CN108442425B - 倾斜沉井纠偏施工技术 - Google Patents

倾斜沉井纠偏施工技术 Download PDF

Info

Publication number
CN108442425B
CN108442425B CN201810251650.1A CN201810251650A CN108442425B CN 108442425 B CN108442425 B CN 108442425B CN 201810251650 A CN201810251650 A CN 201810251650A CN 108442425 B CN108442425 B CN 108442425B
Authority
CN
China
Prior art keywords
open caisson
lifting
holes
forced landing
lifting holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810251650.1A
Other languages
English (en)
Other versions
CN108442425A (zh
Inventor
叶香雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810251650.1A priority Critical patent/CN108442425B/zh
Publication of CN108442425A publication Critical patent/CN108442425A/zh
Application granted granted Critical
Publication of CN108442425B publication Critical patent/CN108442425B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • E02D23/14Decreasing the skin friction while lowering
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures

Abstract

本发明公开了一种倾斜沉井纠偏施工技术,其特征是在沉井下沉慢的一侧设置迫降孔,迫降孔直径为75~120mm,迫降孔间距为1.5~2.2m,在沉井下沉快的一侧设置抬升孔,抬升孔直径为60~90mm,抬升孔间距为1.8~2.5m,抬升孔深度为2.2~2.5倍沉井高度,抬升孔采用两排,抬升孔注入水泥浆,水泥浆水灰比为0.45~0.5,水泥浆掺入硫铝酸钙类膨胀剂;纠偏顺序是先进行迫降,再进行抬升,迫降或抬升均采用信息化施工。

Description

倾斜沉井纠偏施工技术
技术领域
本发明涉及纠偏施工方法,特别涉及一种倾斜沉井纠偏施工技术。
背景技术
沉井施工过程中容易出现倾斜,沉井倾斜后要进行纠偏,传统沉井纠偏方法有挖土法和增加外部荷载法,挖土法是对下沉慢的一边多挖土,增加沉井刃脚与土壤间的空隙,促使其下沉。对下沉快的一边视情况少挖土,不挖土或堆土,及堆土夯实,增加下沉摩阻力,减缓下沉速度。增加外部荷载法是在沉井下沉慢的一侧增加荷载,同时在其刃脚下挖空,以利克服摩阻力来校正偏斜。这些传统技术所存在的问题是施工过程中难以控制,纠偏容易矫枉过正。
发明内容
针对现有技术中存在的不足,本发明的目的在于提供一种倾斜沉井纠偏施工技术来保证纠偏效果。
本发明在沉井下沉慢的一侧设置迫降孔,迫降孔直径为75~120mm,迫降孔间距为1.5~2.2m,采用钻孔方式形成迫降孔使沉井井壁与其周围土体摩擦力减少,在钻孔过程中不断注水使沉井下沉,采用智能控制方式来指导纠偏工艺,钻机钻速和注水压力根据土质和纠偏速率进行调整。
在沉井下沉快的一侧设置抬升孔,抬升孔直径为60~90mm,抬升孔间距为1.8~2.5m,抬升孔深度为2.2~2.5倍沉井高度,抬升孔采用两排,两排抬升孔布置参数采用如下:第一排抬升孔为竖直,第一排抬升孔离沉井边缘距离为500~700mm,第二排抬升孔为倾斜,倾斜度为60~70度,这里倾斜度是指抬升孔与水平线的夹角,第二排抬升孔离沉井边缘距离为1000~1200mm;两排抬升孔布置参数还可以采用如下:第一排抬升孔为倾斜,倾斜度为60~70度,第一排抬升孔离沉井边缘距离为1000~1200mm,第二排抬升孔为倾斜,倾斜度为60~70度,第二排抬升孔和第一排抬升孔平行布置,第二排抬升孔离沉井边缘距离为1500~1700mm;抬升孔注入水泥浆,水泥浆水灰比为0.45~0.5,水泥浆掺入硫铝酸钙类膨胀剂,掺有硫铝酸钙类膨胀剂的水泥浆进入土体后会出现水化反应,水化过程中地基土体积膨胀,对沉井产生抬升力,硫铝酸钙类膨胀剂的掺量与沉井的抬升力直接相关,掺有硫铝酸钙类膨胀剂的水泥浆进入土体后不仅起到了膨胀抬升的作用,而且起到了挤密压实作用,随着硫铝酸钙类膨胀剂的水泥浆的固化膨胀,地基土体密实度明显增加,压缩性减小。硫铝酸钙类膨胀剂的掺量根据抬升量来确定,抬升量大于或等于100mm时,硫铝酸钙类膨胀剂的掺量为7%;抬升量大于50mm且小于100mm时,硫铝酸钙类膨胀剂的掺量为6%;抬升量小于50mm时,硫铝酸钙类膨胀剂的掺量为5%。
纠偏顺序是先进行迫降,再进行抬升,迫降或抬升均采用信息化施工,在沉井顶部布置位移传感器,位移传感器与电脑连接进行智能控制,位移传感器即时将数据传输给电脑,电脑根据采集的数据每下沉或抬升2mm绘制一次曲线,并根据曲线斜率给出纠偏速率,分析纠偏发展趋势。
迫降施工过程中钻孔速度和注水压力根据土质和下沉速率进行调整,当沉井底部为淤泥质土,下沉速率小于或等于0.02mm/min时,钻机钻速小于或等于120r/min且大于110r/min,注水压力为1.3MPa;当钻孔土质为淤泥质土时,下沉速率大于0.02mm/min且小于0.03mm/min时,钻机钻速小于或等于110r/min且大于100r/min,注水压力为1.3MPa;当钻孔土质为淤泥质土时,下沉速率大于或等于0.03mm/min时,钻机钻速小于或等于100r/min且大于90r/min,注水压力为1.3MPa;
当沉井底部为粘土,下沉速率小于或等于0.02mm/min时,钻机钻速小于或等于90r/min且大于80r/min,注水压力为1.2MPa;当钻孔土质为粘土,下沉速率大于0.02mm/min且小于0.03mm/min时,钻机钻速小于或等于80r/min且大于75r/min,注水压力为1.2MPa;当钻孔土质为粘土,下沉速率大于或等于0.03mm/min时,钻机钻速小于或等于75r/min且大于70r/min,注水压力为1.2MPa;
当沉井底部为粉土,下沉速率小于或等于0.02mm/min时,钻机钻速小于或等于70r/min且大于65r/min,注水压力为1.1MPa;当钻孔土质为粉土,下沉速率大于0.02mm/min且小于0.03mm/min时,钻机钻速小于或等于65r/min且大于60r/min,注水压力为1.1MPa;当钻孔土质为粉土,下沉速率大于或等于0.03mm/min时,钻机钻速小于或等于60r/min且大于55r/min,注水压力为1.1MPa;
当沉井底部为砂土,下沉速率小于或等于0.02mm/min时,钻机钻速小于或等于55r/min且大于50r/min,注水压力为1.0MPa;当钻孔土质为砂土,下沉速率大于0.02mm/min且小于0.03mm/min时,钻机钻速小于或等于50r/min且大于45r/min,注水压力为1.0MPa;当钻孔土质为砂土,下沉速率大于或等于0.03mm/min时,钻机钻速小于或等于45r/min且大于40r/min,注水压力为1.0MPa;
在粉土或者砂土中,沉井会难以下沉,可以采用下列技术措施:成孔完毕后通过注浆管注入掺有微晶高岭石的水,水中掺入1%~2%的微晶高岭石后马上通过注浆管注入孔中,微晶高岭石进入孔后膨胀为直径为3~5mm的小球依附在沉井壁,使滑动摩擦变为滚动摩擦,降低了孔壁摩擦力,有利于纠偏产生效果。如果地质存在流砂层,掺入2%~3%的纯碱来提高浆液稠度,增加纳离子以改变土粒子水化性能。
抬升施工采用间隔施工,即先施工完毕奇数序号的抬升孔,再施工偶数序号的抬升孔,序号从左往右进行编排,防止相邻抬升孔因孔距过近在施工时相互影响或抬升孔浆液膨胀力释放而影响纠偏加固效果。奇数序号的抬升孔施工完毕后经过20~30min的间歇时间后再施工偶数序号的抬升孔,目的是让膨胀应力获得一定的释放确保纠偏效果。
本发明具有纠偏效果好、安全可靠的优点,具有较好的应用前景。
附图说明
图1为沉井纠偏平面布置示意图一,图2为沉井纠偏立面布置示意图一。
附图标志:1、迫降孔,2、抬升孔,3、沉井。
具体实施方式
以下结合附图对本实施例进行详细描述。
实施例一
图1为沉井纠偏平面布置示意图二,图2为沉井纠偏立面布置示意图二。
本实施例在沉井3下沉慢的一侧设置迫降孔1,迫降孔1直径为80mm,迫降孔1间距为1.7m,采用钻孔方式形成迫降孔1使沉井3井壁与其周围土体摩擦力减少,在钻孔过程中不断注水使沉井3下沉,采用智能控制方式来指导纠偏工艺,钻机钻速和注水压力根据土质和纠偏速率进行调整。
在沉井3下沉快的一侧设置抬升孔2,抬升孔2直径为70mm,抬升孔2深度为2.3倍沉井3高度,抬升孔2间距为2m,抬升孔2采用两排,两排抬升孔2布置参数采用如下:第一排抬升孔2为倾斜,倾斜度为65度,第一排抬升孔2离沉井3边缘距离为1100mm,第二排抬升孔2为倾斜,倾斜度为65度,第二排抬升孔2和第一排抬升孔2平行布置,第二排抬升孔2离沉井3边缘距离为1600mm;抬升孔2注入水泥浆,水泥浆水灰比为0.45,水泥浆掺入硫铝酸钙类膨胀剂。抬升量为70mm,硫铝酸钙类膨胀剂的掺量为6%。
纠偏顺序是先进行迫降,再进行抬升,迫降或抬升均采用信息化施工,在沉井3顶部布置位移传感器,位移传感器与电脑连接进行智能控制,位移传感器即时将数据传输给电脑,电脑根据采集的数据每下沉2mm绘制一次曲线,并根据曲线斜率给出纠偏速率,分析纠偏发展趋势。
迫降施工过程中钻孔速度和注水压力根据土质和下沉速率进行调整,沉井3底部为粘土,下沉速率小于或等于0.02mm/min时,钻机钻速小于或等于90r/min且大于80r/min,注水压力为1.2MPa;下沉速率大于0.02mm/min且小于0.03mm/min时,钻机钻速小于或等于80r/min且大于75r/min,注水压力为1.2MPa;下沉速率大于或等于0.03mm/min时,钻机钻速小于或等于75r/min且大于70r/min,注水压力为1.2MPa;
抬升施工采用间隔施工,即先施工完毕奇数序号的抬升孔2,再施工偶数序号的抬升孔2,序号从左往右进行编排。奇数序号的抬升孔2施工完毕后经过20~30min的间歇时间后再施工偶数序号的抬升孔2。

Claims (1)

1.一种倾斜沉井纠偏施工方法,其特征是在沉井下沉慢的一侧设置迫降孔,迫降孔直径为75~120mm,迫降孔间距为1.5~2.2m,采用钻孔方式形成迫降孔使沉井井壁与其周围土体摩擦力减少,在钻孔过程中不断注水使沉井下沉,采用智能控制方式来指导纠偏工艺,钻机钻速和注水压力根据土质和纠偏速率进行调整;
在沉井下沉快的一侧设置抬升孔,抬升孔直径为60~90mm,抬升孔间距为1.8~2.5m,抬升孔深度为2.2~2.5倍沉井高度,抬升孔采用两排,抬升孔注入水泥浆,水泥浆水灰比为0.45~0.5,水泥浆掺入硫铝酸钙类膨胀剂;
纠偏顺序是先进行迫降,再进行抬升,迫降或抬升均采用信息化施工,在沉井顶部布置位移传感器,位移传感器与电脑连接进行智能控制,位移传感器即时将数据传输给电脑,电脑根据采集的数据每下沉或抬升2mm绘制一次曲线,并根据曲线斜率给出纠偏速率,分析纠偏发展趋势;
两排抬升孔布置参数采用如下:第一排抬升孔为倾斜,倾斜度为60~70度,第一排抬升孔离沉井边缘距离为1000~1200mm,第二排抬升孔为倾斜,倾斜度为60~70度,第二排抬升孔和第一排抬升孔平行布置,第二排抬升孔离沉井边缘距离为1500~1700mm。
CN201810251650.1A 2016-11-17 2016-11-17 倾斜沉井纠偏施工技术 Active CN108442425B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810251650.1A CN108442425B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工技术

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810251650.1A CN108442425B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工技术
CN201611062968.2A CN106592615B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201611062968.2A Division CN106592615B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工方法

Publications (2)

Publication Number Publication Date
CN108442425A CN108442425A (zh) 2018-08-24
CN108442425B true CN108442425B (zh) 2020-01-17

Family

ID=58595003

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201611062968.2A Active CN106592615B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工方法
CN201810252458.4A Active CN108360545B (zh) 2016-11-17 2016-11-17 倾斜沉井组合纠偏施工方法
CN201810251650.1A Active CN108442425B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工技术
CN201810251485.XA Active CN108396758B (zh) 2016-11-17 2016-11-17 沉井纠偏施工方法
CN201810252828.4A Active CN108487278B (zh) 2016-11-17 2016-11-17 沉井纠偏施工技术
CN201810252386.3A Active CN108396759B (zh) 2016-11-17 2016-11-17 不同土质情况下倾斜沉井纠偏施工方法
CN201810252548.3A Active CN108396760B (zh) 2016-11-17 2016-11-17 倾斜沉井组合纠偏施工技术

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201611062968.2A Active CN106592615B (zh) 2016-11-17 2016-11-17 倾斜沉井纠偏施工方法
CN201810252458.4A Active CN108360545B (zh) 2016-11-17 2016-11-17 倾斜沉井组合纠偏施工方法

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201810251485.XA Active CN108396758B (zh) 2016-11-17 2016-11-17 沉井纠偏施工方法
CN201810252828.4A Active CN108487278B (zh) 2016-11-17 2016-11-17 沉井纠偏施工技术
CN201810252386.3A Active CN108396759B (zh) 2016-11-17 2016-11-17 不同土质情况下倾斜沉井纠偏施工方法
CN201810252548.3A Active CN108396760B (zh) 2016-11-17 2016-11-17 倾斜沉井组合纠偏施工技术

Country Status (1)

Country Link
CN (7) CN106592615B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592615B (zh) * 2016-11-17 2018-08-07 叶香雄 倾斜沉井纠偏施工方法
CN107246037A (zh) * 2017-08-09 2017-10-13 上海岩土工程勘察设计研究院有限公司 一种用于桩端砂性土持力层的建筑物纠偏结构及方法
CN110144921A (zh) * 2019-06-06 2019-08-20 广东水利电力职业技术学院(广东省水利电力技工学校) 一种简易高效沉井纠偏方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215929A (zh) * 2007-12-26 2008-07-09 南京工业大学 房屋纠偏的沉井予力作用工法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1021982C (zh) * 1991-06-26 1993-09-01 黄正轩 房屋倾斜纠偏加固的方法
JP2002004296A (ja) * 2000-06-19 2002-01-09 Takenaka Doboku Co Ltd オープンケーソンの拡径刃口部掘削用ケレン装置
CN2654698Y (zh) * 2003-06-30 2004-11-10 唐业清 一种负摩擦力纠倾降水井
CN101793098B (zh) * 2010-03-13 2011-09-07 中铁西北科学研究院有限公司 一种协调互动组合纠倾方法
CN101845830B (zh) * 2010-06-05 2013-08-28 朱虹 一种沉井纠偏施工方法
CN102926394B (zh) * 2010-06-05 2015-03-25 朱虹 一种利用石灰桩纠偏沉井的方法
CN102251542A (zh) * 2011-04-18 2011-11-23 张继红 一种桩基础高压喷水扰动纠偏施工方法及其所用的施工设备
CN103938663A (zh) * 2013-10-29 2014-07-23 国家电网公司 一种单拼角钢主材的倾斜输电铁塔纠偏装置
JP6386829B2 (ja) * 2014-08-08 2018-09-05 大成建設株式会社 ニューマチックケーソンの傾斜修正方法
CN105863362B (zh) * 2016-04-13 2017-11-14 太原理工大学 一种用于倾斜输电铁塔的纠偏装置
CN106592615B (zh) * 2016-11-17 2018-08-07 叶香雄 倾斜沉井纠偏施工方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215929A (zh) * 2007-12-26 2008-07-09 南京工业大学 房屋纠偏的沉井予力作用工法

Also Published As

Publication number Publication date
CN108487278A (zh) 2018-09-04
CN108396758B (zh) 2020-02-21
CN108396759B (zh) 2020-02-04
CN108396760A (zh) 2018-08-14
CN106592615A (zh) 2017-04-26
CN108396759A (zh) 2018-08-14
CN108396758A (zh) 2018-08-14
CN108396760B (zh) 2020-02-04
CN108360545A (zh) 2018-08-03
CN106592615B (zh) 2018-08-07
CN108442425A (zh) 2018-08-24
CN108360545B (zh) 2019-09-10
CN108487278B (zh) 2020-02-28

Similar Documents

Publication Publication Date Title
CN103422511B (zh) 一种复合式软土地基下输电杆塔浅埋基础地基加固方法
CN104404974B (zh) 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺
CN103277120A (zh) 一种非全深冻结立井解冻后的涌水防治方法
CN204023501U (zh) 一种用于土石坝的除险加固防渗处理结构
CN210858745U (zh) 基于袖阀管注浆的黄土隧道超前加固结构
CN108442425B (zh) 倾斜沉井纠偏施工技术
CN104612179B (zh) 贯穿超厚粉砂层的地下连续墙的施工方法
CN107237323A (zh) 大直径超厚卵石层成孔方法
CN106522989A (zh) 风井结构和盾构掘进平行施工的方法
CN205260041U (zh) 一种水平旋喷冻结法支护结构
CN105133641A (zh) 一种薄壁型连续墙式地基基础加固结构及方法
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
CN102817361B (zh) 一种用在破碎岩体帷幕灌浆的双套管顶盖及其施工方法
CN203878532U (zh) 一种用于深层陡倾断层裂隙处理结构
CN109594575A (zh) 一种沉井周边注浆加固土体施工方法
CN106049413B (zh) 一种应用于深层饱和软土地基的复合动力排水固结系统及施工方法
CN108914911A (zh) 一种地层预加应力超前开挖稳定性控制方法
CN114109394B (zh) 隧道浅埋软弱围岩高压旋喷桩法地表加固的桩长确定方法
CN215367226U (zh) 一种中掘后注浆根固增强的引扩孔扩体桩
CN202131603U (zh) 用于岩基中软弱夹层或破碎带的截渗结构
CN110939161B (zh) 一种大直径嵌岩抗浮锚杆的施工方法及用于该方法中的钻具
CN209959261U (zh) 一种矫正地铁隧道水平变形的实时反馈注浆装置
CN115182782A (zh) 一种煤矿开采地下水“浅保-深储”全空间保护方法
CN207469263U (zh) 一种旋挖桩和高压注浆管桩复合深基坑围护体系
CN104878762A (zh) 一种适用于倾斜坚硬岩石地段钻孔桩施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325025 117, building 2, Xinyi building, Lucheng District, Wenzhou City, Zhejiang Province

Applicant after: Ye Xiangxiong

Address before: 325025, No. 26, North Sichuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Wenzhou, Zhejiang

Applicant before: Ye Xiangxiong

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province

Patentee after: Ye Xiangxiong

Address before: 325025 117, building 2, Xinyi building, Lucheng District, Wenzhou City, Zhejiang Province

Patentee before: Ye Xiangxiong