CN103277120A - 一种非全深冻结立井解冻后的涌水防治方法 - Google Patents
一种非全深冻结立井解冻后的涌水防治方法 Download PDFInfo
- Publication number
- CN103277120A CN103277120A CN2013102434867A CN201310243486A CN103277120A CN 103277120 A CN103277120 A CN 103277120A CN 2013102434867 A CN2013102434867 A CN 2013102434867A CN 201310243486 A CN201310243486 A CN 201310243486A CN 103277120 A CN103277120 A CN 103277120A
- Authority
- CN
- China
- Prior art keywords
- grouting
- section
- wall
- water
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明公开了一种非全深冻结立井解冻后的涌水防治方法,方法包括:注浆形式确定,井筒防治水时机确定,注浆位置确定,注浆孔的布置,注浆材料,注浆压力,注浆管的制作与安装;其中单液为主,双液为辅,按质量比单液浆配比:水:硅酸盐水泥;按质量比双液浆配比:硅酸盐水泥:水玻璃:三乙醇胺;高低压并用,注浆时工作压力为该处静水压力的1.2~1.5倍,注浆终压为该处静水压力的2~2.5倍;深浅孔结合,冻结表土段采用壁间注浆,冻结基岩段采用壁间注浆和壁后注浆,浅孔注浆管为φ38mm×600mm,深孔注浆管为φ38mm×3100mm。具有施工及操作方便,可注性强,不透水性强,密实性好,强度高,用于解冻后的立井。
Description
技术领域
本发明涉及立井涌水防治方法,具体涉及一种非全深冻结立井解冻后的涌水防治方法。
背景技术
我国自1955年首次在开滦林西风井应用冻结法施工成功后,迄今已建成了700多个冻结井筒,但井筒解冻后围岩会产生新的裂隙,岩石的渗流通道会发生变化,相应的涌水规律也会发生变化,当涌水量很大,仅仅靠排水已不可能满足施工要求时,注浆堵截水源通道后再进行排水成为主要治理措施。注浆堵水是将水泥浆或化学浆通过管道压入井下岩层空隙、裂隙或巷道中,使其扩散、凝固和硬化,从而使岩层具有较高的强度、密实性和不透水性,达到封堵截断补给水源和加固地层的作用,它是矿井防治水害的重要手段之一。
目前井筒冻结法解冻后的涌水防治技术存在几个缺陷:一、注浆的时机不好选择,注浆过早,围岩裂隙还未形成,治理效果不好,注浆过迟,涌水很大,浆液全被水冲出,达不到注浆效果。二、注浆的形式,单一的注浆方式对于富水弱渗地层可注性不强。三、注浆位置的确定,一旦位置确定不好,会造成过多的注浆工作量,且注浆效果不好。
发明内容
本发明的目的是提供一种施工及操作方便,可注性强,不透水性强,密实性好,强度高,防治水效果显著,高低压并用,深浅孔结合,单液为主、双液为辅的一种非全深冻结立井解冻后的涌水防治方法。
为了达到发明目的,本发明的技术方案是这样解决的:一种非全深冻结立井解冻后的涌水防治方法,本发明的特殊之处在于该方法按下述步骤进行:
1)、注浆形式的确定
井筒解冻后围岩裂隙区贯通,围岩裂隙涌水量较大,在富水弱渗地区,一般注浆形式难以注入或是注入效果不好,本发明采用单液为主、双液为辅,高低压并用,深浅孔结合的注浆方式;
2)、井筒防治水时机的确定:
(1)、为保证未冻结段施工的下部井筒及马头门安全施工,在下部井筒及马头门施工过程中,上部井筒要保证一定的负温,即为-4℃,避免上部井筒解冻过早引起的涌水对未冻结段凿井的下部井筒的施工带来不利影响,这是非全深冻结法立井施工井筒防治水技术的一个重要技术措施;
(2)、井筒防治水时机的确定是未冻结段施工的下部井筒及马头门施工完毕,允许非全深冻结法的上部井筒自然解冻完毕,然后立即实施井筒防治水工作;
(3)、如果在自然解冻后没有立即进行防治水处理,存在冻结段解冻后涌水通道随着时间的推移,在地下水的作用之下,岩体中的裂隙不断发展扩大、连通最终会形成一系列强渗流水力通道,最终导致大的涌水灾害发生的缺陷,为此,应选择立即进行防治水处理;
3)、注浆位置的确定
井筒自上而下分为冻结表土段、冻结基岩段、未冻结段,所述冻结表土段采用壁间注浆,所述冻结基岩段采用壁间注浆和壁后注浆,所述未冻结段不注浆;
(1)、所述壁间注浆
所述冻结表土段和冻结基岩段为双层井壁段,注浆管为φ38mm×600mm,孔深500mm,终孔位置位于内壁与外壁之间,用以封堵内外壁间的水力联系;
内外层井壁夹层间注浆充填时间的确定应满足下列规定:
A、夹层周围井壁混凝土温度应不低于4℃;
B、冻结壁在解冻过程中但仍处于封闭状态,并能承受外部水压力;
(2)、所述壁后注浆
应用于冻结基岩段(双层井壁段),注浆管为φ38mm×3100mm,孔深3000mm,终孔位置位于冻结管处,用以封堵冻结管环形通道与基岩的水力联系,壁后注浆不能对掘进施工的正常进行产生明显影响,也不能对井壁浇筑质量构成危害;
4)、注浆孔的布置
壁间注浆间隔20~30m布置一个断面,上下断面错开45°,一个断面均布4个孔,孔深500mm,注浆管为φ38×600mm;
壁后注浆间隔40~50m布置一个断面,一个断面均布4个孔,孔深3000mm,注浆管为φ38×3100mm;若有出水点,可根据实际情况调整孔位;
5)、注浆材料
按质量比单液浆配比:水: 硅酸盐水泥=0.6:1~1.25:1;
按质量比双液浆配比:硅酸盐水泥:水玻璃: 三乙醇胺=1:1:0.1%~0.25%,水玻璃浓度为38~40°Be′;
所述外加剂三乙醇胺,三乙醇胺既有速凝作用又有缓凝作用与水泥类型和掺量有关;对于硅酸盐水泥,三乙醇胺掺量为0.02%时起速凝作用,掺量为0.25%时有轻微的缓凝作用,掺量为0.5%时有很强的缓凝作用,而当掺量为0.1%时则表现出强烈的速凝作用;
氯化钠主要作为抗冻剂,在冬季施工时防止水结冰而影响水泥砂浆的强度,按质量比单液浆总质量或双液浆总质量与氯化钠的配比=0.3%~0.5%:×0.1%~0.3%;
6)、注浆压力
工作压力:达到该处静水压力的1.2~1.5倍;
注浆终压:达到该处静水压力的2~2.5倍;同时以不引起围岩与井壁开裂凸起为原则,不应超过井壁强度;
7)、注浆管的制作与安装
注浆孔使用YT-28风锤,配以 42“一”字型钻头打眼,壁间注浆孔孔深500mm,壁后注浆孔孔深3000mm,注浆管采用32无缝钢管制作,一头设马牙扣,另一头设内丝扣配管帽,长度根据壁厚加工,注浆管用麻丝缠绕,打入孔内,外露长度不得大于50mm,注浆管采用套孔的方式进行埋管,打好注浆孔后,然后埋入Φ38mm×600mm或Φ38mm×3000mm的注浆管,管口安装阀门,钻孔进入外壁深度不得大于100mm。
本发明的有益效果为:具有施工及操作方便,可注性强,不透水性强,密实性好,强度高,防治水效果显著的特点,用于解冻后的立井。
附图说明
图1为本发明的冻结立井剖面主视结构示意图;
图2为本发明的冻结表土段冻结管布置平面图;
图3为本发明的冻结基岩段冻结管布置平面图;
图4为单液浆或双液浆工艺流程示意图;
图5为单液浆或双液浆注浆工艺流程图。
具体实施方式
下面结合附图和实施例对发明内容作进一步说明:
实施例1
参照图1、图2、图3、图4、图5所示,一种非全深冻结立井解冻后的涌水防治方法,该方法按下述步骤进行:
1)、注浆形式的确定
井筒解冻后围岩裂隙区贯通,围岩裂隙涌水量较大,在富水弱渗地区,一般注浆形式难以注入或是注入效果不好,本发明采用单液为主、双液为辅,高低压并用,深浅孔结合的注浆方式;
2)、井筒防治水时机的确定:
(1)、为保证未冻结段施工的下部井筒及马头门安全施工,在下部井筒及马头门施工过程中,上部井筒要保证一定的负温,即为-4℃,避免上部井筒解冻过早引起的涌水对未冻结段凿井的下部井筒的施工带来不利影响,这是非全深冻结法立井施工井筒防治水技术的一个重要技术措施;
(2)、井筒防治水时机的确定是未冻结段施工的下部井筒及马头门施工完毕,允许非全深冻结法的上部井筒自然解冻完毕,然后立即实施井筒防治水工作;
(3)、如果在自然解冻后没有立即进行防治水处理,存在冻结段解冻后涌水通道随着时间的推移,在地下水的作用之下,岩体中的裂隙不断发展扩大、连通最终会形成一系列强渗流水力通道,最终导致大的涌水灾害发生的缺陷,为此,应选择立即进行防治水处理;
3)、注浆位置的确定
井筒自上而下分为冻结表土段、冻结基岩段、未冻结段,所述冻结表土段采用壁间注浆,所述冻结基岩段采用壁间注浆和壁后注浆,所述未冻结段不注浆;
(1)、所述壁间注浆
所述冻结表土段和冻结基岩段为双层井壁段,注浆管为φ38mm×600mm,孔深500mm,终孔位置位于内壁与外壁之间,用以封堵内外壁间的水力联系;
内外层井壁夹层间注浆充填时间的确定应满足下列规定:
A、夹层周围井壁混凝土温度应不低于4℃;
B、冻结壁在解冻过程中但仍处于封闭状态,并能承受外部水压力;
(2)、所述壁后注浆
应用于冻结基岩段(双层井壁段),注浆管为φ38mm×3100mm,孔深3000mm,终孔位置位于冻结管处,用以封堵冻结管环形通道与基岩的水力联系,壁后注浆不能对掘进施工的正常进行产生明显影响,也不能对井壁浇筑质量构成危害;
4)、注浆孔的布置
壁间注浆间隔20~30m布置一个断面,上下断面错开45°,一个断面均布4个孔,孔深500mm,注浆管为φ38×600mm;
壁后注浆间隔40~50m布置一个断面,一个断面均布4个孔,孔深3000mm,注浆管为φ38×3100mm;若有出水点,可根据实际情况调整孔位;
5)、注浆材料
按质量比单液浆配比:水: 硅酸盐水泥=0.6:1~1.25:1;
按质量比双液浆配比:硅酸盐水泥:水玻璃: 三乙醇胺=1:1:0.1%~0.25%,水玻璃浓度为38~40°Be′;
所述外加剂三乙醇胺,三乙醇胺既有速凝作用又有缓凝作用与水泥类型和掺量有关;对于硅酸盐水泥,三乙醇胺掺量为0.02%时起速凝作用,掺量为0.25%时有轻微的缓凝作用,掺量为0.5%时有很强的缓凝作用,而当掺量为0.1%时则表现出强烈的速凝作用;
氯化钠主要作为抗冻剂,在冬季施工时防止水结冰而影响水泥砂浆的强度,按质量比单液浆总质量或双液浆总质量与氯化钠的配比=0.3%~0.5%:×0.1%~0.3%;
6)、注浆压力
工作压力:达到该处静水压力的1.2~1.5倍;
注浆终压:达到该处静水压力的2~2.5倍;同时以不引起围岩与井壁开裂凸起为原则,不应超过井壁强度;
7)、注浆管的制作与安装
注浆孔使用YT-28风锤,配以42“一”字型钻头打眼,壁间注浆孔孔深500mm,壁后注浆孔孔深3000mm,注浆管采用32无缝钢管制作,一头设马牙扣,另一头设内丝扣配管帽,长度根据壁厚加工,注浆管用麻丝缠绕,打入孔内,外露长度不得大于50mm,注浆管采用套孔的方式进行埋管,打好注浆孔后,然后埋入Φ38mm×600mm或Φ38mm×3000mm的注浆管,管口安装阀门,钻孔进入外壁深度不得大于100mm。
实施例2
主井注浆方案
(1)注浆管的制作与布设
注浆孔使用YT—28风锤,配以42㎜“一”字型钻头打眼,眼深穿过井壁,进入围岩1000mm,每水平均布六个眼并安装注浆管,尽量布置在出水点,上、下水平孔应错开,注浆管采用32㎜无缝钢管制作,一头设马牙扣,另一头设内丝扣配管帽,长度根据壁厚加工,注浆管用麻丝缠绕,打入孔内,外露长度不得大于50mm。
(2)浆液的配置
本次注浆采用单液水泥浆和水泥水玻璃双液浆两种。其应用原则是以单液浆为主,双液浆为辅,浆液采用先稀后浓的原则,水灰比为:1.5:1、1:1、0.8:1三个级配,水玻璃选用模数2.8~3.2,浓度为:32~45°Be′,水泥浆与水玻璃体积比控制在1:0.3~0.6范围内,水泥选用42.5R普通硅酸盐水泥。
(3)注浆压力
式中:
——注浆部位井壁能承受的压力,MPa;
为防止井壁破坏,注浆最大压力不得超过表8.2中段高的计算允许承受压力。
注浆时,视浆液吸水量确定起始浓度,浆液以单液水泥浆为主,注浆浆液调配原则为先稀后浓再稀。若遇可注性较差情况,每次注浆前可考虑注入1~2m3水玻璃对钻孔裂隙进行润滑处理,以提高可注性,并增加注浆效果。注浆终压为静水压力的2~2.5倍。若浆液注入量过大可考虑使用双液浆。另外止浆垫和孔口套管耐压试验出现漏浆现象时,即可加入双液浆,双液浆与单液水泥浆的配比为1:1。
(5)注浆量
以实际注入量为准。
主井涌水防治效果试验评价
(1)×年×月×日开始注浆,×年×月×停止注浆。历时29天零18小时10分钟。水量由17.82m3/h降到0.39m3/h。消耗材料数量如表8.6所示。
实施例3
副井注浆方案
(1)凿孔
基岩段壁后注浆孔根据出水点实际位置确定注浆孔位置,一般在出水点1m范围内进行布孔,施工前由于有经验的老工人进行现场定位。孔深以穿透基岩段井壁进入岩石0.5m为宜。注浆管规格为φ38×600mm。
壁间注浆分层进行,从垂深-234m为起点,以50m层间距离的各水平充填注浆孔均匀布置在井壁的4个方向上,采用套孔的方式进行埋管。先使用φ42mm的钻孔进行凿孔,孔深750mm,然后埋入φ38×600mm的注浆管,管口安装1.2阀门,钻孔进入外壁深度不得大于100mm。
(2)注浆管埋设
开孔后,将预先加工好的注浆口管马牙扣端缠上丝麻,抹上铅油,丝扣端上好套管,用大锤将注浆管砸入孔内,下放孔内部小于550mm,管套拧下,将高压球阀安装到注浆孔口管的丝头上。注浆前,小压水试验,球阀与高压混合器接好后,开动注浆泵用清水冲孔,并作耐压试验。
(3)注浆参数
工作压力:达到该处静水压力的1.2倍。
注浆终压:达到该处静水压力的2倍。同时以不引起围岩与井壁开裂凸起为原则,不应超过井壁强度。
(4)浆液配比
单液浆配比:水灰比:0.6:1~1.25:1;
双液浆配比:C:S1为1:1,水玻璃浓度为38~40°Be′。
(5)注浆
注浆时,视浆液吸水量确定起始浓度,浆液以单液水泥浆为主,注浆浆液调配原则为先稀后浓再稀。若遇可注性较差情况,每次注浆前可考虑注入1~2m3水玻璃对钻孔裂隙进行润滑处理,以提高可注性,并增加注浆效果。注浆终压为静水压力的2~2.5倍。若浆液注入量过大可考虑使用双液浆。另外止浆垫和孔口套管耐压试验出现漏浆现象时,即可加入双液浆,双液浆与单液水泥浆的配比为1:1。
(6)注浆量
以实际注入量为准。
副井涌水防治效果试验评价
×年×月×日开始注浆,×年×月×停止注浆。历时12天零2小时55分钟,水量由19.5m3/h降到0.02m3/h。消耗材料如表8.8所示。
综上所述,
(1)进行了××煤矿主、副井防治水关键技术应用。结果表明,注浆后,主井井筒漏水量由17.82m3/h降低为0.39m3/h,。副井井筒漏水量由19.5m3/h降到0.02m3/h,满足国家有关规范对井筒涌水量的要求,非全深冻结法井筒解冻后的防治水效果显著。
(2)注浆防治水技术方案可概括为“高低压并用,深浅孔结合,单液为主双液为辅”,所谓“高低压并用”是指,对于注浆压力根据注浆封堵不同的涌水通道而分为高压和低压两种形式,“深浅孔结合”是跟据不同注浆部位分为深孔注浆和浅孔注浆两种形式,“单液为主双液为辅”指的是根据出水点水量大小、漏浆情况及吸水难易程度适当调整水灰比、水玻璃双液浆等注浆材料,对涌水量较大的出水点采用双液浆直接封堵;对于涌水量较小的出水点或大面积渗水,采用单液浓水泥浆进行充填。其中“高压+深孔+单液浆”主要为封堵冻结管形成环形水力通道,“低压+浅孔+单液浆”主要是进行壁后充填注浆。
Claims (1)
1.一种非全深冻结立井解冻后的涌水防治方法,其特征在于该方法按下述步骤进行:
1)、注浆形式的确定
井筒解冻后围岩裂隙区贯通,围岩裂隙涌水量较大,在富水弱渗地区,一般注浆形式难以注入或是注入效果不好,本发明采用单液为主、双液为辅,高低压并用,深浅孔结合的注浆方式;
2)、井筒防治水时机的确定:
(1)、为保证未冻结段施工的下部井筒及马头门安全施工,在下部井筒及马头门施工过程中,上部井筒要保证一定的负温,即为-4℃,避免上部井筒解冻过早引起的涌水对未冻结段凿井的下部井筒的施工带来不利影响,这是非全深冻结法立井施工井筒防治水技术的一个重要技术措施;
(2)、井筒防治水时机的确定是未冻结段施工的下部井筒及马头门施工完毕,允许非全深冻结法的上部井筒自然解冻完毕,然后立即实施井筒防治水工作;
(3)、如果在自然解冻后没有立即进行防治水处理,存在冻结段解冻后涌水通道随着时间的推移,在地下水的作用之下,岩体中的裂隙不断发展扩大、连通最终会形成一系列强渗流水力通道,最终导致大的涌水灾害发生的缺陷,为此,应选择立即进行防治水处理;
3)、注浆位置的确定
井筒自上而下分为冻结表土段、冻结基岩段、未冻结段,所述冻结表土段采用壁间注浆,所述冻结基岩段采用壁间注浆和壁后注浆,所述未冻结段不注浆;
(1)、所述壁间注浆
所述冻结表土段和冻结基岩段为双层井壁段,注浆管为φ38mm×600mm,孔深500mm,终孔位置位于内壁与外壁之间,用以封堵内外壁间的水力联系;
内外层井壁夹层间注浆充填时间的确定应满足下列规定:
A、夹层周围井壁混凝土温度应不低于4℃;
B、冻结壁在解冻过程中但仍处于封闭状态,并能承受外部水压力;
(2)、所述壁后注浆
应用于冻结基岩段(双层井壁段),注浆管为φ38mm×3100mm,孔深3000mm,终孔位置位于冻结管处,用以封堵冻结管环形通道与基岩的水力联系,壁后注浆不能对掘进施工的正常进行产生明显影响,也不能对井壁浇筑质量构成危害;
4)、注浆孔的布置
壁间注浆间隔20~30m布置一个断面,上下断面错开45°,一个断面均布4个孔,孔深500mm,注浆管为φ38×600mm;
壁后注浆间隔40~50m布置一个断面,一个断面均布4个孔,孔深3000mm,注浆管为φ38×3100mm;若有出水点,可根据实际情况调整孔位;
5)、注浆材料
按质量比单液浆配比:水: 硅酸盐水泥=0.6:1~1.25:1;
按质量比双液浆配比:硅酸盐水泥:水玻璃: 三乙醇胺=1:1:0.1%~0.25%,水玻璃浓度为38~40°Be′;
所述外加剂三乙醇胺,三乙醇胺既有速凝作用又有缓凝作用与水泥类型和掺量有关;对于硅酸盐水泥,三乙醇胺掺量为0.02%时起速凝作用,掺量为0.25%时有轻微的缓凝作用,掺量为0.5%时有很强的缓凝作用,而当掺量为0.1%时则表现出强烈的速凝作用;
氯化钠主要作为抗冻剂,在冬季施工时防止水结冰而影响水泥砂浆的强度,按质量比单液浆总质量或双液浆总质量与氯化钠的配比=0.3%~0.5%:×0.1%~0.3%;
6)、注浆压力
工作压力:达到该处静水压力的1.2~1.5倍;
注浆终压:达到该处静水压力的2~2.5倍;同时以不引起围岩与井壁开裂凸起为原则,不应超过井壁强度;
7)、注浆管的制作与安装
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310243486.7A CN103277120B (zh) | 2013-06-19 | 2013-06-19 | 一种非全深冻结立井解冻后的涌水防治方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310243486.7A CN103277120B (zh) | 2013-06-19 | 2013-06-19 | 一种非全深冻结立井解冻后的涌水防治方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103277120A true CN103277120A (zh) | 2013-09-04 |
CN103277120B CN103277120B (zh) | 2015-08-05 |
Family
ID=49059724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310243486.7A Expired - Fee Related CN103277120B (zh) | 2013-06-19 | 2013-06-19 | 一种非全深冻结立井解冻后的涌水防治方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103277120B (zh) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556989A (zh) * | 2013-11-11 | 2014-02-05 | 煤炭工业济南设计研究院有限公司 | 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法 |
CN104453942A (zh) * | 2014-10-17 | 2015-03-25 | 海南大学 | 一种抑制杯型水平冻结冻胀融沉的施工方法 |
CN105507811A (zh) * | 2014-09-27 | 2016-04-20 | 中国石油化工集团公司 | 一种气体钻井过程中地层出水的冻结处理方法 |
CN106088154A (zh) * | 2016-08-16 | 2016-11-09 | 黄竟强 | 预制装配式地下筒仓复合井筒施工方法及筒仓结构 |
CN106567714A (zh) * | 2016-11-09 | 2017-04-19 | 河北钢铁集团矿业有限公司 | 地下矿山巷道的注浆材料及注浆治水方法 |
CN106979012A (zh) * | 2017-05-25 | 2017-07-25 | 兖州煤业股份有限公司 | 立井井筒冻结孔内隐蔽导水通道综合处治方法 |
CN107035376A (zh) * | 2017-05-19 | 2017-08-11 | 陕西长武亭南煤业有限责任公司 | 一种在巨厚基岩含水层中普通法开凿立井施工方法 |
CN107191188A (zh) * | 2017-07-25 | 2017-09-22 | 马钢(集团)控股有限公司 | 基岩段不良含水层定位靶向注浆立井井壁结构、施工装置及方法 |
