CN108360760A - A kind of roof greening construction process - Google Patents
A kind of roof greening construction process Download PDFInfo
- Publication number
- CN108360760A CN108360760A CN201810111839.0A CN201810111839A CN108360760A CN 108360760 A CN108360760 A CN 108360760A CN 201810111839 A CN201810111839 A CN 201810111839A CN 108360760 A CN108360760 A CN 108360760A
- Authority
- CN
- China
- Prior art keywords
- planting soil
- laid
- waterproof layer
- layer
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
- E04D11/02—Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/16—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
- E04D13/1687—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/0404—Drainage on the roof surface
- E04D13/0409—Drainage outlets, e.g. gullies
- E04D2013/0436—Drainage outlets, e.g. gullies with sealing means
- E04D2013/044—Drainage outlets, e.g. gullies with sealing means on multiple levels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/254—Roof garden systems; Roof coverings with high solar reflectance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B80/00—Architectural or constructional elements improving the thermal performance of buildings
- Y02B80/32—Roof garden systems
Abstract
The invention discloses a kind of roof greening construction process, this method work progress is as follows:By foam glass board backfill on roof base layer structure,Pour lightweight concrete,Concrete cover is formed after lightweight concrete solidification,Then the first waterproof layer and the second waterproof layer are laid on concrete cover,Expire drain bar on the second waterproof layer upper berth,The first infiltration cloth is re-layed on drain bar,Drain bar and the first infiltration cloth binding are together,It is laid with irrigation network line and the double-deck planting soil grid on the first infiltration cloth,Upper layer and lower layer planting soil grid is separated by the first geotextiles,Soft poroid material-paving is in lower layer's planting soil grid,The first perlite particle and the second perlite particle are being filled into lower layer's planting soil grid,It is backfilled into lightweight planting soil in the planting soil grid of upper layer,After the backfill for completing lightweight planting soil,Vegetation is planted again,The present invention plays building certain isolation and protective effect,Mitigate soil,Corrosion of the rainwater to building.
Description
Technical field
The present invention relates to roof building technical field, more particularly to a kind of roof greening construction process.
Background technology
Afforest today of industry high speed development, Green Space Construction realizes comprehensive exploitation, three-dimensional, multi-level etc., will afforest to
Spatial development has become inevitable trend, roof greening with urban afforestation covering is substantially increased, alleviate rainwater roofing
Overflow, effective protection roof structure.Roof greening be even more with relative to ground greening take up little area, small investment, it is quick the features such as,
While effectively opening up urban green space " three-dimensional ", also enlarges afforested area for landscape and create leisure, ornamental space.
Currently, existing roof greening construction method is, first, waterproof layer is set on roof, is usually utilized in roof
Base coats some water-repellent paints, and is laid with geotextiles to realize water-proof function, and then on roof, some letters are arranged in substrate surface
Single support construction, and it is laid with the soil horizon for being used for cultivating afforestation vegetation, then by planting on soil horizon.
However, containing acidic materials in planting soil, the acid etching of rainwater is added, it is easy to roof membrane quilt can be caused
It destroys, planting soil and rainwater directly contact with roof surface, cause to corrode to roof surface.
Invention content
The object of the present invention is to provide a kind of roof greening construction process, this method carries out isolation to roof surface and fills out
It fills, effectively planting soil, rainwater and roof surface is kept apart, played a protective role, avoid soil, rainwater to roof table
The corrosion in face.
The present invention above-mentioned technical purpose technical scheme is that:A kind of roof greening construction technique
Method, construction technology process are as follows:
(a), foam glass board is laid on roof base layer structure, and form certain drainage grade;
(b), mesh sheet is laid in foam glass board, then lightweight concrete is cast in foam glass board, forms concrete and protect
Sheath;
(c), the first waterproof layer is laid on concrete cover, before laying, first use waterproof priming paint by concrete cover table
Face applies and brushes one times, and conserves one day, then waterproof roll is laid on concrete cover, forms the first waterproof layer;
(d), be laid with the second waterproof layer on the first waterproof layer, the second waterproof layer bakes SBS modified asphalt waterproof volumes using spray gun fire
Material is uniformly laid on the first waterproof layer, after the completion of laying, is rolled back and forth on the second waterproof layer with machinery drum;
(e), on the second waterproof layer upper berth expire drain bar, be then laid with the first infiltration cloth on drain bar, and by drain bar and the
One infiltration cloth binding is together;
(f), on the first infiltration cloth be laid with irrigation pipe line and the double-deck planting soil grid, the is laid between the double-deck planting soil grid
One geotextiles, the gate hole on the double-deck planting soil grid keep alignment consistent;
(h), bottom by soft poroid material-paving in lower layer's planting soil grid, grain is filled in layer planting soil grid still further below
Diameter then fills the second perlite particle of 10-20mm in the first perlite particle of 2-10mm on the first perlite particle;
(i), backfill in the planting soil grid of upper layer into lightweight planting soil, after the backfill for completing lightweight planting soil, then by vegetation kind
It plants.
By using above-mentioned technical proposal, foam glass board is laid on roof base layer structure, foam glass board is a kind of
Function admirable and with some strength lightweight filler, itself is nontoxic, "dead", fire-protection rating is high, it is moisture-proof, be not easy
Weathering and aging, the moulding as roof base layer structure is filled, and casting concrete protective layer on it, and the two cooperation makes
It is completely isolated between building roof surface and soil to come, building is played a certain protective role, soil, rainwater pair are mitigated
The corrosion of building, concrete cover have the function of protecting foam glass board;Because concrete cover cannot be too thick, can increase
Add the load of building roof, so concrete cover replaces reinforcement construction than relatively thin, with mesh sheet.First waterproof layer and second
Waterproof layer plays the role of the double-deck waterproof, and by the edge of the first waterproof layer of waterproof roll pair and roof base layer structure into
Row sealing, prevents rainwater from being penetrated into from the gap of edge.By vegetation plantation on lightweight planting soil, with the growth of vegetation rhizome
Increasingly deeper, rhizome can pierce through the first geotextiles, then extend into lower layer's planting soil grid, due to lower layer's planting soil lattice
It is filled with the first and second perlite particles in grid, there is gap between these perlite particles, stretched into for the rhizome of vegetation, increases
Add the growing space of vegetation root system, on the other hand, the first perlite particle and the second perlite particle structural strength are relatively high, can
Think that upper layer vegetation and upper layer planting soil grid play preferable supporting role;It can make seedling root using upper layer planting soil grid
Development is secured, avoids that the danger such as landslide occur, protects nursery stock vegetation growth, and reduce soil erosion, is returned with lightweight planting soil
It fills out, plays the role of certain mitigation carrying to building.
The effect of drain bar is in excessive rainfall, and rainwater oozed the first He under self gravitation effect along vegetation root system
The gap of second perlite particle, then by first infiltration cloth, be discharged eventually by drain bar, avoid the occurrence of excessive rainfall without
The case where method is discharged occurs.
Further, it is provided with the water tank for recycling rainwater on the roof base layer structure, is equipped on the water tank
Antiultraviolet thermal insulation protection lid, and cover to open up in antiultraviolet thermal insulation protection and enter the water storage hole in water tank for rainwater, it is described
Water tank is connected to the irrigation pipeline.
By using above-mentioned technical proposal, rainwater enters water tank along the gradient of roof base layer structure by water storage hole
Interior, water tank plays the role of collecting to rainwater to be recycled, and antiultraviolet thermal insulation protection lid is used on water tank, can be reduced in water tank again
Using the evaporation capacity of water, ensure have a certain amount of rainwater that can utilize in water tank, the rainwater in water tank is realized by irrigating pipeline
The mode of irrigation to vegetation, irrigation can be trickle irrigation, can also be sprinkling pouring etc., finally realize the cycle profit to water resource
With, greening and environmental protection.
Further, the nonwoven that filtering rainwater is provided with below antiultraviolet thermal insulation protection lid is located in the water tank
Cloth, the non-woven fabrics between two layers and two layers there are certain gap, during alum is filled in the gap and is used for and
The alkali electroless agent of acid rain.
By using above-mentioned technical proposal, alum is as water purification agent, the silt adulterated in adsorbable rainwater, to make rainwater
Purer, alkali electroless agent can then neutralize rainwater, and the PH of rainwater is made to be in neutrality, and reduce the loss to vegetation, non-woven fabrics tool
There is preferable seepage of water, using non-woven fabrics, the rainwater by non-woven fabrics can be made to obtain preliminary filtering, and nonwoven is fallen in rainwater
When on cloth, rainwater can quickly be spread, and will not be concentrated at one and be flowed downward, and make rainwater, alum and alkali electroless in this way
The chemical reaction area of agent maximizes, and makes the filtration, purification effect of rainwater faster, more thoroughly, with the continuous infiltration nonwoven of rainwater
Cloth, part rainwater can slowly fall to the bottom of water tank.
Further, the steel wire for being used to support non-woven fabrics is provided with below non-woven fabrics in the water tank.
By using above-mentioned technical proposal, steel wire plays supporting bracket role to non-woven fabrics, avoids the non-woven fabrics system of Himdu logic
Alum, alkali electroless agent overall weight become sagging after weight, to make non-woven fabrics not to be destroyed, keep preferable filtering form.
Further, in step(c)In, it is laid with tack waterproof in the edge of the first waterproof layer and roof base layer structure
Coiled material is used in combination liquid water-proofing glue to be brushed in edge.
By using above-mentioned technical proposal, self-adhesive waterproof roll material is by the seam between the first waterproof layer, roof base layer structure
Gap seals, and rainwater is avoided to be penetrated on roof base layer structure from gap, to building surface play preferably isolation,
Protective effect makes building surface be not exposed to corrode, and self-adhesive waterproof roll material has higher soft and moist property, corrosion-resistant, tension
Intensity is high, receives border region and uses liquid water-proofing glue brushing one after ensureing that self-adhesive waterproof roll material has sticked roof base layer structure
Time, it is different from Normal practice so do it is possible to prevente effectively from waterproof roll is just constructed and is locally taken off before completion not up to adhesive strength
It has fallen hollowing and the case where leak has occurred.
Further, in step(d)In, with aluminum metal lipping item by the first waterproof layer and the second waterproof layer edge pressure
Tightly.
By using above-mentioned technical proposal, with aluminum metal lipping item by the first waterproof layer and the second waterproof layer edge pressure
Tightly, make that there is preferable leakproofness between the first waterproof layer and the second waterproof layer, avoid rainwater from the first waterproof layer, the second waterproof
Gap between layer is penetrated into, and preferable waterproof effect is played.
Further, it is provided with eyenut on the double-deck planting soil grid, and is made eyenut by the way of bar planting
Enter in roof base layer structure, then will be sealed between eyenut and roof base layer structure with fluid sealant and liquid coiled material.
By using above-mentioned technical proposal, the double-deck planting soil grid is fixed on by eyenut on roof base layer structure,
The phenomenon that making the double-deck planting soil grid be not in offset shift, seals up eyenut and roof with fluid sealant and liquid coiled material
The gap of base layer structure further enhances the fastness that the double-deck planting soil grid is fixed on roof base layer structure.
Further, every cube of quality proportioning of the lightweight planting soil is:Ureaformaldehyde, double superphosphate of lime, agricultural stone
Limestone, potassium sulfate, gypsum for agriculture=2:2:2:3:3.
By using above-mentioned technical proposal, which selects the planting soil of lightweight, on the one hand meets roof greening lotus
It is light as far as possible to carry requirement, on the other hand also meets the required nutrient of nursery stock.
In conclusion the invention has the advantages that:
1, roof base layer structure is filled using foam glass board and concrete cover, to roof surface and soil, rain
Water segregation comes, and plays certain isolation, protective effect to building, alleviates the corrosion that roof surface is subject to;
2, using the double-deck planting soil grid, with the first, second perlite particle is closed, the load of planting soil grid is increased, and
Gap between first, second perlite particle provides space for the growth of vegetation root system.
Description of the drawings
Fig. 1 is the exploded perspective view of embodiment;
Fig. 2 is the diagrammatic cross-section of embodiment;
Fig. 3 is the portions A enlarged diagram in Fig. 2, the construction location for showing the first perlite particle and the second perlite particle;
Fig. 4 is the portions B enlarged diagram in Fig. 2, the internal structure for showing water tank.
In figure:1, roof base layer structure;2, foam glass board;3, concrete cover;4, the first waterproof layer;5, second is anti-
Water layer;6, drain bar;7, the first infiltration cloth;8, the double-deck planting soil grid;801, lower layer's planting soil grid;802, upper layer planting soil
Grid;9, lightweight planting soil;10, water tank;11, antiultraviolet thermal insulation protection lid;12, water storage hole;121, mesh sheet;122, the first soil
Work cloth;123, the second perlite particle;124, the first perlite particle;125, non-woven fabrics;126, alum;127, alkali electroless
Agent;128, steel wire;129, soft poroid material.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
The modification that not creative contribution can be made to the present embodiment as needed after reading this specification, but as long as in this hair
It is all protected by Patent Law in bright right.
Embodiment:A kind of roof greening construction process, as shown in Fig. 2, this method flow is as follows:(a), manual measurement
The gradient on 1 surface of roof base layer structure, and be preferentially laid with upper foam glass board 2 in the high position of the gradient, then along the gradient by
High to low direction is paved with foam glass board 2 on roof base layer structure 1, and the 2 surface shape of foam glass board for keeping laying complete
At certain drainage grade;
(b), in conjunction with shown in Fig. 1, mesh sheet 121 is laid in foam glass board 2, mesh sheet 121 selects stainless steel metal mesh sheet 121,
Lightweight concrete is cast in foam glass board 2 again, is conserved three days, after lightweight concrete surface is fully cured, forms one
The concrete cover 3 of layer 5cm thickness;
(c), as shown in Figure 1,3 removing surface of concrete cover is clean, it is anti-that first is then laid on concrete cover 3
Water layer 4 is first used waterproof priming paint by 3 external coating of concrete cover one time, is conserved one day before laying, then by waterproof roll
It is laid on concrete cover 3, forms the first waterproof layer 4.The edge of first waterproof layer 4 and roof base layer structure 1 is laid with
Tack water-proof glue is used in combination liquid water-proofing glue to be brushed in edge, makes tack water-proof glue by the first waterproof layer 4 and roof
The edge of base layer structure 1 is bonded together, seamless;
(d), the second waterproof layer 5 is laid on the first waterproof layer 4, before laying, check the first waterproof layer 4 whether have hollowing and damage
Bad region, the second waterproof layer 5 are uniformly laid on the first waterproof layer 4, are spread using the roasting SBS modified asphalt waterproof coiled materials of fire
If after the completion, being rolled back and forth with machinery drum, the first waterproof layer 4 and the second waterproof layer 5 is set to be fully adhered to together, with aluminum gold
Belong to trimming strip to compress the first waterproof layer 4 and 5 edge of the second waterproof layer;
(e), drain bar 6 is loosely paved on the second waterproof layer 5, drain bar 6 has the osculum of Openworks shape, adjacent two pieces of rows
It is secured with jointing tape or the binding of stainless steel steel wire rope between water plate 6, the first infiltration cloth 7 is then laid on drain bar 6, and will
The infiltration cloth 7 of drain bar 6 and first is bound together with stainless steel steel wire rope;
(f), on the first infiltration cloth 7 be laid with irrigation pipe line and the double-deck planting soil grid 8, spread between the double-deck planting soil grid 8
If the first geotextiles 122, the double-deck planting soil grid 8 is the independent cell structure of upper layer and lower layer, on upper layer planting soil grid 802
Gate hole keeps alignment consistent with the gate hole on lower layer planting soil grid 801, and hanging ring spiral shell is both provided on the double-deck planting soil grid 8
Mother, and by eyenut drivescrew base layer structure by the way of bar planting, then with fluid sealant and liquid coiled material by hanging ring spiral shell
Clearance seal between female and roof base layer structure 1 gets up;
(h), as shown in Figures 2 and 3, soft poroid material 129 is laid on the bottom in lower layer's planting soil grid 801, it is soft
Poroid material 129 selects sponge, still further below first perlite particle of the filling grain size in 2-10mm in layer planting soil grid 801
124, the second perlite particle 123 of 10-20mm is then filled on the first perlite particle 124, by lower layer's planting soil grid
801 fill up, and 123 lighter weight of the first perlite particle 124 and the second perlite particle, hardness are higher;
(i), backfill in upper layer planting soil grid 802 and will be planted after upper layer planting soil grid 802 fills up into lightweight planting soil 9
It is planted on lightweight planting soil 9;
Every cube of quality proportioning of lightweight planting soil 9 is:It is ureaformaldehyde, double superphosphate of lime, agricultural lime rock, potassium sulfate, agricultural
Gypsum=2:2:2:3:3.
As shown in Fig. 2, being provided with the water tank 10 for recycling rainwater on roof base layer structure 1, water tank 10 is mounted on roof
The minimum position of 1 gradient of base layer structure, 10 upper surface of water tank are equipped with antiultraviolet thermal insulation protection lid 11, the heat-insulated guarantor of antiultraviolet
Water storage hole 12 is offered on protecting cover 11, water tank 10 is connected to pipeline is irrigated;Rainwater on roof base layer structure 1 is flowed to along the gradient
It on antiultraviolet thermal insulation protection lid 11, and is entered in water tank 10 by water storage hole 12, then by irrigating pipeline by water tank 10
The rainwater of interior savings is extracted out, for pouring the vegetation on lightweight planting soil 9.
In conjunction with shown in Fig. 4, be provided in water tank 10 filtering rainwater non-woven fabrics 125, non-woven fabrics 125 be located at antiultraviolet every
The underface of Thermal protection lid 11, and it is horizontally disposed;Non-woven fabrics 125 is upper layer and lower layer structure, and there are certain between upper layer and lower layer
Gap, be filled with alum 126 and alkali electroless agent 127 in gap, alkali electroless agent 127 is used for neutralizing acid rain, alum 126
Then cross some silts in drainage;Steel wire 128 is provided in water tank 10, steel wire 128 is located at the lower section of non-woven fabrics 125, and
Non-woven fabrics 125 is held for supporting.
Work progress of the present invention is as follows:1 removing surface of roof base layer structure is clean, foam glass board 2 is backfilled in room
It pushes up on base layer structure 1, mesh sheet 121 is laid in foam glass board 2 and then starts to pour as the skeleton for pouring lightweight concrete
Lightweight concrete is built, concrete cover 3 is formed after lightweight concrete solidification, foam glass board 2 and roof base layer structure 1 is risen
To the effect of protection, isolation;
Then it is laid with the first waterproof layer 4 and the second waterproof layer 5 on concrete cover 3, plays double-layer waterproof effect;And to
One waterproof layer 4, roof base layer structure 1 edge be sealed with self-adhesive waterproof roll material;First waterproof layer 4 and the second waterproof
Layer 5 compresses sealing with aluminum metal lipping item, is rolled back and forth with machinery drum pair the first waterproof layer 4, the second waterproof layer 5;
Expire drain bar 6 on 5 upper berth of the second waterproof layer, the first infiltration cloth 7, the infiltration cloth of drain bar 6 and first are re-layed on drain bar 6
7 bindings together, are laid with irrigation network line and the double-deck planting soil grid 8, upper layer and lower layer planting soil grid is logical on the first infiltration cloth 7
It crosses the first geotextiles 122 to separate, soft poroid material 129 is laid in lower layer's planting soil grid 801, to lower layer's planting soil lattice
The first perlite particle 124 of filling and the second perlite particle 123 in grid 801;
It is backfilled in upper layer planting soil grid 802 into lightweight planting soil 9, after the backfill for completing lightweight planting soil 9, then by vegetation kind
It plants.
When the rainy day, the rainwater of silt is mixed with along the gradient of roof base layer structure 1, water tank 10 is imported by water storage hole 12
Interior, rainwater passes through non-woven fabrics 125, and under alum 126 and the effect of the filtration, purification of alkali electroless agent 127, non-woven fabrics 125 helps rain
Water quickly spreads and quickly falls on 10 bottom of water tank by oozing non-woven fabrics 125, and the rainwater after then purifying and neutralizing passes through
Irrigation system exports, and realizes the irrigation to vegetation on lightweight planting soil 9.
Claims (8)
1. a kind of roof greening construction process, which is characterized in that construction technology process is as follows:
(a), foam glass board (2) is laid on roof base layer structure (1), and form certain drainage grade;
(b), mesh sheet (121) is laid in foam glass board (2), then lightweight concrete is cast in foam glass board (2), shape
At concrete cover (3);
(c), the first waterproof layer (4) is laid on concrete cover (3), before laying, first use waterproof priming paint by concrete protective
Layer (3) external coating one time, conserves one day, then waterproof roll is laid on concrete cover (3), forms the first waterproof layer
(4);
(d), be laid with the second waterproof layer (5) on the first waterproof layer (4), the second waterproof layer (5) bakes SBS using spray gun fire and is modified drip
Green waterproof roll is uniformly laid on the first waterproof layer (4), after the completion of laying, with machinery drum on the second waterproof layer (5)
It rolls back and forth;
(e), on the second waterproof layer (5) upper berth expire drain bar (6), the first infiltration cloth (7) is then laid on drain bar (6), and
Drain bar (6) and the first infiltration cloth (7) are bound together;
(f), irrigation pipe line and the double-deck planting soil grid (8) are laid in the first infiltration cloth (7), in the double-deck planting soil grid (8)
Between be laid with the first geotextiles (122), gate hole on the double-deck planting soil grid (8) keeps alignment consistent;
(h), soft poroid material (129) is laid on the bottom in lower layer's planting soil grid (801), layer planting soil lattice still further below
Filling grain size is then filled out on the first perlite particle (124) in the first perlite particle (124) of 2-10mm in grid (801)
Fill the second perlite particle (123) of 10-20mm;
(i), backfill into lightweight planting soil (9) in the upper layer planting soil grid (802), after the backfill for completing lightweight planting soil (9),
Vegetation is planted again.
2. a kind of roof greening construction process according to claim 1, which is characterized in that the roof base layer structure
(1) it is provided with the water tank (10) for recycling rainwater on, antiultraviolet thermal insulation protection lid (11) is installed on the water tank (10),
And opened up on antiultraviolet thermal insulation protection lid (11) and enter the water storage hole (12) in water tank (10) for rainwater, the water tank (10)
It is connected to the irrigation pipeline.
3. a kind of roof greening construction process according to claim 2, which is characterized in that in the water tank (10)
The non-woven fabrics (125) of filtering rainwater is provided with below antiultraviolet thermal insulation protection lid (11), the non-woven fabrics (125) is
There are certain gaps between two layers and two layers, and alum (126) and the alkalinity for neutralizing acid rain are filled in the gap
Chemical agent (127).
4. a kind of roof greening construction process according to claim 3, which is characterized in that in the water tank (10)
The steel wire (128) for being used to support non-woven fabrics (125) is provided with below non-woven fabrics (125).
5. a kind of roof greening construction process according to claim 1, which is characterized in that in step(c)In,
One waterproof layer (4) and the edge of roof base layer structure (1) are laid with self-adhesive waterproof roll material, are used in combination liquid water-proofing glue in edge
It is brushed.
6. a kind of roof greening construction process according to claim 1, which is characterized in that in step(d)In, use aluminium
Metal lipping item processed compresses the first waterproof layer (4) and the second waterproof layer (5) edge.
7. a kind of roof greening construction process according to claim 1, which is characterized in that the double-deck planting soil grid
(8) it is provided with eyenut on, and is squeezed into eyenut in roof base layer structure (1) by the way of bar planting, then with sealing
Glue and liquid coiled material will seal between eyenut and roof base layer structure (1).
8. a kind of roof greening construction process according to claim 1, which is characterized in that the lightweight planting soil
(9) every cube of quality proportioning is:Ureaformaldehyde, double superphosphate of lime, agricultural lime rock, potassium sulfate, gypsum for agriculture=2:2:2:3:
3。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810111839.0A CN108360760B (en) | 2018-02-05 | 2018-02-05 | A kind of roof greening construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810111839.0A CN108360760B (en) | 2018-02-05 | 2018-02-05 | A kind of roof greening construction process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108360760A true CN108360760A (en) | 2018-08-03 |
CN108360760B CN108360760B (en) | 2019-10-15 |
Family
ID=63004598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810111839.0A Active CN108360760B (en) | 2018-02-05 | 2018-02-05 | A kind of roof greening construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360760B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113273410A (en) * | 2021-05-18 | 2021-08-20 | 北京城建集团有限责任公司 | Fixing structure and fixing method for slope roof planting soil |
CN113678663A (en) * | 2021-08-30 | 2021-11-23 | 上海园林(集团)有限公司 | Assembly type ground decoration construction process |
CN113882596A (en) * | 2021-10-19 | 2022-01-04 | 富利建设集团有限公司 | Waterproof exhaust apparatus of building roofing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1146330A (en) * | 1979-09-17 | 1983-05-17 | Nicholas F. Morrone | Insulating board product for use in roofing systems |
CN101250929A (en) * | 2008-04-08 | 2008-08-27 | 新蒲建设集团有限公司 | Planting roofing as well as construction method thereof |
CN103774797A (en) * | 2012-10-25 | 2014-05-07 | 陕西龙海工程建设有限公司 | Construction technology of bituminous waterproof sheet materials |
CN204162567U (en) * | 2014-08-29 | 2015-02-18 | 上海水源地建设发展有限公司 | Compound type constructed wetland system |
CN104533028A (en) * | 2014-12-23 | 2015-04-22 | 杭州置顶科技有限公司 | Roof greening structure |
CN107119859A (en) * | 2017-05-27 | 2017-09-01 | 华东建筑设计研究院有限公司 | A kind of greening structure and method |
-
2018
- 2018-02-05 CN CN201810111839.0A patent/CN108360760B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1146330A (en) * | 1979-09-17 | 1983-05-17 | Nicholas F. Morrone | Insulating board product for use in roofing systems |
CN101250929A (en) * | 2008-04-08 | 2008-08-27 | 新蒲建设集团有限公司 | Planting roofing as well as construction method thereof |
CN103774797A (en) * | 2012-10-25 | 2014-05-07 | 陕西龙海工程建设有限公司 | Construction technology of bituminous waterproof sheet materials |
CN204162567U (en) * | 2014-08-29 | 2015-02-18 | 上海水源地建设发展有限公司 | Compound type constructed wetland system |
CN104533028A (en) * | 2014-12-23 | 2015-04-22 | 杭州置顶科技有限公司 | Roof greening structure |
CN107119859A (en) * | 2017-05-27 | 2017-09-01 | 华东建筑设计研究院有限公司 | A kind of greening structure and method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113273410A (en) * | 2021-05-18 | 2021-08-20 | 北京城建集团有限责任公司 | Fixing structure and fixing method for slope roof planting soil |
CN113678663A (en) * | 2021-08-30 | 2021-11-23 | 上海园林(集团)有限公司 | Assembly type ground decoration construction process |
CN113882596A (en) * | 2021-10-19 | 2022-01-04 | 富利建设集团有限公司 | Waterproof exhaust apparatus of building roofing |
Also Published As
Publication number | Publication date |
---|---|
CN108360760B (en) | 2019-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206903071U (en) | A kind of discharge structure of planted roof | |
CN108360760B (en) | A kind of roof greening construction process | |
CN106013624B (en) | A kind of technical method on the green sponge roof based on grass planting plane transformation | |
CN108951667B (en) | Integrated reinforcing method for green ecological side slope | |
CN105201025B (en) | Basement waterproofing construction and its construction method | |
CN105569281B (en) | A kind of environmental roof greening structure and its construction method | |
CN109601272A (en) | A kind of slag, rubble quality slope vegetation restoration method | |
CN102165890B (en) | Three-dimensional greening structure for soilless lawn and construction method thereof | |
CN113235620B (en) | Slope ecological restoration structure of damaged mountain and restoration method thereof | |
CN108678297B (en) | Slim roof garden of intelligence drainage and water | |
CN211547762U (en) | A ecological blanket structure for ecological bank protection | |
CN205934646U (en) | Water conservancy system | |
CN2590362Y (en) | Roof plants covering layer coiled material | |
CN206467914U (en) | The discharge structure of planted roof | |
CN215482055U (en) | Waterproof construction in mirror surface waterscape tree pool | |
CN205511165U (en) | Flat roof is planted layer with making and is held, drainage irrigation system | |
CN205046589U (en) | Waterproof structure of basement | |
CN212671026U (en) | Planting roof | |
CN210491889U (en) | Rain-collecting salt-separating sunlight greenhouse | |
CN110880269B (en) | Water-saving garden demonstration model and construction method thereof | |
CN106522478A (en) | Roof water-permeable, water-collecting and greening integrated rainwater utilization system and construction method | |
CN210459442U (en) | Sponge urban greening road | |
KR100661485B1 (en) | Thin-floor rooftop greenery system and building method there of | |
CN1651688A (en) | Roof leak proof technology and material | |
CN209227664U (en) | Radial pattern rain-water accumulating releases seepage well system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |