used for inputting actual index data information of the environment-friendly acceptance information of the construction project;
the self-checking module is used for carrying out comparative analysis on the actual index data information and the reference index data information to obtain a comparative analysis result;
And the management module is used for carrying out overall process management on the environment-friendly acceptance check of construction project completion according to the comparison and analysis result.
7. the system for managing the whole acceptance process of the as-built environmental protection inspection of the construction project according to claim 6, wherein the self-inspection module comprises:
the environmental protection acceptance pre-flow unit is used for checking the completion progress of the environmental protection acceptance pre-flow according to the actual index data information and the reference index data information;
the environmental protection facility state unit is used for checking the complete state of the environmental protection facility of the construction project according to the actual index data information and the reference index data information;
a change identification unit for identifying whether the construction project has a first type of change according to the actual index data information and the reference index data information;
and the total amount calculating unit is used for checking whether the total pollutant emission amount of the construction project calculated according to the actual index data information exceeds the total pollutant emission amount preset by the reference index data information.
8. The system for the total self-inspection management of the as-built environment-friendly acceptance inspection of the construction project according to claim 6 or 7, wherein the management module further comprises:
and the acceptance decision unit is used for making acceptance passing judgment according to the comparison and analysis result.
9. The system for the total self-inspection management of the as-built environment-friendly acceptance inspection of the construction project according to claim 6 or 7, wherein the management module further comprises:
and the acceptance early warning unit is used for making acceptance and non-passing early warning judgment according to the comparison and analysis result.
10. the system for the total self-inspection management of the as-built and environment-friendly acceptance inspection of construction projects as claimed in claim 8, wherein the management module further comprises:
and the acceptance report unit is used for inputting acceptance opinions, acceptance monitoring reports, acceptance monitoring report publicity information and acceptance cautions.
CN201910825756.2A 2019-09-03 2019-09-03 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system Pending CN110570112A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910825756.2A CN110570112A (en) 2019-09-03 2019-09-03 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910825756.2A CN110570112A (en) 2019-09-03 2019-09-03 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system

Publications (1)

Publication Number Publication Date
CN110570112A true CN110570112A (en) 2019-12-13

Family

ID=68777349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910825756.2A Pending CN110570112A (en) 2019-09-03 2019-09-03 construction project completion environment-friendly acceptance inspection overall process self-checking management method and system

Country Status (1)

Country Link
CN (1) CN110570112A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction
CN204988370U (en) * 2015-09-28 2016-01-20 石阳 Real -time detection device is managed in environmental protection
CN108229777A (en) * 2016-12-21 2018-06-29 中国石油化工股份有限公司 A kind of petrochemical enterprise Environmental protection management information system
CN108510248A (en) * 2018-04-08 2018-09-07 广东新康博思信息技术有限公司 A kind of construction project environment approval system of overall monitor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104318408A (en) * 2014-11-25 2015-01-28 上海建科工程咨询有限公司 Multi-target and multi-dimension risk management system for large building engineering construction
CN204988370U (en) * 2015-09-28 2016-01-20 石阳 Real -time detection device is managed in environmental protection
CN108229777A (en) * 2016-12-21 2018-06-29 中国石油化工股份有限公司 A kind of petrochemical enterprise Environmental protection management information system
CN108510248A (en) * 2018-04-08 2018-09-07 广东新康博思信息技术有限公司 A kind of construction project environment approval system of overall monitor

Similar Documents

Publication Publication Date Title
CN111310803B (en) Environment data processing method and device
Tong et al. Modeling of unsafe behavior risk assessment: A case study of Chinese furniture manufacturers
CN113191730A (en) Dangerous chemical full life cycle information supervision system based on big data
CN112150098A (en) Electric power facility anti-terrorism security supervision method and system
Heshmat et al. Simulation modelling and analysis of a production line
CN110570112A (en) construction project completion environment-friendly acceptance inspection overall process self-checking management method and system
CN113570214A (en) Nuclear power project risk network diagram analysis technology implementation method
CN115600856A (en) Method, device, equipment and medium for automatically auditing and distributing events
Sekhar et al. Confluence of Six Sigma, simulation and environmental quality: An application in foundry industries
CN113869639B (en) Yangtze river basin enterprise screening method and device, electronic equipment and storage medium
CN115600797A (en) Task processing method, device, equipment and medium
CN107590591A (en) A kind of environmental protection treatment station big data and its application system construction method
CN114781852A (en) Enterprise environment wind control management system and method based on dual prevention mechanism
Love et al. Retrospective future proofing of a copper mine: Quantification of errors and omissions in ‘As-built’documentation
CN113961770A (en) Enterprise big data monitoring system and monitoring method
Wetzel et al. The utilization of an asset safety identification tool (ASIT) to support safety during facilities management
Jin et al. Research on factors affecting the life-circle cost of prefabricated building in China
CN111798319A (en) Industrial waste comprehensive management platform
CN112559609A (en) Method for reading transformer data from Word and storing transformer data into Excel
CN113516416B (en) Evaluation method, device, equipment and medium for cement kiln waste treatment complete cycle
Ryzhkova et al. United Digital Platform for Efficient Construction Development
Xu et al. Identification of construction safety risks based on text mining and LIBSVM method
Dadfarma et al. Analysis of Occupational Accidents: A Data Mining Study
CN115048981A (en) Decoration garbage high-calorific-value component treatment and inspection method and device and electronic equipment
Pehlken et al. Assessment of Reusability of used car part components with support of decision tool RAUPE

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination