CN106193499A - A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process - Google Patents

A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process Download PDF

Info

Publication number
CN106193499A
CN106193499A CN201610773457.5A CN201610773457A CN106193499A CN 106193499 A CN106193499 A CN 106193499A CN 201610773457 A CN201610773457 A CN 201610773457A CN 106193499 A CN106193499 A CN 106193499A
Authority
CN
China
Prior art keywords
plate
thermal insulating
fastener
torr
composite panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610773457.5A
Other languages
Chinese (zh)
Other versions
CN106193499B (en
Inventor
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Just Lei Building Materials Technology Co Ltd
Original Assignee
Shandong Just Lei Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Just Lei Building Materials Technology Co Ltd filed Critical Shandong Just Lei Building Materials Technology Co Ltd
Priority to CN201610773457.5A priority Critical patent/CN106193499B/en
Publication of CN106193499A publication Critical patent/CN106193499A/en
Application granted granted Critical
Publication of CN106193499B publication Critical patent/CN106193499B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0866Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements composed of several layers, e.g. sandwich panels or layered panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Abstract

A kind of combined heat-insulating integral plate anchoring torr hanging hang structure, including dry hanging article (1), thermal insulating composite panel, it is characterized in that described dry hanging article is " L " template shape, including fixed plate (11) and gripper shoe (12), described thermal insulating composite panel is located at the both sides of gripper shoe, described gripper shoe one end is provided with " work " shape fastener (13), described fixed plate central authorities are provided with bar shaped fixing hole (14), described thermal insulating composite panel comprises decoration panel (2) from the outside to the core, warming plate (3), described decoration panel two ends have catching groove (4), fit with catching groove groove face in the inner side of the outer button wing (131) of described fastener (13), the interior button wing (132) of described fastener embeds in described warming plate, the lateral surface of the described outer button wing is less than described decoration panel lateral surface.

