CN108486982A - A kind of luminous road surface and its construction method - Google Patents
A kind of luminous road surface and its construction method Download PDFInfo
- Publication number
- CN108486982A CN108486982A CN201810329577.5A CN201810329577A CN108486982A CN 108486982 A CN108486982 A CN 108486982A CN 201810329577 A CN201810329577 A CN 201810329577A CN 108486982 A CN108486982 A CN 108486982A
- Authority
- CN
- China
- Prior art keywords
- road surface
- adhesive
- layer
- fluorescence
- basal layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08K—Use of inorganic or non-macromolecular organic substances as compounding ingredients
- C08K3/00—Use of inorganic substances as compounding ingredients
- C08K3/01—Use of inorganic substances as compounding ingredients characterized by their specific function
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08K—Use of inorganic or non-macromolecular organic substances as compounding ingredients
- C08K5/00—Use of organic ingredients
- C08K5/0008—Organic ingredients according to more than one of the "one dot" groups of C08K5/01 - C08K5/59
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08L—COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
- C08L75/00—Compositions of polyureas or polyurethanes; Compositions of derivatives of such polymers
- C08L75/04—Polyurethanes
Abstract
The invention discloses a kind of luminous road surface and its construction methods, including basal layer, the basal layer is mixed mud layer, bitumen layer, stone material layer or ground brick layer, irregular fluorescence resin particle is covered in by adhesive on basal layer, the fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes the component of following portions by weight:0.015~6g of green, 5.04~126g of opening agent, 168 3.75~1500g of antioxidant, 2.25~900g of UV531 UV resistant agents, the spontaneous 0.275~16.5g of fluorescence material of special yellow green, 8558~72365g of TPU/PP/PVC/AS/ABS/PC/PMMA resins.The sheen that the luminous road surface that the present invention researches and develops is sent out is without dazzling.The pollution for effectively reducing accent light is increasingly severe, avoids having a negative impact to the urban life of people;Since the road surface that shines is to use fluorescence resin granular materials, construction depth is will produce between particle and particle, reduces slipping phenomenon, to reduce the generation of accident, trip has certain help safely to people.
Description
Technical field
The present invention relates to pavement technique field, specifically a kind of luminous road surface.
Background technology
In urban life, the pollution of accent light is increasingly severe, and more negative effect is generated to the life of the mankind,
It is laid with luminous road face on road surface, reduces accent light pollution, while ensuring road traveling safety, becomes urgent problem to be solved.
In view of the above-mentioned problems, existing treatment of road surfaces method mainly has:1, fluorescent paint is laid on road surface;2, on road surface
It is laid with fluorescence stone.
Wherein, have with deficiency the characteristics of fluorescent paint:
1, safety coefficient is low:Since fluorescent paint surface is pulpous state, it is smooth to make finished product rear surface, especially under
Rainy day, snowy day, moisture weight, freeze weather under, fluorescence paint material rain, damp ground be easy skid, influence pedestrian and
The safety of driving.
2, spontaneous luminous intensity is weak:There is the work of the pulverulent fillers fluorescent paint filler material of 20-30% in fluorescent paint material prescription
With:If without filler material, fluorescent paint can be lost in as water, embody the effect less than fluorescent paint).Due to fluorescent paint self-luminous
Material is weak light source, and filler material additive amount can have a certain impact to the illumination effect of itself, self luminous intensity and material
Thickness has relationship.It can increase with the thickness of material and become strong.Fluorescent paint, which can only do film, cannot fully meet this requirement, because
The spontaneous luminous intensity of this fluorescent paint can be restricted.
3, the service life of fluorescence paint material is short:The hardness of fluorescence paint material is generally in 1.5h.Surface is easy production when use
Raw cut has the region of cut to be easy to show-through, loses fluorescent effect, influence beauty since fluorescent paint can only do film, reduces
Service life.
4, the variation of fluorescent paint material surface effect is fast:Fluorescence paint material, which has two kinds of effects, to be occurred:1) surface color;2) certainly
Luminescent color.The formation of the color of fluorescent paint surfacing is not pass through high temperature, is directly stirred, in high/low temperature, ultraviolet
Under the influence of line, humidity, surface color is easy to deepen flavescence, has not only affected the beauty on fluorescent paint surface but also has affected spontaneous light efficiency
Fruit.It notes (depth of material surface color can generate illumination effect certain influence).
5, fluorescent paint material environmental protection index is low:Due to most of fluorescent paint raw material be made of material not environmentally and
Pungent taste can be sent out when construction, is affected to environment.
Wherein, the characteristics of fluorescence stone and shortcoming:
1, the spontaneous luminous intensity of fluorescence stone:Fluorescence stone main material is that have the stone dust after crushing and self-luminous raw material group
It closes, structure is in muddy state, therefore luminous intensity is not good enough.
2, fluorescence stone luminescent material is easy to run off:Fluorescence stone hardness and powder is easily become after crisp weight, after weight containing from
The powder of luminescent material is easy to be lost in after wind and weather, it is easy to which the fluorescent effect for influencing itself reduces use
Birthday noodle.
3, the texture after fluorescence stone is mated formation:Since the fluorescence stone hardness way that fluorescence stone is layered on road surface simultaneously is usually to inlay
Onto basic road surface, the part of fluorescence stone can be projected into surface, and feel has hard feeling when people's row, is unfavorable for the work of people
It is dynamic, while also making troubles riding.
Invention content
The purpose of the present invention is to provide a kind of luminous road surfaces, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of luminous road surface, including basal layer, the base
Plinth layer is mixed mud layer, bitumen layer, stone material layer or ground brick layer, and the fluorescence resin particle is covered in basal layer by adhesive
On.
Wherein, the fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes the group of following portions by weight
Point:0.015~6g of green, 5.04~126g of opening agent, 168 3.75~1500g of antioxidant, UV531 UV resistant agents 2.25~
Spontaneous 0.275~the 16.5g of fluorescence material of 900g, special yellow green, TPU/PP/PVC/AS/ABS/PC/PMMA resins 8558~
72365g。
Wherein, the fluorescence resin particle is yellow green green-emitting fluorescent particle, specifically includes the group of following portions by weight
Point:0.01~4g of L208 yellow, 0.01~4g of S602 yellow, 0.0025~1g of Y608 yellow, 5.01~125.25g of opening agent,
The spontaneous fluorescence material of 168 3.75~1500g of antioxidant, 2.25~900g of UV531 UV resistant agents, special yellow green 0.275
8558~72365g of~16.5g, TPU/PP/PVC/AS/ABS/PC/PMMA resins.
Wherein, the fluorescence resin particle is that sky blue sends out day blue light fluorescent grain, specifically includes following portions by weight
Component:0.005~2g of green, 0.025~10g of blue, 4.98~124.50g of opening agent, 168 3.75~1500g of antioxidant,
2.25~900g of UV531 UV resistant agents, the spontaneous 0.275~16.5g of fluorescence material of special blue, TPU/PP/PVC/AS/
8558~72365g of ABS/PC/PMMA resins.
Wherein, the fluorescence resin particle is rose blue-emitting fluorescent particle, specifically includes the group of following portions by weight
Point:0.35~140g of L rhodos, 3.7~92.50g of opening agent, 168 3.75~1500g of antioxidant, UV531 UV resistant agents 2.25
Spontaneous 2.25~the 900g of fluorescence material of~900g, special yellow green, TPU/PP/PVC/AS/ABS/PC/PMMA resins 8558~
72365g。
A kind of construction method on luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) brushing seal coat on the basis of mixed mud layer or bitumen layer, in one side brushing gluing after primary coat is completely dry
Agent paves the fluorescence resin particle and adhesive being sufficiently stirred simultaneously, after the completion of paving compacting smooth out;Or in mixed mud layer
Or brushing adhesive on the basis of bitumen layer, while fluorescence resin particle directly being shed on adhesive, it is pressed after the completion of paving
It is real to smooth out;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
Wherein, the specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter
It is layered on the road surface that will be constructed, it is good with rubber belt sealing on side, after 24 hours, film is opened it is seen that whether road surface has tide
Gas defers from the test that tries again for one day if there is moisture, confirms that road surface is thoroughly dried, then construct.
Wherein, dry sand grain density is in the step 6):2.5-2.7g/cm3。
Wherein, fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).
Wherein, by fluorescence resin grain forming slabbing in the step 7).
Compared with prior art, the beneficial effects of the invention are as follows:The luminous road surface of the present invention is complete in common basal layer
After work, irregular fluorescence resin particle is covered on surface, to play luminous effect, this shines after the extinction of road surface, evening
Upper self-luminous 5~8 hours;Fluorescence resin particle is high using after-glow brightness, and the bright time is long, it is environmentally friendly the features such as raw material;It shines
Road surface will not only have certain effect at night, and daytime also will also have certain requirement, color to use the road surface surface effect that shines
Inorganic weatherability, resistance to discoloration raw material be formulated;Using environmentally friendly fluorescence resin particle, this fluorescence resin particle has certain
Toughness, resistance to compression, it is wear-resisting the features such as, in weight, pound again after will not become powder.The luminous road surface that the present invention researches and develops sends out soft
Light is without dazzling.The pollution for effectively reducing accent light is increasingly severe, avoids having a negative impact to the urban life of people;By
It is to use fluorescence resin granular materials in luminous road surface, construction depth is will produce between particle and particle, reduces and skid now
As to reduce the generation of accident, it is fluorescent powder that people, trip, which has certain help, spontaneous fluorescence material, safely.
Specific implementation mode
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field
The every other embodiment that art personnel are obtained without making creative work belongs to the model that the present invention protects
It encloses.
Embodiment one
A kind of luminous road surface, including basal layer, the basal layer are mixed mud layer, and irregular fluorescence resin particle passes through glue
Stick is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following weight parts
Several components:It is green 0.015g, opening agent 5.04g, 168 antioxidant 3.75g, UV531 UV resistant agent 2.25g, special yellowish green
Spontaneous fluorescence material 0.275g, TPU resin 8558g of color.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer or bitumen layer;
The first, in step 5) on the basis of mixed mud layer or bitumen layer brushing seal coat, after primary coat is completely dry
In one side brushing adhesive (adhesive paves in time before without solidification) while the fluorescent grain being stirred that paves.(note:Fluorescence
Particle is sufficiently stirred with adhesive);It is smoothed out using specific purpose tool compacting after the completion of paving.
The first, in step 5) using specific purpose tool directly brushing adhesive on the basis of mixed mud layer or bitumen layer,
Brushing adhesive (adhesive without paving in time before solidification) while the fluorescent grain (note being stirred that paves on one side:Fluorescence
Grain is sufficiently stirred with adhesive);
Bitumen layer basis can first be filled and led up the gap on bitumen layer basis using material for repairing before doing primary coat;It is sealing
Primary coat is closed, the small bitumen layer basis in some gaps is without filling and leading up gap.
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Anti-slip pervious colorful light-emitting construction Craft
One, construction tool:Gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction, seek to do a road surface drying test and are opening
Work because construction road surface cannot have water or have humidity, the road surface of moisture that can reduce intention type colorful light-emitting road surface special glue
The bonding force of stick glue and road surface, influences bonding quality, if rainy day will wait ground to be completely dried, is tested doing a road surface
It is constructing.
Road surface aridity test method:It is layered on the road surface that will be constructed with the plastic film of a fritter, adhesive tape is used on side
It is sealed, opens within 24 hours films it is seen that whether road surface has moisture, primary survey is being done if there is moisture defers from one day
Examination confirms that thoroughly drying is being constructed on road surface.
Two, pavement construction:
The first step cleans road surface
Pay attention to:Construction road surface cannot have water or carry moisture, and moist road surface cannot construct, first use reflective cone or other
Warning guardrail encloses the road surface that needs are laid with, in use besom or road sweeper the sundries and other rubbish on ground
Rubbish cleans up, and the dust on ground is being cleaned out using hair-dryer.
Second step, the stirring of colorful light-emitting road surface special-purpose adhesive
The special primer in intention type colorful light-emitting road surface is opened, is first stirred base-material using blender, mixing time
Generally 3-5 minutes.
Pay attention to:Have to an adhesive uniform stirring cannot it is too short can not be too long, the time, which has been grown, can cause primer too fast
Solidification, should not spread out painting, adhesive is caused to scrap or influence quality.
Third walks, and mixed mud chooses whether to polish depending on base case, and purpose removes the laitance on surface, understands dust, drips
Green basis, chooses whether to need to polish according to road surface concrete condition.
4th step:Mixed mud basis has to do seal coat, and next procedure is being done after completely dry.Pitch basis is optionally
Brushing primary coat.
5th step:Completely paving type colorful light-emitting road surface special-purpose adhesive mixes dry sand (dry sand granular size can be according to recess situation
Selection) recess is replenished, doing next procedure after completely dry.
6th step:Pave the full special fluorescent grain in colorful light-emitting road surface
After the completion of fluorescent grain is sufficiently stirred with adhesive, it is compacted in uniform paving concrete pavement, before the fluorescent grain that paves
First special-purpose adhesive is uniformly brushed on ground, pave fluorescent grain in brush coating stick, and synchronous construction is using special tool
Tool compacting, has certain water penetration, surface particles color that can arbitrarily arrange in pairs or groups between this process particulates and particle, also can be with
Other not luminescent material collocation constructions.
7th step:Play side
It sheds in particle compacting rear curing time and plays side, pay attention to:Side is played after the fluorescent grain that paves compacting, depending on concrete condition
It is fixed, if it is beautiful to have delayed side time effects.
8th step:Painting is covered with paving type colorful light-emitting top course material
The luminous top course proprietary material of rolling is sprayed on the grains dedicated layer in luminous road surface to have completed using specific purpose tool,
Extend the service life on completely paving type colorful light-emitting road surface, completely paving type colorful light-emitting road surface road surface is completed.
9th step:Fluorescent grain be laid with after the completion of, observation solidification situation, under normal circumstances, 48 hours can open to traffic,
With specific reference to temperature change open hour traffic time, completely paving type colorful light-emitting road surface is completed.
Embodiment two
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:Green 6g, opening agent 126g, 168 antioxidant 1500g, UV531 UV resistant agent 900g, special yellow green self-luminous
Fluorescent material 16.5g, TPU resin 72365g.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer or bitumen layer;
The first, in step 5) on the basis of mixed mud layer or bitumen layer brushing seal coat, after primary coat is completely dry
In one side brushing adhesive (adhesive paves in time before without solidification) while the fluorescent grain being stirred that paves.(note:Fluorescence
Particle is sufficiently stirred with adhesive);It is smoothed out using specific purpose tool compacting after the completion of paving.
The first, in step 5) using specific purpose tool directly brushing adhesive on the basis of mixed mud layer or bitumen layer,
Brushing adhesive (adhesive without paving in time before solidification) while the fluorescent grain (note being stirred that paves on one side:Fluorescence
Grain is sufficiently stirred with adhesive);
Bitumen layer basis can first be filled and led up the gap on bitumen layer basis using material for repairing before doing primary coat;It is sealing
Primary coat is closed, the small bitumen layer basis in some gaps is without filling and leading up gap.
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) it after being sufficiently stirred fluorescence resin particle and adhesive, then uniformly paves to basal layer and is compacted, paving
The fluorescence resin particle being sufficiently stirred is needed first to brush adhesive on basal layer, be paved in brush coating stick with before adhesive
The fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Water-permeable colored luminous construction Craft
One, construction tool, gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction.
Two, pavement construction, basic dirt bed processing
The first step cleans road surface, and the rubble of big specification as requested in homogeneous thickness is paved to lower layer's soil basis
On, 1, use is to increase the penetration of water using the big gap between big dimension crushed stone and rubble, 2, improve the flatness on basis
And resistance to compression.
Second step, small dimension rubble pervious bed,
After the completion of the metalling of big specification, pave after small dimension rubble is mixed evenly with cementitious matter broken to big specification
In rock layers, compacting polishes, and the use of this technique is to increase permeable permeability and surface smoothness and small dimension rubble secondary
Aesthetic effect.
The combination (1) of small dimension rubble pervious bed and fluorescent grain be not hardened it while constructing small dimension rubble
It is preceding that light-emitting particles are taped against inside small dimension rubble, different moulding can also be made;
Small dimension rubble pervious bed is combined (2) completely to spread one after construction small dimension metalling is fully hardened with fluorescent grain
Layer fluorescent grain layer;
Small dimension rubble pervious bed is combined (3) that the small dimension metalling after hardened is wanted according to difference with fluorescent grain
It has asked and has produced different grooves, fluorescent grain is mounted to inside the small dimension metalling after hardening, is formed with small dimension metalling
One plane.
Third walks, and construction porous pavement has face color surface layer
After small dimension metalling is fully hardened, one layer of Mian Ceng is uniformly sprayed on surface by specific purpose tool, this face layer can be to appoint
Meaning color.
Light-emitting particles are taped against surface after the layer completion of permeable face and are formed by the combination (1) of porous pavement face layer and fluorescent grain
With a light-emitting particles layer, different moulding can be also made.
Porous pavement face layer and the combination (2) of fluorescent grain are the permeable face layer after hardened according to different requirements detonation
Go out different grooves, fluorescent grain is mounted to the porous pavement face layer the inside after hardening, one is formed with the surface layer of porous pavement
Plane.
4th step:Fluorescent grain be laid with after the completion of, observation solidification situation, under normal circumstances, 48 hours can open to traffic,
With specific reference to temperature change open hour traffic time, colorful light-emitting road surface is completed.
Embodiment three
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:L208 yellow 0.01g, S602 yellow 0.01g, Y608 yellow 0.0025g, opening agent 5.01g, 168 antioxidant
Spontaneous fluorescence material 0.275g, TPU resin 25000g of 3.75g, UV531 UV resistant agent 2.25g, special yellow green.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Sheet colorful light-emitting road surface installing type construction technology
One, construction tool, gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction, seek to do a road surface drying test and are opening
Work because construction road surface cannot have water or have humidity, the road surface of moisture that can reduce the special gluing in sheet colorful light-emitting road surface
The bonding force of agent glue and road surface, influences bonding quality, if rainy day will wait ground to be completely dried, exists doing a road surface test
Construction.
Road surface aridity test method:
It is layered on the road surface that will be constructed with the plastic film of a fritter, it is good with rubber belt sealing on side, it opens within 24 hours thin
Film is being done a test if there is moisture defers from one day it is seen that whether road surface has moisture, confirms that road surface is thoroughly dried
It is constructing.
Two, pavement construction
The first step cleans road surface
Pay attention to:Construction road surface cannot have water or carry moisture, and moist road surface cannot construct, first use reflective cone or other
Warning guardrail encloses the road surface that needs are laid with, in use besom or road sweeper the sundries and other rubbish on ground
Rubbish cleans up, and the dust on ground is being cleaned out using hair-dryer.
Second step, the installation of sheet colorful light-emitting ground surface material
It will need the region for installing sheet colorful light-emitting ground surface material that line is put well as requested, by sheet colorful light-emitting
Ground surface material uses screw, nail to be close-coupled on ground.
Third walks:Brushing sheet colorful light-emitting top course material
This surface material, which optionally considers can be used, not to be had to.
4th step:After the completion of sheet colorful light-emitting top course material-paving, you can upper people, sheet colorful light-emitting road surface peace
Dress formula is completed.
Example IV
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:L208 yellow 4g, S602 yellow 4g, Y608 yellow 1g, opening agent 125.25g, 168 antioxidant 1500g, UV531 are anti-
The spontaneous fluorescence material 16.5g of ultraviolet light agent 900g, special yellow green, ABS resin 8558g.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Keel type color fluorescence material construction technology
One, construction tool, gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction, seek to do a drying and test going into operation,
Basic aridity test method:
It is layered on the surface that will be constructed with the plastic film of a fritter, it is good with rubber belt sealing on side, it opens within 24 hours thin
Film is being done a test if there is moisture defers from one day it is seen that whether have moisture, confirms that thoroughly drying is being constructed.
Two, construction
The first step cleans
The region that needs are laid with is enclosed using reflective cone or other warning guardrails, is using besom or cleaner handle
Sundries and other refuse sweepings on surface is clean, and the dust on ground is being cleaned out using hair-dryer.
Second step, the installation of keel
As requested, first the keel position line is put well, (basis is on the basis of keel are fixed on:Mixed mud, pitch, ground
Brick, the hard such as marble basis).
Third walks, the installation of keel type colorful light-emitting ground surface material
Sheet color fluorescence material is fixed on keel after the completion of keel construction.
4th step:Installation is complete, cleaning.
Embodiment five
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:Green 0.005g, blue 0.025g, opening agent 4.98g, 168 antioxidant 3.75g, UV531 UV resistant agent 2.25g,
Special spontaneous fluorescence material 0.275g, AS resin 72365g of blue.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Sheet colorful light-emitting construction Craft
One, construction tool, gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper has to the work done before this point construction, seeks to do a road surface drying test and is opening
Work because construction road surface cannot have water or have humidity, the road surface of moisture that can reduce the special gluing in sheet colorful light-emitting road surface
The bonding force of agent glue and road surface, influences bonding quality, if rainy day will wait ground to be completely dried, exists doing a road surface test
Construction,
Road surface aridity test method:
It is layered on the road surface that will be constructed with the plastic film of a fritter, it is good with rubber belt sealing on side, it opens within 24 hours thin
Film is being done a test if there is moisture defers from one day it is seen that whether road surface has moisture, confirms that road surface is thoroughly dried
It is constructing.
Two, pavement construction
The first step cleans road surface
Pay attention to:Construction road surface cannot have water or carry moisture, and moist road surface cannot construct, and first use reflective cone or other
Warning guardrail encloses the road surface that needs are laid with, using besom or road sweeper on ground sundries and other rubbish
Rubbish cleans up, and the dust on ground is being cleaned out using hair-dryer.
Second step, sheet colorful light-emitting road surface adhesive
Adhesive is opened, is first stirred base-material using blender, mixing time is generally 1-3 minutes, glue
Stick can be that single two-component all may be used.
Pay attention to:Have to an adhesive uniform stirring, cannot it is too short can not be too long, the time, which has been grown, can cause primer too fast
Solidification, should not spread out painting, adhesive is caused to scrap or influence quality.
Third walks, and the laitance on surface is removed cleaning dust, pitch and mixed mud basis are selected according to road surface concrete condition
Whether polish brushing primary coat is needed.
4th step mixes dry sand (dry sand granular size can be selected according to recess situation) using special-purpose adhesive and replenishes recess,
Next procedure is being done after completely dry.
5th step, the sheet that paves colorful light-emitting road surface adhesive
It is paved with roller or batch knife, needs to ensure the luminous road surface adhesive that uniformly paves in construction figure, construction
Personnel will carefully notice checking which place does not pave uniformly to material, keep the consistency of thickness of glue as possible,
6th step, the sheet that paves fluorescent material
On the ground that uniformly paves after the completion of first adhesive is sufficiently stirred, while sheet type colorful light-emitting ground surface material
It is installed to ground, the service life in order to increase sheet material fluorescent material can increase nail, other attachments such as screw, can be according to requiring
Make different patterns and moulding.
7th step:Brushing sheet colorful light-emitting top course material, this surface material, which optionally considers can be used, not to be had to.
8th step:After the completion of sheet colorful light-emitting top course material-paving, observation solidification situation, under normal circumstances,
People, 12 hours feasible bicycles can be gone up after capable of reaching 4 hours, sheet colorful light-emitting road surface is completed.
Embodiment six
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:Green 2g, blue 10g, opening agent 124.50g, 168 antioxidant 1500g, UV531 UV resistant agent 900g, special indigo plant
Spontaneous fluorescence material 16.5g, PMMA resin 25000g of color.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Anti-slip pervious colorful light-emitting construction Craft
One, construction tool:Gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction, seek to do a road surface drying test and are opening
Work because construction road surface cannot have water or have humidity, the road surface of moisture that can reduce intention type colorful light-emitting road surface special glue
The bonding force of stick glue and road surface, influences bonding quality, if rainy day will wait ground to be completely dried, is tested doing a road surface
It is constructing.
Road surface aridity test method:It is layered on the road surface that will be constructed with the plastic film of a fritter, adhesive tape is used on side
It is sealed, opens within 24 hours films it is seen that whether road surface has moisture, primary survey is being done if there is moisture defers from one day
Examination confirms that thoroughly drying is being constructed on road surface.
Two, pavement construction:
The first step cleans road surface
Pay attention to:Construction road surface cannot have water or carry moisture, and moist road surface cannot construct, first use reflective cone or other
Warning guardrail encloses the road surface that needs are laid with, in use besom or road sweeper the sundries and other rubbish on ground
Rubbish cleans up, and the dust on ground is being cleaned out using hair-dryer.
Second step, the stirring of colorful light-emitting road surface special-purpose adhesive
The special primer in intention type colorful light-emitting road surface is opened, is first stirred base-material using blender, mixing time
Generally 3-5 minutes.
Pay attention to:Have to an adhesive uniform stirring cannot it is too short can not be too long, the time, which has been grown, can cause primer too fast
Solidification, should not spread out painting, adhesive is caused to scrap or influence quality.
Third walks, and mixed mud chooses whether to polish depending on base case, and purpose removes the laitance on surface, understands dust, drips
Green basis, chooses whether to need to polish according to road surface concrete condition.
4th step:Mixed mud basis has to do seal coat, and next procedure is being done after completely dry.Pitch basis is optionally
Brushing primary coat.
5th step:Completely paving type colorful light-emitting road surface special-purpose adhesive mixes dry sand (dry sand granular size can be according to recess situation
Selection) recess is replenished, doing next procedure after completely dry.
6th step:Pave the full special fluorescent grain in colorful light-emitting road surface
After the completion of fluorescent grain is sufficiently stirred with adhesive, it is compacted in uniform paving concrete pavement, before the fluorescent grain that paves
First special-purpose adhesive is uniformly brushed on ground, pave fluorescent grain in brush coating stick, and synchronous construction is using special tool
Tool compacting, has certain water penetration, surface particles color that can arbitrarily arrange in pairs or groups between this process particulates and particle, also can be with
Other not luminescent material collocation constructions.
7th step:Play side
It sheds in particle compacting rear curing time and plays side, pay attention to:Side is played after the fluorescent grain that paves compacting, depending on concrete condition
It is fixed, if it is beautiful to have delayed side time effects.
8th step:Painting is covered with paving type colorful light-emitting top course material
The luminous top course proprietary material of rolling is sprayed on the grains dedicated layer in luminous road surface to have completed using specific purpose tool,
Extend the service life on completely paving type colorful light-emitting road surface, completely paving type colorful light-emitting road surface road surface is completed.
9th step:Fluorescent grain be laid with after the completion of, observation solidification situation, under normal circumstances, 48 hours can open to traffic,
With specific reference to temperature change open hour traffic time, completely paving type colorful light-emitting road surface is completed.
Embodiment seven
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:L rhodos 0.35g, opening agent 3.7g, 168 antioxidant 3.75g, UV531 UV resistant agent 2.25g, special yellow green are certainly
Light-emitting fluorescent material 2.25g, PP resin 72365g.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
Water-permeable colored luminous construction Craft
One, construction tool, gloves, electric mixer, adhesive, generator, hair-dryer, scrub-brush, besom, hair roller,
Spade, reflective cone, bucket, U.S. line paper have to the work done before this point construction.
Two, pavement construction, basic dirt bed processing
The first step cleans road surface, and the rubble of big specification as requested in homogeneous thickness is paved to lower layer's soil basis
On, 1, use is to increase the penetration of water using the big gap between big dimension crushed stone and rubble, 2, improve the flatness on basis
And resistance to compression.
Second step, small dimension rubble pervious bed,
After the completion of the metalling of big specification, pave after small dimension rubble is mixed evenly with cementitious matter broken to big specification
In rock layers, compacting polishes, and the use of this technique is to increase permeable permeability and surface smoothness and small dimension rubble secondary
Aesthetic effect.
The combination (1) of small dimension rubble pervious bed and fluorescent grain be not hardened it while constructing small dimension rubble
It is preceding that light-emitting particles are taped against inside small dimension rubble, different moulding can also be made;
Small dimension rubble pervious bed is combined (2) completely to spread one after construction small dimension metalling is fully hardened with fluorescent grain
Layer fluorescent grain layer;
Small dimension rubble pervious bed is combined (3) that the small dimension metalling after hardened is wanted according to difference with fluorescent grain
It has asked and has produced different grooves, fluorescent grain is mounted to inside the small dimension metalling after hardening, is formed with small dimension metalling
One plane.
Third walks, and construction porous pavement has face color surface layer
After small dimension metalling is fully hardened, one layer of Mian Ceng is uniformly sprayed on surface by specific purpose tool, this face layer can be to appoint
Meaning color.
Light-emitting particles are taped against surface after the layer completion of permeable face and are formed by the combination (1) of porous pavement face layer and fluorescent grain
With a light-emitting particles layer, different moulding can be also made.
Porous pavement face layer and the combination (2) of fluorescent grain are the permeable face layer after hardened according to different requirements detonation
Go out different grooves, fluorescent grain is mounted to the porous pavement face layer the inside after hardening, one is formed with the surface layer of porous pavement
Plane.
4th step:Fluorescent grain be laid with after the completion of, observation solidification situation, under normal circumstances, 48 hours can open to traffic,
With specific reference to temperature change open hour traffic time, colorful light-emitting road surface is completed.
Embodiment eight
A kind of luminous road surface, including basal layer, the basal layer are bitumen layer, and irregular fluorescence resin particle passes through gluing
Agent is covered on basal layer.The fluorescence resin particle is dark green green-emitting fluorescent particle, specifically includes following portions by weight
Component:L rhodos 140g, opening agent 92.50g, 168 antioxidant 1500g, UV531 UV resistant agent 900g, special yellow green are certainly
Light-emitting fluorescent material 900g, PC resin 25000g.