CN107345483A (zh) * | 2017-08-21 | 2017-11-14 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN108119143A (zh) * | 2017-12-20 | 2018-06-05 | 湖南科技大学 | 一种立井工作面水泥-水玻璃双液与化学浆液双圈帷幕联合注浆方法 |
CN108119170A (zh) * | 2017-12-19 | 2018-06-05 | 淮南矿业(集团)有限责任公司 | 风井注浆堵水方法 |
CN108506023A (zh) * | 2018-03-27 | 2018-09-07 | 王林成 | 一种隧道注浆帷幕施工方法 |
CN109519176A (zh) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN109519174A (zh) * | 2019-01-09 | 2019-03-26 | 东北大学 | 一种竖井井壁支护结构 |
CN110630187A (zh) * | 2019-09-12 | 2019-12-31 | 中国矿业大学 | 一种预防井下用水文钻孔孔口管断裂的方法 |
CN110645000A (zh) * | 2019-09-16 | 2020-01-03 | 中国矿业大学 | 一种运行立井井壁水砂突涌灾害抢险治理方法 |
CN112253186A (zh) * | 2020-07-26 | 2021-01-22 | 中铁二院工程集团有限责任公司 | 铁路隧道竖井不同层深工作面堵漏方法 |
CN112326945A (zh) * | 2020-11-05 | 2021-02-05 | 山东科技大学 | 一种深部巷道围岩紧密裂隙剪切激励增透注浆试验装置及方法 |
CN113464144A (zh) * | 2021-06-16 | 2021-10-01 | 枣庄矿业(集团)有限责任公司 | 治理鲁南地区煤矿井筒漏水及裂缝的地面注浆工艺 |
CN115030727A (zh) * | 2022-06-20 | 2022-09-09 | 长沙矿山研究院有限责任公司 | 对已完成设备安装的井筒内出现局部淋水危害的治理方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101105130A (zh) * | 2006-07-11 | 2008-01-16 | 盛天宝 | 复合井壁壁间快速注浆技术 |
CN101864967A (zh) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | 高地压软岩巷道分层次注浆强化加固方法 |
JP4904581B2 (ja) * | 2006-09-29 | 2012-03-28 | 清水建設株式会社 | 廃棄物地下埋設処分施設の立坑及び廃棄物地下埋設処分施設の立坑構築方法 |
-
2013
- 2013-06-19 CN CN201310243486.7A patent/CN103277120B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101105130A (zh) * | 2006-07-11 | 2008-01-16 | 盛天宝 | 复合井壁壁间快速注浆技术 |
JP4904581B2 (ja) * | 2006-09-29 | 2012-03-28 | 清水建設株式会社 | 廃棄物地下埋設処分施設の立坑及び廃棄物地下埋設処分施設の立坑構築方法 |
CN101864967A (zh) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | 高地压软岩巷道分层次注浆强化加固方法 |
Non-Patent Citations (5)
Title |
---|
张峰飞等: "井筒壁后注浆堵水技术在小庄矿井的应用", 《内蒙古煤炭经济》, no. 2, 17 April 2013 (2013-04-17) * |
王海军: "浅谈冻结段壁后及壁间注浆封堵地层水", 《中州煤炭》, no. 6, 31 December 2009 (2009-12-31) * |
赵强等: "壁后注浆技术在全深冻结井筒防治水中的应用", 《煤炭工程》, no. 11, 31 December 2011 (2011-12-31) * |
邵红旗: "综合注浆封堵全深冻结井筒井壁渗漏(涌)水技术", 《煤炭工程》, no. 9, 31 December 2011 (2011-12-31) * |
阎建华等: "大直径深立井施工中的新技术应用", 《建井技术》, vol. 34, no. 1, 28 February 2013 (2013-02-28) * |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556989B (zh) * | 2013-11-11 | 2016-05-18 | 煤炭工业济南设计研究院有限公司 | 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法 |
CN103556989A (zh) * | 2013-11-11 | 2014-02-05 | 煤炭工业济南设计研究院有限公司 | 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法 |
CN105507811A (zh) * | 2014-09-27 | 2016-04-20 | 中国石油化工集团公司 | 一种气体钻井过程中地层出水的冻结处理方法 |
CN104453942A (zh) * | 2014-10-17 | 2015-03-25 | 海南大学 | 一种抑制杯型水平冻结冻胀融沉的施工方法 |
CN106088154B (zh) * | 2016-08-16 | 2018-05-25 | 黄竟强 | 预制装配式地下筒仓复合井筒施工方法及筒仓结构 |
CN106088154A (zh) * | 2016-08-16 | 2016-11-09 | 黄竟强 | 预制装配式地下筒仓复合井筒施工方法及筒仓结构 |
CN106567714A (zh) * | 2016-11-09 | 2017-04-19 | 河北钢铁集团矿业有限公司 | 地下矿山巷道的注浆材料及注浆治水方法 |
CN107035376B (zh) * | 2017-05-19 | 2019-04-09 | 陕西长武亭南煤业有限责任公司 | 一种在巨厚基岩含水层中普通法开凿立井施工方法 |
CN107035376A (zh) * | 2017-05-19 | 2017-08-11 | 陕西长武亭南煤业有限责任公司 | 一种在巨厚基岩含水层中普通法开凿立井施工方法 |
CN106979012A (zh) * | 2017-05-25 | 2017-07-25 | 兖州煤业股份有限公司 | 立井井筒冻结孔内隐蔽导水通道综合处治方法 |
CN107191188B (zh) * | 2017-07-25 | 2023-06-06 | 马钢(集团)控股有限公司 | 基岩段不良含水层定位靶向注浆立井井壁结构、施工装置及方法 |
CN107191188A (zh) * | 2017-07-25 | 2017-09-22 | 马钢(集团)控股有限公司 | 基岩段不良含水层定位靶向注浆立井井壁结构、施工装置及方法 |
CN107345483A (zh) * | 2017-08-21 | 2017-11-14 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN107345483B (zh) * | 2017-08-21 | 2023-02-28 | 安徽理工大学 | 一种新建防渗煤矿井筒及其制备方法 |
CN108119170A (zh) * | 2017-12-19 | 2018-06-05 | 淮南矿业(集团)有限责任公司 | 风井注浆堵水方法 |
CN108119143A (zh) * | 2017-12-20 | 2018-06-05 | 湖南科技大学 | 一种立井工作面水泥-水玻璃双液与化学浆液双圈帷幕联合注浆方法 |
CN108506023A (zh) * | 2018-03-27 | 2018-09-07 | 王林成 | 一种隧道注浆帷幕施工方法 |
CN109519174A (zh) * | 2019-01-09 | 2019-03-26 | 东北大学 | 一种竖井井壁支护结构 |
CN109519176A (zh) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN109519176B (zh) * | 2019-01-28 | 2024-04-02 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN110630187A (zh) * | 2019-09-12 | 2019-12-31 | 中国矿业大学 | 一种预防井下用水文钻孔孔口管断裂的方法 |
CN110645000A (zh) * | 2019-09-16 | 2020-01-03 | 中国矿业大学 | 一种运行立井井壁水砂突涌灾害抢险治理方法 |
CN112253186A (zh) * | 2020-07-26 | 2021-01-22 | 中铁二院工程集团有限责任公司 | 铁路隧道竖井不同层深工作面堵漏方法 |
CN112326945A (zh) * | 2020-11-05 | 2021-02-05 | 山东科技大学 | 一种深部巷道围岩紧密裂隙剪切激励增透注浆试验装置及方法 |
CN113464144A (zh) * | 2021-06-16 | 2021-10-01 | 枣庄矿业(集团)有限责任公司 | 治理鲁南地区煤矿井筒漏水及裂缝的地面注浆工艺 |
CN115030727A (zh) * | 2022-06-20 | 2022-09-09 | 长沙矿山研究院有限责任公司 | 对已完成设备安装的井筒内出现局部淋水危害的治理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103277120B (zh) | 2015-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103277120A (zh) | 一种非全深冻结立井解冻后的涌水防治方法 | |
CN100591866C (zh) | 流砂层及砂砾层动水双液高压注浆堵水施工方法 | |
CN103967507B (zh) | 一种适于富水矿山井下开采堵水用的帷幕注浆工艺 | |
CN104453913B (zh) | 一种竖井工作面超前预注浆方法 | |
CN102705005B (zh) | 定向导流注浆封堵矿井突水技术 | |
CN101260672B (zh) | 弱面岩质边坡注浆方法及用于注浆的锚管 | |
CN103510964B (zh) | 一种采用护盾式tbm施工时对豆砾石回填灌浆的方法 | |
CN101666234B (zh) | 破碎岩体无止浆墙复合式注浆施工方法 | |
CN206667278U (zh) | 溶岩裂隙涌水处理施工结构 | |
CN105041325A (zh) | 一种高压富水特大断层软弱角砾岩隧道的施工方法 | |
CN102926770A (zh) | 薄基岩、厚松散砂层富水区域井下疏水注浆工艺 | |
CN102660952B (zh) | 可控粘土膏浆灌浆方法 | |
CN105386435B (zh) | 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺 | |
CN104612134A (zh) | 一种用于浇筑施工的钻孔灌注桩后注浆施工方法 | |
CN102787846A (zh) | 海底隧道断层破碎带上堵下排的施工方法 | |
CN105887886A (zh) | 一种强岩溶发育地层帷幕灌浆施工方法 | |
CN101525881A (zh) | 岩溶地层桩孔护壁构造及桩孔施工方法 | |
CN101793154A (zh) | 利用隧道围岩地质参数和设置分流孔的注浆堵水方法 | |
CN103362117A (zh) | 注浆段全段注浆的方法 | |
CN205260041U (zh) | 一种水平旋喷冻结法支护结构 | |
CN102174818A (zh) | 第四系强透水性地层的可控防渗堵漏挤入灌浆止水工艺 | |
CN103742162B (zh) | 盾尾顶部设置有同步注浆装置的盾构机及同步注浆装置 | |
CN207406345U (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构 | |
CN103174135B (zh) | 不达标后注浆灌注桩的修补方法 | |
CN103967506B (zh) | 一种矿体顶板岩溶裂隙发育且强富水矿床的帷幕注浆方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20210619 |