Description

A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process
Technical field
The present invention relates to a kind of heat preservation plate material construction method, particularly relate to a kind of combined heat-insulating integral plate anchoring torr hanging hang structure And process.
Background technology
Along with global warming, country has put into effect a series of energy-saving and emission-reduction measure, including industry and civil buildings Insulation.A kind of common way of wall thermal insulating is first to complete the main building including body of wall in building construction process, so After do wall thermal insulating again, do exterior wall or inner wall decoration the most again.Wall thermal insulating is typically at wall outer side or inner side complex heat-preservation Sheet material, such as styrofoam, polyurethane sheet etc., uses grid cloth, anchoring piece etc. to coordinate special mortar that warming plate is fixed on side within the walls Or outside wall, then outside warming plate, do decorative cover.Whole Engineering Task amount is quite big, and local holdfast comes off, it is easy to Cause whole heat-insulation layer to come off, there is certain potential safety hazard.
Summary of the invention
For solving the deficiencies in the prior art, the invention provides a kind of combined heat-insulating integral plate anchoring torr hanging hang structure and technique Method, including dry hanging article, thermal insulating composite panel, it is characterised in that described dry hanging article is " L " template shape, including fixed plate and support Plate, described thermal insulating composite panel is located at the both sides of gripper shoe, and described gripper shoe one end is provided with " work " shape fastener, described fixed plate central authorities Being provided with bar shaped fixing hole, described thermal insulating composite panel comprises decoration panel, warming plate from the outside to the core, and described decoration panel two ends have button Groove, fit with catching groove groove face in the inner side of the outer button wing of described fastener, in the button wing described warming plate of embedding of described fastener, described The lateral surface of the outer button wing is less than described decoration panel lateral surface.
Further, described fixed plate, gripper shoe and fastener are integrated casting and form.
Further, described gripper shoe is connected with fastener by dormant bolt.
Further, the interior button wing side of described fastener extends and forms connecting plate, and described connecting plate is provided with screwed hole, described Gripper shoe has bar shaped fixing hole two, and described dormant bolt is connected through fixing hole two with screwed hole.
Further, described screwed hole outer end protrudes from described connecting plate, and is embedded in warming plate.
Further, the hole week footpath of described fixing hole two is gradually reduced the most from inside to outside.
The construction method of a kind of insulating composite board dried hanging hang structure, it is characterised in that step comprises the following steps:
A, base treatment: first carry out picking chisel or repairing by the part protruded or cave in body of wall basic unit, during repairing, use water Cement mortar is filled and is smeared, the degree of depth part more than 35mm during for repairing, and needs take longitudinal bar planting and smear adding of interfacial agents Strong measure, then the polymer cement mortar using intensity to be not less than M7.5 carries out leveling to basic unit, thickness is not more than 15mm;
B, surveying setting-out: design according to elevation of building, eject out door window level line, orthogonal control lines and partition seam in basic unit Line;
C, extension datum line: hang vertical reference line at building four big angle and other necessity, each floor appropriate location hangs level Line, in order to control perpendicularity and the flatness of thermal insulating composite panel;
D, preparation adhesive mortar: adhesive mortar Ying Suiyong is with stirring, and handheld electric stirrer mixing time is no less than 3min, so Rear standing 5min, the adhesive mortar being stirred should be finished in 2 to 4 hours.
E, paste heat-preserving composite plate: before (1) installs, should be by the specification of thermal insulating composite panel, design requirement and job site Size carries out typesetting, and the thermal insulating composite panel that need to cut should be arranged in negative and positive angular position, and (2) are in the warming plate one side of thermal insulating composite panel In coating step D, the adhesive mortar of preparation, must not smear adhesive mortar in the side of warming plate, then thermal insulating composite panel is affixed on base On layer body of wall, softly, uniformly extrude thermal insulating composite panel during stickup, have adhesive mortar to overflow to edges of boards, remove the binding sand overflowed Slurry, and immediately use the guiding ruler of 2m and cable inlet bracket to check perpendicularity and flatness, (3) are drill with ferrule anchor hole under composite insulation boards, will Detaining the wing outside the fastener of dry hanging article to be stuck on mouthful groove groove face, the interior button wing embeds in warming plate, makes the fixed plate of dry hanging article be adjacent to simultaneously Base course wall also makes anchor hole be positioned at the bar shaped fixing hole of fixed plate, squeezes into expanded tubular and make dry hanging article fix in anchor hole On base course wall, make dry hanging article play the effect holding warming plate, then paste another block complex heat-preservation in the lower section of warming plate Plate, the sequence of construction vertical direction of stickup should from down to up, and horizontal direction should inner corner trim, the biggest face, rear little and hole after first external corner Mouthful;
F, plate seam seals: for the separation formed due to catching groove and dry hanging article between two pieces of thermal insulating composite panels of stickup in step E Seam, first the cleaning overlap of partitioning slot both sides, burr and the adhesive mortar of spilling, then give full mark space with fluid sealant, inner corner trim external corner Should first squeeze into its degree of depth during fluid sealant prevents from expanding with heat and contract with cold gap to 1-2mm is that thickness of slab is given full mark slot again.
The distinguishing feature of the present invention be from composite insulation boards plug-in method consider, by base course wall every one Set a distance arranges one and drains suspension member, is buckled in by warming plate in " work " type fastener of hanging part, and the most each warming plate is provided with up and down Two catching grooves mated with dry hanging article, the method using mechanical snap to connect, make composite insulation boards and the stronger combination of body of wall , the weight of warming plate is assigned on dry hanging article together, reduces the load-bearing of adhesive mortar, even if adhesive mortar is bonding the most firm Or generation skin effect phenomenon, it is possible to make the fixed of warming plate.
Accompanying drawing explanation
Fig. 1 is the dry hanging article structural representation of the embodiment of the present invention one;
Fig. 2 is the dry hanging article structural representation of the embodiment of the present invention two;
Fig. 3 is the dry hanging article structural representation of the embodiment of the present invention two;
Fig. 4 is the structural representation that the dry hanging article of the embodiment of the present invention one coordinates with composite insulation boards;
Fig. 5 is the structural representation that the dry hanging article of the embodiment of the present invention two coordinates with composite insulation boards;
Fig. 6 is the embodiment of the present invention two structural representation that dry hanging article coordinates with composite insulation boards when constructing;
Schematic diagram when Fig. 7 is external corner of the present invention construction;
Schematic diagram when Fig. 8 is inner corner trim of the present invention construction;
Wherein, 1 is dry hanging article, and 2 is decoration panel, and 3 is warming plate, and 4 is catching groove, and 5 is dormant bolt, and 6 is connecting plate, and 7 is fixing Hole two, 8 is screwed hole, and 9 is expanded tubular, and 10 is base course wall, and 11 is fixed plate, and 12 is gripper shoe, and 13 is fastener, and 14 is bar Shape fixing hole, 15 is adhesive mortar, and 131 is the outer button wing, and 132 is the interior button wing.
Detailed description of the invention
Embodiment one, according to Fig. 1, Fig. 3, Fig. 6 to shown in 8, the present invention is specially a kind of combined heat-insulating integral plate anchoring torr Hanging hang structure and process, including dry hanging article (1), thermal insulating composite panel, it is characterised in that described dry hanging article is " L " template shape, bag Including fixed plate (11) and gripper shoe (12), described thermal insulating composite panel is located at the both sides of gripper shoe, and described gripper shoe one end is provided with " work " shape fastener (13), described fixed plate, gripper shoe and fastener be integrated casting and form, and it is solid that described fixed plate central authorities are provided with bar shaped Determining hole (14), described thermal insulating composite panel comprises decoration panel (2), warming plate (3) from the outside to the core, and described decoration panel two ends have catching groove (4), fit with catching groove groove face in the inner side of the outer button wing (131) of described fastener (13), and the button wing (132) of described fastener embeds institute Stating in warming plate, the lateral surface of the described outer button wing is less than described decoration panel lateral surface.
Concrete preparation of construction and execution conditions
1) basic unit should be solid, smooth, dry, clean, and except meeting existing national standards, " building decoration fills road base construction quality Repair acceptance of engineering quality specification " outside GB50210, " unified standard for constructional quality " GB50300, still should meet and be The requirement of system operation instructions.Metope can not directly be constructed when having water, and ambient temperature is not less than 5 DEG C, the above strong wind of Pyatyi or rain It can not be constructed, and door and window or auxiliary frame install, and the various pipelines relevant with exterior wall, built-in fitting have been mounted to position, and in advance Reserve warming plate leeway.
2) new building basic unit that intensity should be used to be not less than M7.5 polymer cement mortar is levelling, thickness is not preferably greater than 15mm, dimensional discrepancy should meet regulation.
3), when existing building body of wall being carried out reducing energy consumption, answer the original finish coat of External Wall to check, check and accept on inspection Qualified can carry out external wall outer insulation engineering construction.
4), when basic unit is unsatisfactory for requiring, should process by the following method:
(1) to new construction, basic unit's perpendicularity, flatness are unsatisfactory for part and should pick chisel or repair.Employing is plastered when repairing, and plasters When gross thickness is more than or equal to 35mm, strengthening measure should be taked.The foreign material such as concrete residue, dirt must be cleaned out, fully Ensure the wet infiltration of invading of bonding mortar and basic unit face, improve mortar adhesive strength.
(2), when existing building body of wall being carried out reducing energy consumption, basic unit is it cannot be guaranteed that be firmly combined with heat-insulating decorative composite board Part, should remove clean and carry out repairing and levelling.After basic unit's acceptance(check) on inspection, lower road construction technology can be carried out.
5) material recheck the most on request qualified.
6) the on-the-spot drawing experiment of anchoring piece should be carried out on base course wall, and thus determine that anchoring piece is every by design requirement Square metre quantity.When anchor drawing experiment does not meets the requirement of this code, answer design for change or carry out reinforcement process.
Construction technology
1) installing heat-insulating decorative composite board and should use form of construction work line production from down to up, construction technology process is preferably pressed following Operation is carried out:
2) base treatment
By the method in preparation of construction condition, basic unit is processed.
3) surveying setting-out
Design according to elevation of building (or metope), eject out door window level line, orthogonal control lines, separation suture etc. in basic unit.
4) datum line is hung
Hanging vertical reference line at building four big angle and other necessity, each floor appropriate location hangs horizontal line, in order to control The perpendicularity of heat-insulating decorative composite board and flatness.
5) preparation adhesive mortar
The cooperation when operation instructions provided in strict accordance with manufacturer are prepared, and answer special messenger to be responsible for during preparation.Binding sand Slurry Ying Suiyong is no less than 3min with stirring, handheld electric stirrer mixing time, then stands 5min, the bonding being stirred Mortar should be finished in 2 to 4 hours.
6) paste heat-preserving composite plate
(1), before installing, typesetting should be carried out by the size of the specification of thermal insulating composite panel, design requirement and job site, and number, mark Note.The thermal insulating composite panel that need to cut should be arranged in negative and positive angular position, and plate width is no less than 300mm.
(2) sequence of construction vertical direction should from down to up, horizontal direction should inner corner trim after first external corner, the biggest face, rear little and Hole.
(3) bar bonding or some frame method can be used to paste, paste thickness and should control at 8mm~10mm, bar bonding bar width 10mm, Point frame method diameter >=Φ 150, the bonding area pasting binder course should be not less than the 90% of composite plate area, viscous expansion tube binder course Bonding area and should must not smear adhesive mortar in the side of plate not less than the 60% of composite plate area.
(4) when pasting, softly, uniformly should extrude heat-insulating decorative composite board, note removing the adhesive mortar that edges of boards overflow, and Instant by 2m guiding ruler and cable inlet bracket inspection perpendicularity and flatness.
7) dry hanging article is installed
(1) dry hanging article install application electric drill boring, enter basic unit anchorage depth concrete wall >=35mm, stretch into brick wall body >= 50mm, air parcel brick penetrates about 220mm.It should be noted that the reinforcing bar dodged in body of wall during boring, drilling depth is that anchorage depth adds again Upper 10mm.
(2) dry hanging article quantity every square metre is no less than 5 sets
(3) in dry hanging article uses Al-alloy parts, fastener, the button wing stretches into 35mm in plate.Fastener answers stress in panel.
(4) expanded tubular stretches into concrete wall >=35mm, stretches into brick wall body >=50mm, and air parcel brick penetrates about 220mm, Material uses nylon (forbidding to use reworked material), and crab-bolt uses zinc-plated.
8) plate seam seals waterproof, pump-down process
(1) with the specific purpose tool cleaning overlap of partitioning slot both sides, burr and the adhesive of spilling, separate by design requirement filling Seam.
(2) if make insulation rod with foam plastics or polystyrene, diameter or width should be 1.3 times that seam is wide, insert Thickness should be identical with insulation layer thickness.
(3), time to partitioning slot sealing and water-proofing treatment, the degree of depth should be about 50% that seam is wide.
(4) steam vent is preferably arranged at partitioning slot, and after glue to be sealed is constructed complete 24 hours, or cross middle at plate seam is handed over Install at fork.Steam vent arranges 1 by every 15, bores the hole matched with blow-cook, and coats with blow-cook surrounding in hole After fluid sealant, by blow-cook embedded hole, it is desirable to down, with water-inlet-proof, pore does not blocks steam vent, paste when blow-cook is installed Necessary firmly ne-leakage, installs large size blow-cook at top or parapet.
9) cleaning surface layer
(1) taking off protecting film to carry out after complete 1 month at sticking heat-preservation plate, cleaner plate face should be carried out before removing outrigger.
(2) after all techniques are fully completed, U.S. stricture of vagina paper when tearing plate surface protective film, gluing off, is pasted.As plate face is stayed accidentally There is fluid sealant, cleaner special removing should be stained with by timely cloth, then remove one time with clear water cloth.Forbid to exceed the work in plate face by hardness Tool is rejected, and prevents from damaging decorative board.
(3) seam is installed and should note controlling in conjunction with design drawing the construction thickness of fluid sealant, full, it is impossible to have space or gas Bubble, ash cutter should at the uniform velocity move along seam, and crush seal glue strength also should be uniform;Fluid sealant is the thinnest be unfavorable for ensureing airtight quality and Prevent rain leakage, and to because of the heat insulation decoration integrated plate tension produced of expanding with heat and contract with cold the most unfavorable;But can not be the thickest, when When jointing agent is by pulling force, the thickest easily it is pulled off destruction, makes sealing and antiseep lose efficacy.
10) self-inspection: if pinpointing the problems, repeats above correlation step.
Embodiment two
According to Fig. 2, Fig. 4 to shown in 8, the detailed description of the invention of the present invention be a kind of combined heat-insulating integral plate anchoring torr hanging hang structure and Process, including dry hanging article (1), thermal insulating composite panel, it is characterised in that described dry hanging article is " L " template shape, including fixed plate (11) and gripper shoe (12), described thermal insulating composite panel is located at the both sides of gripper shoe, and described gripper shoe one end is provided with " work " shape fastener (13), gripper shoe is connected with fastener by dormant bolt (5), and the interior button wing side of described fastener extends and forms connecting plate (6), institute Stating connecting plate and be provided with screwed hole (8), described gripper shoe has bar shaped fixing hole two (7), and described dormant bolt passes fixing hole two Being connected with screwed hole, described screwed hole outer end protrudes from described connecting plate, and is embedded in warming plate, and described fixed plate central authorities are provided with Bar shaped fixing hole (14), described thermal insulating composite panel comprises decoration panel (2), warming plate (3) from the outside to the core, and described decoration panel two ends are opened Having catching groove (4), fit with catching groove groove face in the inner side of the outer button wing (131) of described fastener (13), the button wing (132) of described fastener Embedding in described warming plate, the lateral surface of the described outer button wing is less than described decoration panel lateral surface, the hole Zhou Jing of described fixing hole two It is gradually reduced the most from inside to outside.
Connecting plate is partial to the side in " work " shape fastener axle center, it is therefore intended that when being combined into dry hanging article, connecting plate and gripper shoe Connect the axle center of overlapping and the axis coinciding of " work " shape fastener, it is ensured that uniform force, increase the workpiece life-span.
Concrete form of construction work is as embodiment one, and difference is that dry hanging article is split type, freely adjustable dry The width of suspension member, to adapt to the composite insulation boards of different-thickness.
Only the preferred embodiment of the present invention disclosed above, but the present invention is not limited to this, any this area What technical staff can think does not has a creative change, and the some improvement made without departing from the principles of the present invention and Retouching, all should be within the scope of the present invention.

Claims (7)

1. a combined heat-insulating integral plate anchoring torr hanging hang structure, including dry hanging article (1), thermal insulating composite panel, it is characterised in that described Dry hanging article is " L " template shape, and including fixed plate (11) and gripper shoe (12), described thermal insulating composite panel is located at the both sides of gripper shoe, Described gripper shoe one end is provided with " work " shape fastener (13), and described fixed plate central authorities are provided with bar shaped fixing hole (14), and described insulation is multiple Plywood comprises decoration panel (2), warming plate (3) from the outside to the core, and described decoration panel two ends have catching groove (4), described fastener (13) The inner side of the outer button wing (131) and catching groove groove face are fitted, and the button wing (132) of described fastener embeds in described warming plate, described outside The lateral surface of the button wing is less than described decoration panel lateral surface.
2. combined heat-insulating integral plate anchoring torr hanging hang structure as claimed in claim 1 a kind of, it is characterised in that described fixed plate, Fagging and fastener are integrated casting and form.
3. a kind of combined heat-insulating integral plate anchoring torr hanging hang structure as claimed in claim 1, it is characterised in that described gripper shoe is led to Cross dormant bolt (5) to connect with fastener.
4. combined heat-insulating integral plate anchoring torr hanging hang structure as claimed in claim 3 a kind of, it is characterised in that described fastener interior Button wing side extends and forms connecting plate (6), and described connecting plate is provided with screwed hole (8), and described gripper shoe has bar shaped fixing hole two (7), described dormant bolt is connected through fixing hole two with screwed hole.
5. a kind of combined heat-insulating integral plate anchoring torr hanging hang structure as claimed in claim 1, it is characterised in that outside described screwed hole Distal process is for described connecting plate, and is embedded in warming plate.
6. a kind of combined heat-insulating integral plate anchoring torr hanging hang structure as claimed in claim 4, it is characterised in that described fixing hole two Hole week footpath be gradually reduced the most from inside to outside.
7. the process of a kind of combined heat-insulating integral plate anchoring torr hanging hang structure as described in claim 1 to 6 is arbitrary, its feature It is that step comprises the following steps:
A, base treatment: first carry out picking chisel or repairing by the part protruded or cave in body of wall basic unit, during repairing, use water Cement mortar is filled and is smeared, the degree of depth part more than 35mm during for repairing, and needs take longitudinal bar planting and smear adding of interfacial agents Strong measure, then the polymer cement mortar using intensity to be not less than M7.5 carries out leveling to basic unit, thickness is not more than 15mm;
B, surveying setting-out: design according to elevation of building, eject out door window level line, orthogonal control lines and partition seam in basic unit Line;
C, extension datum line: hang vertical reference line at building four big angle and other necessity, each floor appropriate location hangs level Line, in order to control perpendicularity and the flatness of thermal insulating composite panel;
D, preparation adhesive mortar: adhesive mortar Ying Suiyong is with stirring, and handheld electric stirrer mixing time is no less than 3min, so Rear standing 5min, the adhesive mortar being stirred should be finished in 2 to 4 hours
E, paste heat-preserving composite plate: before (1) installs, should be by the specification of thermal insulating composite panel, design requirement and the size of job site Carrying out typesetting, the thermal insulating composite panel that need to cut should be arranged in negative and positive angular position, and (2) are in the warming plate one side coating of thermal insulating composite panel In step, the adhesive mortar of preparation, must not smear adhesive mortar, then thermal insulating composite panel is affixed on basic unit's wall in the side of warming plate On body, softly, uniformly extrude thermal insulating composite panel during stickup, have adhesive mortar to overflow to edges of boards, remove the adhesive mortar overflowed, and The guiding ruler of instant 2m and cable inlet bracket check perpendicularity and flatness, and (3) are drill with ferrule anchor hole under composite insulation boards, by dry hanging article Fastener outside detain the wing and be stuck on mouthful groove groove face, the interior button wing embeds in warming plate, makes the fixed plate of dry hanging article be adjacent to basic unit's wall simultaneously Body also makes anchor hole be positioned at the bar shaped fixing hole of fixed plate, squeezes into expanded tubular and make dry hanging article be fixed on basic unit in anchor hole On body of wall, make dry hanging article play the effect holding warming plate, then paste another block composite insulation boards in the lower section of warming plate, paste Sequence of construction vertical direction should from top to bottom, horizontal direction should inner corner trim, the biggest face, rear little and hole after first external corner;
F, plate seam seals: for the separation formed due to catching groove and dry hanging article between two pieces of thermal insulating composite panels of stickup in step E Seam, first the cleaning overlap of partitioning slot both sides, burr and the adhesive mortar of spilling, then give full mark slot with sealant for stone material, inner corner trim, External corner should first be squeezed into fluid sealant and prevent to 1-2mm its degree of depth in the gap of rising-heat contracting-cold from being thickness of slab, then slot of giving full mark.
CN201610773457.5A 2016-08-31 2016-08-31 Anchoring and supporting structure of composite heat-insulation integrated plate and process method Active CN106193499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610773457.5A CN106193499B (en) 2016-08-31 2016-08-31 Anchoring and supporting structure of composite heat-insulation integrated plate and process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610773457.5A CN106193499B (en) 2016-08-31 2016-08-31 Anchoring and supporting structure of composite heat-insulation integrated plate and process method

