CN108375506A - 固定偏心受压混凝土柱立式加载的试验装置 - Google Patents
固定偏心受压混凝土柱立式加载的试验装置 Download PDFInfo
- Publication number
- CN108375506A CN108375506A CN201810373748.4A CN201810373748A CN108375506A CN 108375506 A CN108375506 A CN 108375506A CN 201810373748 A CN201810373748 A CN 201810373748A CN 108375506 A CN108375506 A CN 108375506A
- Authority
- CN
- China
- Prior art keywords
- concrete column
- bolt
- support
- hinged
- hinge plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/02—Details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0014—Type of force applied
- G01N2203/0016—Tensile or compressive
- G01N2203/0019—Compressive
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种固定偏心受压混凝土柱立式加载的试验装置,包括钢筋混凝土柱、钢绞线、底板等,从下至上依次放置底板、第一圆铰支座、钢筋混凝土柱、第二圆铰支座;第一圆铰支座和第二圆铰支座之间通过钢绞线相连。本发明的优点在于:通过张拉钢绞线的方式调整混凝土柱垂直度、优化偏心距的定位精度,保障混凝土柱在立式安装过程中的稳固性,同时可有效防止加载后期构件弯曲变形过大产生的倾侧现象,提高偏心受压混凝土柱立式加载过程中的安全性;圆铰支座有效避免混凝土柱在两端加载区域形成应力集中,防止产生局部劈裂裂缝。
Description
技术领域
本发明涉及混凝土结构试验方法领域,尤其涉及一种固定偏心受压混凝土柱立式加载的试验装置。
背景技术
钢筋混凝土柱偏心受压试验是土木工程结构实验中的基础实验之一。传统的钢筋混凝土柱偏心受压试验加载装置一般通过刀口支座或者球形支座来实现的,但是传统加载装置如下问题:
1.刀口支座易致混凝土柱端部局部破坏。采用刀口支座加载时,偏心荷载通过刀口施加,由于加载装置铰板刚度不足,局部应力难以释放,及易使得混凝土柱在刀口支座加载端部造成局部应力集中,使混凝土柱端部产生劈裂裂缝并发生破坏。
2.球形支座加载时偏心距不易控制。采用球形支座加载时,尽管可有效缓解上述局部破坏问题,但是,由于偏心荷载通过两端球铰施加,加载初始偏心距不易精确控制,同时在偏心加载过程中,实际偏心距可能发生变化。
3.混凝土柱立式加载布置困难。由于混凝土柱尺寸大、重量大,在实际固定安放时难以立式固定,不但偏心距不易精准调整,而且试验过程中由于构件弯曲变形过大极易导致构件倾侧,存在安全隐患。因此,在实际试验加载时,为了定位方便以及加载安全,有时采用横放混凝土柱加载方式,但横放混凝土柱加载显然与实际情况不符,由于承台对混凝土柱侧限的影响,大大影响了混凝土柱的侧向刚度,测试数据结果与立式加载结果产生较大偏差。
发明内容
针对上述不足,本发明提供一种固定偏心受压混凝土柱立式加载的试验装置,通过张拉钢绞线的方式调整钢筋混凝土柱垂直度并优化偏心距的定位精度,张拉钢绞线可有效保障混凝土柱在立式安装过程中的稳固性,同时可有效防止加载后期构件弯曲变形过大产生的倾侧现象,提高偏心受压混凝土柱立式加载过程中的安全性;在加载阶段,采用圆铰支座有效避免混凝土柱在两端加载区域形成应力集中,防止产生局部劈裂裂缝。
为实现上述功能,本发明所采用的技术方案是:一种固定偏心受压混凝土柱立式加载的试验装置,包括钢筋混凝土柱、钢绞线、花篮螺栓、第一羊眼螺栓、底板、第二羊眼螺栓,从下至上依次放置底板、第一圆铰支座、钢筋混凝土柱、第二圆铰支座;所述第二圆铰支座的凹铰板上沿圆周方向均匀开有至少四个第一螺栓孔道,第一螺栓孔道上旋接第一羊眼螺栓;所述底板上沿圆周方向均匀开有与第一螺栓孔道数量相同且一一对应的第二螺栓孔道,第二螺栓孔道上旋接第二羊眼螺栓;钢绞线的一端与第一羊眼螺栓相连,钢绞线的另一端通过花篮螺栓与与第一羊眼螺栓相对应的第二羊眼螺栓相连。
进一步的,加载力的方向与第一圆铰支座和第二圆铰支座的铰接点的连线相重合。
进一步的,所述第一圆铰支座由相互配合的第一凹铰板和第一凸铰板组成,第一凹铰板布置在第一凸铰板的上面。
进一步的,所述第二圆铰支座由相互配合的第二凹铰板和第二凸铰板组成,第二凸铰板布置在第二凹铰板上面。
进一步的,第一凹铰板和第二凹铰板结构相同,均包括凹铰本体,凹铰本体上开有凹槽;第一凸铰板和第二凸铰板结构相同,均包括凸铰本体,凸铰本体上开有凸起,凹槽和凸起相配合。
进一步的,所述凹槽和凸起的横截面为半圆形。
进一步的,钢绞线的两端均通过钢丝锁扣打圆结锁紧。
现对于现有技术,本发明的有益效果如下:通过张拉钢绞线的方式调整混凝土柱垂直度、优化偏心距的定位精度,保障混凝土柱在立式安装过程中的稳固性,同时可有效防止加载后期构件弯曲变形过大产生的倾侧现象,提高偏心受压混凝土柱立式加载过程中的安全性;圆铰支座有效避免混凝土柱在两端加载区域形成应力集中,防止产生局部劈裂裂缝。
附图说明
图1为本发明实施例的主视图;
图2为本发明实施例的左视图;
图3为本发明实施例的俯视图;
图中,钢筋混凝土柱1、第一凹铰板2、第二凹铰板3、第一凸铰板4、钢绞线5、花篮螺栓6、第一羊眼螺栓7、第二凸铰板8、底板9、第二羊眼螺栓10、辅助垫板11、钢丝锁扣12。
具体实施方式
下面结合实施例和附图对本发明作进一步的说明。
试验研究内容为钢筋混凝土柱偏心抗压力学性能,按照《混凝土结构设计规范》(GB 500102002)对试验柱进行配筋设计,分别设计大偏心(偏心距90mm)和小偏心(偏心距50mm)两种情况。如下图所示,试验柱共计24根,分为CAS(偏心距50mm)、CBS(偏心距50mm)、CAL(偏心距90mm)和CBL(偏心距90mm)四组,每组柱各6根。各组0-5号试件的钢筋锈蚀程度不同,其中0号为无锈蚀,1-5号锈蚀程度依次增加。其中,CAS组和CAL组试验柱箍筋为HRP300 6@200;CBS组和CBL组试验柱箍筋为HRP300 6@100。所有试验柱均为对称配筋,两侧均配2根直径20mm的HRP335钢筋,为了方便施加偏心力并同时防止柱被局部压碎,柱两端均局部放大为牛腿形,抗压柱尺寸均为200mm×240mm(440mm)×1500mm,保护层厚度为30mm。
如图1-3所示,本发明是一种固定偏心受压混凝土柱立式加载的试验装置,包括钢筋混凝土柱1、钢绞线5、花篮螺栓6、第一羊眼螺栓7、底板9、第二羊眼螺栓10,从下至上依次放置底板9、第一圆铰支座、钢筋混凝土柱1、第二圆铰支座;第一圆铰支座和第二圆铰支座用于加载偏心荷载;所述第二圆铰支座的凹铰板上沿圆周方向均匀开有至少四个第一螺栓孔道,第一螺栓孔道上旋接第一羊眼螺栓7;所述底板9上沿圆周方向均匀开有与第一螺栓孔道数量相同且一一对应的第二螺栓孔道,第二螺栓孔道上旋接第二羊眼螺栓10;钢绞线5的一端与第一羊眼螺栓7相连,钢绞线5的另一端通过花篮螺栓6与与第一羊眼螺栓7相对应的第二羊眼螺栓10相连,通过调节花篮螺栓6可以张紧或放松钢绞线5,钢绞线5的两端均通过钢丝锁扣12打圆结锁紧。
所述第一圆铰支座由相互配合的第一凹铰板2和第一凸铰板4组成,第一凹铰板2布置在第一凸铰板4的上面。所述第二圆铰支座由相互配合的第二凹铰板3和第二凸铰板8组成,第二凸铰板8布置在第二凹铰板3上面。第一凹铰板2和第二凹铰板3结构相同,均包括凹铰本体,凹铰本体上开有凹槽;第一凸铰板4和第二凸铰板8结构相同,均包括凸铰本体,凸铰本体上开有凸起,凹槽和凸起相配合,所述凹槽和凸起的横截面为半圆形。
所述凹铰板与凸铰板平面尺寸均为240mm×200mm,考虑到扩散角的影响范围,第一凹铰板2和第二凹铰板3的厚度为80mm,中部凹槽半圆圆角直径为20mm;第一凸铰板4和第二凸铰板8厚度为30mm,顶端半圆圆角直径为20mm。第二凹铰板3上的第一螺栓孔道的圆角直径10mm。底板在本例中取1200mm×358mm×15mm,第二螺栓孔道的圆角直径10mm。
考虑到避免孔道开孔后影响凹铰板整体性能,孔道开孔方向与凸铰本体延伸方向平行,底板上孔道开孔方向也相应与之平行。
本发明的使用方法如下:加载平台上放置底板9,底板9上放置第一凸铰板4和第一凹铰板2,由于混凝土柱自重及偏心作用影响。试块及装置的安装固定和定位是不易的。在第一凸铰板4和第一凹铰板2之间设置两块辅助垫板11,起到防止混凝土柱倾斜度过大的作用,以便初步定位和固定混凝土柱和加载装置。在第一凹铰板2上安放钢筋混凝土柱1,在钢筋混凝土柱1上方放置第二凹铰板3和第二凸铰板8,在第二凹铰板3和底板9上的螺栓孔道中分别旋入第一羊眼螺栓7和第二羊眼螺栓10,再将第二羊眼螺栓10与花篮螺栓6的挂钩端相连,钢绞线5连接花篮螺栓6的圆孔端和第一羊眼螺栓7,调节花篮螺栓6,控制钢绞线5的张拉力的大小,起到张拉或放松钢绞线5的作用,来精确调整钢筋混凝土柱1两端面的水平度及高度方向轴线的垂直度。精确定位后,辅助垫板11与其上方凹铰板脱离,不承受荷载。
在第二凸铰板8上加载,加载力的方向与第一圆铰支座和第二圆铰支座的铰接点的连线相重合。第一圆铰支座和第二圆铰支座扩散荷载,避免端部应力集中,防止产生劈裂裂缝。同时通过四根张拉钢绞线5的方式调整混凝土柱垂直度、优化偏心距的定位精度,保障混凝土柱在立式安装过程中的稳固性,同时可有效防止加载后期构件弯曲变形过大产生的倾侧现象,提高偏心受压混凝土柱立式加载过程中的安全性;圆铰支座有效避免混凝土柱在两端加载区域形成应力集中,防止产生局部劈裂裂缝。
在安装过程中,通过张拉钢绞线立式布置的混凝土柱稳固可靠,偏心距精准可调;4组小偏心和大偏心混凝土柱,每组6根,共24根,其中,各根小偏心混凝土柱加载到极限荷载970kN,884kN,837kN,805kN,795kN,763kN,740kN,739kN,728kN,690kN,649kN,628kN,各根大偏心混凝土柱加载到极限荷载858kN,802kN,651kN,570kN,526kN,513kN,509kN,447kN,434kN,430kN,411kN,372kN,具体试验结果,见表一,小偏心和大偏心混凝土柱在两端加载区域未产生局部劈裂裂缝,构件未因弯曲变形过大而产生倾侧。
表一:
Claims (7)
1.一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,包括钢筋混凝土柱、钢绞线、花篮螺栓、第一羊眼螺栓、底板、第二羊眼螺栓等,从下至上依次放置底板、第一圆铰支座、钢筋混凝土柱、第二圆铰支座;所述第二圆铰支座的凹铰板上沿圆周方向均匀开有至少四个第一螺栓孔道,第一螺栓孔道上旋接第一羊眼螺栓;所述底板上沿圆周方向均匀开有与第一螺栓孔道数量相同且一一对应的第二螺栓孔道,第二螺栓孔道上旋接第二羊眼螺栓;钢绞线的一端与第一羊眼螺栓相连,钢绞线的另一端通过花篮螺栓与与第一羊眼螺栓相对应的第二羊眼螺栓相连。
2.根据权利要求1所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,加载力的方向与第一圆铰支座和第二圆铰支座的铰接点的连线相重合。
3.根据权利要求1所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,所述第一圆铰支座由相互配合的第一凹铰板和第一凸铰板组成,第一凹铰板布置在第一凸铰板的上面。
4.根据权利要求3所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,所述第二圆铰支座由相互配合的第二凹铰板和第二凸铰板组成,第二凸铰板布置在第二凹铰板上面。
5.根据权利要求4所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,第一凹铰板和第二凹铰板结构相同,均包括凹铰本体,凹铰本体上开有凹槽;第一凸铰板和第二凸铰板结构相同,均包括凸铰本体,凸铰本体上开有凸起,凹槽和凸起相配合。
6.根据权利要求5所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,所述凹槽和凸起的横截面为半圆形。
7.根据权利要求1所述的一种固定偏心受压混凝土柱立式加载的试验装置,其特征在于,钢绞线的两端均通过钢丝锁扣打圆结锁紧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810373748.4A CN108375506A (zh) | 2018-04-24 | 2018-04-24 | 固定偏心受压混凝土柱立式加载的试验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810373748.4A CN108375506A (zh) | 2018-04-24 | 2018-04-24 | 固定偏心受压混凝土柱立式加载的试验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108375506A true CN108375506A (zh) | 2018-08-07 |
Family
ID=63032739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810373748.4A Pending CN108375506A (zh) | 2018-04-24 | 2018-04-24 | 固定偏心受压混凝土柱立式加载的试验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108375506A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109632467A (zh) * | 2019-01-08 | 2019-04-16 | 哈尔滨工业大学(威海) | 一种适用于不同尺寸矩形钢管受压试验装配式双刀铰支座 |
CN109632468A (zh) * | 2019-01-08 | 2019-04-16 | 哈尔滨工业大学(威海) | 一种适用于多种直径圆钢管受压试验装配式双刀铰支座 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06264559A (ja) * | 1993-01-07 | 1994-09-20 | Shimizu Corp | プレキャストコンクリート被覆柱およびその構築方法 |
RU53776U1 (ru) * | 2005-12-06 | 2006-05-27 | Государственное образовательное учреждение высшего профессионального образования "Томский государственный архитектурно-строительный университет" (ГОУВПО "ТГАСУ") | Стенд для испытания железобетонных элементов на косое внецентренное кратковременное динамическое сжатие |
CN202139846U (zh) * | 2011-06-09 | 2012-02-08 | 上海市第七建筑有限公司 | 应用于玻璃钢圆柱模板的固定系统 |
CN203499247U (zh) * | 2013-08-16 | 2014-03-26 | 中国建筑第八工程局有限公司 | 圆柱定型木模施工结构 |
CN103728178A (zh) * | 2014-01-01 | 2014-04-16 | 浙江建设职业技术学院 | 一种柱的充气式加载定位装置及加载定位方法 |
RU143345U1 (ru) * | 2014-03-18 | 2014-07-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Томский государственный архитектурно-строительный университет" (ТГАСУ) | Стенд для статических испытаний железобетонных элементов на продольное внецентренное и косое внецентренное сжатие |
CN203891462U (zh) * | 2014-05-21 | 2014-10-22 | 江苏建筑职业技术学院 | 清水混凝土独立柱支模装置 |
CN104612401A (zh) * | 2015-02-10 | 2015-05-13 | 中国十七冶集团有限公司 | 一种无拼接缝圆柱结构的施工方法 |
CN204330478U (zh) * | 2014-12-30 | 2015-05-13 | 黄振宇 | 受压试验的通用支座装置 |
CN105004602A (zh) * | 2015-07-27 | 2015-10-28 | 河南城建学院 | 一种用于柱受压试验的铰支座装置及其使用方法 |
CN106198204A (zh) * | 2016-08-25 | 2016-12-07 | 河南城建学院 | 一种用于圆形杆件受弯试验中的u型固定铰支座 |
KR20170073942A (ko) * | 2015-12-21 | 2017-06-29 | 한국해양과학기술원 | 자유낙하 시험기 |
CN208313712U (zh) * | 2018-04-24 | 2019-01-01 | 浙江大学 | 一种固定偏心受压混凝土柱立式加载的试验装置 |
-
2018
- 2018-04-24 CN CN201810373748.4A patent/CN108375506A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06264559A (ja) * | 1993-01-07 | 1994-09-20 | Shimizu Corp | プレキャストコンクリート被覆柱およびその構築方法 |
RU53776U1 (ru) * | 2005-12-06 | 2006-05-27 | Государственное образовательное учреждение высшего профессионального образования "Томский государственный архитектурно-строительный университет" (ГОУВПО "ТГАСУ") | Стенд для испытания железобетонных элементов на косое внецентренное кратковременное динамическое сжатие |
CN202139846U (zh) * | 2011-06-09 | 2012-02-08 | 上海市第七建筑有限公司 | 应用于玻璃钢圆柱模板的固定系统 |
CN203499247U (zh) * | 2013-08-16 | 2014-03-26 | 中国建筑第八工程局有限公司 | 圆柱定型木模施工结构 |
CN103728178A (zh) * | 2014-01-01 | 2014-04-16 | 浙江建设职业技术学院 | 一种柱的充气式加载定位装置及加载定位方法 |
RU143345U1 (ru) * | 2014-03-18 | 2014-07-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Томский государственный архитектурно-строительный университет" (ТГАСУ) | Стенд для статических испытаний железобетонных элементов на продольное внецентренное и косое внецентренное сжатие |
CN203891462U (zh) * | 2014-05-21 | 2014-10-22 | 江苏建筑职业技术学院 | 清水混凝土独立柱支模装置 |
CN204330478U (zh) * | 2014-12-30 | 2015-05-13 | 黄振宇 | 受压试验的通用支座装置 |
CN104612401A (zh) * | 2015-02-10 | 2015-05-13 | 中国十七冶集团有限公司 | 一种无拼接缝圆柱结构的施工方法 |
CN105004602A (zh) * | 2015-07-27 | 2015-10-28 | 河南城建学院 | 一种用于柱受压试验的铰支座装置及其使用方法 |
KR20170073942A (ko) * | 2015-12-21 | 2017-06-29 | 한국해양과학기술원 | 자유낙하 시험기 |
CN106198204A (zh) * | 2016-08-25 | 2016-12-07 | 河南城建学院 | 一种用于圆形杆件受弯试验中的u型固定铰支座 |
CN208313712U (zh) * | 2018-04-24 | 2019-01-01 | 浙江大学 | 一种固定偏心受压混凝土柱立式加载的试验装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109632467A (zh) * | 2019-01-08 | 2019-04-16 | 哈尔滨工业大学(威海) | 一种适用于不同尺寸矩形钢管受压试验装配式双刀铰支座 |
CN109632468A (zh) * | 2019-01-08 | 2019-04-16 | 哈尔滨工业大学(威海) | 一种适用于多种直径圆钢管受压试验装配式双刀铰支座 |
CN109632468B (zh) * | 2019-01-08 | 2021-06-11 | 哈尔滨工业大学(威海) | 一种适用于多种直径圆钢管受压试验装配式双刀铰支座 |
CN109632467B (zh) * | 2019-01-08 | 2021-06-15 | 哈尔滨工业大学(威海) | 一种适用于不同尺寸矩形钢管受压试验装配式双刀铰支座 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3348711B1 (en) | Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge | |
CN102061746B (zh) | 一种钢结构组合预埋件及其施工方法 | |
CN104674945B (zh) | 树形钢管柱结构及其施工方法 | |
KR101431640B1 (ko) | 거더의 형식에 관계없이 적용할 수 있는 거더 고정장치 및 이를 이용한 라멘교의 시공방법 | |
CN105431595B (zh) | 混凝土基座和用于制造用于风电塔架的混凝土基座的方法以及用于套管在混凝土基座中的定位的定位装置 | |
CN106087744B (zh) | 斜拉桥混凝土梁索导管支撑定位装置及方法 | |
CN108375506A (zh) | 固定偏心受压混凝土柱立式加载的试验装置 | |
CN110907152B (zh) | 一种旋转索夹试验装置及试验方法 | |
CN105544396B (zh) | 现浇拱桥杆件式支架钢制弧形分配梁构造及施工方法 | |
CN105466741A (zh) | 一种任意方位多组节理岩桥试样制备装置及方法 | |
CN208313712U (zh) | 一种固定偏心受压混凝土柱立式加载的试验装置 | |
KR101292395B1 (ko) | 고강도 다각형 원심성형 기둥의 시공오차 보정구조 | |
CN205999789U (zh) | 斜拉桥混凝土梁索导管支撑定位装置 | |
CN106638334B (zh) | 一种体外预应力加固装置及其施工方法 | |
KR20190109675A (ko) | 에스알씨 기둥용 거푸집 지지장치 | |
CN106639347B (zh) | 双向预应力半圆钢板在线无破损加固混凝土圆柱法 | |
CN208748712U (zh) | 一种试验桩竖向抗压检测装置 | |
CN104894984B (zh) | 采用反吊桥结构体系的刚构桥加固方法 | |
CN106001333A (zh) | 一种制作标准钢筋笼的简易模具及其施工方法 | |
CN113565260B (zh) | 防止支撑梁变形的施工方法 | |
KR20080076889A (ko) | 거더의 내하력 조절장치 및 방법 | |
CN105926933A (zh) | 用于异形混凝土构件的模板型钢围檩及施工工艺 | |
CN104675023A (zh) | 一种波纹管精确定位装置 | |
CN207484310U (zh) | 一种对悬臂梁式桥体接合处进行加固的支撑结构 | |
CN205918103U (zh) | 一种建筑模板支撑用早拆顶托 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |