CN101105130A - 复合井壁壁间快速注浆技术 - Google Patents

复合井壁壁间快速注浆技术 Download PDF

Info

Publication number
CN101105130A
CN101105130A CNA2006100180902A CN200610018090A CN101105130A CN 101105130 A CN101105130 A CN 101105130A CN A2006100180902 A CNA2006100180902 A CN A2006100180902A CN 200610018090 A CN200610018090 A CN 200610018090A CN 101105130 A CN101105130 A CN 101105130A
Authority
CN
China
Prior art keywords
slip casting
shaft
injection
wall
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006100180902A
Other languages
English (en)
Other versions
CN100545418C (zh
Inventor
盛天宝
白云来
王俊臣
魏世义
陈新明
田亚军
祁书峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100180902A priority Critical patent/CN100545418C/zh
Publication of CN101105130A publication Critical patent/CN101105130A/zh
Application granted granted Critical
Publication of CN100545418C publication Critical patent/CN100545418C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种复合井壁壁间快速注浆技术,根据冻结井筒深度、井壁厚度、强度、含水层层位,对井筒进行注浆分段,分段段高为100-200m,在施工内层井壁时,预设、预埋与注浆分段高度相适应的竖向分段注浆管,分段注浆管上设置有若干注浆头,注浆头与塑料夹层壁间连通,在一个段高内同时形成多个注浆点,分段注浆管的上端连接输浆管,输浆管的另一端通过连接胶管与注浆泵连接,具有工艺简单、安全可靠、注浆速度快、效率高、费用低等特点,且壁间注浆工序占用井筒的时间可减少60-90%,缩短了建井工期。

Description

复合井壁壁间快速注浆技术
技术领域:
本发明属于冻结法凿井复合井壁壁间注浆技术领域。
背景技术:
冻结法凿井是穿过深厚表土含水层建井采用的主要特殊施工方法。国内采用冻结法已建成了矿山立井井筒500多个,在建的冻结井筒30多个,目前井筒穿过表土层的厚度、冻结深度已达到528m、628m,冻结井筒多采用混疑土、钢筋混疑土塑料夹层复合井壁结构形式。冻结凿井施工工艺包括:①打钻冻结;②井筒开挖并由上向下分段砌筑外层井壁;③掘砌壁座;④敷设塑料板并由下向上套内层井壁;⑤塑料夹层壁间注浆。壁间注浆的目的是充填塑料夹层与外壁之间存在的间隙、外层井壁接茬缝、冻结压力产生的外壁裂缝,防止井壁漏水,并使内外层井壁紧密结合共同抵抗地压。现有塑料夹层壁间注浆技术是在井筒内吊盘上进行,采用分段上行或分段下行注浆方式,注浆分段段高为20-30m;在每分段段高内,用风钻沿内层井壁圆周水平凿出4-6个注浆孔,孔深略大内层井壁厚度穿过夹层,注浆孔内安设注浆管,也有在施工内层井壁时预埋水平注浆管;用安装在吊盘上的注浆泵逐孔进行注浆;注浆结束后封堵,升降吊盘再进行下一分段注浆。现有注浆技术可以完成壁间注浆,但存在注浆速度慢、占用井筒工期长、辅助工序多、系统复杂等缺陷,而且随着井筒冻结深度的增大更加凸显。当冻结深度为200-300m时,注浆分段数8-12段,壁间注浆约占用井筒工期15-20天,冻结深度为500-600m时,注浆分段数20-25段,约占用井筒30-35天。在吊盘上施工,注浆材料、人员需垂直提升,空间小安全条件差,效率低、费用高。
发明内容:
本发明的目的是提供一种高效、快速、安全、不占或少占井筒的复合井壁壁间快速注浆技术。
为了实现上述目的,本发明采用的技术方案是:根据冻结井筒深度、井壁厚度、强度、含水层层位,对井筒进行注浆分段,分段段高为100-200m,在施工内层井壁时,预设、预埋与注浆分段高度相适应的竖向分段注浆管,分段注浆管上设置有若干注浆头,注浆头与塑料夹层壁间连通,在一个段高内同时形成多个注浆点,分段注浆管的上端连接输浆管,输浆管的另一端通过连接胶管与注浆泵连接。
在各注浆分段上部设置有观察孔,观察孔一端与塑料夹层壁间相通,另一端与井筒相通,用于观察注浆效果,控制注浆压力。
由于本发明采用的是大段高分段,竖向预埋分段注浆管,分段注浆管上设置有若干注浆头,这样,在对塑料夹层壁间进行注浆时,浆液由注浆泵经连接胶管、输浆管、分段注浆管、多个注浆头注入塑料夹层壁间,能够在一个大段高内同时实现多点、快速、高效壁间注浆;通过浆液扩散,起到充填间隙、裂缝,防止井壁漏水,并使内外井壁紧密结合,提高井壁整体强度;本发明具有工艺简单、安全可靠、注浆速度快、效率高、费用低等特点,且壁间注浆工序占用井筒的时间可减少60-90%,缩短了建井工期。
附图说明:
下面结合附图对本发明作进一步详细说明。
图1为地面壁间注浆系统示意图。
图2为井筒吊盘壁间注浆系统示意图。
具体实施方式:
实施例1
由图1所示,复合井壁由外层井壁2、内层井壁4、塑料夹层壁间3构成。注浆泵10固定在井口地面,注浆前根据冻结井筒深度、井壁厚度、强度、含水层层位,对井筒进行注浆分段,一般把井筒分成1-4个注浆分段,分段段高一般为100-200m,在施工内层井壁4时,预设、预埋与注浆分段高度相适应的竖向分段注浆管6,分段注浆管6设置在内层井壁中,预设、预埋竖向分段注浆管从壁座1以上开始向上依次进行。分段注浆管6上设置有若干注浆头5,注浆头5间距为5-7米,注浆头5与塑料夹层壁间3连通,在一个段高内同时形成多个注浆点。各分段注浆管6的上端连接各分段长输浆管8,各分段输浆管预设、预埋在内层井壁4中并直通井口露出地面,各分段输浆管8的地面露出端通过连接胶管11与注浆泵10连接。注浆时,注浆泵分别与地面各分段输浆管连接,采用分段上行式注浆。为了保证注浆效果,根据井筒9的直径及注浆要求确定设置分段注浆管6的趟数及位置,趟数一般为2-3趟,位置以井筒圆周均匀布置。在各注浆分段上部设置有观察孔7,观察孔一端与塑料夹层壁间3连通,另一端与井筒9连通,用于观察注浆效果,控制注浆压力。
实施例2
由图2所示,复合井壁由外层井壁2、内层井壁4、塑料夹层壁间3构成。注浆泵10固定在井筒9内的吊盘13上,吊盘13由四根吊盘钢丝绳12牵引,注浆前根据冻结井筒深度、井壁厚度、强度、含水层层位,对井筒进行注浆分段,一般把井筒分成2-3个注浆分段,分段段高一般为100-200m,在施工内层井壁4时,预设、预埋与注浆分段高度相适应的竖向分段注浆管6,分段注浆管6设置在内层井壁4中,预设、预埋竖向分段注浆管从壁座1以上开始向上依次进行。分段注浆管6上设置有若干注浆头5,注浆头间距为5-7米,注浆头5与塑料夹层壁间3连通,在一个段高内同时形成多个注浆点。各分段注浆管6上端口在备注浆分段上部露出内层井壁并与短输浆管8连接,输浆管8的另一端通过连接胶管11与吊盘上的注浆泵10连接,实施注浆,注完一个分段后,提升吊盘再注上一分段。为了保证注浆效果,根据井筒9的直径及注浆要求确定设置分段注浆管6的趟数及位置,趟数一般为2-3趟,位置以井筒圆周均匀布置。在各注浆分段上部设置有观察孔7,观察孔一端与塑料夹层壁间3连通,另一端与井筒9连通,用于观察注浆效果,控制注浆压力。

Claims (2)

1.一种复合井壁壁间快速注浆技术,根据冻结井筒深度、井壁厚度、强度、含水层层位,对井筒进行注浆分段,其特征是分段段高为100-200m,在施工内层井壁(4)时,预设、预埋与注浆分段高度相适应的竖向分段注浆管(6),分段注浆管(6)上设置有若干注浆头(5),注浆头(5)与塑料夹层壁间(3)连通,在一个段高内同时形成多个注浆点,分段注浆管(6)的上端连接输浆管(8),输浆管(8)的另一端通过连接胶管(11)与注浆泵(10)连接。
2.根据权利要求1所述的复合井壁壁间快速注浆技术,其特征是所述的各注浆分段上部设置有观察孔(7),观察孔一端与塑料夹层壁间(3)连通,另一端与井筒(9)连通。
CNB2006100180902A 2006-07-11 2006-07-11 复合井壁壁间快速注浆系统 Expired - Fee Related CN100545418C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100180902A CN100545418C (zh) 2006-07-11 2006-07-11 复合井壁壁间快速注浆系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100180902A CN100545418C (zh) 2006-07-11 2006-07-11 复合井壁壁间快速注浆系统

Publications (2)

Publication Number Publication Date
CN101105130A true CN101105130A (zh) 2008-01-16
CN100545418C CN100545418C (zh) 2009-09-30

Family

ID=38999187

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100180902A Expired - Fee Related CN100545418C (zh) 2006-07-11 2006-07-11 复合井壁壁间快速注浆系统

Country Status (1)

Country Link
CN (1) CN100545418C (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277120A (zh) * 2013-06-19 2013-09-04 西安科技大学 一种非全深冻结立井解冻后的涌水防治方法
CN103696775A (zh) * 2013-12-20 2014-04-02 中煤第一建设有限公司 大段高多组含水层分段下行注浆法
CN104453913A (zh) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 一种竖井工作面超前预注浆方法
CN104533424A (zh) * 2014-11-17 2015-04-22 大同煤矿集团有限责任公司 冻结立井井筒裂纹加固方法
CN104533425A (zh) * 2015-01-04 2015-04-22 中煤能源黑龙江煤化工有限公司 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法
CN108412499A (zh) * 2018-03-11 2018-08-17 吕琳 一种立井修复井壁结构
CN108775241A (zh) * 2018-05-23 2018-11-09 北京中煤矿山工程有限公司 能够使得浆液在冻结井筒内外壁间均匀分布的充填工艺
CN109667586A (zh) * 2019-01-07 2019-04-23 中国矿业大学 一种双层井壁注浆系统及注浆方法
CN110565740A (zh) * 2019-08-13 2019-12-13 中广核工程有限公司 海底隧洞与立管的开孔连接方法
CN113202480A (zh) * 2021-06-16 2021-08-03 中国矿业大学 一种联合承载的双层井壁及其施工方法
CN117388440A (zh) * 2023-10-23 2024-01-12 中国矿业大学 用于双层井壁壁间注浆工艺试验和效果检测的装置和方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277120B (zh) * 2013-06-19 2015-08-05 西安科技大学 一种非全深冻结立井解冻后的涌水防治方法
CN103277120A (zh) * 2013-06-19 2013-09-04 西安科技大学 一种非全深冻结立井解冻后的涌水防治方法
CN103696775A (zh) * 2013-12-20 2014-04-02 中煤第一建设有限公司 大段高多组含水层分段下行注浆法
CN103696775B (zh) * 2013-12-20 2016-02-24 中煤第五建设有限公司 大段高多组含水层分段下行注浆法
CN104533424A (zh) * 2014-11-17 2015-04-22 大同煤矿集团有限责任公司 冻结立井井筒裂纹加固方法
CN104453913A (zh) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 一种竖井工作面超前预注浆方法
CN104533425A (zh) * 2015-01-04 2015-04-22 中煤能源黑龙江煤化工有限公司 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法
CN108412499A (zh) * 2018-03-11 2018-08-17 吕琳 一种立井修复井壁结构
CN108775241A (zh) * 2018-05-23 2018-11-09 北京中煤矿山工程有限公司 能够使得浆液在冻结井筒内外壁间均匀分布的充填工艺
CN109667586A (zh) * 2019-01-07 2019-04-23 中国矿业大学 一种双层井壁注浆系统及注浆方法
CN109667586B (zh) * 2019-01-07 2020-07-28 中国矿业大学 一种双层井壁注浆系统的注浆方法
CN110565740A (zh) * 2019-08-13 2019-12-13 中广核工程有限公司 海底隧洞与立管的开孔连接方法
CN113202480A (zh) * 2021-06-16 2021-08-03 中国矿业大学 一种联合承载的双层井壁及其施工方法
CN117388440A (zh) * 2023-10-23 2024-01-12 中国矿业大学 用于双层井壁壁间注浆工艺试验和效果检测的装置和方法

Also Published As

Publication number Publication date
CN100545418C (zh) 2009-09-30

Similar Documents

Publication Publication Date Title
CN100545418C (zh) 复合井壁壁间快速注浆系统
CN105240047A (zh) 一种治理露天矿地下采空区的充填加固方法
CN112324337B (zh) 一种松软煤层底板穿层沿顶梳状钻孔全程瓦斯抽采方法
CN204552747U (zh) 一种煤矿立井井壁结构
CN108999634A (zh) 地面钻孔实现水害防治和地表沉降控制的一孔多用方法
CN103821538B (zh) J型水平羽翼分支孔地面预注浆方法
CN104453913A (zh) 一种竖井工作面超前预注浆方法
CN105201513A (zh) 一种轨道交通的竖井施工方法
CN102182470A (zh) 全断面封闭挤压注浆法
CN103291325A (zh) 承压水体上采煤底板岩层突水的防控方法
CN206667278U (zh) 溶岩裂隙涌水处理施工结构
CN204175177U (zh) 一种加强型长螺旋嵌岩施工设备
CN204849738U (zh) 能够穿透砂层的静压管桩及其施工装置
CN103256025A (zh) 一种复合井网式煤层气开采方法
CN102877470B (zh) 组合土钉支护施工方法
CN102493821A (zh) 一种高应力巷道煤岩体的支护方法
CN102011592B (zh) 环向可压缩的复合井壁及其施工方法
CN107975375A (zh) 一种城市隧道微型钢管桩加固软弱地基施工方法
CN102011591A (zh) 深井工作面注浆工艺
CN102619536B (zh) 煤矿深井巷道注浆体养护方法
CN111005760A (zh) 一种岩溶隧道引流式排水系统
CN204691803U (zh) 一种煤体柔性加固全长锚固锚杆
CN104929667A (zh) 一种煤体柔性加固全长锚固锚杆及其应用
CN101906973A (zh) 具有可压缩夹层的复合井壁及施工方法
CN106894827A (zh) 煤矿采煤工作面回采期间防治瓦斯的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930

Termination date: 20100711