Publications (2)

Publication Number Publication Date
CN106193499A true CN106193499A (en) 2016-12-07
CN106193499B CN106193499B (en) 2020-06-02

Family

ID=58089012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610773457.5A Active CN106193499B (en) 2016-08-31 2016-08-31 Anchoring and supporting structure of composite heat-insulation integrated plate and process method

Country Status (1)

Country Link
CN (1) CN106193499B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836709A (en) * 2017-01-21 2017-06-13 亚士创能科技(滁州)有限公司 The construction method of the heat-insulating decorative composite board with drum connector
CN106906978A (en) * 2017-03-29 2017-06-30 陈岩 A kind of combined wall board bracket and the wall body structure using the bracket
CN108560862A (en) * 2017-12-22 2018-09-21 山东国创节能科技股份有限公司 Heat insulating decorative board adjustable slide type anchoring piece
CN108915199A (en) * 2018-07-16 2018-11-30 上海紫霓节能科技有限公司 The cladding installation method of GRC art stone heat-insulating decorative composite board
CN109184118A (en) * 2018-10-23 2019-01-11 沈阳远大铝业工程有限公司 A kind of mounting structure and installation method of bright frame heat-insulating integral aluminium sheet
CN110273496A (en) * 2018-12-25 2019-09-24 浙江亚厦装饰股份有限公司 A kind of bridge cut-off installation keel
CN110424594A (en) * 2019-07-31 2019-11-08 陈凯 A kind of vertical joint structure of fireproof density plate
CN112900660A (en) * 2021-01-19 2021-06-04 上海能循建筑节能科技有限公司 Construction process of external wall heat-insulation composite board
CN113668804A (en) * 2021-07-27 2021-11-19 宁夏长力节能建材有限公司 Hanging system for building heat-insulation decorative structural slab

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN201738538U (en) * 2010-06-29 2011-02-09 易科美德(天津)环保建材有限公司 Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
CN203462685U (en) * 2013-08-03 2014-03-05 山西峰岩新型建材股份有限公司 Dry hanger of insulation decorative board
CN203834866U (en) * 2014-02-16 2014-09-17 山东华德隆建材科技有限公司 Dry-hanging piece for stone heat preservation and decoration composite board
WO2014188284A1 (en) * 2013-05-24 2014-11-27 Uab "Fibrolt" A fiber glass construction element of buildings
FR3018539A1 (en) * 2014-03-14 2015-09-18 H L R FRAMEWORK OF JOINERY, ASSEMBLY AND CONSTRUCTION EQUIPPED WITH SUCH A FRAMEWORK
CN104975658A (en) * 2014-04-02 2015-10-14 花海东 Pre-fixed plate system wall insulation system construction technology
CN205475869U (en) * 2016-01-19 2016-08-17 文登蓝岛建筑工程有限公司 Do style of calligraphy and connect wall body with embedded revolving stage
CN205976290U (en) * 2016-08-31 2017-02-22 山东刚磊建材科技有限公司 Compound incubation intergral template anchor is held in palm and is hung structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN201738538U (en) * 2010-06-29 2011-02-09 易科美德(天津)环保建材有限公司 Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
WO2014188284A1 (en) * 2013-05-24 2014-11-27 Uab "Fibrolt" A fiber glass construction element of buildings
CN203462685U (en) * 2013-08-03 2014-03-05 山西峰岩新型建材股份有限公司 Dry hanger of insulation decorative board
CN203834866U (en) * 2014-02-16 2014-09-17 山东华德隆建材科技有限公司 Dry-hanging piece for stone heat preservation and decoration composite board
FR3018539A1 (en) * 2014-03-14 2015-09-18 H L R FRAMEWORK OF JOINERY, ASSEMBLY AND CONSTRUCTION EQUIPPED WITH SUCH A FRAMEWORK
CN104975658A (en) * 2014-04-02 2015-10-14 花海东 Pre-fixed plate system wall insulation system construction technology
CN205475869U (en) * 2016-01-19 2016-08-17 文登蓝岛建筑工程有限公司 Do style of calligraphy and connect wall body with embedded revolving stage
CN205976290U (en) * 2016-08-31 2017-02-22 山东刚磊建材科技有限公司 Compound incubation intergral template anchor is held in palm and is hung structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭万军. 陈洪根: "无机纤维真空保温板薄抹灰外墙外保温系统施工技术研究", 《建筑施工》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836709A (en) * 2017-01-21 2017-06-13 亚士创能科技(滁州)有限公司 The construction method of the heat-insulating decorative composite board with drum connector
CN106836709B (en) * 2017-01-21 2019-05-07 亚士创能科技(滁州)有限公司 The construction method of heat-insulating decorative composite board with drum connector
CN106906978A (en) * 2017-03-29 2017-06-30 陈岩 A kind of combined wall board bracket and the wall body structure using the bracket
CN108560862A (en) * 2017-12-22 2018-09-21 山东国创节能科技股份有限公司 Heat insulating decorative board adjustable slide type anchoring piece
CN108560862B (en) * 2017-12-22 2023-09-26 山东国创节能科技股份有限公司 Adjustable sliding anchoring piece of heat-insulating decorative board
CN108915199A (en) * 2018-07-16 2018-11-30 上海紫霓节能科技有限公司 The cladding installation method of GRC art stone heat-insulating decorative composite board
CN109184118A (en) * 2018-10-23 2019-01-11 沈阳远大铝业工程有限公司 A kind of mounting structure and installation method of bright frame heat-insulating integral aluminium sheet
CN110273496A (en) * 2018-12-25 2019-09-24 浙江亚厦装饰股份有限公司 A kind of bridge cut-off installation keel
CN110273496B (en) * 2018-12-25 2021-08-06 浙江亚厦装饰股份有限公司 Bridge cut-off installation fossil fragments
CN110424594A (en) * 2019-07-31 2019-11-08 陈凯 A kind of vertical joint structure of fireproof density plate
CN112900660A (en) * 2021-01-19 2021-06-04 上海能循建筑节能科技有限公司 Construction process of external wall heat-insulation composite board
CN113668804A (en) * 2021-07-27 2021-11-19 宁夏长力节能建材有限公司 Hanging system for building heat-insulation decorative structural slab

Also Published As

Publication number Publication date
CN106193499B (en) 2020-06-02

Similar Documents

Publication Publication Date Title
CN106193499A (en) A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process
CN101487335B (en) External wall heat-preserving decoration wall and its construction process
CN104018598B (en) A kind of external wall structure and construction installation method
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN103643754B (en) The waterproof treatment structure of building wall body interface seam crossing and processing method
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN205976290U (en) Compound incubation intergral template anchor is held in palm and is hung structure
CN103806655A (en) construction method for glass brick wall
CN100557162C (en) Anchoring composite insulation boards cast polyurethane exterior wall outer thermal insulation construction method
CN211774781U (en) External wall insulation decorates intergral template construction structures
CN208996333U (en) A kind of inverted roof balcony node waterproof structure
CN205663040U (en) High -rise building ceramic tile wall surface cast in situs formula polyurethane rigid foam outer wall device that keeps warm outward
CN209723488U (en) A kind of building heat preservation decoration uses keel shoe
CN113882562A (en) Construction method of special-shaped double-sided wood grain fair-faced concrete wall
CN209443693U (en) A kind of inner corner trim work of nature stone mounting structure
CN111851896A (en) Construction method of heat-preservation decoration sintering integrated plate of building external wall
CN1090364A (en) The mounting process of colour facing concrete board
CN204510524U (en) A kind of steam pressure sand aerated concrete block combination masonry panel
CN103711208A (en) Heat reflection heat-insulation energy-saving system for outer wall and manufacturing method thereof
CN109881859A (en) Building heat preservation decoration keel shoe and its application in metope insulation and decoration
CN103422671A (en) Construction method of integrated process model house for building engineering construction
CN203669147U (en) Waterproof processing structure for building wall interface seam
CN215670189U (en) Ultra-thin adiabatic vacuum insulation structure of outer wall STP

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Gang

Inventor after: Lv Chungang

Inventor after: Huang Hejun

Inventor before: Wang Gang

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant