CN108374339A - 索道桥风缆 - Google Patents

索道桥风缆 Download PDF

Info

Publication number
CN108374339A
CN108374339A CN201810516816.8A CN201810516816A CN108374339A CN 108374339 A CN108374339 A CN 108374339A CN 201810516816 A CN201810516816 A CN 201810516816A CN 108374339 A CN108374339 A CN 108374339A
Authority
CN
China
Prior art keywords
wind
cable
line
wind cable
drag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810516816.8A
Other languages
English (en)
Other versions
CN108374339B (zh
Inventor
杜洪亮
傅支黔
毛穗丰
游选成
刘庆舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201810516816.8A priority Critical patent/CN108374339B/zh
Publication of CN108374339A publication Critical patent/CN108374339A/zh
Application granted granted Critical
Publication of CN108374339B publication Critical patent/CN108374339B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种索道桥风缆,属于桥梁工程领域。本发明包括风缆拉索和抗风主索,抗风主索两端锚固于风缆锚碇,风缆锚碇设于索道桥的河道两岸,风缆拉索一端与抗风主索连接、另一端与索道桥的横梁连接,横梁端部设有用于连接风缆拉索的风缆拉钩,风缆拉钩包括固定直杆、曲线滑轨和滑轮,固定直杆固定于横梁上,曲线滑轨安装在固定直杆上,滑轮与风缆拉索连接后安装在曲线滑轨上。本发明设计了一种新的风缆拉钩形式,当横梁发生位移后,风缆拉索端部的滑轮会自动滑移至使风缆拉索拉力最小的位置。本发明可以保证在风缆拉索内力增量不大的情况下实现较大的竖向位移,避免风缆拉索发生断裂。

Description

索道桥风缆
技术领域
本发明涉及一种索道桥风缆,属于桥梁工程领域。
背景技术
现代索道桥是大型工程建设中广泛采用的一种临时性桥梁结构形式,索道桥的车辆荷载通过桥面板传递给承重主索,主索将力传递给锚固于两岸的锚碇。
索道桥是在河道两岸分别设置锚碇,锚碇之间铺设多根并排设置的主索,主索上面铺设桥面板,车辆在桥面板上行驶。车辆荷载通过桥面板传递给承重主索,主索将力传递给锚固于两岸的锚碇。当桥位处设计风速较大或者索道桥自身抗风能力不足时,需要在索道桥两侧设置风缆。风缆系统一般由抗风主缆、抗风拉索和风缆拉钩组成。抗风主缆是一条空间曲线,通过抗风拉索与索道桥横梁连接。
索道桥竣工状态为中间低两桥头高的悬链线。在运营工况下车辆行驶于桥面时(特别是在仅单个桥头有重车行驶时),主索线型发生巨大变化,即有重车的桥头主缆挠度增大,而无重车的桥头挠度减小。此时,无重车侧桥头的主缆向上发生了较大的位移,与其相连的横梁及横梁上的风缆拉钩随之发生位移。当位移过大时,风缆拉索会发生断裂。索道桥的常见病害中也有此种类型。造成此种情况的原因是,在索道桥架设时需对风缆进行初张拉,使其具有一定的横向刚度,且索道桥的风缆为与桥面及竖直面均成一定角度的空间曲线,即对桥面的竖向位移也起到约束作用。当主索向上发生较大位移时,拉索内力超过其抗拉强度导致断裂。
目前,通常采用加强巡视,发现病害及时更换风缆拉索。
发明内容
本发明所要解决的技术问题是:提供一种索道桥风缆,可以保证在风缆拉索内力增量不大的情况下实现较大的竖向位移,避免风缆拉索发生断裂。
为解决上述技术问题本发明所采用的技术方案是:索道桥风缆,包括风缆拉索和抗风主索,抗风主索两端锚固于风缆锚碇,风缆锚碇设于索道桥的河道两岸,风缆拉索一端与抗风主索连接、另一端与索道桥的横梁连接,横梁端部设有用于连接风缆拉索的风缆拉钩,风缆拉钩包括固定直杆、曲线滑轨和滑轮,固定直杆固定于横梁上,曲线滑轨安装在固定直杆上,滑轮与风缆拉索连接后安装在曲线滑轨上。曲线滑轨的线型方程及固定直杆的长度应通过分析计算确定,保证风缆拉索不出现拉断现象。
进一步的是:滑轮与风缆拉索的连接结构为,风缆拉索端部穿过滑轮的轴孔后通过绳卡与风缆拉索的本体相连接,滑轮的滑槽扣合在曲线滑轨上、同时使得曲线滑轨位于风缆拉索端部通过绳卡形成的绳圈内。
进一步的是:横梁的每一端配设两根风缆拉索,两根风缆拉索呈“八”字型布置。
本发明实施步骤为:将固定直杆、曲线滑轨和滑轮组装成风缆拉钩,风缆拉索端部穿过滑轮后通过绳卡连接,并将风缆拉钩固定于横梁上;
按照传统工艺将风缆锚碇、抗风主索、横梁及桥面板架设完成;
风缆拉索与抗风主索相连;
抗风主索初张拉,并与风缆锚碇固定;
通车运行。
本发明的有益效果是:设计了一种新的风缆拉钩形式,当横梁发生位移后,风缆拉索端部的滑轮会自动滑移至使风缆拉索拉力最小的位置。本发明可以保证在风缆拉索内力增量不大的情况下实现较大的竖向位移,避免风缆拉索发生断裂。
附图说明
图1是本发明的立面示意图;
图2是本发明的平面示意图;
图3是本发明中风缆拉钩处的局部放大示意图;
图4是本发明中滑轮与风缆拉索的连接结构示意图;
图中标记:1-风缆拉索、2-抗风主索、3-风缆锚碇、4-横梁、5-固定直杆、6-曲线滑轨、7-滑轮、8-绳卡。
具体实施方式
下面结合附图及实施例对本发明作进一步说明。
如图1至图3所示,本发明索道桥风缆,包括风缆拉索1和抗风主索2,抗风主索2两端锚固于风缆锚碇3,风缆锚碇3设于索道桥的河道两岸,风缆拉索1一端与抗风主索2连接、另一端与索道桥的横梁4连接,横梁4端部设有用于连接风缆拉索1的风缆拉钩,风缆拉钩包括固定直杆5、曲线滑轨6和滑轮7,固定直杆5固定于横梁4上,曲线滑轨6安装在固定直杆5上,滑轮7与风缆拉索1连接后安装在曲线滑轨6上。曲线滑轨的线型方程及固定直杆的长度应通过分析计算确定,保证风缆拉索不出现拉断现象。
滑轮7与风缆拉索1的连接结构只要能使得滑轮7与风缆拉索1固定相连、滑轮7能安装在曲线滑轨6上不掉落、滑轮7会因受力变化自动滑移即可。本发明中该连接结构的优选实施方式如图4所示,风缆拉索1端部穿过滑轮7的轴孔后通过绳卡8与风缆拉索1的本体相连接,滑轮7的滑槽扣合在曲线滑轨6上、同时使得曲线滑轨6位于风缆拉索1端部通过绳卡8形成的绳圈内。采用该连接方式,结构简单,实施方便。此外,本发明中的曲线滑轨6可采用钢筋折弯制成,而风缆拉索1则通常采用钢丝绳。
为使索道桥风缆具有更强的抗风能力,横梁4的每一端配设两根风缆拉索1,两根风缆拉索1呈“八”字型布置。

Claims (3)

1.索道桥风缆,包括风缆拉索(1)和抗风主索(2),抗风主索(2)两端锚固于风缆锚碇(3),风缆锚碇(3)设于索道桥的河道两岸,风缆拉索(1)一端与抗风主索(2)连接、另一端与索道桥的横梁(4)连接,横梁(4)端部设有用于连接风缆拉索(1)的风缆拉钩,其特征在于:风缆拉钩包括固定直杆(5)、曲线滑轨(6)和滑轮(7),固定直杆(5)固定于横梁(4)上,曲线滑轨(6)安装在固定直杆(5)上,滑轮(7)与风缆拉索(1)连接后安装在曲线滑轨(6)上。
2.如权利要求1所述的索道桥风缆,其特征在于:滑轮(7)与风缆拉索(1)的连接结构为,风缆拉索(1)端部穿过滑轮(7)的轴孔后通过绳卡(8)与风缆拉索(1)的本体相连接,滑轮(7)的滑槽扣合在曲线滑轨(6)上、同时使得曲线滑轨(6)位于风缆拉索(1)端部通过绳卡(8)形成的绳圈内。
3.如权利要求1或2所述的索道桥风缆,其特征在于:横梁(4)的每一端配设两根风缆拉索(1),两根风缆拉索(1)呈“八”字型布置。
CN201810516816.8A 2018-05-25 2018-05-25 索道桥风缆 Active CN108374339B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810516816.8A CN108374339B (zh) 2018-05-25 2018-05-25 索道桥风缆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810516816.8A CN108374339B (zh) 2018-05-25 2018-05-25 索道桥风缆

Publications (2)

Publication Number Publication Date
CN108374339A true CN108374339A (zh) 2018-08-07
CN108374339B CN108374339B (zh) 2023-09-19

Family

ID=63033633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810516816.8A Active CN108374339B (zh) 2018-05-25 2018-05-25 索道桥风缆

Country Status (1)

Country Link
CN (1) CN108374339B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306656A (zh) * 2018-11-05 2019-02-05 中国石油天然气集团公司 一种管道悬索跨越结构抗风系统
CN109306657A (zh) * 2018-11-05 2019-02-05 中国石油天然气集团公司 一种管道悬索跨越抗风体系
CN110258292A (zh) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 不等跨连续索道桥
CN113106878A (zh) * 2021-04-14 2021-07-13 苏交科集团股份有限公司 一种提高超大跨度桥梁颤振临界风速的方法及加固装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586607A (ja) * 1991-09-27 1993-04-06 Jiro Katada エンドレスケーブル式吊り橋
JPH07317019A (ja) * 1994-05-27 1995-12-05 Tokyo Seiko Co Ltd 小規模吊橋
CN202500089U (zh) * 2012-03-09 2012-10-24 柳州豪姆机械有限公司 悬索桥主缆万向连接装置
CN204919361U (zh) * 2015-09-09 2015-12-30 中国铁建大桥工程局集团有限公司 一种抗强风浪的桥梁通航孔临时索道桥
CN205443901U (zh) * 2015-12-21 2016-08-10 长安大学 一种悬索桥横向稳定风撑系统
KR101678849B1 (ko) * 2016-09-07 2016-11-23 (주) 코리아에스이 출렁거림 및 비틀림 억제 구조를 가지는 케이블 교량의 시공방법 및 이에 의해 시공된 케이블 교량
CN106968164A (zh) * 2017-05-16 2017-07-21 中国电建集团成都勘测设计研究院有限公司 索道桥桥台

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586607A (ja) * 1991-09-27 1993-04-06 Jiro Katada エンドレスケーブル式吊り橋
JPH07317019A (ja) * 1994-05-27 1995-12-05 Tokyo Seiko Co Ltd 小規模吊橋
CN202500089U (zh) * 2012-03-09 2012-10-24 柳州豪姆机械有限公司 悬索桥主缆万向连接装置
CN204919361U (zh) * 2015-09-09 2015-12-30 中国铁建大桥工程局集团有限公司 一种抗强风浪的桥梁通航孔临时索道桥
CN205443901U (zh) * 2015-12-21 2016-08-10 长安大学 一种悬索桥横向稳定风撑系统
KR101678849B1 (ko) * 2016-09-07 2016-11-23 (주) 코리아에스이 출렁거림 및 비틀림 억제 구조를 가지는 케이블 교량의 시공방법 및 이에 의해 시공된 케이블 교량
CN106968164A (zh) * 2017-05-16 2017-07-21 中国电建集团成都勘测设计研究院有限公司 索道桥桥台

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306656A (zh) * 2018-11-05 2019-02-05 中国石油天然气集团公司 一种管道悬索跨越结构抗风系统
CN109306657A (zh) * 2018-11-05 2019-02-05 中国石油天然气集团公司 一种管道悬索跨越抗风体系
CN110258292A (zh) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 不等跨连续索道桥
CN110258292B (zh) * 2019-07-17 2024-03-26 中国电建集团成都勘测设计研究院有限公司 不等跨连续索道桥
CN113106878A (zh) * 2021-04-14 2021-07-13 苏交科集团股份有限公司 一种提高超大跨度桥梁颤振临界风速的方法及加固装置

Also Published As

Publication number Publication date
CN108374339B (zh) 2023-09-19

Similar Documents

Publication Publication Date Title
CN108374339A (zh) 索道桥风缆
CN101224856A (zh) 大跨重载缆索吊机及其安装方法
CN201172597Y (zh) 大跨重载缆索吊机
CN201635015U (zh) 一种可调式缆风索
CN208250914U (zh) 索道桥风缆
CN2900616Y (zh) 一种双线往复式牵引装置
CN212025936U (zh) 用于斜拉桥塔端连续型钢绞线斜拉索安装的设备
CN110258292A (zh) 不等跨连续索道桥
CN208362941U (zh) 一种通过实腹现浇板加固单孔旧空心板桥构造
CN106968178B (zh) 一种斜拉式吊桥主梁施工方法
CN209128888U (zh) 一种悬索桥背索后锚头牵引装置
CN209024941U (zh) 一种高应力幅网状吊杆系杆拱体系
CN205653707U (zh) 缆索吊机
CN108411801A (zh) 一种通过实腹现浇板加固单孔旧空心板桥构造及施工方法
CN209509311U (zh) 一种矩形开孔梁结构
CN210368581U (zh) 不等跨连续索道桥
CN208965386U (zh) 用于桥梁施工的斜拉扣挂结构
CN210458969U (zh) 一种菱形挂篮结构
CN108221639B (zh) 一种三塔悬索桥主梁安装施工结构
CN208577308U (zh) 一种防止电缆晃动装置
CN207934293U (zh) 一种活动屋盖拱形钢桁架控制推力免卡轨装置
CN208346658U (zh) 一种铰缝纵向预应力加固单孔旧空心板桥构造
CN112064513A (zh) 一种民用小型快速拼接的桥梁设备
CN202989760U (zh) 平拉索桥的抗风结构
CN111778850A (zh) 用于索塔的下塔柱拉压结构及其方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant