EP3348711B1 - Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge - Google Patents

Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge Download PDF

Info

Publication number
EP3348711B1
EP3348711B1 EP16871923.5A EP16871923A EP3348711B1 EP 3348711 B1 EP3348711 B1 EP 3348711B1 EP 16871923 A EP16871923 A EP 16871923A EP 3348711 B1 EP3348711 B1 EP 3348711B1
Authority
EP
European Patent Office
Prior art keywords
wire
wire strand
strand
steel
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16871923.5A
Other languages
German (de)
French (fr)
Other versions
EP3348711A1 (en
EP3348711A4 (en
Inventor
Jun Zhao
Shiwei NING
Huajuan Xue
Zhubing Zhou
Qiong Wu
Qiang QIANG
Kebin HUANG
Xiaoxiong ZHU
Weihong SHU
Jin Wang
Zhongmei LIANG
Pengcheng ZHAI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Fasten Steel Cable Co Ltd
Original Assignee
Jiangsu Fasten Steel Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Fasten Steel Cable Co Ltd filed Critical Jiangsu Fasten Steel Cable Co Ltd
Publication of EP3348711A1 publication Critical patent/EP3348711A1/en
Publication of EP3348711A4 publication Critical patent/EP3348711A4/en
Application granted granted Critical
Publication of EP3348711B1 publication Critical patent/EP3348711B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B1/00Constructional features of ropes or cables
    • D07B1/06Ropes or cables built-up from metal wires, e.g. of section wires around a hemp core
    • D07B1/0693Ropes or cables built-up from metal wires, e.g. of section wires around a hemp core having a strand configuration
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B1/00Constructional features of ropes or cables
    • D07B1/14Ropes or cables with incorporated auxiliary elements, e.g. for marking, extending throughout the length of the rope or cable
    • D07B1/148Ropes or cables with incorporated auxiliary elements, e.g. for marking, extending throughout the length of the rope or cable comprising marks or luminous elements
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B5/00Making ropes or cables from special materials or of particular form
    • D07B5/002Making parallel wire strands
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2201/00Ropes or cables
    • D07B2201/20Rope or cable components
    • D07B2201/2015Strands
    • D07B2201/2042Strands characterised by a coating
    • D07B2201/2044Strands characterised by a coating comprising polymers
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2201/00Ropes or cables
    • D07B2201/20Rope or cable components
    • D07B2201/2083Jackets or coverings
    • D07B2201/2089Jackets or coverings comprising wrapped structures
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2205/00Rope or cable materials
    • D07B2205/30Inorganic materials
    • D07B2205/3021Metals
    • D07B2205/3071Zinc (Zn)
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2207/00Rope or cable making machines
    • D07B2207/40Machine components
    • D07B2207/4031Winding device
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B2501/00Application field
    • D07B2501/20Application field related to ropes or cables
    • D07B2501/2015Construction industries
    • D07B2501/203Bridges
    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B7/00Details of, or auxiliary devices incorporated in, rope- or cable-making machines; Auxiliary apparatus associated with such machines
    • D07B7/02Machine details; Auxiliary devices
    • D07B7/10Devices for taking-up or winding the finished rope or cable

Definitions

  • the anchor device is the main structure to transmit a cable tension of the prefabricated parallel-wire preformed wire strand to an anchor system.
  • Zinc-copper alloy or zinc-copper-aluminum alloy is adopted for casting, and the casting process is as follows:

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ropes Or Cables (AREA)
  • Bridges Or Land Bridges (AREA)

Description

  • The invention belongs to the technical field of wire strands for main cables of suspension bridge, and more particularly to a method for fabricating a preformed wire strand from parallel steel wires for a main cable of a suspension bridge.
  • Suspension bridge is an ancient bridge type, and rattan and bamboo and other materials have been utilized to construct the suspension bridge for a long time to solve the traffic problem. There are many records about ancient suspension bridges in China, the first suspension may be the single-wire strand bridge, which is made of vine or bamboo, and people have to use a wood on the wire strand to slide across the bridge. Such suspension bridge is made of bamboo, rattan, and even iron chain, and are primarily for pedestrian as restricted by material performance. Early in Europe and America, with the development of society and the progress of smelting technology, iron chains with high tensile strength have been utilized as the main cable of the suspension bridge. Luding Bridge across the Dadu River in Sichuan is the earliest suspension bridge using the iron chain in China, which was built in 1706 and has a span exceeding 100 meters. In the mid-18th century, iron-cable bridge using the iron chain as a loading component also appeared in the western countries, and the iron-cable bridge having a span of 21.34 meters was constructed across the Tess river in British in 1741. In 1808, the Finley Bridge was built, in addition to the iron chain, a horizontal bridge floor, that is, stiffening beam, was suspended by suspension rods, forming a prototype of the modern suspension bridge. In 1816, the first pedestrian suspension bridge adopting a main cable made by steel wires was built, which is the beginning of the development of the suspension bridge. Modern materials including the steel wires and the steel wire strand have been widely applied in the development of the suspension bridge. With the development of the metal industry, most main cables of the suspension bridges began to adopt high strength steel wires with much higher tensile strength. As being convenient to the construction, the steel wire-main cables are predominantly utilized in suspension bridges having middle or small span. However, the steel wire rope has small elastic modulus, resulting in large deformation of the suspension bridge, so the main cable is not suitable for the construction of suspension bridge with large span, and main cables of suspension bridge with large span is generally made of parallel steel wire having high strength.
  • Modern suspension bridge appeared in the United States in the 1850s, and its most significant mark is that main cables made of large diameter parallel wire were firstly utilized. Since then, the materials for the main cable of the suspension bridge of large span rarely changes, high strength zinc-coated steel wires having diameters of 5 mm are adopted, and the construction method of the main cables may be different. Two methods for the construction of the main cable of the suspension bridge with large span are air spinning (AS) method and prefabricated wire strand (PS or PWS) method. In the AS method, each cable contains between 30 and 90 wire strands, and each wire strand contains between 400 and 500 steel wires. Thus, the anchoring tonnage for a single wire strand is large, the anchoring space is relatively concentrated. A main drawback of the AS method is that the wind resistance in laying the main cable is weak and requires much labor.
    CN201665818U discloses a wire strand for a main cable of a suspension bridge, wherein the wire strand comprises a plurality of steel wires and has a cross section of hexagon (see Fig. 8 in CN201665818U ). Besides, a standard steel wire 5 with a standard length is arranged in each layer within the wire strand. And several marked steel wires 4 are provided in the wire strand (see Fig. 8 in CN201665818U ).
  • In view of the above-described problems, the present invention provides a method for fabricating a preformed wire strand from parallel steel wires for a main cable of a suspension bridge as described in claim 1 as well as its dependent claims.
    Specifically, the method includes: prefabricating regularly hexagonal wire strands using multiple zinccoated wires in a plant, each wire strand consisting of 61 wires (optionally 91 or 127 wires), anchoring two ends of the wire strand by hot-casting anchors, pre-forming the wire strand in a plant for facilitating insertion of the wire strand into saddles during construction, then coiling the wire strands and transporting the wire strand coils to a construction field, and respectively laying the wire strands.
  • To achieve the above objective, in accordance with one embodiment of the invention, there is provided a method for fabricating a preformed wire strand from parallel steel wires for a main cable of a suspension bridge comprises the following steps:
  • 1) Fabricating a marking steel wire
  • In order to conveniently observe and discriminate whether parallel-wire strands are twisted during fabrication and laying of the wire strand, a marking steel wire is set at a vertex of the hexagonal cross section of each parallel-wire strand and the marker wire is coated with a color for discrimination. Generally, the marking steel wire is coated red.
  • 2) Fabricating a steel wire with standard length
  • A cable shape is one of important parameters of the suspension bridge, and a length of each wire strand is required to be controlled during fabrication. In order to control length accuracy of a parallel wire unit for the prefabricated parallel-wire strand, one, two, or more than two steel wires having standard lengths are set at vertexes of the hexagonal cross section as standard wires functioning in controlling a whole length of the wire strand of the main cable of the suspension bridge. Preferably, one or multiple standard wires are set at vertexes of the hexagonal cross sections to realize the double control of the wire strand's length and to measure a within-wire strand error using a length difference between two standard wires.
  • In the meanwhile, obvious position markers are made according to design requirements at feature locations on each standard wire corresponding to control points of splay cable saddles, center points of main cable saddles, middle points of side bands, a middle point of a main span, and starting points being 1 meter away from anchor heads of anchor spans, and the position makers are made as follows:
    A length of each steel wire free from stress is used as a standard, and an operation correction is calculated in view of error factors. Thereafter, the steel wire is loaded and stretched on a base line in the construction field. A temperature is measured, and errors resulting from the temperature, a stress, and a sag, and other factors are corrected. During the fabrication, a displacement is repeatedly checked and marked to make specific marking positions.
  • The length of the standard wire is determined by baseline measurement. Specifically, a tensioning force is applied to two ends of the steel wires to make the steel wires straight, and stress correction and temperature correction are then carried out according to the following equation: L = L 0 × 1 + F / EA + α T 20
    Figure imgb0001

    in which, L represents a length (m) of a steel wire under a stress, L0 represents a designed length (m) of a steel wire free from a stress, F represents a tensioning force (N), E represents an elastic module (MPa) of a steel wire, and fabrication of the standard wire adopts a measured value, A represents an area of a cross section (m2) of the steel wire, and fabrication of the standard wire adopts the measured value, α represents an expansion coefficient of the steel wire, and T represents a temperature of the environment.
  • The systematic error in the fabrication process of the standard wire of the parallel-wire strand is greatly reduced by the above method. The fabrication precision of the standard wire exceeds 1/30000, the fabrication precision of the finished wire strand is increased to 1/20000 from the industry standard of 1/12000, the manually marking mistakes are greatly reduced, and the property of the production of the human error is reduced, thus improving the working efficiency.
  • 3) Relaxing coils of steel wires for shaping
  • Each prefabricated parallel-wire strand is formed by multiple (61, 91, 127, or 169) steel wires. During the preformation, coils of steel wires (including the marking steel wire and the standard steel wire) having the same double length and the same rotation direction are put into a pay-out stand and a tension of each coil of the steel wire is then regulated. A tension of the steel wire relaxing is the main factor affecting the within-wire strand error, and uneven tension easily results in length inconsistency of the steel wires within the wire strand, thus the tension of each coil of the steel wire is required to be basically consistent. In fabrication of the prefabricated parallel-wire strand, a rolling mold formed by shaping wheels is utilized to shape a cross section of the parallel steel wires. The rolling mold possesses a hexagonal cross section matching with the shape of the cross section of the wire strand. The pre-formed parallel-wire unit is set and wrapped at equal intervals by a high strength wrapping bandage to avoid scattering of the steel wires during traction. During the prefabrication in the plant, a surface of the wire strand is wrapped by the wrapping bandage to well fix the shape of the steel wire unit.
  • As the wrapping bandage generally adopts high polymer materials, the performance thereof is inevitably affected by factors including the temperature and the sunlight and therefore deteriorated. In addition, the construction conditions in the construction field are complicated, no cracking of the wrapping bandage during the laying process of the wire strand is almost impossible. If the cracking of the wrapping bandage occurs at critical positions like the main cable saddles and the splay cable saddles, when the wire strand is accommodated in the saddle, bulges and displacement errors of the steel wires occur, and the shape of the wire strand cannot be adjusted beyond cable saddles. Thus, if the wire strand at the wire strand feature points (features points are set at two sides of the main cable saddles and the splay cable saddles, if the span is too large, a plurality of additional feature points are set within the span) keep good shape and no relative displacement in the longitudinal direction of the steel wires occurs, then after being accommodated in the cable saddle, the wire strand is exerted with the self-gravity, and certain wrapping bandages between two feature positions are cut off from the wire strand and the wire strand is knocked to remove the wire bulges and the displacement errors of the wires and to recover the hexagonal shape of the original wire strand. Based on the above reasons, in addition to the arrangement of the wrapping bandage on the wire strand at certain intervals, steel wire hoops or shaping clips are reasonably arranged on the wire strand. The steel wire hoops are able to locate the whole wire strand of a certain shape into the saddles, prevent the displacement errors of the wires of the wire strand, and ensure the cross section of the critical parts, which are beneficial to the observation and location when laying the wire strand. Even the wrapping bandage of a certain section of the wire strand is seriously cracked which results in wire scattering, it is convenient to repair such local regions under the restrain of the steel wire hoops or the shaping clips. In the meanwhile, the steel wire hoops and the shaping clips also ensure good shapes of the wire strand in the vicinity of the cable saddles and bring great benefit for local repair. Positions for arranging the steel wire hoops or the shaping clips comprise: positions in the vicinity of center points of corresponding splay cable saddles, positions in the vicinity of center points of main cable saddles, middle points of side spans, starting points of anchor heads of the side spans, and the middle point of the main span. The steel wire hoops are formed by wrapping zinc-coated steel wires. Materials of the steel wire hoops and the wire strand belong to the same series. To reduce the injury on the steel wires of the inner wire strand, the steel wire hoops have a length of between 100 and 300 mm and a diameter of between 1.0 and 3.0 mm.
  • 4) Preforming of positions of the cable saddles
  • Shapes of positions of the wire strand corresponding to the main cable saddles and the splay cable saddles are preformed to make the shape of the cross section of the wire strand to be preformed match with the shapes of inner cavities of the main cable saddles and the splay cable saddles thus facilitating the accommodation of the wire strand in the saddles. Specific operations are as follows: dimensions and cross sections of the wire strand before and after the preforming are firstly designed according to the dimensions of the inner cavities of the main cable saddles and the splay cable saddles. According to the design, the wire strand is processed to have the shape of the target cross section matching with the shapes of the inner cavities of the main cable saddles and the splay cable saddles. Positions to be preformed of the wire strand corresponding to the main cable saddles and the splay cable saddles are processed by a shaping machine to shape the cross section of the wire strand into the target shape, and then respectively fixed using retaining clips having a quadrilateral inner cavity for several times. Fixed positions are wrapped by the wrapping bandages for setting the shape.
  • 5) coiling the prefabricated parallel-wire preforming wire strand
  • The coiling and the cable relaxing are two opposite operations having close relations therebetween but also being in conformity with separate motion rule. Different steel wires have different bend radius, and a bending force of the steel wire relates to the bending radius. The smaller the bending radius is, the greater the bending force is. As long as a coiling force is larger than the bending force, the wire strand is able to coil. Thus, the tightness of the coiling is affected by the coiling force. The tightness of the coiling directly affects the progress of the cable relaxing and also indirectly affects the forming quality of the wire strand. The prefabricated parallel-wire strand is coiled by a coil frame, and a coil diameter is equal to or larger than 30 folds of the diameter of the wire strand.
  • 6) Casting anchor of the prefabricated parallel-wire pre-forming wire strand
  • The anchor device is the main structure to transmit a cable tension of the prefabricated parallel-wire preformed wire strand to an anchor system. Zinc-copper alloy or zinc-copper-aluminum alloy is adopted for casting, and the casting process is as follows:
    1. a. Ends of the wire strand are perpendicularly fixed in a casting platform of an anchor cup, the steel wires of the wire strand inserted into the anchor cup are dispersed in the form of concentric circles, oil stains and rusts are removed from the steel wires of the wire strand, a uniform space is maintained, and an inner wall of the anchor cup is cleaned.
    2. b. After the wire strand is inserted into the anchor cup, a center of the wire strand coincides with a center of the anchor cup, and the steel wire is prevented from contacting with the anchor cup.
    3. c. A vertical length of the wire strand beneath the anchor cup is equal to or larger than 30 folds of the diameter of the wire strand, and a curved radius is required to be 25 folds larger than the diameter of the wire strand.
    4. d. A lower opening of the anchor cup is required to be fully sealed to ensure no leakage of the poured alloy from the lower opening, and the anchor cup is preheated before casting the zinc-copper alloy or zinc-copper-aluminum alloy.
    5. e. When pouring the alloy into the anchor cup, violation is prevented, and the casting is carried out fluently without disruption.
  • In a class of this embodiment, the wrapping bandage utilizes a complex of a high strength polyester and fiber bands as a matrix, and a surface of the matrix is coated with a pressure-sensitive adhesive of high viscosity.
  • According to the claimed invention, in 4), the cross section of the wire strand to be preformed is shaped from a hexagon into a quadrilateral to make preformed positions of the wire strand matching with inner cavities of the main cable saddles and the splay cable saddles.
  • Moreover, the shaping machine of 4) comprises: a U-shaped base and a cover plate disposed at an opening above the U-shaped base; and the U-shaped base and the cover plate are enclosed to form a quadrilateral shaping through hole matching with the quadrilateral cross section of the wire strand.
  • In a class of this embodiment, curved ribs are formed on inner sides opposite to the U-shaped base; an extending direction of the curved ribs is parallel to the steel wires of the wire strand; and a radius of each curved rib and an interval between adjacent curved ribs respectively match with a radius of the steel wire of the wire strand.
  • In a class of this embodiment, the retaining clip of 4) comprises a quadrilateral shaping through hole for allowing the quadrilateral wire strand to pass through; and the retaining clip is formed by locking two independent clamping blocks having square openings together.
  • In a class of this embodiment, the U-shaped base and the cover plate are both made of nylon materials to avoid the destruction on the steel wire.
  • Advantages of the method for fabricating the preformed wire strand from parallel steel wires for the main cable of the suspension bridge in accordance with embodiments of the invention are summarized as follows: in the method, regularly hexagonal wire strands are prefabricated using multiple zinc-coated wires in a plant, the wire strand are then preformed at specific positions for facilitating insertion of the wire strand into saddles, two ends of the wire strand are anchored by the hot-casting anchors, and then the wire strands are coiled and transported to the construction field where the wire strand are respectively laid.
  • The invention is described hereinbelow with reference to the accompanying drawings, in which:
    • FIG. 1 is a structure diagram showing distribution of feature points of a standard wire;
    • FIG. 2 is a structure diagram showing arrangement of a standard wire and a marking steel wire in a wire strand of a small specification;
    • FIG. 3 is a structure diagram showing arrangement of standard wires and a marking steel wire in a wire strand of a large specification;
    • FIG. 4 is a structure diagram of a shaping machine having a quadrilateral inner cavity in shaping a cross section of a wire strand;
    • FIG. 5 is a front view of a shaping machine having a quadrilateral inner cavity;
    • FIG. 6 is a side view of a shaping machine having a quadrilateral inner cavity;
    • FIG. 7 is a front view of a retaining clip having a quadrilateral inner cavity; and
    • FIG. 8 is a side view of a retaining clip having a quadrilateral inner cavity.
  • A method for fabricating a preformed wire strand from parallel steel wires for a main cable of a suspension bridge are described below combined with the drawings.
  • A method for fabricating a preformed wire strand from parallel steel wires for a main cable of a suspension bridge is illustrated. The method includes: prefabricating regularly hexagonal wire strands using multiple zinc-coated wires in a plant, each wire strand consisting of 61 wires (optionally 91 or 127 wires, according to working conditions), pre-forming quadrilateral cross sections at certain positions of the wire strand corresponding to main cable saddles and splay cable saddles for accommodating the wire strand of certain positions in cable saddles, anchoring two ends of the wire strand by hot-cast anchors, coiling and transporting the wire strands to a construction field, and respectively laying the wire strand.
  • The method is specifically conducted as follows:
  • 1) Fabricating a marking steel wire
  • In order to conveniently observe and discriminate whether parallel-wire strand is twisted during fabrication and laying of the wire strand, a marking steel wire is set at a left upper corner of the hexagonal cross section of each parallel-wire strand and the marking steel wire is coated red.
  • 2) Fabricating a wire with standard length
  • In order to control length accuracy of a parallel wire unit for the prefabricated parallel-wire strand, steel wires having standard lengths are set at vertexes of the hexagonal cross section as standard wires functioning in controlling a whole length of the wire strand of the main cable of the suspension bridge. For wire strand of large specification, the standard wires are set at two vertexes of the hexagonal cross sections to realize the double control of the wire strand's length and to measure a within-wire strand error using a length difference between the two standard wires, as shown in FIGS. 2-3 .
  • In the meanwhile, as shown in FIG. 1 , obvious position markers are made according to design requirements at feature locations on each standard wire corresponding to control points of splay cable saddles, center points of main cable saddles, middle points of side bands, a middle point of a main span, and starting points being 1 meter away from anchor heads of anchor spans, and the position makers are made as follows:
  • A length of each standard wire free from stress is used as a standard, and an operation correction is calculated in view of error factors. Thereafter, the steel wires are loaded and stretched on a base line in the construction field. A temperature is measured, and errors resulting from the temperature, a stress, and a sag, and other factors are corrected. During the fabrication, a displacement is repeatedly checked and marked to make specific marking positions.
  • The length of the standard wire is determined by baseline measurement. Specifically, a tensioning force is applied to two ends of the steel wires to make the steel wires straight, and stress correction and temperature correction are then carried out according to the following equation: L = L 0 × 1 + F / EA + α T 20
    Figure imgb0002

    in which, L represents a length (m) of a steel wire under a stress, L0 represents a designed length (m) of a steel wire free from a stress, F represents a tensioning force (N), E represents an elastic module (MPa) of a steel wire, and fabrication of the standard wire adopts a measured value, A represents an area of a cross section (m2) of the steel wire, and fabrication of the standard wire adopts the measured value, α represents an expansion coefficient of the steel wire, and T represents a temperature of the environment.
  • The systematic error in the fabrication process of the standard wire of the parallel-wire strand is greatly reduced by the above method. The fabrication precision of the standard wire exceeds 1/30000, the fabrication precision of the finished wire strand is increased to 1/20000 from the industry standard of 1/12000, the manually marking mistakes are greatly reduced, and the property of the production of the human error is reduced, thus improving the working efficiency.
  • 3) Relaxing coils of steel wires for shaping
  • Each prefabricated parallel-wire strand is formed by multiple steel wires. During the preformation, coils of steel wires having the same double length and the same rotation direction are put into a pay-out stand and a tension of each coil of the steel wire is then regulated. In fabrication of the prefabricated parallel-wire strand, a rolling mold formed by shaping wheels is utilized to shape a cross section of the parallel steel wires. The rolling mold possesses a hexagonal cross section matching with the shape of the cross section of the wire strand. The pre-formed parallel-wire unit is set and wrapped at equal intervals by a high strength wrapping bandage to avoid scattering of the steel wires during traction. The wrapping bandage utilizes a complex of a high strength polyester and fiber bands as a matrix, and a surface of the matrix is coated with a pressure-sensitive adhesive of high viscosity.
  • In addition to the arrangement of the wrapping bandage on the wire strand at certain intervals, steel wire hoops are reasonably arranged on the wire strand. The steel wire hoops are able to locate the whole wire strand of a certain shape into the saddles and to avoid wire scattering occurred in the wire strand, thus ensuring the shape of the cross section of critical portions for the observation and location in laying the wire strand. Even the wrapping bandage of a certain section of the wire strand is seriously cracked which results in wire scattering, it is convenient to repair such local regions under the restrain of the steel wire hoops. Positions for arranging the steel wire hoops comprise: positions in the vicinity of center points of corresponding splay cable saddles, positions in the vicinity of center points of main cable saddles, middle points of side spans, starting points of anchor heads of the side spans, and the middle point of the main span. The steel wire hoops are formed by wrapping zinc-coated steel wires. Materials of the steel wire hoops and the wire strand belong to the same series. To reduce the injury on the steel wires of the inner wire strand, the steel wire hoops have a length of between 100 and 300 mm and a diameter of between 1.0 and 3.0 mm.
  • 4) Preforming of positions of the cable saddles
  • Positions to be preformed of the wire strand corresponding to the main cable saddles and the splay cable saddles are processed by a shaping machine having a quadrilateral inner cavity to shape the cross section of the wire strand from the hexagon into the quadrangle, and then respectively fixed using retaining clips having a quadrilateral inner cavity for four times. Fixed positions are wrapped by the wrapping bandages for setting the shape. The wrapping bandages are wrapped for between 8 and 10 layers, a width of the bandage is between 40 and 60 mm, and a thickness of the bandage is between 0.15 and 0.25 mm, and a tensile resistance of a single layer of the bandage is equal to or larger than 1 kN, thus ensuring that the wire strand of the preformed positions effectively maintains the quadrilateral shape after being coiled. The wrapping by the wrapping bandage has no corrosion on the steel wire and does not destroy the quality of the steel wire.
  • As shown in FIGS. 4-6 , the shaping machine comprises: a U-shaped base 1.1 and a cover plate 1.2 disposed at an opening above the U-shaped base 1.1. The U-shaped base 1.1 and the cover plate 1.2 are both made of nylon materials to avoid the destruction on the steel wire. The U-shaped base 1.1 and the cover plate 1.2 are enclosed to form a quadrilateral shaping through hole matching with the quadrilateral cross section of the wire strand, and the U-shaped base 1.1 and the cover plate 1.2 are connected and fixed together by hexagonal screws 1.3.
  • Furthermore, curved ribs 1.4 are formed on inner sides opposite to the U-shaped base 1.1. An extending direction of the curved ribs 1.4 is parallel to the direction of the quadrilateral shaping through hole, and a radius of each curved rib 1.4 and an interval between adjacent curved ribs 1.4 respectively match with a radius of the steel wire of the wire strand, thus facilitating the preforming of the wire strand.
  • As shown in FIGS. 7-8 , the retaining clip comprises a quadrilateral shaping through hole for allowing the quadrilateral wire strand to pass through. The retaining clip is formed by locking two independent clamping blocks 2.1 having square openings together, which is convenient to be disassembled, thus being convenient to the shaping and fixation of the wire strand. The retaining clip is also made of nylon material.
  • 5) Coiling the prefabricated parallel-wire preforming wire strand
  • The coiling and the cable relaxing are two opposite operations, the tightness of the coiling directly affects the progress of the cable relaxing and also indirectly affects the forming quality of the wire strand. The prefabricated parallel-wire strand is coiled by a coil frame, and a coil diameter is equal to or larger than 30 folds of the diameter of the wire strand.
  • 6) Casting anchor of the prefabricated parallel-wire pre-forming wire strand
  • The anchor device is the main structure to transmit a cable tension of the prefabricated parallel-wire preformed wire strand to an anchor system. Zinc-copper alloy or zinc-copper-aluminum alloy is adopted for casting, and the casting process is as follows:
    1. a. Ends of the wire strand are perpendicularly fixed in a casting platform of an anchor cup, the steel wires of the wire strand inserted into the anchor cup are dispersed in the form of concentric circles, oil stains and rusts are removed from the steel wires of the wire strand, a uniform space is maintained, and an inner wall of the anchor cup is cleaned.
    2. b. After the wire strand is inserted into the anchor cup, a center of the wire strand coincides with a center of the anchor cup, and the steel wire is prevented from contacting with the anchor cup.
    3. c. A vertical length of the wire strand beneath the anchor cup is equal to or larger than 30 folds of the diameter of the wire strand, and a curved radius is required to be 25 folds larger than the diameter of the wire strand.
    4. d. A lower opening of the anchor cup is required to be fully sealed to ensure no leakage of the poured alloy from the lower opening, and the anchor cup is preheated before casting the zinc-copper alloy or zinc-copper-aluminum alloy.
    5. e. When pouring the alloy into the anchor cup, violation is prevented, and the casting is carried out fluently without disruption.

Claims (7)

  1. A method for fabricating a wire strand from parallel steel wires for a main cable of a suspension bridge, the method comprising:
    1) fabricating a marking steel wire, including
    selecting and coloring a steel wire as a marking steel wire which is to be positioned at a vertex of a wire strand comprising a plurality of parallel steel wires and having an equilateral polygon section;
    2) fabricating a steel wire having a standard length, including
    selecting at least one steel wire having a standard length which is to be positioned at one or more vertexes of the wire strand as a standard steel wire to control an overall length of the wire strand of the suspension bridge; adopting a length of the standard steel wire of the wire strand in an unstressed state as a reference, determining position markers at positions of the standard steel wire corresponding to control points of splay cable saddles, center points of main cable saddles, middle points of side spans, a middle point of a middle span, and starting points being one meter away from anchor heads of anchor spans of the suspension bridge; calculating operation corrections corresponding to the position markers of the standard steel wire subject to error factors; loading and stretching the standard steel wire of the wire strand in an unstressed state on a baseline in a construction field; measuring ambient temperature, and correcting errors of the operation corrections resulting from temperature, stress, and sag; calculating and checking position displacement corresponding to the position markers of the standard steel wire; and drawing, according to design requirements, the position markers at positions of the standard steel wire corresponding to control points of splay cable saddles, center points of main cable saddles, middle points of side spans, a middle point of a middle span, and starting points being one meter away from anchor heads of anchor spans of the suspension bridge;
    3) relaxing and shaping coils of steel wires, including
    loading coils of steel wires having the same double length and the same rotation direction to a pay-out stand; regulating a tension of each coil of the steel wires and shaping a cross section of the steel wires by using a rolling mold comprising shaping wheels and having a hexagonal cross section to yield a prefabricated wire strand comprising a plurality of parallel steel wires; shaping and wrapping the prefabricated wire strand comprising the parallel steel wires at equal intervals by a wrapping bandage; wherein the parallel steel wires comprise feature points corresponding to control points of splay cable saddles, center points of main cable saddles, middle points of side spans, a middle point of a middle span, and starting points of anchor heads of anchor spans of the suspension bridge, and steel wire hoops and shaping clips are disposed on the features points of the parallel steel wires;
    4) preforming of positions of cable saddles, including
    designing dimension and cross section of the prefabricated wire strand according to dimensions of inner cavities of the main cable saddles and the splay cable saddles; according to the design, shaping positions of the prefabricated wire strand corresponding to the main cable saddles and the splay cable saddles by a shaping machine to present a target cross section shape corresponding to the shapes of the inner cavities of the main cable saddles and the splay cable saddles, and then respectively fixing the positions of the wire strand corresponding to the main cable saddles and the splay cable saddles using retaining clips repeatedly; wrapping fixed positions of the strain by wrapping bandages, thus achieving preforming of the positions of the wire strand corresponding to the main cable saddles and the splay cable saddles to ensure the shape of the cross section of the wire strand to match the shapes of the inner cavities of the main cable saddles and the splay cable saddles thus mounting the wire strand in the saddles;
    in the step 4), the cross section of the prefabricated wire strand is shaped from a hexagon into a quadrilateral to facilitate the match of preformed positions of the wire strand with the inner cavities of the main cable saddles and the splay cable saddles,
    and the shaping machine in the step 4) comprises: a U-shaped base (1.1) and a cover plate (1.2) disposed above an opening of the U-shaped base (1.1); and the U-shaped base (1.1) and the cover plate (1.2) form a quadrilateral through hole matching with the quadrilateral cross section of the wire strand;
    5) coiling the prefabricated parallel-wire preforming wire strand, including
    coiling the wire strand comprising the parallel steel wires by a coil frame, wherein a coil diameter is equal to or larger than 30 folds diameter of the wire strand;
    6) casting anchor of the prefabricated parallel-wire pre-forming wire strand, including
    casting anchor of the wire strand comprising parallel steel wires using a zinc-copper alloy or zinc-copper-aluminum alloy and an anchor device which is a main structure to transmit a cable tension of the wire strand comprising the parallel steel wires to an anchor system.
  2. The method of claim 1, characterized in that the length of the standard steel wire of 2) is determined by baseline measurement; in operation, a tensioning force is applied to two ends of the standard steel wire to straighten the steel wire, and stress correction and temperature correction are then carried out according to the following equation: L = L 0 × 1 + F / EA + α T 20
    Figure imgb0003
    in which, L represents a length (m) of the steel wire in a stressed state, L0 represents a designed length, m, of the steel wire in an unstressed state, F represents a tensioning force, N, E represents an elastic module, MPa, of the steel wire, and fabrication of the standard wire adopts a measured value, A represents an area of a cross section, m2 , of the steel wire, and fabrication of the standard wire adopts the measured value, α represents an expansion coefficient of the steel wire, and T represents a temperature of the environment.
  3. The method of claim 1, characterized in that the steel wire hoops in 3) are formed by wrapping zinc-coated steel wires; and the steel wire hoops have a length of between 100 and 300 mm and a diameter of between 1.0 and 3.0 mm.
  4. The method of claim 1, characterized in that the wrapping bandage comprises a composite substrate comprising a polyester and fiber bands, and a surface of the matrix is coated with a pressure-sensitive adhesive.
  5. The method of claim 1, characterized in that curved ribs (1.4) are formed on two opposite inner sides of the U-shaped base; an extending direction of the curved ribs (1.4) is parallel to the steel wires of the wire strand; and a radius of each curved rib (1.4) and an interval between adjacent curved ribs (1.4) both match with a radius of the steel wire of the wire strand.
  6. The method of claim 1, characterized in that the retaining clip of 4) comprises a quadrilateral through hole for allowing the wire strand to pass through; and the retaining clip comprises two independent clamping blocks (2.1) having square openings together.
  7. The method of claim 1, characterized in that a casting process of 6) is as follows:
    a. perpendicularly fixing ends of the wire strand in a casting platform of an anchor cup, inserting the steel wires of the wire strand in the anchor cup are dispersed in the form of concentric circles, removing oil stains and rusts from the steel wires of the wire strand, and cleaning an inner wall of the anchor cup is cleaned;
    b. after the wire strand is inserted into the anchor cup, coinciding a center of the wire strand with a center of the anchor cup, and preventing the steel wire from contacting with the anchor cup;
    c. controlling a vertical length of the wire strand beneath the anchor cup to be equal to or larger than 30 folds of the diameter of the wire strand, and a curved radius to be 25 folds larger than the diameter of the wire strand;
    d. fully sealing a lower opening of the anchor cup to ensure no leakage of the poured alloy from the lower opening, preheating the anchor cup, and casting the zinc-copper alloy or zinc-copper-aluminum alloy; and
    e. one-step pouring the alloy into the anchor cup steadily and continuously.
EP16871923.5A 2015-12-10 2016-02-03 Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge Active EP3348711B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510906592.8A CN105421244B (en) 2015-12-10 2015-12-10 A kind of preparation method of main rope of suspension bridge Prefabricated parallel preshaping of wire strand
PCT/CN2016/073350 WO2017096712A1 (en) 2015-12-10 2016-02-03 Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge

Publications (3)

Publication Number Publication Date
EP3348711A1 EP3348711A1 (en) 2018-07-18
EP3348711A4 EP3348711A4 (en) 2018-11-14
EP3348711B1 true EP3348711B1 (en) 2019-05-08

Family

ID=55499759

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16871923.5A Active EP3348711B1 (en) 2015-12-10 2016-02-03 Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge

Country Status (4)

Country Link
US (1) US10584453B2 (en)
EP (1) EP3348711B1 (en)
CN (1) CN105421244B (en)
WO (1) WO2017096712A1 (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862592B (en) * 2016-04-13 2017-08-11 江苏法尔胜缆索有限公司 A kind of preparation method of hot extruded polyethylene Zn-Al Alloy Coated Steel Wire drag-line
CN106284082B (en) * 2016-08-15 2019-03-08 云南云岭桥隧科技有限公司 Main rope of suspension bridge strand is preforming and erection construction method
CN110318331A (en) * 2019-08-05 2019-10-11 河源迪奇亚工业技术有限公司 Main rope of suspension bridge strand is preforming and erection construction method
CN110362961B (en) * 2019-08-09 2022-11-22 中国航发沈阳发动机研究所 Method for determining bird strike test parameters of fan rotor blade of aircraft engine
CN110629672A (en) * 2019-09-02 2019-12-31 吴兴余 Manufacturing method of prefabricated parallel steel wire preformed strand for main cable of suspension bridge
CN110593097B (en) * 2019-09-04 2021-06-15 郭斌 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system
CN110592989B (en) * 2019-09-17 2021-11-30 广东迈诺工业技术有限公司 Manufacturing method of prefabricated parallel steel wire preformed strand for main cable of suspension bridge
CN110565523A (en) * 2019-09-17 2019-12-13 广东迈诺工业技术有限公司 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system
CN110878523B (en) * 2019-09-19 2020-12-29 西南交通大学 Multi-standard-wire-based suspension bridge main cable strand mark alignment erection method
CN111651821B (en) * 2020-05-29 2023-06-16 中铁大桥勘测设计院集团有限公司 Method for determining positions of strand separation points in loose cable sleeve
CN111705674B (en) * 2020-06-30 2021-03-09 西南交通大学 Method for positioning and erecting suspension bridge main cable to prefabricate parallel cable strands based on scale cable strands
CN112553981B (en) * 2020-09-07 2022-04-15 同济大学 Long-line cable force control system and method for cable rail structure
CN112160242A (en) * 2020-09-23 2021-01-01 中国铁建投资集团有限公司 Cable strand processing technology
CN112411388A (en) * 2020-11-26 2021-02-26 西南交通大学 Alignment erection method for main cable strand marks of suspension bridge based on multi-reference cable strands
CN113417216B (en) * 2021-07-09 2023-04-25 长安大学 Method for erecting main cable of suspension bridge without reference cable strand
CN113945436B (en) * 2021-08-31 2023-01-17 江苏法尔胜缆索有限公司 Manufacturing method of high-precision super-long suspension bridge main cable strand standard wire
CN114032772B (en) * 2021-10-29 2024-04-26 成都林立宇坤勘察设计有限公司 Method for designing comprehensive nodes of main cable former unit erected by suspension bridge AS method
CN114192745B (en) * 2021-11-05 2023-05-26 江苏法尔胜缆索有限公司 Main cable strand anchor filling method for suspension bridge
CN114411552A (en) * 2021-12-17 2022-04-29 江苏法尔胜缆索有限公司 High-precision reference cable strand manufacturing and marking method for main cable of suspension bridge

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2971255A (en) * 1958-11-06 1961-02-14 Colorado Fuel & Iron Corp Method of spinning cables for suspension bridges
GB902240A (en) * 1959-06-05 1962-08-01 John Howard & Company Ltd A method of preforming parallel wire strands particularly for bridge cables
US3526570A (en) * 1966-08-25 1970-09-01 Bethlehem Steel Corp Parallel wire strand
US3500625A (en) * 1967-05-17 1970-03-17 Isao Gokyu Parallel cables
US4117582A (en) * 1972-08-05 1978-10-03 Wolfgang Borelly Apparatus for producing parallel wire strands for bridges and the like by winding and unwinding strand of large cross-section and for simultaneously applying corrosion protection thereto
ES2042271T5 (en) * 1989-04-12 1997-11-01 Vorspann Technik Gmbh TENSIONING GROUP OF VARIOUS TENSIONING ELEMENTS SUCH AS LACES, RODS OR WIRES.
JPH10245817A (en) * 1997-03-04 1998-09-14 Honsyu Shikoku Renrakukiyou Kodan Transfer platform having core adjusting mechanism
FR2798408B1 (en) * 1999-09-15 2002-01-18 Freyssinet Int Stup PARALLEL WIRE CABLE FOR CONSTRUCTION OPENING STRUCTURE, ANCHORING SUCH CABLE, AND ANCHORING METHOD
US7076985B2 (en) * 2004-03-03 2006-07-18 Howard Thomas Rex Wire winding machine
BRPI0517002A (en) * 2004-10-22 2008-09-30 Beast Cabling Systems Inc cabling tool
CN100545351C (en) * 2007-09-12 2009-09-30 巨力索具股份有限公司 Cable suspension rope and preparation method thereof
CN201221051Y (en) * 2008-06-20 2009-04-15 上海浦江缆索股份有限公司 Shaping fixture for linear unit strand of main cable of rope-suspension bridge
CN101608429B (en) * 2008-06-20 2012-09-05 上海浦江缆索股份有限公司 Method for manufacturing high strength and large specification wire rope sling
CN102224284B (en) * 2008-11-25 2013-06-19 贝卡尔特公司 Metal fiber yarn with enhanced strength and processability
CN201730051U (en) * 2009-11-27 2011-02-02 上海浦江缆索股份有限公司 Prefabricated parallel galvanized aluminized wire cable strand
CN201665818U (en) * 2010-03-08 2010-12-08 江苏法尔胜新日制铁缆索有限公司 Main cable strand of long-span suspension bridge
CN101949130B (en) * 2010-04-27 2011-12-07 江苏法尔胜新日制铁缆索有限公司 Method for manufacturing standard wires under control of reference wires
EP2627926A4 (en) * 2010-10-11 2015-11-11 Ideal Ind Cable lacing tie devices and methods of using the same
CN201933410U (en) * 2011-03-03 2011-08-17 重庆万桥交通科技发展有限公司 Main cable strand
CN202047368U (en) * 2011-03-17 2011-11-23 江苏法尔胜新日制铁缆索有限公司 Large gauge suspension bridge main cable strand structure adopting 7mm steel wires
US20120260590A1 (en) * 2011-04-12 2012-10-18 Lambert Walter L Parallel Wire Cable
KR101441846B1 (en) * 2014-02-19 2014-09-19 현대건설주식회사 Breaking Device and Method of Wire Swift, Wire Swift and Manufacturing Apparatus for Prefabricated Parallel Wire Strand for Suspension Bridge using thereof
CN203947405U (en) * 2014-03-11 2014-11-19 江苏法尔胜缆索有限公司 A kind of main rope of suspension bridge and this main push-towing rope strand
CN203923907U (en) * 2014-04-10 2014-11-05 上海浦江缆索股份有限公司 The pre-integer unit cable strand of main rope of suspension bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
US20180100278A1 (en) 2018-04-12
CN105421244A (en) 2016-03-23
EP3348711A1 (en) 2018-07-18
WO2017096712A1 (en) 2017-06-15
CN105421244B (en) 2017-07-28
EP3348711A4 (en) 2018-11-14
US10584453B2 (en) 2020-03-10

Similar Documents

Publication Publication Date Title
EP3348711B1 (en) Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge
US8962150B2 (en) Steel fibre for reinforcing concrete or mortar having an anchorage end with at least two bent sections
EP2440718B1 (en) Concrte structure comprising high elongation fibres with good anchorage
US9435122B2 (en) Steel fibre for reinforcing concrete or mortar having an anchorage end with at least three straight sections
EP2440717B1 (en) High elongation fibres for conventional concrete
CN109235732B (en) Construction method for prefabricated hollow beam slab
CN109343591B (en) Post-tensioning pre-stress tensioning fine control device and method based on intelligent steel strand
KR101546213B1 (en) The testbed for measuring tensile force and the measuring method thereof
US3696573A (en) Pressure container prestressed concrete or the like
CN106149541A (en) The prefabricated box bridge of a kind of prestressed stretch-draw and construction method
CN110592989B (en) Manufacturing method of prefabricated parallel steel wire preformed strand for main cable of suspension bridge
CN111855169A (en) Suspension bridge AS method main cable strand boot anchoring test assembly and test method thereof
CN208313712U (en) A kind of experimental rig of the fixed vertical load of eccentric compression concrete column
CN207032036U (en) A kind of interchangeable anchorage prestress anchoraging device
CN207452739U (en) A kind of cable-stayed bridge beams of concrete mid-span closure segment pre-stress system
CN112160242A (en) Cable strand processing technology
CN106932877B (en) A kind of aerial optical cable route messenger wire erection construction method
CN213749355U (en) Suspension bridge AS method main cable strand boot anchoring test assembly
Yoo et al. High-strength prefabricated parallel wire strand for ulsan harbor bridge and its mass production system in Korea
CN115712944A (en) Large-span prestressed concrete beam reduced scale model modeling method
CN117405154A (en) Ultra-long intelligent composite airtight cable and preparation method thereof
CN112627540A (en) Construction method of prestressed waffle slab for large-scale clean electronic factory building
Bright et al. Evaluation of New Reactive FRP Reinforcement Assemblies for Reinforced Concrete Transportation Structures
Atadero et al. Evaluation of New Reactive FRP Reinforcement Assemblies for Reinforced Concrete Transportation Structures
ITMO20080275A1 (en) METAL REINFORCED PANEL FOR CALDANE

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180411

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

A4 Supplementary search report drawn up and despatched

Effective date: 20181012

RIC1 Information provided on ipc code assigned before grant

Ipc: D07B 1/14 20060101ALI20181008BHEP

Ipc: E01D 19/16 20060101AFI20181008BHEP

Ipc: E01D 11/02 20060101ALI20181008BHEP

Ipc: D07B 5/00 20060101ALI20181008BHEP

17Q First examination report despatched

Effective date: 20181031

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JIANGSU FASTEN STEEL CABLE CO., LTD.

RIN1 Information on inventor provided before grant (corrected)

Inventor name: ZHAO, JUN

Inventor name: ZHAI, PENGCHENG

Inventor name: WANG, JIN

Inventor name: WU, QIONG

Inventor name: XUE, HUAJUAN

Inventor name: LIANG, ZHONGMEI

Inventor name: HUANG, KEBIN

Inventor name: QIANG, QIANG

Inventor name: ZHU, XIAOXIONG

Inventor name: NING, SHIWEI

Inventor name: ZHOU, ZHUBING

Inventor name: SHU, WEIHONG

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190214

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1130315

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016013832

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190508

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190908

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190808

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190809

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190808

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1130315

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190508

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016013832

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

26N No opposition filed

Effective date: 20200211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190908

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190508

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240118

Year of fee payment: 9

Ref country code: GB

Payment date: 20240103

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240103

Year of fee payment: 9