CN108412205A CN201810076689.4A CN201810076689A CN108412205A CN 108412205 A CN108412205 A CN 108412205A CN 201810076689 A CN201810076689 A CN 201810076689A CN 108412205 A CN108412205 A CN 108412205A
Authority
CN
China
Prior art keywords
frame column
circular arc
arc angle
angle bead
short side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810076689.4A
Other languages
Chinese (zh)
Inventor
刘俊杰
宋亚庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
Original Assignee
China Huaye Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN201810076689.4A priority Critical patent/CN108412205A/en
Publication of CN108412205A publication Critical patent/CN108412205A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention provides a kind of formwork erection methods of clear water frame column, and this approach includes the following steps:S1, it is fixed after circular arc angle bead to be distinguished to two short side template bondings, then uses adhesion agent for blocking;S2, the both ends brushwork adhesive stickup plastic strip in short side template, paste long cheek board, then the lower part of long cheek board and circular arc angle bead are adhesively fixed afterwards;S3, in long cheek board upper end brushwork adhesive, paste plastic strip, and another short side template is pasted onto towards long cheek board on long cheek board, to form rectangular frame column ontology, then will be fixed after the upper inner lateral surface of two long cheek boards and the bonding of circular arc angle bead, then use the gap between adhesion agent for blocking circular arc angle bead and long cheek board;S4, it is reinforced by fixing piece.Simple installation, speed of application are fast, and frame column molding rear pillar corner can be effectively prevented from the case of mortar leakage prevention and is easily deformed or even falls, reduce caused by post-processing and maintenance delay the duration and the production cost increases.

Description

Clear water frame column and its formwork erection method
Technical field
The present invention relates to clear water frame column the realm of building construction, specifically, designing a kind of clear water frame column and its template Erection method.
Background technology
Dry wall is after brick wall wall face is built into, it is only necessary to which jointing becomes finished product, does not need exterior wall surface decorative, lays bricks Quality requirement is high, and mortar is full, and brickwork joint specification is beautiful.It is clear water frame column that the frame column set up is needed when dry wall is constructed. Frame column is to bear the load that frame structure central sill and plate transmit in construction, and load is transmitted to a kind of structure on basis, It is main vertical supporting structure.The formwork erection of traditional clear water frame column is to be installed using plank sheathing, use flitch foot hand again Pipe is reinforced, and wherein column template is to use the molding mold of reinforced column, including template, holder and fastener three parts.Column Template is to ensure that concrete keeps correct shape and size in casting process, as being protected and supported in hardening process The tool of shield.Spillage is bonded sponge strip at template splicing in order to prevent in the prior art, and reinforces using split bolt to frame Two opposite faces of trestle are reinforced.
It is found in long-term construction and practice, the main method using sponge strip as mortar leakage prevention, it can be because of construction Bonding level is difficult to ensure equal construction factors to personnel manually so that frequent spillage at suspension column, template splicing, therefore, in concrete After the completion of pouring, need to carry out manual repair to ensure construction quality;It is easy to be collided in column side quadrangle after frame column molding Occurs deformation even arrisdefect afterwards.In addition, frame column uses split bolt reinforcing template, a large amount of bolt is will produce after dismounting Hole, later stage need to block these bolts hole again, not only refill aftershaping concrete frame trestle and exist largely Aberration influences frame column integral construction quality, and refills bolt hole and need to expend a large amount of artificial and cost.
In view of this, the clear water framed column template erection method under the prior art should be improved, it is existing to solve Above-mentioned technical problem present in technology.
Invention content
In order to solve the above-mentioned technical problem the present invention makes, the purpose is to provide a kind of simple installation, construction speed Degree is fast, and frame column molding rear pillar corner can be effectively prevented from the case of mortar leakage prevention and is easily deformed or even falls, is reduced The formwork erection method for delaying duration and the clear water frame column that the production cost increases caused by post-processing and maintenance.
To achieve the goals above, the present invention provides a kind of formwork erection method of clear water frame column, this method includes Following steps:S1, it is fixed after bonding circular arc angle bead with the both sides on a surface of two short side templates of frame column respectively, and The gap described in adhesion agent for blocking between circular arc angle bead and the short side template is used afterwards;S2, it is applied at the both ends of a short side template Brush adhesive pastes plastic strip, and pastes the lower end of two long cheek boards in the side for being provided with the circular arc angle bead respectively, so Afterwards will be fixed after the lower inboard surface of two long cheek boards and circular arc angle bead bonding, then use adhesion agent for blocking institute State the gap between circular arc angle bead and the long cheek board;S3, in the upper end brushwork adhesive of the long cheek board, paste plastics Item, and there is the side of the arc chord angle item to be pasted onto the long side mould towards the long cheek board another short side template-setup On plate, to form rectangular frame column ontology, then by the upper inner lateral surface of two long cheek boards and the circle It is fixed after the bonding of arc angle item, then use the gap described in adhesion agent for blocking between circular arc angle bead and the long cheek board;S4, in institute The periphery mounting fixing parts of frame column ontology are stated, the fixing piece is erected on holder and surrounds the frame column ontology.
It preferably, can be by the short side template or long side of circular arc angle bead and the frame column in the step S1-S3 After template edge bonding, the circular arc angle bead and the short side template or long cheek board are fixed using air nail gun.
Preferably, in the step S1, the length of the long cheek board can be equal to section length with it is two pieces described short The sum of cheek board thickness.
Preferably, in the step S2 and S3, material strip is shaped using " work ".
Preferably, in the step S4, the fixing piece is channel steel can adopt when being reinforced to the big section of column Outer shroud ring is carried out with No. 20 channel steels and/or No. 18 channel steels;When being reinforced to column small bore, may be used No. 16 channel steels and/ Or No. 14 channel steels carry out outer shroud ring.
Preferably, in the step S4, split bolt can be installed between the every channel steel.
Preferably, in the step S4, the maximum spacing of channel steel can be determined by Force Calculation.
Preferably, in the step S4, channel steel spacing maximum length is in the range of 320mm to 360mm.
Correspondingly, the present invention also provides a kind of clear water frame column, including frame column ontology, the frame column ontology are length Two rectangular including opposite block length cheek boards and opposite two pieces of short side templates, adjacent every block length cheek board and every piece of short side Template forms a right angle;Circular arc angle bead is pasted onto the intrinsic each right angle of the frame column, and each circular arc angle bead The every block length cheek board and every piece of short side template contacted with the circular arc angle bead is fixed by air nail, the circular arc angle bead with it is every Gap between block length cheek board and every piece of short side template passes through adhesion agent for blocking;Plastic strip is pasted onto adjacent every block length side At the template splicing of template and every piece of short side template;Holder supports the frame column ontology and outside from the frame column ontology It stretches out;And reinforcing member, setting are outer to be carried out to the frame column ontology on the bracket and around the frame column ontology Shroud ring.
As described above with practice it is found that a kind of clear water frame column of the present invention formwork erection method in, After using air nail gun to fix again by the bonding of the short template of polyvinyl chloride circular arc angle bead and frame column, with the side of adhesion agent for blocking Formula, the substitution mode in the prior art that sponge strip is arranged at formwork edge joint, can be in the premise for ensureing bonding place not spillage Under, it realizes simple installation, improve speed of application, and reduce the increase for the cost that frame column molding post-processing maintenance is brought, Improve construction period;Outer shroud ring is carried out using various sizes of channel steel to the big small bore of frame column cylinder, after reinforcing again Second consolidation is carried out using split bolt, can effectively ensure the consolidation effect of frame column, construction precision is improved and frame is whole Body stability;Tie is finally installed after the completion of integrally installing from below to up immediately, and strictly controls column verticality, in column, beam Junction is reinforced with angle bar to increase formwork rigidity herein, ensures that faulting of slab ends will not occur because of concrete lateral pressure for template, Improve the stability of frame column entirety;In conclusion the formwork erection method of clear water frame column of the present invention, can protect Demonstrate,prove template not spillage while, with simple installation, speed of application is fast, reduces the technique effect of construction cost.
Description of the drawings
Fig. 1 is flow chart, shows the formwork erection method of the clear water frame column described in one embodiment of the present of invention;
Fig. 2 is schematic diagram, shows the formwork erection method of the clear water frame column described in one embodiment of the present of invention Middle frame column template structure after molding;
Fig. 3 is schematic diagram, shows the structure of the circular arc angle bead in clear water framed column template shown in Fig. 2;
Fig. 4 is state diagram, shows circular arc angle bead shown in Fig. 2 and the state after template bonding;
Fig. 5 is state diagram, shows the I-shaped in clear water framed column template described in one embodiment of the present of invention The structure of plastic strip;
Fig. 6 is state diagram, shows the state that plastics day is arranged in one embodiment of the present of invention between long cheek board.
Specific implementation mode
The implementation of a kind of clear water frame column of the present invention and its formwork erection method described below with reference to the accompanying drawings Example.Those skilled in the art will recognize, without departing from the spirit and scope of the present invention, can use each The different mode of kind is modified described embodiment.Therefore, attached drawing and description are regarded as illustrative in nature, rather than For limiting scope of the claims.In addition, in the present specification, attached drawing is drawn not in scale, and identical attached drawing Label indicates identical part.
Fig. 1 is flow chart, shows the formwork erection method of the clear water frame column described in one embodiment of the present of invention. As shown in Figure 1, in this embodiment of the invention, the formwork erection method of the clear water frame column includes S1, by arc chord angle Item is fixed after being bonded respectively with the both sides on a surface of two short side templates of frame column, then uses circle described in adhesion agent for blocking Gap between arc angle item and the short side template;S2, in the both ends brushwork adhesive of a short side template, paste plastic strip, And the lower end of two long cheek boards is pasted in the side for being provided with the circular arc angle bead respectively, then by two long cheek boards The bonding of lower inboard surface and the circular arc angle bead after it is fixed, then use circular arc angle bead and the long side described in adhesion agent for blocking Gap between template;S3, in the upper end brushwork adhesive of the long cheek board, paste plastic strip, and by another short side mould The side that plate is provided with the circular arc angle bead is pasted onto towards the long cheek board on the long cheek board, to form rectangle Frame column ontology, then will be fixed after the bonding of the upper inner lateral surface of two long cheek boards and the circular arc angle bead, and The gap described in adhesion agent for blocking between circular arc angle bead and the long cheek board is used afterwards;S4, in the periphery of the frame column ontology Mounting fixing parts, the fixing piece are erected on holder and surround the frame column ontology.In this embodiment of the invention, it adopts With the circular arc angle bead of polyvinyl chloride material, I-shaped plastic strip.
Specifically, construction checks circular arc angle bead, plastic strip and channel steel before starting, to ensure construction quality. Fig. 2 is schematic diagram, shows the formwork erection method center trestle of the clear water frame column described in one embodiment of the present of invention Template structure after molding.Fig. 3 is schematic diagram, shows the structure of the circular arc angle bead described in one embodiment of the present of invention. Fig. 4 is state diagram, shows circular arc angle bead shown in Fig. 2 and the state after template bonding.As shown in Figures 2 to 4, in the present invention The embodiment in, the size of circular arc angle bead 1 is 40mm*40mm, and circular arc angle bead 1 is 90 degree.In step sl, first using bonding Agent bonds four edges of four circular arc angle beads 1 and the two opposite short side templates of frame column 2, then uses air nail gun will be every One circular arc angle bead 1 and the junction of short side template 2 are punched, so that circular arc angle bead 1 is fixedly connected with short side template 2.After fixation, Brush adhesive in gap between circular arc angle bead 1 and short side template 2, in this way so that between arc chord angle item 1 and short side template 2 Gap it is closed, mortar leakage prevention.
In step s 2, in the both ends brushwork adhesive of a short side template 2, plastic strip 5 is pasted, and be provided with respectively The lower end of two long cheek boards 3 is pasted in the side of circular arc angle bead 1, then by the lower inboard surface and circle of two long cheek boards 3 Arc angle item 1 is fixed after bonding, and then uses the gap between adhesion agent for blocking circular arc angle bead 1 and long cheek board 3.Long cheek board 3 Width is equal to the sum of the thickness of section length and two pieces of short side templates 2.
Fig. 5 is state diagram, shows the I-shaped in clear water framed column template described in one embodiment of the present of invention The structure of plastic strip.Fig. 6 is state diagram, shows and plastic strip is arranged in one embodiment of the present of invention between long cheek board State.As shown in Figure 5 and Figure 6, in step s3, when the upper end brushwork adhesive of long cheek board 3, plastic strip 5 is pasted, and will be another The side that one short side template 2 is provided with circular arc angle bead 1 is pasted onto towards long side template 3 on long cheek board 3, rectangular to be formed The frame column ontology of shape, it is fixed after then bonding the upper inner lateral surface of long cheek board 3 and circular arc angle bead 1, then use adhesive Block the gap between circular arc angle bead 1 and long cheek board 3.
In step s 4, after the completion of formwork erection, the big section of frame column is carried out using No. 20 and/or No. 18 channel steels 4 Outer shroud ring carries out outer shroud ring using No. 16 and/or No. 14 channel steels 4 to frame column small bore, after the completion of outer shroud ring, passes through stress meter Calculation obtains channel steel spacing, and split bolt is installed on channel steel and is reinforced, and keeps the spacing between channel steel 4 in the model of 320mm to 360mm In enclosing, in this embodiment of the invention, 4 spacing of channel steel is maintained at 350mm, but embodiments of the present invention are not limited thereto.Channel steel 4 After being provided with, checks displacement, verticality, diagonal line and be corrected, tie is installed from bottom to top immediately after errorless.
Correspondingly, the present invention also provides a kind of clear water frame column based on the above, referring to Fig. 2, clear water frame column Including frame column ontology, frame column ontology is rectangle, including two opposite block length cheek boards 3 and opposite two pieces of short side templates 2, adjacent every block length cheek board 3 and every piece of short side template 2 form a right angle;Circular arc angle bead 1 is pasted onto in frame column ontology Each right angle, and each circular arc angle bead 1 with and the every block length cheek board 3 that contacts of circular arc angle bead 1 and every piece of short side template 2 It is fixed by air nail, the gap between circular arc angle bead 1 and every block length cheek board 3 and every piece of short side template 2 passes through adhesion agent for blocking; Plastic strip 5 is pasted onto at adjacent every block length cheek board 3 and the template splicing of every piece of short side template 2;Holder, support frame trestle Ontology is simultaneously protruding from frame column ontology;And reinforcing member, it is arranged on holder and surround frame column ontology, with to frame column Ontology carries out outer shroud ring.
As described above with practice it is found that a kind of clear water frame column of the present invention and its formwork erection method In, after using air nail gun to fix again by the bonding of the short template of polyvinyl chloride circular arc angle bead and frame column, with adhesion agent for blocking Mode, the substitution mode in the prior art that sponge strip is arranged at formwork edge joint can ensure bonding place not before spillage It puts, realizes simple installation, improves speed of application, and reduce the increasing for the cost that frame column molding post-processing maintenance is brought Add, improves construction period;Outer shroud ring is carried out using various sizes of channel steel to the big small bore of frame column cylinder, after reinforcing It uses split bolt to carry out second consolidation again, can effectively ensure the consolidation effect of frame column, improve construction precision and frame Overall stability;Tie is finally installed from below to up immediately after the completion of integrally installing, and strictly controls column verticality, column, Beam junction is reinforced with angle bar to increase formwork rigidity herein, ensures that because of concrete lateral pressure mistake will not occur for template Platform improves the stability of frame column entirety;In conclusion clear water frame column of the present invention and its formwork erection method, it can With while ensureing template not spillage, with simple installation, speed of application is fast, reduces the technique effect of construction cost.
Describe a kind of clear water frame column according to the present invention and its template in an illustrative manner above with reference to attached drawing Erection method.It will be understood by those skilled in the art, however, that a kind of clear water frame column that is proposed for aforementioned present invention and its Formwork erection method can also make various improvement on the basis of not departing from the content of present invention.Therefore, protection model of the invention Enclosing should be determined by the content of appended claims.

Claims (9)

1. a kind of formwork erection method of clear water frame column, which is characterized in that this approach includes the following steps:
S1, it fixes after bonding circular arc angle bead with the both sides on a surface of two short side templates of frame column respectively, then uses Gap between circular arc angle bead described in adhesion agent for blocking and the short side template;
S2, in the both ends brushwork adhesive of a short side template, paste plastic strip, and be provided with the circular arc angle bead respectively The lower end of two long cheek boards is pasted in side, then by the lower inboard surface of two long cheek boards and the circular arc angle bead It is fixed after bonding, then use the gap described in adhesion agent for blocking between circular arc angle bead and the long cheek board;
S3, in the upper end brushwork adhesive of the long cheek board, paste plastic strip, and another short side template-setup had described The side of circular arc angle bead is pasted onto towards the long cheek board on the long cheek board, to form rectangular frame column sheet Body, then will be fixed after the upper inner lateral surface of two long cheek boards and circular arc angle bead bonding, then uses adhesive Block the gap between the circular arc angle bead and the long cheek board;
S4, in the periphery mounting fixing parts of the frame column ontology, the fixing piece is erected on holder and surrounds the frame Column ontology.
2. the formwork erection method of clear water frame column as described in claim 1, which is characterized in that in the step S1-S3, After the short side template of circular arc angle bead and the frame column or the bonding of long side template edge, using air nail gun by the circular arc angle bead It is fixed with the short side template or long cheek board.
3. the formwork erection method of clear water frame column as described in claim 1, which is characterized in that in the step S1, institute The length for stating long cheek board is equal to the sum of frame column cylinder section length and two pieces of short side template thickness.
4. the formwork erection method of clear water frame column as described in claim 1, which is characterized in that in the step S2 and S3 In, material strip is shaped using " work ".
5. the formwork erection method of clear water frame column as described in claim 1, which is characterized in that in the step S4, institute It is channel steel to state fixing piece, when the long side length of column section is more than 1000mm, is carried out using No. 20 channel steels and/or No. 18 channel steels outer Shroud ring;When the long side length of column section is less than 1000mm, carry out outer shroud ring using No. 16 channel steels and/or No. 14 channel steels.
6. the formwork erection method of clear water frame column as claimed in claim 5, which is characterized in that in the step S4, Split bolt is installed between the every channel steel.
7. the formwork erection method of clear water frame column as claimed in claim 6, which is characterized in that in the step S4, lead to Cross the maximum spacing that Force Calculation determines channel steel.
8. the formwork erection method of clear water frame column as claimed in claim 7, which is characterized in that in the step S4, slot Steel spacing maximum length is in the range of 320mm to 360mm.
9. a kind of clear water frame column, including:
Frame column ontology, the frame column ontology are rectangle, including two opposite block length cheek boards and opposite two pieces of short sides Template, adjacent every block length cheek board and every piece of short side template form a right angle;
Circular arc angle bead is pasted onto the intrinsic each right angle of the frame column, and each circular arc angle bead and and the circular arc Angle bead contact every block length cheek board and every piece of short side template fixed by air nail, the circular arc angle bead with often block length cheek board and Gap between every piece of short side template passes through adhesion agent for blocking;
Plastic strip is pasted onto at adjacent every block length cheek board and the template splicing of every piece of short side template;
Holder supports the frame column ontology and protruding from the frame column ontology;And
Reinforcing member, setting is on the bracket and around the frame column ontology, to carry out outer shroud ring to the frame column ontology.
CN201810076689.4A 2018-01-26 2018-01-26 Clear water frame column and its formwork erection method Pending CN108412205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810076689.4A CN108412205A (en) 2018-01-26 2018-01-26 Clear water frame column and its formwork erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810076689.4A CN108412205A (en) 2018-01-26 2018-01-26 Clear water frame column and its formwork erection method

Publications (1)

Publication Number Publication Date
CN108412205A true CN108412205A (en) 2018-08-17

Family

ID=63126263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810076689.4A Pending CN108412205A (en) 2018-01-26 2018-01-26 Clear water frame column and its formwork erection method

Country Status (1)

Country Link
CN (1) CN108412205A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585734A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Column template assembling method and disassembling method based on column construction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1100170A (en) * 1993-09-09 1995-03-15 李大为 Combinated shuttering for shaping reinforced concrete member
CN101457588A (en) * 2007-12-11 2009-06-17 浙江省建工集团有限责任公司 Formwork method for concrete post
CN201372568Y (en) * 2008-12-30 2009-12-30 中冶成工上海五冶建设有限公司 Connection device for clear water concrete construction
CN101748890A (en) * 2008-12-08 2010-06-23 河南省第五建筑安装工程(集团)有限公司 Template dowel bar
CN202718393U (en) * 2012-07-19 2013-02-06 山东电力建设第二工程公司 Template connecting and fastening device for construction of bare concrete column
CN103669846A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Sealing device for abutted seams of formworks
CN103726650A (en) * 2013-12-30 2014-04-16 江苏百新塑业有限公司 Building formwork joint filling bar
WO2016033859A1 (en) * 2014-09-05 2016-03-10 苏运升 3d printing-based house manufacturing system and method
CN107035142A (en) * 2017-04-11 2017-08-11 中国建筑第二工程局有限公司 A kind of flexible reinforcement system of framed column template and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1100170A (en) * 1993-09-09 1995-03-15 李大为 Combinated shuttering for shaping reinforced concrete member
CN101457588A (en) * 2007-12-11 2009-06-17 浙江省建工集团有限责任公司 Formwork method for concrete post
CN101748890A (en) * 2008-12-08 2010-06-23 河南省第五建筑安装工程(集团)有限公司 Template dowel bar
CN201372568Y (en) * 2008-12-30 2009-12-30 中冶成工上海五冶建设有限公司 Connection device for clear water concrete construction
CN202718393U (en) * 2012-07-19 2013-02-06 山东电力建设第二工程公司 Template connecting and fastening device for construction of bare concrete column
CN103669846A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Sealing device for abutted seams of formworks
CN103726650A (en) * 2013-12-30 2014-04-16 江苏百新塑业有限公司 Building formwork joint filling bar
WO2016033859A1 (en) * 2014-09-05 2016-03-10 苏运升 3d printing-based house manufacturing system and method
CN107035142A (en) * 2017-04-11 2017-08-11 中国建筑第二工程局有限公司 A kind of flexible reinforcement system of framed column template and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585734A (en) * 2021-09-29 2021-11-02 天津仝元材料科技有限公司 Column template assembling method and disassembling method based on column construction

Similar Documents

Publication Publication Date Title
CN2893055Y (en) Super high wall body three-section form
CN100582421C (en) Formwork method for concrete pillar
CN201943347U (en) Mounting structure for plastic formwork of frame column
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN204850434U (en) A mold sheet composition structure for cast -in -place wall body
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN108412205A (en) Clear water frame column and its formwork erection method
CN204209803U (en) A kind of prefabricated box girder inner formwork aluminum alloy mould plate
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN113585757A (en) Reinforcing construction method for right-angle corner-shaped column formwork
CN204645616U (en) Side wall rubber watertight strip fixed mould
CN112459472A (en) Construction method of constructional column after secondary masonry structure is finished
CN205976472U (en) Pour mould of building post -cast strip
CN204645615U (en) Top board rubber watertight strip fixed mould
CN216142396U (en) Adjustable template unit of arc-shaped shear wall and adjustable template of arc-shaped shear wall
CN104775613A (en) External corner reinforcing system for concrete pouring in building construction
CN212428077U (en) Stair step template construction structures
CN211229514U (en) Clear water concrete column pouring section mould system
CN108004986B (en) Tunnel anti-collision wall template reinforcing system and construction method
CN211498965U (en) Structure for fixing embedded water stop
CN101260738B (en) Reinforced concrete winding stairs die type formwork and its construction method
CN110206303A (en) Hollow elastic sealing strip secondary structure template construction method is installed
CN208949921U (en) Waterstop fixing mould
CN207194439U (en) Cornerite plywood form
CN202284291U (en) Concrete overflowing surface template shaped like Chinese character ba

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180817