CN108487608A - A kind of exterior-wall heat insulation board construction method and its constructing device - Google Patents
A kind of exterior-wall heat insulation board construction method and its constructing device Download PDFInfo
- Publication number
- CN108487608A CN108487608A CN201810248366.9A CN201810248366A CN108487608A CN 108487608 A CN108487608 A CN 108487608A CN 201810248366 A CN201810248366 A CN 201810248366A CN 108487608 A CN108487608 A CN 108487608A
- Authority
- CN
- China
- Prior art keywords
- adhesive tape
- gluing
- paper self
- line paper
- gluing head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/165—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/165—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
- E04F21/1652—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers for smoothing and shaping joint compound to a desired contour
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Coating Apparatus (AREA)
Abstract
The present invention relates to a kind of exterior-wall heat insulation board construction method and its constructing devices, including glue gun gun body, the output end of gun body is arranged with gluing head, the output end of gun body is removably connected with gluing mechanism and frictioning mechanism in the position where gluing head, gluing mechanism includes being relatively arranged on the fixed link of gluing head both sides, end of the both sides fixed link far from gluing head is equipped with fixed plate, it is equipped with rotation axis in the fixed plate of both sides, coiling has line paper self-adhesive tape in rotation axis, frictioning mechanism includes the glue scraping plate being arranged on gun body output end, glue scraping plate is set on gluing head perpendicular to the position where gluing mechanism.When needing to filling up silicone sealant in partitioning slot, line paper self-adhesive tape is connected in side walls, drive gluing head gluing into partitioning slot, glue scraping plate scrapes extra silicone sealant to the line paper self-adhesive tape of both sides so that glue gun can be completed at the same time tape, the work of gluing and frictioning.
Description
Technical field
The present invention relates to technical field of building construction more particularly to a kind of exterior-wall heat insulation board construction method and its construction dresses
It sets.
Background technology
External wall thermal insulation/decoration integration board construction technology is that the cladding construction technology with thermal insulation board installation of comprehensive furring tile is wanted
It asks, and is improved on this basis, customized and processed in factory by heat insulation decoration integrated plate, and carved at the construction field (site)
The processing of the working procedures such as slot, stickup and anchoring makes the heat preservation of wall face and decorates the construction technology of disposal molding.Heat preservation dress
Decorations integrated board belongs to advanced composite material (ACM), is applied on exterior wall, can simplify the working procedure of exterior-wall heat insulation and decoration, shorten
Construction period.
Existing thermal insulating composite panel by binder when being installed to basic metope, it usually needs in two pieces of adjacent guarantors
There are partitioning slots between warm composite plate, when being finished to thermal insulating composite panel stickup, need the embedded polystyrene bubble into partitioning slot
Then foam item is squeezing into silicone sealant, is realizing to the aesthetics and water proofing property of entire exterior wall, usually fill up the operation of partitioning slot
According to the design requirement of partitioning slot, line paper self-adhesive tape to be attached on adjacent thermal insulating composite panel and being located at partitioning slot position
Side clears up impurity and dust in partitioning slot, at least both sides organic silicon water-proofing glue is brushed on the section of thermal insulating composite panel, is waited until
After organic silicon water-proofing glue is dry, it manually is embedded in polystyrene foam item in partitioning slot, it then will be into partitioning slot using glue gun
Silicone sealant is added, after the completion of gluing, the silicone sealant being extruded in partitioning slot progress glue-line is repaiied and is scraped, by extra silicon
Ketone seal gum is scraped to the line paper self-adhesive tape of both sides, after waiting for silicone sealant dry, finally takes line paper self-adhesive tape off, will be extra
Silicone sealant is torn together with line paper self-adhesive tape so that partitioning slot is smooth beautiful and with preferable water proofing property etc..
This method is disadvantageous in that operating personnel need first to paste line paper self-adhesive tape on thermal insulating composite panel, to
Silicone sealant is added in partitioning slot, then is struck off extra silicone sealant by scraper plate, and finally line paper self-adhesive tape is torn,
Operating process is relatively complicated, affects the working efficiency of operating personnel.
Invention content
The first object of the present invention is to provide a kind of external wall insulation constructing device have and be carried out at the same time gluing of taping
Frictioning and the advantages of working efficiency can be improved.
The present invention above-mentioned technical purpose technical scheme is that:A kind of external wall insulation construction dress
It sets, including glue gun gun body, the output end of the gun body is arranged with gluing head, and the output end of the gun body is where gluing head
Position is removably connected with gluing mechanism and frictioning mechanism, and the gluing mechanism includes being relatively arranged on the fixation of gluing head both sides
Bar, end of the fixed link far from gluing head described in both sides are equipped with fixed plate, are equipped with rotation axis in fixed plate described in both sides, institute
Stating coiling in rotation axis has line paper self-adhesive tape, and the frictioning mechanism includes the glue scraping plate being arranged on gun body output end, described to scrape
Offset plate is set on gluing head perpendicular to the position where gluing mechanism.
Implement above-mentioned technical proposal, when needing to filling up silicone sealant in partitioning slot, gluing head be directed at partitioning slot,
Line paper self-adhesive tape is connected in side walls, glue gun gun body glue spraying into partitioning slot is driven, by the U.S. line paper of gluing head direction
Direction movement where adhesive tape so that line paper self-adhesive tape is while having pasted adhesive tape, gluing head gluing into partitioning slot, in gluing
While head has played glue, glue scraping plate scrapes extra silicone sealant to the line paper self-adhesive tape of both sides, finally by line paper self-adhesive tape
Tear, the setting of gluing mechanism and frictioning mechanism may make glue gun can be completed at the same time tape, the work of gluing and frictioning
Make, improves the working efficiency of operating personnel.
Further, the output end of the gun body is equipped with retainer plate, and the retainer plate is arranged and is fixedly connected on the defeated of gun body
In outlet, the gluing mechanism and frictioning mechanism may be contained on retainer plate.
Implement above-mentioned technical proposal, gluing mechanism and frictioning mechanism are arranged on retainer plate so that gluing mechanism and scrapes
Gluing mechanism is detachably connected on the output end of gun body, when needing to remove gluing mechanism and frictioning mechanism, will directly be fixed
The output end enclosed in gun body is removed, when the output end for needing to add to gluing mechanism and frictioning mechanism other glue gun gun bodies
When upper, fixed trap was directly set to the output end of gun body, improves the using effect of gluing mechanism and frictioning mechanism.
Further, the both ends of the fixed link are hingedly connected in fixed plate and retainer plate, in the fixed link with fixation
Plate and the hinged position of retainer plate are equipped with tightens bolt for lock hinge joint rotation.
Implement above-mentioned technical proposal, when needing to carry out silicone sealant filling to inner corner trim or external corner, by adjusting fixation
The position of bar and fixed plate so that the zone face of line paper self-adhesive tape can be abutted with the wall of inner corner trim or external corner, and can be in certain journey
On degree adjust the distance between line paper self-adhesive tape and partitioning slot so that gluing head in partitioning slot filling silicone sealant after,
Extra silicone sealant can be scraped to the line paper self-adhesive tape of both sides, convenient to clear up extra silicone sealant, when
Behind the position for having adjusted line paper self-adhesive tape, bolt will be tightened and tightened, prevented in line paper self-adhesive tape to filling silicon in inner corner trim or external corner
When ketone seal gum, line paper self-adhesive tape generates movement, to be normally carried out the work of rubberizing.
Further, face of the fixed plate far from fixed link is equipped with sliding slot, on the sliding slot along its length with cunning
Slot is vertically equipped with protrusion, and end of the rotation axis far from line paper self-adhesive tape is equipped with and is slidably connected in the sliding slot and and sliding slot
The sliding part being equipped with is equipped with for sliding part to be locked in supporting for position in sliding slot towards sliding slot inner wall on the sliding part
Tight bolt.
Implement above-mentioned technical proposal, it, can when adjustment line paper self-adhesive tape so that the zone face of line paper self-adhesive tape is parallel with wall
By sliding part in being slided in sliding slot, the distance between line paper self-adhesive tape and partitioning slot are adjusted, when adjust line paper self-adhesive tape and divided
When the distance between space, bolt will be pushed against and tightened so that rotation axis is locked to a certain position in sliding slot, prevents U.S. line paper glue
For band while rubberizing, line paper self-adhesive tape generates movement, can be prevented by adjusting the distance between line paper self-adhesive tape and partitioning slot
In to partitioning slot when gluing, silicone sealant is applied on wall, convenient to clear up wall.
Further, spring, the sliding are connected between end and sliding part of the rotation axis far from line paper self-adhesive tape
It is coaxially provided with spring for preventing the inclined guide cylinder of spring in portion.
Implement above-mentioned technical proposal to support rotation axis when needing the zone face by line paper self-adhesive tape with abutting between the walls
The elastic force of anti-spring compresses the spring into guide cylinder so that and line paper self-adhesive tape can be abutted further with generating between the walls, and
And when compressing the spring into guide cylinder, it can prevent rotation axis from spring being driven to generate inclination, to further prevent U.S. line paper
For adhesive tape when being abutted with wall, line paper self-adhesive tape generates inclination.
Further, the rotation axis is equipped with the flange for preventing line paper self-adhesive tape to be detached from rotation axis, the flange and rotation
Axle thread connects.
Implement above-mentioned technical proposal, the setting of flange can prevent line paper self-adhesive tape from falling off in generation in rotation axis, when U.S. line
Paper self-adhesive tape use finishes when being replaced, by flange in being dismantled in rotation axis, by line paper self-adhesive tape towards the side of rotation axis
To skidding off rotation axis, you can the replacement to line paper self-adhesive tape is completed, it is convenient and simple.
The second object of the present invention is to provide a kind of exterior-wall heat insulation board construction method.
The present invention above-mentioned technical purpose technical scheme is that:A kind of external wall insulation construction party
Method, which is characterized in that include the following steps:
S1:Base checks and processing, is polished by dedicated mortar with coarse place to the bumps of base course wall;
S2:Surveying setting-out, the size specification of Fundamentals of Measurement metope data and thermal insulation board are drawn using CAD according to real data and are protected
Warm plate actual installation typesetting figure launches horizontal control lines with spirit level at ± 0.000 or more 1m according to practical typesetting figure, then uses
Theodolite pop-up is often across orthogonal control lines, according to control line and the good cut-off rule of reference gate window position bullet;
S3:Mortar configure, be added by a certain percentage to container using special adhesive mortar dry powder and water, with it is hand-held when electric mixing
The time is mixed not less than 5min, the mortar being finished in 2h after stirring;
S4:Paste heat-preserving composite plate drills in anchorage point, applying mortar on face is pasted in thermal insulation board, according to heat preservation
The size of composite plate is in central area applying mortar cake, one circle mortar of mill, the mortar on periphery on the periphery of thermal insulating composite panel
Diagonal position opens up venting channels respectively, and total paving product of mortar cannot be less than 60%, and thermal insulation board is suitable according to from bottom to top
Sequence is vertically laid with;
S5:Anchoring piece, bracket are installed, row's Zinc-coated angle steel, which is arranged, according to each layer height of building height drags part, cleaning to need to pacify
The drilling for filling anchoring piece, carries out the installation of anchoring piece, the anchoring piece of the circumferential position of every piece of thermal insulation board is no less than 6, anchoring piece
Depth into foundation wall is not less than 50mm, and anchoring piece is mounted on wall and tightens expansion anchor, it is ensured that expansion anchor
Return twist be allowed to fully anchor with foundation wall, needed after anchoring to anchoring piece carry out suspension force experiment, by the noon of 10kg hang to
For 24 hours, anchoring piece is qualification without flexural deformation to anchoring piece outermost end;
S6:Using the external wall insulation constructing device to filling silicone sealant in partitioning slot, gluing head is directed at gap, is made
The elastic force for obtaining the line paper self-adhesive tape resistance spring of gluing head both sides is abutted with the metope by partitioning slot, is adjusted line paper self-adhesive tape and is divided
The distance between space starts external wall insulation constructing device and starts gluing, by gluing head towards the side where line paper self-adhesive tape
To movement so that metope after having pasted line paper self-adhesive tape to carrying out gluing in partitioning slot, while gluing is completed, on gluing head
Glue scraping plate complete to extra silicone sealant scrape, finally line paper self-adhesive tape is torn;
S7:Venting plug is installed, first electric drill is used to drill towards lower tilt, fluid sealant is added with venting plug surrounding in hole, will arrange
Vent plug is filled in hole;
S8:Thermal insulating composite panel surface is cleared up, plate face is cleaned using detergent after fluid sealant is dry, guards against scratch surface.
Implement above-mentioned technical proposal, in step S1, the crack and uneven to wall is polished using dedicated mortar may make
When follow-up thermal insulation board is labelled on metope, thermal insulation board integrally has preferable flatness;In step S2, installation row is drawn using CAD
Domain can determine Makeup Optimization technical solution so that lattice scheme accomplishes material saving, beauty, safety;In step S3, by what is be stirred
Mortar is finished in 2h, can prevent mortar from condensing, because the mortar after condensation can lose certain adherence force, therefore by mortar in 2h
Inside it is finished the sticking effect that mortar can be improved to thermal insulation board;In step S4, on the periphery of thermal insulation board and central area applying mortar,
May make thermal insulation board to be adhered on wall has preferable stability;In step S5, the setting of anchoring piece may make thermal insulation board
It is optionally further secured to foundation wall, doing suspension force experiment to anchoring piece can ensure that anchoring piece is preferable firm in having on wall
Solidity;In step S6, when using glue gun gun body wall to gluing in partitioning slot, glue gun gun body can be completed at the same time rubberizing
The operation of band, gluing and frictioning, improves the working efficiency of operating personnel;In step S7, venting plug is arranged downward and may make
When meeting with heavy rain weather, rainwater is entered to by venting plug in wall, to improve the using effect of venting plug;Step S8
In, in work progress, it is easily infected with various dirt impurity due to various reasons, on exterior wall, clearing up dirt impurity can
It protects exterior wall glue envelope and panel not to be damaged, and the aesthetics of entire thermal insulation board can be improved.
Further, it is by the method that line paper self-adhesive tape is abutted with external corner both sides metope in the step S6:
S101:Gluing head is aligned to the partition seam of external corner, keeps the extended line of gluing head and the metope of external corner both sides at 45 °;
S102:Bolt is tightened in release, and both sides fixed link is adjusted in the hinged direction far from gluing head that is positioned against of retainer plate;
S103:By fixed plate in the hinged direction adjustment being positioned against close to gluing head of fixed link, bolt is tightened so that
Line paper self-adhesive tape squeezes spring, compresses the spring into guide cylinder so that the zone face of line paper self-adhesive tape resist the elastic force of spring with
The wall of external corner both sides abuts.
Implement above-mentioned technical proposal, it, will be in glue gun gun body when needing to carry out gluing to external corner using glue gun gun body
Fixed link and fixed plate adjust separately position so that the zone face of line paper self-adhesive tape can be abutted with the side walls of external corner, to
So that glue gun gun body can simultaneously tape to external corner, the work of gluing and frictioning, the work effect of operating personnel is improved
Rate.
Further, it is by the method that line paper self-adhesive tape is abutted with external corner both sides metope in the step S6:
S201:Gluing head is aligned to the partition seam of external corner, keeps the extended line of gluing head and the metope of external corner both sides at 45 °;
S202:Bolt is tightened in release, and both sides fixed link is adjusted in the hinged direction far from gluing head that is positioned against of retainer plate;
S303:By fixed plate in the hinged direction adjustment being positioned against close to gluing head of fixed link, bolt is tightened so that
Line paper self-adhesive tape squeezes spring, compresses the spring into guide cylinder so that the zone face of line paper self-adhesive tape resist the elastic force of spring with
The wall of external corner both sides abuts.
Implement above-mentioned technical proposal, it, will be in glue gun gun body when needing to carry out gluing to inner corner trim using glue gun gun body
Fixed link and fixed plate adjust separately position so that the zone face of line paper self-adhesive tape can be abutted with the side walls of inner corner trim, to
So that glue gun gun body can simultaneously tape to inner corner trim, the work of gluing and frictioning, the work effect of operating personnel is improved
Rate.
Further, the method for adjustment line paper self-adhesive tape and the distance between partitioning slot is in the step S6:
S301:Bolt will be pushed against to unscrew;
S302:By sliding part in being slided in sliding slot, the distance between line paper self-adhesive tape and partitioning slot in rotation axis are adjusted;
S303:By tightening abutting bolt, it is allowed to abut with the inner wall of sliding slot.
Implement above-mentioned technical proposal, behind the position because adjust fixed link and fixed plate, line paper self-adhesive tape separating distance stitches
Between there is also a certain distance, therefore sliding slot is set, when needing to finely tune the distance between line paper self-adhesive tape separating distance seam,
By sliding part in being slided in sliding slot, bolt will be pushed against and tightened so that line paper self-adhesive tape can be fixed in away from partitioning slot any distance
Position prevent silicone sealant to be applied to around external corner or inner corner trim to improve the using effect of line paper self-adhesive tape
On wall.
In conclusion the invention has the advantages that:
One, the setting of gluing mechanism and frictioning mechanism may make glue gun can be completed at the same time tape, the work of gluing and frictioning,
Improve the working efficiency of operating personnel;
Two, fixed link is hingedly connected on retainer plate and fixed plate, may make gluing head can be directed to inner corner trim and external corner simultaneously into
Row tape, the work of gluing and frictioning, improve the using effect of glue gun;
Three, the setting of sliding slot and sliding part may make glue gun gun body distance fine regulation between line paper self-adhesive tape and partitioning slot, from
And further such that line paper self-adhesive tape can be abutted with the generation of the wall of partitioning slot both sides.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
Obtain other attached drawings according to these attached drawings.
Fig. 1 is whole structural schematic diagram of the gun body to inner corner trim gluing of the embodiment of the present invention one.
Fig. 2 is the structural schematic diagram of the gluing mechanism and frictioning mechanism of the embodiment of the present invention one;
Fig. 3 is the portions the A enlarged drawing in Fig. 2;
Fig. 4 is whole structural schematic diagram of the gun body to external corner gluing of the embodiment of the present invention one;
Fig. 5 is the portions the B enlarged drawing in Fig. 4;
Fig. 6 is the flow chart of the construction method of the external wall insulation of the embodiment of the present invention two;
Fig. 7 is flow chart of the gluing head to external corner gluing of the embodiment of the present invention two;
Fig. 8 is flow chart of the gluing head to inner corner trim gluing of the embodiment of the present invention two;
Fig. 9 is the flow chart of the adjustment line paper self-adhesive tape and partitioning slot spacing of the embodiment of the present invention two.
Reference numeral:1, gun body;11, glue scraping plate;12, retainer plate;2, gluing head;3, fixed link;31, fixed plate;311、
Sliding slot;312, raised;32, rotation axis;321, line paper self-adhesive tape;322, sliding part;323, flange;33, bolt is tightened;34, it supports
Tight bolt;35, spring;36, guide cylinder.
Specific implementation mode
In the following detailed description, it is proposed that many details, in order to complete understanding of the present invention.But
It will be apparent to those skilled in the art that the present invention can be in some details in not needing these details
In the case of implement.Below the description of embodiment is used for the purpose of providing to the present invention more by showing the example of the present invention
Understand well.
Below in conjunction with attached drawing, the technical solution of the embodiment of the present invention is described.
Embodiment one:
As shown in Figure 1, the present embodiment is related to a kind of external wall insulation constructing device, including glue gun gun body 1, the output of gun body 1
End cap is equipped with gluing head 2, and the output end of gun body 1 is removably connected with gluing mechanism and spreading machine in the position where gluing head 2
Structure.
The output end of gun body 1 is equipped with retainer plate 12 combined with Figure 1 and Figure 2, and retainer plate 12 is arranged and is fixedly connected on gun body 1
Output end on, gluing mechanism and frictioning mechanism may be contained on retainer plate 12.By gluing mechanism and the setting of frictioning mechanism solid
Surely on circle 12 so that gluing mechanism and frictioning mechanism are detachably connected on the output end of gun body 1, when needing gluing mechanism and
When frictioning mechanism is removed, the output end directly by retainer plate 12 in gun body 1 is removed, when needing gluing mechanism and spreading machine
When structure is added on the output end of other glue gun gun bodies 1, retainer plate 12 is directly sheathed on to the output end of gun body 1, is improved
The using effect of gluing mechanism and frictioning mechanism.
Gluing mechanism includes being relatively arranged on the fixed link 3 of 2 both sides of gluing head combined with Figure 1 and Figure 2, and both sides fixed link 3 is remote
End from gluing head 2 is equipped with fixed plate 31, and rotation axis 32 is equipped in both sides fixed plate 31, and coiling has U.S. in rotation axis 32
Line paper self-adhesive tape 321, rotation axis 32 be equipped with prevent line paper self-adhesive tape 321 be detached from rotation axis 32 flange 323, flange 323 with turn
Moving axis 32 is threadedly coupled.The setting of flange 323 can prevent line paper self-adhesive tape 321 from falling off in generation in rotation axis 32, when U.S. line paper
321 use of adhesive tape finishes when being replaced, and flange 323 is dismantled in rotation axis 32, by line paper self-adhesive tape 321 towards turning
The direction of moving axis 32 skids off rotation axis 32, you can the replacement to line paper self-adhesive tape 321 is completed, it is convenient and simple.
Frictioning mechanism includes the glue scraping plate 11 being arranged on 1 output end of gun body combined with Figure 1 and Figure 2, and glue scraping plate 11 is set to
Perpendicular to the position where gluing mechanism on gluing head 2.The both ends of fixed link 3 are hingedly connected to fixed plate 31 and retainer plate 12
On, in fixed link 3 position hinged with fixed plate 31 and retainer plate 12 be equipped with for lock hinge joint rotation tighten bolt
33。
When needing to carry out silicone sealant filling to inner corner trim or external corner, by adjusting the position of fixed link 3 and fixed plate 31
It sets so that the zone face of line paper self-adhesive tape 321 can be abutted with the wall of inner corner trim or external corner, and can adjust U.S. line to a certain extent
The distance between paper self-adhesive tape 321 and partitioning slot so that gluing head 2 in partitioning slot after to filling silicone sealant, extra silicon
Ketone seal gum can be scraped to the line paper self-adhesive tape 321 of both sides, and line paper self-adhesive tape 321 is carried out to the wall by partitioning slot
When gluing, glue gun gun body 1 can be completed at the same time the work of gluing and frictioning, improve the working efficiency of operating personnel;And it is square
Just extra silicone sealant is cleared up, after having adjusted the position of line paper self-adhesive tape 321, bolt 33 will be tightened and tightened,
It preventing when line paper self-adhesive tape 321 in inner corner trim or external corner to filling silicone sealant, line paper self-adhesive tape 321 generates movement, to
The work of rubberizing cannot be normally carried out.
In conjunction with Fig. 2 and Fig. 3, face of the fixed plate 31 far from fixed link 3 is equipped with sliding slot 311, side along its length on sliding slot 311
It is equipped with protrusion 312 to vertical with sliding slot 311, end of the rotation axis 32 far from line paper self-adhesive tape 321 is equipped with and is slidably connected to sliding slot
It is equipped with towards 311 inner wall of sliding slot for by sliding part on 322 sliding part 322 of sliding part being equipped in 311 and with sliding slot 311
322 are locked in the abutting bolt 34 of any position in sliding slot 311.
It, can be by sliding part 322 when adjusting line paper self-adhesive tape 321 so that the zone face of line paper self-adhesive tape 321 is parallel with wall
The sliding in the sliding slot 311, adjusts the distance between line paper self-adhesive tape 321 and partitioning slot, when adjust line paper self-adhesive tape 321 and divided
When the distance between space, bolt 34 will be pushed against and tightened so that rotation axis 32 is locked to a certain position in sliding slot 311, prevents
For line paper self-adhesive tape 321 while rubberizing, line paper self-adhesive tape 321 generates movement, by adjusting line paper self-adhesive tape 321 and partitioning slot
The distance between when can prevent the gluing in partitioning slot, silicone sealant is applied on wall, convenient to clear up wall.
As shown in Fig. 2, it is connected with spring 35 between end of the rotation axis 32 far from line paper self-adhesive tape 321 and sliding part 322,
It is coaxially provided with spring 35 for preventing 35 inclined guide cylinder 36 of spring on sliding part 322.When needing line paper self-adhesive tape 321
Zone face with abutting between the walls when, by rotation axis 32 resist spring 35 elastic force spring 35 is compressed in guide cylinder 36, make
Line paper self-adhesive tape 321 can be abutted further with generating between the walls, can and when spring 35 to be compressed in guide cylinder 36
Prevent rotation axis 32 from spring 35 being driven to generate inclination, to further prevent line paper self-adhesive tape 321 when being abutted with wall, U.S. line
Paper self-adhesive tape 321 generates inclination.
Embodiment two:
The present embodiment is related to a kind of exterior-wall heat insulation board construction method, includes the following steps:
S1:Base checks and processing, is polished by dedicated mortar with coarse place to the bumps of base course wall;
S2:Surveying setting-out, the size specification of Fundamentals of Measurement metope data and thermal insulation board are drawn using CAD according to real data and are protected
Warm plate actual installation typesetting figure launches horizontal control lines with spirit level at ± 0.000 or more 1m according to practical typesetting figure, then uses
Theodolite pop-up is often across orthogonal control lines, according to control line and the good cut-off rule of reference gate window position bullet;
S3:Mortar configure, be added by a certain percentage to container using special adhesive mortar dry powder and water, with it is hand-held when electric mixing
The time is mixed not less than 5min, the mortar being finished in 2h after stirring;
S4:Paste heat-preserving composite plate drills in anchorage point, applying mortar on face is pasted in thermal insulation board, according to heat preservation
The size of composite plate is in central area applying mortar cake, one circle mortar of mill, the mortar on periphery on the periphery of thermal insulating composite panel
Diagonal position opens up venting channels respectively, and total paving product of mortar cannot be less than 60%, and thermal insulation board is suitable according to from bottom to top
Sequence is vertically laid with;
S5:Anchoring piece, bracket are installed, row's Zinc-coated angle steel, which is arranged, according to each layer height of building height drags part, cleaning to need to pacify
The drilling for filling anchoring piece, carries out the installation of anchoring piece, the anchoring piece of the circumferential position of every piece of thermal insulation board is no less than 6, anchoring piece
Depth into foundation wall is not less than 50mm, and anchoring piece is mounted on wall and tightens expansion anchor, it is ensured that expansion anchor
Return twist be allowed to fully anchor with foundation wall, needed after anchoring to anchoring piece carry out suspension force experiment, by the noon of 10kg hang to
For 24 hours, anchoring piece is qualification without flexural deformation to anchoring piece outermost end;
S6:Using external wall insulation constructing device to filling silicone sealant in partitioning slot, gluing head 2 is directed at gap so that
The elastic force that the line paper self-adhesive tape 321 of 2 both sides of gluing head resists spring 35 is abutted with the metope by partitioning slot, adjusts line paper self-adhesive tape
The distance between 321 and partitioning slot start external wall insulation constructing device and start gluing, by gluing head 2 towards line paper self-adhesive tape
Direction movement where 321 so that metope, to carrying out gluing in partitioning slot, is completed after having pasted line paper self-adhesive tape 321 in gluing
While, the glue scraping plate 11 on gluing head 2 is completed to scrape extra silicone sealant, finally tears line paper self-adhesive tape 321;
It is by the method that line paper self-adhesive tape 321 is abutted with external corner both sides metope in step S6:
S101:Gluing head 2 is aligned to the partition seam of external corner, keeps the extended line of gluing head 2 and the metope of external corner both sides at 45 °;
S102:Bolt 33 is tightened in release, by both sides fixed link 3 in the hinged side for being positioned against separate gluing head 2 of retainer plate 12
To adjustment;
S103:By fixed plate 31 in the hinged direction adjustment being positioned against close to gluing head 2 of fixed link 3, bolt is tightened
33 so that line paper self-adhesive tape 321 squeezes spring 35, spring 35 is compressed in guide cylinder 36 so that the band of line paper self-adhesive tape 321
The elastic force that spring 35 is resisted in face is abutted with the wall of external corner both sides.
It is by the method that line paper self-adhesive tape 321 is abutted with inner corner trim both sides metope in step S6:
S201:Gluing head 2 is aligned to the partitioning slot of inner corner trim, keeps the extended line of gluing head 2 and the metope of inner corner trim both sides at 45 °;
S202:Bolt 33 is tightened in release, and both sides fixed link 3 is positioned against close to the side of gluing head 2 in retainer plate 12 is hinged
To adjustment;
S203:Fixed plate 31 is adjusted in the hinged direction far from gluing head 2 that is positioned against of fixed link 3, tightens bolt
33 so that line paper self-adhesive tape 321 squeezes spring 35, spring 35 is compressed in guide cylinder 36 so that the band of line paper self-adhesive tape 321
The elastic force that spring 35 is resisted in face is abutted with the wall of inner corner trim both sides.
Line paper self-adhesive tape 321 is adjusted in step S6 and the method for the distance between partitioning slot is:
S301:Bolt 34 will be pushed against to unscrew;
S302:By sliding part 322 in sliding in sliding slot 311, adjust in rotation axis 32 between line paper self-adhesive tape 321 and partitioning slot
Distance;
S303:Bolt 34 is pushed against by tightening, is allowed to abut with the inner wall of sliding slot 311.
S7:Venting plug is installed, first electric drill is used to drill towards lower tilt, fluid sealant is added with venting plug surrounding in hole,
Venting plug is filled in hole;
S8:Thermal insulating composite panel surface is cleared up, plate face is cleaned using detergent after fluid sealant is dry, guards against scratch surface.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than limits the protection domain of invention.It is aobvious
So, described embodiment is only section Example of the present invention, rather than whole embodiments.Based on these embodiments, ability
The every other embodiment that domain those of ordinary skill is obtained without creative efforts belongs to institute of the present invention
Scope of protection.Although with reference to above-described embodiment, invention is explained in detail, those of ordinary skill in the art according to
So can creative work not be made to according to circumstances mutual group of the feature in various embodiments of the present invention in the absence of conflict
Other adjustment are made in conjunction, additions and deletions, to obtain other technologies scheme of the different, essence without departing from the design of the present invention, these
Technical solution similarly belongs to invention which is intended to be protected.
Claims (10)
1. the output end of a kind of external wall insulation constructing device, including glue gun gun body (1), the gun body (1) is arranged with gluing
Head (2), which is characterized in that the output end of the gun body (1) is removably connected with gluing mechanism in the position where gluing head (2)
With frictioning mechanism, the gluing mechanism includes being relatively arranged on the fixed link (3) of gluing head (2) both sides, fixed link described in both sides
(3) end far from gluing head (2) is equipped with fixed plate (31), and rotation axis (32) is equipped in fixed plate (31) described in both sides,
It includes being arranged on gun body (1) output end that coiling, which has line paper self-adhesive tape (321), the frictioning mechanism, on the rotation axis (32)
Glue scraping plate (11), the glue scraping plate (11) are set to gluing head(2)On perpendicular to the position where gluing mechanism.
2. a kind of external wall insulation constructing device according to claim 1, which is characterized in that the output of the gun body (1)
End is equipped with retainer plate (12), and the retainer plate (12) is arranged and is fixedly connected on the output end of gun body (1), the gluing mechanism
It may be contained on retainer plate (12) with frictioning mechanism.
3. a kind of external wall insulation constructing device according to claim 2, which is characterized in that the two of the fixed link (3)
End be hingedly connected in fixed plate (31) and retainer plate (12), on the fixed link (3) with fixed plate (31) and retainer plate (12)
Hinged position be equipped with for lock hinge joint rotation tighten bolt (33).
4. a kind of external wall insulation constructing device according to claim 3, which is characterized in that the fixed plate (31) is separate
The face of fixed link (3) is equipped with sliding slot (311), on the sliding slot (311) along its length it is vertical with sliding slot (311) be equipped with it is convex
It rises (312), end of the rotation axis (32) far from line paper self-adhesive tape (321), which is equipped with, to be slidably connected in the sliding slot (311)
And the sliding part (322) being equipped with sliding slot (311), the sliding part(322)On towards sliding slot (311) inner wall be equipped be used for
By sliding part(322)It is locked in the abutting bolt (34) of sliding slot (311) interior any position.
5. a kind of external wall insulation constructing device according to claim 4, which is characterized in that the rotation axis (32) is separate
Spring (35) is connected between the end and sliding part (322) of line paper self-adhesive tape (321), on the sliding part (322) and spring
(35) it is coaxially provided with for preventing spring(35)Inclined guide cylinder (36).
6. a kind of external wall insulation constructing device according to claim 5, which is characterized in that set on the rotation axis (32)
There are the flange (323) for preventing line paper self-adhesive tape (321) to be detached from rotation axis (32), the flange (323) and rotation axis (32) screw thread
Connection.
7. a kind of exterior-wall heat insulation board construction method, which is characterized in that include the following steps:
S1:Base checks and processing, is polished by dedicated mortar with coarse place to the bumps of base course wall;
S2:Surveying setting-out, the size specification of Fundamentals of Measurement metope data and thermal insulation board are drawn using CAD according to real data and are protected
Warm plate actual installation typesetting figure launches horizontal control lines with spirit level at ± 0.000 or more 1m according to practical typesetting figure, then uses
Theodolite pop-up is often across orthogonal control lines, according to control line and the good cut-off rule of reference gate window position bullet;
S3:Mortar configure, be added by a certain percentage to container using special adhesive mortar dry powder and water, with it is hand-held when electric mixing
The time is mixed not less than 5min, the mortar being finished in 2h after stirring;
S4:Paste heat-preserving composite plate drills in anchorage point, applying mortar on face is pasted in thermal insulation board, according to heat preservation
The size of composite plate is in central area applying mortar cake, one circle mortar of mill, the mortar on periphery on the periphery of thermal insulating composite panel
Diagonal position opens up venting channels respectively, and total paving product of mortar cannot be less than 60%, and thermal insulation board is suitable according to from bottom to top
Sequence is vertically laid with;
S5:Anchoring piece, bracket are installed, row's Zinc-coated angle steel, which is arranged, according to each layer height of building height drags part, cleaning to need to pacify
The drilling for filling anchoring piece, carries out the installation of anchoring piece, the anchoring piece of the circumferential position of every piece of thermal insulation board is no less than 6, anchoring piece
Depth into foundation wall is not less than 50mm, and anchoring piece is mounted on wall and tightens expansion anchor, it is ensured that expansion anchor
Return twist be allowed to fully anchor with foundation wall, needed after anchoring to anchoring piece carry out suspension force experiment, by the noon of 10kg hang to
For 24 hours, anchoring piece is qualification without flexural deformation to anchoring piece outermost end;
S6:Using the external wall insulation constructing device to filling silicone sealant in partitioning slot, gluing head (2) is aligned and is stitched
Gap so that the elastic force that the line paper self-adhesive tape (321) of gluing head (2) both sides resists spring (35) is abutted with the metope by partitioning slot,
The distance between line paper self-adhesive tape (321) and partitioning slot are adjusted, starts external wall insulation constructing device and starts gluing, by gluing head
(2) it is moved towards the direction where line paper self-adhesive tape (321) so that metope is after having pasted line paper self-adhesive tape (321) to partitioning slot
Interior carry out gluing, while gluing is completed, the glue scraping plate (11) on gluing head (2) is completed to scrape extra silicone sealant,
Finally line paper self-adhesive tape (321) is torn;
S7:Venting plug is installed, first electric drill is used to drill towards lower tilt, fluid sealant is added with venting plug surrounding in hole, will arrange
Vent plug is filled in hole;
S8:Thermal insulating composite panel surface is cleared up, plate face is cleaned using detergent after fluid sealant is dry, guards against scratch surface.
8. a kind of exterior-wall heat insulation board construction method according to claim 7, which is characterized in that by U.S. line in the step S6
The method that paper self-adhesive tape (321) is abutted with external corner both sides metope is:
S101:Gluing head (2) is aligned to the partition seam of external corner, make the metopes of the extended line of gluing head (2) and external corner both sides at
45°;
S102:Bolt is tightened in release(33), both sides fixed link (3) is positioned against far from gluing head in retainer plate (12) is hinged
(2) direction adjustment;
S103:By fixed plate (31) in the hinged direction adjustment being positioned against close to gluing head (2) of fixed link (3), tighten stubborn
Tight bolt(33)So that line paper self-adhesive tape (321) squeezes spring (35), and spring (35) is compressed in guide cylinder (36) so that
The elastic force that the zone face of line paper self-adhesive tape (321) resists spring (35) is abutted with the wall of external corner both sides.
9. a kind of exterior-wall heat insulation board construction method according to claim 7, which is characterized in that by U.S. line in the step S6
The method that paper self-adhesive tape (321) is abutted with inner corner trim both sides metope is:
S201:Gluing head (2) is aligned to the partitioning slot of inner corner trim, make the metopes of the extended line of gluing head (2) and inner corner trim both sides at
45°;
S202:Bolt is tightened in release(33), both sides fixed link (3) is positioned against close to gluing head in retainer plate (12) is hinged
(2) direction adjustment;
S203:Fixed plate (31) is adjusted in the hinged direction far from gluing head (2) that is positioned against of fixed link (3), is tightened stubborn
Tight bolt(33)So that line paper self-adhesive tape (321) squeezes spring (35), and spring (35) is compressed in guide cylinder (36) so that
The elastic force that the zone face of line paper self-adhesive tape (321) resists spring (35) is abutted with the wall of inner corner trim both sides.
10. a kind of exterior-wall heat insulation board construction method according to claim 7, which is characterized in that adjusted in the step S6
Line paper self-adhesive tape (321) and the method for the distance between partitioning slot are:
S301:Bolt (34) will be pushed against to unscrew;
S302:By sliding part (322) in line paper self-adhesive tape (321) in sliding in sliding slot (311), adjustment rotation axis (32) and separation
The distance between seam;
S303:Bolt (34) is pushed against by tightening, is allowed to abut with the inner wall of sliding slot (311).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810248366.9A CN108487608B (en) | 2018-03-24 | 2018-03-24 | A kind of exterior-wall heat insulation board construction method and its constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810248366.9A CN108487608B (en) | 2018-03-24 | 2018-03-24 | A kind of exterior-wall heat insulation board construction method and its constructing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108487608A true CN108487608A (en) | 2018-09-04 |
CN108487608B CN108487608B (en) | 2019-09-03 |
Family
ID=63319658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810248366.9A Active CN108487608B (en) | 2018-03-24 | 2018-03-24 | A kind of exterior-wall heat insulation board construction method and its constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487608B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025208A (en) * | 2018-09-12 | 2018-12-18 | 李丹 | A kind of external corner U.S. seam adhesive tape rolling patch device |
CN109025209A (en) * | 2018-09-12 | 2018-12-18 | 李丹 | A kind of Angular tiles gap beauty stitches method |
CN109057275A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of flat tile gap beauty stitches method |
CN109057274A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of external corner gap beauty stitches method |
CN109057277A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of external corner U.S. seam double-sided tape rolling patch device |
CN109138423A (en) * | 2018-09-21 | 2019-01-04 | 北京城建远东建设投资集团有限公司 | External wall thermal insulation/decoration integration board construction technology |
CN110374305A (en) * | 2019-06-27 | 2019-10-25 | 盐城大孙庄新城建设有限公司 | Glue stations is used in a kind of construction of building decoration engineering |
CN110397251A (en) * | 2019-08-28 | 2019-11-01 | 成都建工集团有限公司 | One kind is squeegeeed glue gun |
CN110528802A (en) * | 2019-04-03 | 2019-12-03 | 江苏艾可陶节能科技有限公司 | A kind of insulation and decoration method of plate installation |
CN111535550A (en) * | 2020-04-10 | 2020-08-14 | 郑永铿 | Skirting line lime ration is extruded and is scraped flat-bed machine |
CN112387550A (en) * | 2020-12-09 | 2021-02-23 | 温州职业技术学院 | Adhesive material control device |
CN112576007A (en) * | 2020-11-20 | 2021-03-30 | 中冶天工集团有限公司 | Combined curtain wall gluing device |
CN115090494A (en) * | 2022-07-15 | 2022-09-23 | 神封胶业(南京)有限公司 | Organic silicon sealant gun with sealing piece |
CN115233951A (en) * | 2022-07-18 | 2022-10-25 | 中建科工集团有限公司 | Glue applying device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130192765A1 (en) * | 2010-02-04 | 2013-08-01 | Eamonn Oliver Owens | Apparatus for a plaster taping device |
FR3012833A3 (en) * | 2013-11-05 | 2015-05-08 | Abdelhak Mammar | APPARATUS FOR COATING A PAPER BAND FOR PLASTER PLATE JOINTS |
CN106760431A (en) * | 2016-12-28 | 2017-05-31 | 徐丽亚 | The construction and decoration U.S. seam glue constructing device of combined type |
CN206681324U (en) * | 2017-03-29 | 2017-11-28 | 陈冬民 | The U.S. seam construction more rotary head combination tools of special portable of construction decorative bonding agent |
CN206752989U (en) * | 2017-01-04 | 2017-12-15 | 皖西学院 | It is a kind of can on arcwall face operation interior decoration gluing device |
-
2018
- 2018-03-24 CN CN201810248366.9A patent/CN108487608B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130192765A1 (en) * | 2010-02-04 | 2013-08-01 | Eamonn Oliver Owens | Apparatus for a plaster taping device |
FR3012833A3 (en) * | 2013-11-05 | 2015-05-08 | Abdelhak Mammar | APPARATUS FOR COATING A PAPER BAND FOR PLASTER PLATE JOINTS |
CN106760431A (en) * | 2016-12-28 | 2017-05-31 | 徐丽亚 | The construction and decoration U.S. seam glue constructing device of combined type |
CN206752989U (en) * | 2017-01-04 | 2017-12-15 | 皖西学院 | It is a kind of can on arcwall face operation interior decoration gluing device |
CN206681324U (en) * | 2017-03-29 | 2017-11-28 | 陈冬民 | The U.S. seam construction more rotary head combination tools of special portable of construction decorative bonding agent |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025208A (en) * | 2018-09-12 | 2018-12-18 | 李丹 | A kind of external corner U.S. seam adhesive tape rolling patch device |
CN109025209A (en) * | 2018-09-12 | 2018-12-18 | 李丹 | A kind of Angular tiles gap beauty stitches method |
CN109057275A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of flat tile gap beauty stitches method |
CN109057274A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of external corner gap beauty stitches method |
CN109057277A (en) * | 2018-09-12 | 2018-12-21 | 李丹 | A kind of external corner U.S. seam double-sided tape rolling patch device |
CN109138423A (en) * | 2018-09-21 | 2019-01-04 | 北京城建远东建设投资集团有限公司 | External wall thermal insulation/decoration integration board construction technology |
CN110528802A (en) * | 2019-04-03 | 2019-12-03 | 江苏艾可陶节能科技有限公司 | A kind of insulation and decoration method of plate installation |
CN110374305A (en) * | 2019-06-27 | 2019-10-25 | 盐城大孙庄新城建设有限公司 | Glue stations is used in a kind of construction of building decoration engineering |
CN110397251A (en) * | 2019-08-28 | 2019-11-01 | 成都建工集团有限公司 | One kind is squeegeeed glue gun |
CN111535550A (en) * | 2020-04-10 | 2020-08-14 | 郑永铿 | Skirting line lime ration is extruded and is scraped flat-bed machine |
CN111535550B (en) * | 2020-04-10 | 2021-06-15 | 郑永铿 | Skirting line lime ration is extruded and is scraped flat-bed machine |
CN112576007A (en) * | 2020-11-20 | 2021-03-30 | 中冶天工集团有限公司 | Combined curtain wall gluing device |
CN112387550A (en) * | 2020-12-09 | 2021-02-23 | 温州职业技术学院 | Adhesive material control device |
CN112387550B (en) * | 2020-12-09 | 2021-09-14 | 温州职业技术学院 | Adhesive material control device |
CN115090494A (en) * | 2022-07-15 | 2022-09-23 | 神封胶业(南京)有限公司 | Organic silicon sealant gun with sealing piece |
CN115233951A (en) * | 2022-07-18 | 2022-10-25 | 中建科工集团有限公司 | Glue applying device |
Also Published As
Publication number | Publication date |
---|---|
CN108487608B (en) | 2019-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108487608B (en) | A kind of exterior-wall heat insulation board construction method and its constructing device | |
CN104100013B (en) | The construction method of space-saving type indoor highly effective sound insulation system | |
CN106677440A (en) | Roofing parapet water-floating structure and construction method thereof | |
CN101956432B (en) | Fireproofing structure of polyphenyl plate outer-wall outer heat-insulating building system and construction method thereof | |
CN104612261A (en) | Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area | |
CN106193499A (en) | A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process | |
CN101487335A (en) | External wall heat-preserving decoration wall and its construction process | |
CN110295697A (en) | Facade hollow brick mounting structure and its mounting process | |
CN111042392A (en) | Construction method of SDHH type disassembly-free formwork foam concrete partition wall | |
CN104499614B (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN108589975A (en) | Assembling cladding and construction technology | |
CN209942071U (en) | Flashing joint structure for steel skeleton light plate roof and parapet wall | |
CN110145083A (en) | A kind of technique of thin-coat plaster rock wool heat-preservation system | |
CN105909122A (en) | Mounting method of plastic steel door and window | |
CN112922272A (en) | EPS line construction method | |
CN116044106A (en) | Integrated construction method for assembled phase-change heat-preservation decorative plate | |
CN205976290U (en) | Compound incubation intergral template anchor is held in palm and is hung structure | |
CN205935245U (en) | Waterproof layer and protection device thereof | |
CN101705777B (en) | Method for anti-seepage construction between hidden frame glass window and building structure | |
CN113882562A (en) | Construction method of special-shaped double-sided wood grain fair-faced concrete wall | |
CN210105071U (en) | Curtain wall veneer external wall insulation system | |
CN103711208A (en) | Heat reflection heat-insulation energy-saving system for outer wall and manufacturing method thereof | |
KR20120077760A (en) | The waterproofing method of buildings | |
CN205777216U (en) | A kind of press strip anchoring type integration is combined veneer construction assembling structure | |
CN105863180A (en) | Novel roof fireproof isolating belt and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |