CN108412101A - 一种钢结构集成楼板及其施工方法 - Google Patents
一种钢结构集成楼板及其施工方法 Download PDFInfo
- Publication number
- CN108412101A CN108412101A CN201810151217.0A CN201810151217A CN108412101A CN 108412101 A CN108412101 A CN 108412101A CN 201810151217 A CN201810151217 A CN 201810151217A CN 108412101 A CN108412101 A CN 108412101A
- Authority
- CN
- China
- Prior art keywords
- floor
- steel
- layer
- steel construction
- short beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
Abstract
本发明提供一种钢结构集成楼板,包括框架层,框架层的上方设有钢筋楼层板和混凝土层,框架下方设有轻钢龙骨和天花板层,框架层包括长梁、短梁和称重柱座,短梁均布设置在两侧的两个长梁之间,短梁与长梁相垂直,称重柱座设置在两侧的长梁的两端和中部,两侧的长梁上分别均布设置两个吊装孔。一种钢结构集成楼板的施工方法,将短梁、长梁、钢筋楼层板和轻钢骨架放置于钢结构集成楼板上,将钢结构集成楼板作为运输平台;吊装钢结构集成楼板,每相邻的两个钢结构集成楼板之间留有一个短梁长度的空间;将短梁的两端分别安装在两个相邻的钢结构集成楼板的长梁上。本发明的有益效果是成倍提高了运输和吊装效率,节约了长梁的材料。
Description
技术领域
本发明属于建筑领域,尤其是涉及一种钢结构集成楼板及其施工方法。
背景技术
钢结构是主要由钢制材料组成的结构,是主要的建筑结构类型之一。结构主要由型钢和钢板等制成的钢梁、钢柱、钢桁架等构件组成,各构件或部件之间通常采用焊缝、螺栓或铆钉连接。因其自重较轻,且施工简便,广泛应用于大型厂房、场馆、超高层等领域。
申请号:201710475743.8公开了一种集成装配式轻质楼板及其施工方法,属于建筑材料领域。该集成装配式轻质楼板,不破坏主体结构受力体系,整块集成式楼板采用工厂模块化生产,提高装配化率,集成楼板与钢结构主梁采用螺栓式连接,便于多次循环使用。焊接量不多,且集成楼板整体高度小,有效提高室内净高。同时该楼板用钢量较小,有效降低工程造价。
现有的钢结构楼板安装方式为分别吊装后采用焊缝、螺栓或铆钉连接,吊装效率低,且需要占用设备。并且吊装完成后还需要安装楼层板、贴地砖、安装轻钢龙骨和吊顶,施工周期长,工作效率低。
发明内容
本发明的目的是提供一种钢结构集成楼板及其施工方式。
本发明的技术方案是:
一种钢结构集成楼板,包括框架层,框架层的上方设有钢筋楼层板,钢筋楼层板上方设有混凝土层,框架层下方设有轻钢龙骨,轻钢龙骨下方设有天花板层,所述框架层包括长梁、短梁和称重柱座,短梁均布设置在两侧的两个长梁之间,短梁与长梁相垂直,称重柱座设置在两侧的长梁的两端和中部,两侧的长梁上分别均布设置两个吊装孔。
本发明钢结构集成楼板工厂化程度高,大大的提高了施工效率。
所述框架层包括三个长梁,中间的长梁与短梁的中部分别垂直相连。
所述混凝土层的上方设有地砖层,所述天花板层上嵌入灯,灯的电线设置于框架层内。
一种钢结构集成楼板的施工方法,包括如下步骤:
1)将边上另一块楼板所需的短梁、长梁、钢筋楼层板和轻钢骨架放置于钢结构集成楼板上,将钢结构集成楼板作为运输平台;
2)吊装钢结构集成楼板,每相邻的两个钢结构集成楼板之间留有一个短梁长度的空间;
3)将短梁的两端分别安装在两个相邻的钢结构集成楼板的长梁上;
4)将长梁安装在短梁的中部;
5)安装钢筋楼层板,现场浇筑混凝土层,安装轻钢骨架和天花板层。
所述步骤5)中现场浇筑混凝土层后贴上地砖层。
本发明施工方法具有的优点和积极效果是:
1)成倍的提高了吊装效率,直接将钢结构集成楼板作为运输吊装平台,短梁和称重柱座不需要单独吊装;
2)每两个相邻的钢结构集成楼板之间设有一个短梁长度的空间,节约了一倍的长梁材料和称重柱座的材料,两个相邻的钢结构集成楼板之间仅采用短梁连接;
3)短梁配载在集成楼板上吊装,提高了运输及吊装效率;
4)短梁人工安装就可以,不需要占用吊装设备,不占施工空间;
5)安装效率高,至少节约10%的总建筑成本,建设速度成倍提高,大大降低了成本。
附图说明
图1是本发明钢结构集成楼板的框架结构示意图
图2是本发明钢结构集成楼板截面结构示意图
图中:
1、长梁 2、短梁 3、吊装孔 4、称重柱座 5、框架层
6、钢筋楼层板 7、混凝土层 8、轻钢龙骨 9、天花板层 10、地砖层
具体实施方式
如图1、图2所示,一种钢结构集成楼板,包括框架层5,框架层5的上方设有钢筋楼层板6,钢筋楼层板6上方设有混凝土层7,框架层5下方设有轻钢龙骨8,轻钢龙骨8下方设有天花板层9,框架层5包括长梁1、短梁2和称重柱座4,短梁2均布设置在两侧的两个长梁1之间,短梁2与长梁1相垂直,称重柱座4设置在两侧的长梁1的两端和中部,两侧的长梁1上分别均布设置两个吊装孔3。
本发明钢结构集成楼板工厂化程度高,大大的提高了施工效率。
进一步的,框架层5包括三个长梁1,中间的长梁1与短梁2的中部分别垂直相连。
在混凝土层7的上方设有地砖层10,在天花板层9上嵌入灯,灯的电线设置于框架层5内。
本实例一种钢结构集成楼板的施工方法,包括如下步骤:
1)将短梁2、长梁1、钢筋楼层板6和轻钢骨架8放置于钢结构集成楼板上,将钢结构集成楼板作为运输平台;
2)吊装钢结构集成楼板,每相邻的两个钢结构集成楼板之间留有一个短梁2长度的空间;
3)将短梁2的两端分别安装在两个相邻的钢结构集成楼板的长梁1上;
4)将长梁1安装在短梁2的中部;
5)安装钢筋楼层板6,现场浇筑混凝土层7,贴上地砖层10。安装轻钢骨架8和天花板层9。
以上对本发明的一个实施例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。
Claims (5)
1.一种钢结构集成楼板,其特征在于:包括框架层,框架层的上方设有钢筋楼层板,钢筋楼层板上方设有混凝土层,框架层下方设有轻钢龙骨,轻钢龙骨下方设有天花板层,所述框架层包括长梁、短梁和称重柱座,短梁均布设置在两侧的两个长梁之间,短梁与长梁相垂直,称重柱座设置在两侧的长梁的两端和中部,两侧的长梁上分别均布设置两个吊装孔。
2.根据权利要求1所述的一种钢结构集成楼板,其特征在于:所述框架层包括三个长梁,中间的长梁与短梁的中部分别垂直相连。
3.根据权利要求1或2所述的一种钢结构集成楼板,其特征在于:所述混凝土层的上方设有地砖层,所述天花板层上嵌入灯,灯的电线设置于框架层内。
4.一种钢结构集成楼板的施工方法,其特征在于:包括如下步骤:
1)将短梁、长梁、钢筋楼层板和轻钢骨架放置于钢结构集成楼板上,将钢结构集成楼板作为运输平台;
2)吊装钢结构集成楼板,每相邻的两个钢结构集成楼板之间留有一个短梁长度的空间;
3)将短梁的两端分别安装在两个相邻的钢结构集成楼板的长梁上;
4)将长梁安装在短梁的中部;
5)安装钢筋楼层板,现场浇筑混凝土层,安装轻钢骨架和天花板。
5.根据权利要求4所属的一种钢结构集成楼板的施工方法,其特征在于:所述步骤5)中现场浇筑混凝土层后贴上地砖层。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810151217.0A CN108412101B (zh) | 2018-02-13 | 2018-02-13 | 一种钢结构集成楼板及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810151217.0A CN108412101B (zh) | 2018-02-13 | 2018-02-13 | 一种钢结构集成楼板及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108412101A true CN108412101A (zh) | 2018-08-17 |
CN108412101B CN108412101B (zh) | 2021-06-25 |
Family
ID=63128838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810151217.0A Active CN108412101B (zh) | 2018-02-13 | 2018-02-13 | 一种钢结构集成楼板及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108412101B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258879A (zh) * | 2019-07-09 | 2019-09-20 | 四川福美来新型建筑材料有限公司 | 一种集成房屋的楼层板 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09317183A (ja) * | 1996-05-28 | 1997-12-09 | Sato Kogyo Co Ltd | 建造物構築方法 |
CN103498523A (zh) * | 2013-09-25 | 2014-01-08 | 张跃 | 楼板系统 |
CN205617631U (zh) * | 2015-12-24 | 2016-10-05 | 河南远大可持续建筑科技有限公司 | 一种高强度模块化楼板 |
CN106193402A (zh) * | 2016-06-28 | 2016-12-07 | 中天建设集团浙江钢构有限公司 | 桁架梁集成式楼面模块及其安装方法 |
CN205976166U (zh) * | 2016-07-08 | 2017-02-22 | 曹海彦 | 装配式组合楼板 |
CN206529951U (zh) * | 2016-12-01 | 2017-09-29 | 牛智勇 | 一种钢骨架复合型楼板模块 |
-
2018
- 2018-02-13 CN CN201810151217.0A patent/CN108412101B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09317183A (ja) * | 1996-05-28 | 1997-12-09 | Sato Kogyo Co Ltd | 建造物構築方法 |
CN103498523A (zh) * | 2013-09-25 | 2014-01-08 | 张跃 | 楼板系统 |
CN205617631U (zh) * | 2015-12-24 | 2016-10-05 | 河南远大可持续建筑科技有限公司 | 一种高强度模块化楼板 |
CN106193402A (zh) * | 2016-06-28 | 2016-12-07 | 中天建设集团浙江钢构有限公司 | 桁架梁集成式楼面模块及其安装方法 |
CN205976166U (zh) * | 2016-07-08 | 2017-02-22 | 曹海彦 | 装配式组合楼板 |
CN206529951U (zh) * | 2016-12-01 | 2017-09-29 | 牛智勇 | 一种钢骨架复合型楼板模块 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258879A (zh) * | 2019-07-09 | 2019-09-20 | 四川福美来新型建筑材料有限公司 | 一种集成房屋的楼层板 |
Also Published As
Publication number | Publication date |
---|---|
CN108412101B (zh) | 2021-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101886468B (zh) | 高位连体结构悬挂式模板支撑施工方法 | |
CN104763109B (zh) | 一种大跨度钢结构厂房屋面压型底瓦快速施工方法 | |
CN102535845A (zh) | 一种连廊结构承重架的施工方法 | |
CN108979131B (zh) | 一种高层建筑施工钢模板及操作架整体提升平台装置 | |
CN104264706A (zh) | 外用电梯钢梁基础构造及其施工方法 | |
CN205444975U (zh) | 一种带有观景平台的大型屋盖钢结构施工支撑系统 | |
CN108412101A (zh) | 一种钢结构集成楼板及其施工方法 | |
CN110107095B (zh) | 高空大跨度钢桁架的安装方法 | |
CN208965581U (zh) | 一种非落地式塔吊基础平台 | |
CN104328922B (zh) | 高空多层悬垂钢结构逆做法吊装施工技术 | |
CN206529892U (zh) | 一种应用于高层结构的建筑结构体系 | |
CN201411926Y (zh) | 弧形梁起重结构 | |
CN201687083U (zh) | 高位连体结构悬挂式模板支撑结构 | |
CN210152320U (zh) | 一种螺栓球节点式网架胎架 | |
CN115247498A (zh) | 预制墙板的固定支架及包含该支架的支撑系统 | |
CN206844680U (zh) | 钢连廊地面拼装荷载转移装置 | |
CN205617789U (zh) | 形心独立支撑结构 | |
CN107010517A (zh) | 一种钢结构电梯用快装式走廊 | |
CN104310184A (zh) | 雨棚一体式自动扶梯 | |
CN215055166U (zh) | 一种高效高层装配式建筑作业平台 | |
CN205369629U (zh) | 一种双梁楼盖结构 | |
CN108442530A (zh) | 一种框架或筒体承重高层模块化建筑施工方法及结构 | |
CN105084229B (zh) | 一种屋面吊机及其在屋面跨中纵向钢梁吊装中的应用 | |
CN219808575U (zh) | 一种钢结构和混凝土组合结构 | |
CN212453279U (zh) | 预制装配式屋面板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221128 Address after: 315000 104-20, building 5, No. 211 Xingguang Road, high tech Zone, Ningbo, Zhejiang Patentee after: Xianbo Construction Technology Co.,Ltd. Address before: 264500 Haiwan new area, Rushan City, Weihai City, Shandong Province Patentee before: SINBO GREEN BUILDING Corp.,Ltd. |
|
TR01 | Transfer of patent right |