The forming method of the fluorescence resin particle includes the following steps:
1) production equipment is heated to 130-260 DEG C;
2) color, weather-proof auxiliary agent and resin particle material is added to stir;
3) special spontaneous fluorescence material raw material are added into the mixed material of step 2), are sufficiently stirred;
4) material that step 3) mixes is poured into machine-shaping device inlet port;
5) material is fabricated to fluorescence resin plank or is ground into fluorescence resin particle by machine-shaping device.
Fluorescent pavement thickness can be that different thickness, the fluorescence resin particle sizes such as 5-8mm are:3-5mm, different size
Particle road surface is suitable for people's row, cycle track and motor vehicle.
The construction method on the luminous road surface, includes the following steps:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, then is made
With besom or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer basal layer
On dust clean out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and is removed
Dust;
5) if basal layer to be onstructed is mixed mud layer, it is necessary to do seal coat, wait for the completely dry roads the Hou Zuoxia work of priming paint
Sequence;If basal layer to be onstructed is bitumen layer, without doing seal coat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) after fluorescence resin particle and adhesive being sufficiently stirred, then with roller or batch knife uniformly pave to basal layer into
Row compacting needs first to brush adhesive on basal layer, side brush in the fluorescence resin particle being sufficiently stirred that paves with before adhesive
Adhesive side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous road surface of rolling is sprayed on the luminous road surface completed using specific purpose tool
Face layer dedicated transparent material, extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and luminous road surface is applied
Work is completed.
The specific method of road surface aridity to be onstructed test is in the step 1):With the plastic film of a fritter be layered on by
It is good with rubber belt sealing on side on the road surface to be constructed, after 24 hours, film is opened it is seen that whether road surface has moisture, such as
Fruit has moisture, defers from the test that tries again for one day, confirms that road surface is thoroughly dried, then construct.Dry sand particle in the step 6)
Density is:2.5-2.7g/cm3.Fluorescence resin particle, small dimension rubble and adhesive are sufficiently stirred in the step 7).Institute
It states fluorescence resin grain forming slabbing in step 7).
The luminous road surface of the present invention is that it is irregular to spread self-luminous on surface after the completion of the basal layers such as common mixed mud
Resin particle to play luminous effect, this shine road surface extinction after, evening self-luminous 5-8 hour, luminescent material use
The after-glow brightness high bright time is long, it is environmentally friendly the features such as raw material, the road surface that shines will not only have certain effect at night, and daytime is also right
The road surface surface effect that shines will also have certain requirement, color to be formulated using the raw material of inorganic weatherability, resistance to discoloration.Using
Environment-friendly resin particle, this particle have certain toughness, resistance to compression, it is wear-resisting the features such as, in weight, pound again after will not become powder
End.Newly doing (after 28 days) that mixed mud will parch completely can just construct, mixed mud hardness requirement:People's row, cycle track reach
To C30 or more;It is smooth surface that loaded vehicle road, which reaches C50 with upper surface, and pitch basis compaction is pressed onto position, flatness requirement;2M
Aluminium alloy guiding ruler be put on the ground and differ less than 3MM.Luminous ground surface material belongs to weak light source, and starting brightness is equivalent to moon full moon
When brightness of the 100W electric lights at 21 meters,
Luminous road surface is a kind of new function road surface, function embodiment to various aspects, and one of road surface function that shines is
Light can be discharged later by absorbing luminous energy, by dying down by force, in cycles.It luminous road surface cannot be compared with the brightness of traditional light
Compared with, this is two kinds of entirely different products, the main feature in road surface that shines cannot completely the brightness on road surface as main feature,
But should embody weak light source road surface not stimulates the other aspects such as eyes and the interest of people.
If can take following methods that traditional light is combined to use to what the brightness on new function road surface there are a special requirement, build
View uses time control lamp, the distance between lamp and lamp to be subject to illumination region and luminous road surface is completely covered, and the brightness of lamp is in 60W.
Light, which may be used, has strong the characteristics of dying down to combine the road surface that shines, so as to achieve the effect that brightness is best.When light time control
Between be spaced 1- hours be unit, lighting hours be 15-30 minutes.According to the dosage for requiring to calculate luminous road surface material requested.
Fluorescent lifetime 5-8 hours is by gradually dying down by force, depending on the time that dies down is by light conditions.
Shine road surface and light:Pollution in view of accent light is increasingly severe, and negative impact is generated to the life of the mankind,
The sheen that fluorescence (luminous) road surface that the present invention researches and develops is sent out is without dazzling, environmentally friendly new function road surface.Anti-skidding effect:Due to luminous road
Face surface is to use color fluorescence resin particle material, particle and between will produce construction depth, reduce slipping phenomenon, to
The generation of reduction accident, to people, trip has certain help safely.Environmental activity:Due to shine road surface at night can shine it is several small
When, this road surface is mated formation using seamless link technology, is had some improvement to urban environment improvement.
The characteristics of integrated fluorescence paint and fluorescence stone and shortcoming independent research synthesis self-luminescent material:The luminous material of synthesis
Expect brightness:Due to synthetic material be select transparency 80-90% or more material, this transparency be far longer than fluorescent paint with
Fluorescence stone, therefore more, the note that illumination effect is better than them:(illumination effect also has certain relationship with transparency);Synthesis hair
Luminescent material can make the shape of the particle and different sheets of different-thickness, therefore can flexibly promote the bright of luminescent material
Degree;Safety coefficient is high:Synthesizing luminescent material 1, irregular particle 2, sheet (there is non-slip texture on surface) are when being used in road surface
Mated formation by the way of particle and particles stick, certain construction depth is will produce between particle and particle, (there is spy on surface to sheet
The non-slip texture of system) therefore certain antiskid effect is had, synthesizing luminescent material is especially in rainy day, snowy day, moisture weight, knot
Under the weather of ice, shorten braking distance, reduce slipping phenomenon, to reduce the generation of accident, has to the safety trip of people certain
Help.The wearability of synthesizing luminescent material is good, long lifespan:Synthesizing luminescent material is at a high temperature of 130-260 degree by shining
Material, weatherable materials are formed, so by the synthetic material of high temperature in high/low temperature, ultraviolet light drenches with rain down, and surface color is not easy
It fades, the finished product of synthesizing luminescent material only can deform or become slabbing under weight, and finished product luminescent material all has from inside to outside
There is illumination effect, it is small to influential effect after mating formation even if there are abrasion and cut in surface, use birthday noodle to extend;Synthesis hair
Luminescent material is used in texture when road surface:Since synthesizing luminescent material is using being made of the material of certain toughness, when people's row, has bright
Aobvious very hard feeling, alleviates fatigue in contrast;The synthesizing luminescent material feature of environmental protection:Synthesizing luminescent material environmental protection index accords with
Close environmental protection index.The application range of synthesizing luminescent material:Road surface, indoor and outdoor ground, indoor and outdoor wall, home decoration and other vertical
Body field is also used for the various daily necessities arts work, communal facility.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.
Claims (10)
1. a kind of luminous road surface, which is characterized in that including basal layer, the basal layer be mixed mud layer, bitumen layer, stone material layer or
Ground brick layer, irregular fluorescence resin particle are covered in by adhesive on basal layer.
2. luminous road surface according to claim 1, which is characterized in that the fluorescence resin particle is that dark green green light is glimmering
Light particle specifically includes the component of following portions by weight:0.015~6g of green, 5.04~126g of opening agent, 168 antioxidant
3.75~1500g, 2.25~900g of UV531 UV resistant agents, the spontaneous 0.275~16.5g of fluorescence material of special yellow green,
8558~72365g of TPU/PP/PVC/AS/ABS/PC/PMMA resins.
3. luminous road surface according to claim 1, which is characterized in that the fluorescence resin particle is that yellow green green light is glimmering
Light particle specifically includes the component of following portions by weight:0.01~4g of L208 yellow, 0.01~4g of S602 yellow, Y608 yellow
0.0025~1g, 5.01~125.25g of opening agent, 168 3.75~1500g of antioxidant, UV531 UV resistant agents 2.25~
Spontaneous 0.275~the 16.5g of fluorescence material of 900g, special yellow green, TPU/PP/PVC/AS/ABS/PC/PMMA resins 8558~
72365g。
4. luminous road surface according to claim 1, which is characterized in that the fluorescence resin particle is that sky blue sends out day blue light
Fluorescent grain specifically includes the component of following portions by weight:0.005~2g of green, 0.025~10g of blue, opening agent 4.98~
124.50g, 168 3.75~1500g of antioxidant, 2.25~900g of UV531 UV resistant agents, the special spontaneous fluorescence material of blue
0.275~16.5g, 8558~72365g of TPU/PP/PVC/AS/ABS/PC/PMMA resins.
5. luminous road surface according to claim 1, which is characterized in that the fluorescence resin particle is that rose blue light-emitting is glimmering
Light particle specifically includes the component of following portions by weight:0.35~140g of L rhodos, 3.7~92.50g of opening agent, 168 antioxidant
3.75~1500g, 2.25~900g of UV531 UV resistant agents, the spontaneous 2.25~900g of fluorescence material of special yellow green, TPU/
8558~72365g of PP/PVC/AS/ABS/PC/PMMA resins.
6. the construction method on the luminous road surface according to any one of claim 2 to 5, which is characterized in that including walking as follows
Suddenly:
1) basal layer aridity to be onstructed is tested, confirms that basal layer thoroughly after drying, is constructed;
2) basal layer is cleaned:First the basal layer that needs are laid with is enclosed with reflective cone or other warning guardrails, reuses and sweeps
Or road sweeper on basal layer sundries and other refuse sweepings it is clean, then, using hair-dryer on basal layer
Dust is cleaned out;
3) adhesive is stirred:Adhesive is stirred using blender first;
4) basal layer concrete condition to be onstructed is studied, then, polishing, it is ensured that the laitance of basic layer surface is removed, and removes dust;
5) brushing seal coat on the basis of mixed mud layer or bitumen layer, on one side, brushing adhesive is same after primary coat is completely dry
When pave the fluorescence resin particle and adhesive being sufficiently stirred, after the completion of paving compacting smooth out;Either in mixed mud layer or
Brushing adhesive on the basis of bitumen layer, while fluorescence resin particle directly being shed on adhesive, it is compacted smear after the completion of paving
It is flat;
6) adhesive is mixed into dry sand and replenishes recess, after completely dry;
7) it after being sufficiently stirred fluorescence resin particle and adhesive, then with roller or batch knife is uniformly paved to basal layer and is pressed
It is real, in the fluorescence resin particle being sufficiently stirred that paves with before adhesive, need first to brush adhesive on basal layer, side brush coating is viscous
Agent side paves the fluorescence resin particle and adhesive being sufficiently stirred.
8) the fluorescence resin particle being sufficiently stirred is paved with after adhesive compacting, before curing, has carried out side;
9) it is coated with the road surface surface material that shines:The luminous top course of rolling is sprayed on the luminous road surface completed using specific purpose tool
Dedicated transparent material extends the service life on the road surface that shines;
10) it shines after the completion of road surfacing, observation solidification situation, after 48 hours, hardness is obviously improved, and the pavement construction that shines is complete
At.
7. the construction method on luminous road surface according to claim 6, which is characterized in that road surface to be onstructed in the step 1)
Aridity test specific method be:It is layered on the road surface that will be constructed with the plastic film of a fritter, rubber belt sealing is used on side
It is good, after 24 hours, film is opened it is seen that whether road surface has moisture, if there is moisture, defers from the survey that tries again for one day
Examination confirms that road surface is thoroughly dried, then constructs.
8. the construction method on luminous road surface according to claim 6, which is characterized in that dry sand particle is close in the step 6)
Degree is:2.5-2.7g/cm3。
9. the construction method on luminous road surface according to claim 6, which is characterized in that by fluorescence resin in the step 7)
Particle, small dimension rubble and adhesive are sufficiently stirred.
10. the construction method on luminous road surface according to claim 6, which is characterized in that by fluorescence tree in the step 7)
Fat grain forming slabbing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810329577.5A CN108486982B (en) | 2018-04-12 | 2018-04-12 | Luminous pavement and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810329577.5A CN108486982B (en) | 2018-04-12 | 2018-04-12 | Luminous pavement and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108486982A true CN108486982A (en) | 2018-09-04 |
CN108486982B CN108486982B (en) | 2021-01-08 |
Family
ID=63316179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810329577.5A Active CN108486982B (en) | 2018-04-12 | 2018-04-12 | Luminous pavement and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108486982B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109507404A (en) * | 2018-12-31 | 2019-03-22 | 山西省交通科学研究院 | A kind of bituminous pavement aridity test method |
CN110564253A (en) * | 2019-09-26 | 2019-12-13 | 青岛天地彩涂料工程应用有限公司 | heat-absorbing photoelectric conversion fluorescent exterior wall coating and manufacturing method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10227009A (en) * | 1997-02-14 | 1998-08-25 | Osamu Kuroishi | Construction of road marking and coating thereof |
CN101796121A (en) * | 2007-08-31 | 2010-08-04 | Gs加特克斯公司 | Colored long fiber reinforced pellet and colored resin article manufactured by using the same |
CN102311627A (en) * | 2011-07-06 | 2012-01-11 | 惠州市昌亿科技股份有限公司 | Polycarbonate/ABS alloy, its preparation method and its application |
CN103924496A (en) * | 2014-04-25 | 2014-07-16 | 黑龙江省龙建路桥第三工程有限公司 | Paving method of antiskid colored ceramic granular pavement |
CN205046433U (en) * | 2015-10-13 | 2016-02-24 | 宁波德腾环保新材料有限公司 | Colored fluorescence road surface |
CN206109928U (en) * | 2016-06-22 | 2017-04-19 | 宁波德腾环保新材料有限公司 | Fluorescence anti -skid surface |
CN106751221A (en) * | 2016-12-31 | 2017-05-31 | 天津科彩塑料科技有限公司 | A kind of hard PVC color masterbatch and preparation method thereof |
-
2018
- 2018-04-12 CN CN201810329577.5A patent/CN108486982B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10227009A (en) * | 1997-02-14 | 1998-08-25 | Osamu Kuroishi | Construction of road marking and coating thereof |
CN101796121A (en) * | 2007-08-31 | 2010-08-04 | Gs加特克斯公司 | Colored long fiber reinforced pellet and colored resin article manufactured by using the same |
CN102311627A (en) * | 2011-07-06 | 2012-01-11 | 惠州市昌亿科技股份有限公司 | Polycarbonate/ABS alloy, its preparation method and its application |
CN103924496A (en) * | 2014-04-25 | 2014-07-16 | 黑龙江省龙建路桥第三工程有限公司 | Paving method of antiskid colored ceramic granular pavement |
CN205046433U (en) * | 2015-10-13 | 2016-02-24 | 宁波德腾环保新材料有限公司 | Colored fluorescence road surface |
CN206109928U (en) * | 2016-06-22 | 2017-04-19 | 宁波德腾环保新材料有限公司 | Fluorescence anti -skid surface |
CN106751221A (en) * | 2016-12-31 | 2017-05-31 | 天津科彩塑料科技有限公司 | A kind of hard PVC color masterbatch and preparation method thereof |
Non-Patent Citations (1)
Title |
---|
张素芝、张熙桐: "新型防滑彩色路面施工工艺技术探讨", 《科技创新与应用》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109507404A (en) * | 2018-12-31 | 2019-03-22 | 山西省交通科学研究院 | A kind of bituminous pavement aridity test method |
CN110564253A (en) * | 2019-09-26 | 2019-12-13 | 青岛天地彩涂料工程应用有限公司 | heat-absorbing photoelectric conversion fluorescent exterior wall coating and manufacturing method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108486982B (en) | 2021-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106046979B (en) | A kind of pervious concrete pavement noctilucence cover protective agent and the protectant road surface of cover containing noctilucence and construction method | |
US11075311B2 (en) | Photovoltaic structure for a roadway | |
CN111548592B (en) | MMA polymer thin-layer color antiskid paving material and preparation method and construction method thereof | |
CN110735371B (en) | Weather-resistant colored resin cover and preparation method thereof | |
CN101143986A (en) | Terrace paint | |
CN100529261C (en) | Rolled polymer modified cement-concrete sprayed colour road surface structure, and its construction method | |
CN102431246B (en) | Skidproof permeable road pad and manufacturing technology thereof | |
CN108486982A (en) | A kind of luminous road surface and its construction method | |
CN105060768A (en) | Self-luminous anti-skidding pavement material and preparation method thereof | |
CN108250912A (en) | A kind of ageing-resistant Pavement Skid Resistance material of toughness and construction method | |
CN105625140A (en) | Construction method for air-permeable and water-drainage self-grained composite plastic track | |
CN103924496A (en) | Paving method of antiskid colored ceramic granular pavement | |
CN108914800A (en) | A kind of reflective curb of self-luminous-and preparation method thereof | |
CN202755600U (en) | Non-glare wear-resistant anti-skidding environment-friendly silicon Poly Urethane (PU) plastic surface layer | |
CN108505412A (en) | A kind of fluorescent pavement and its construction method | |
CN1435393A (en) | Color brick for walk, and method for making same | |
CN202208874U (en) | Anti-skid permeable road mat | |
CN110042718A (en) | A kind of anti-shearing machine spreading super-thin pavement technique of colour | |
KR100877350B1 (en) | Paving materials and constructing method thereof | |
JPH11181707A (en) | Pavement method using water-permeable resin pavement material, and manufacture of block | |
KR19980064895A (en) | Soil road paving method | |
CN108467231A (en) | Preparation method of self-luminous pavement material and luminous pavement | |
CN107500713A (en) | Anti-slip material and anti-slip construction method thereof | |
KR102151050B1 (en) | Starpass Pavement Method Using Photoluminescent Eco Chip and Starpass Pavement | |
CN209353178U (en) | A kind of self-luminous washing stone water-permeable brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |