CN108360475B - 航电枢纽贯流式机组流道形体控制装置及方法 - Google Patents

航电枢纽贯流式机组流道形体控制装置及方法 Download PDF

Info

Publication number
CN108360475B
CN108360475B CN201810086428.0A CN201810086428A CN108360475B CN 108360475 B CN108360475 B CN 108360475B CN 201810086428 A CN201810086428 A CN 201810086428A CN 108360475 B CN108360475 B CN 108360475B
Authority
CN
China
Prior art keywords
runner
main shaft
curved surface
rod
probe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810086428.0A
Other languages
English (en)
Other versions
CN108360475A (zh
Inventor
刘昌宇
才永发
胥继全
舒磊
黄小斌
封艳健
柴伟明
周坤
黎学皓
李新明
熊建武
李希
桂春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201810086428.0A priority Critical patent/CN108360475B/zh
Publication of CN108360475A publication Critical patent/CN108360475A/zh
Application granted granted Critical
Publication of CN108360475B publication Critical patent/CN108360475B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/04Free-flow canals or flumes; Intakes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明提供一种航电枢纽贯流式机组流道形体控制装置,包括主轴和滑杆,所述主轴连接第一伸缩杆,第一伸缩杆上设有棱镜,主轴底部设有滑轨和滑轨锁定装置;滑杆顶部通过连杆连接在第一伸缩杆上端,滑杆底部连接探头。本发明采用流道形体控制装置,利用BIM技术建模流道模型,确定流道变截面半径与坐标关系曲线,可以快速定位和检查流道模板曲面空间位置,加快流道施工进度,确保流道型体质量。

Description

航电枢纽贯流式机组流道形体控制装置及方法
技术领域
本发明涉及水利工程技术领域,具体涉及航电枢纽贯流式机组流道形体控制装置及方法。
背景技术
航电枢纽工程电站厂房流道体型复杂、断面大(7.1~16.2m)、曲面多且混凝土施工面有水平段与方变圆的曲面。由于流道尺寸大且结构复杂,导致流道模板安装过程中的信息化程度较低,从而影响流道的安全性、稳固性和外观质量。如何快速定位和检查流道曲面的装置及方法已成为本领域技术人员亟待解决的技术问题。
发明内容
本发明所要解决的技术问题是提供一种航电枢纽贯流式机组流道形体控制装置及方法,采用BIM技术建模流道模型,确定流道变截面半径与坐标关系曲线,在流道中沿着轴线设置移动校准钢筋及模板,加快流道施工进度,确保流道型体质量。
为解决上述技术问题,本发明所采用的技术方案是:一种航电枢纽贯流式机组流道形体控制装置,包括主轴和滑杆;
主轴连接第一伸缩杆,第一伸缩杆上设有棱镜,主轴底部设有滑轨和滑轨锁定装置;
滑杆顶部通过连杆连接在第一伸缩杆上端,滑杆底部连接探头。
优选方案中,所述滑轨通过滑轨锚定桩与流道底面平段固定连接。
优选方案中,所述棱镜和探头分别位于主轴和滑杆的轴线上。
优选方案中,所述滑杆底部通过第二伸缩杆连接探头。
优选方案中,所述探头通过连杆沿主轴的第一伸缩杆旋转。
优选方案中,所述滑杆底部设有第二伸缩锁定装置。
优选方案中,所述第一伸缩杆设有第一伸缩锁定装置。
优选方案中,航电枢纽贯流式机组流道形体控制装置工艺方法,所述的工艺方法包括以下步骤:
1)根据施工图绘制出轴线的三维放样坐标,确定施工控制点后,将全站仪架设在控制点,进行放样;
2)调整滑轨,将滑轨与流道水平轴线重合之后,将滑轨锚定桩与流道底面平段预留的锚筋焊接固定;
3)将流道形体控制装置中的主轴沿滑轨滑动到需要测试的曲面圆,通过滑轨锁定装置锁定主轴的位置,根据设计的流道单线图已确定曲面轴心坐标,调节第一伸缩锁定装置,确保棱镜与当前测量曲面区段曲面轴心重合,完成流道形体控制装置定位校准;
4)调整第二伸缩锁定装置,使棱镜到探头的距离,即探头所在的圆半径,与当前曲面圆半径相同;
5)将已经加工成型后的流道模板吊装至步骤3)中已确定位置的曲面部位进行调整和定位,完成流道模板的安装;
6)探头通过连杆沿主轴的第一伸缩杆旋转,复核模板空间坐标满足流道单线图中流道线型参数要求;
7)对其他流道曲面的定位和检查时,重复步骤3)至步骤6)。
优选方案中,所述流道模板采用木质材料。
本发明将全站仪与棱镜固定后,通过全站仪发射激光到棱镜上,通过棱镜检验流道模板三维坐标定位的准确性,具有以下有益效果:
1)该装置结构简单;
2)可以快速定位流道曲面,辅助钢筋和模板定位,简化校核,减少返工,节约施工工期;
3)利于快速检查流道曲面,确保流道型体质量。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明流道形体控制装置的结构示意图。
图2为本发明流道曲面示意图。
图3为本发明流道曲面局部示意图。
图中:棱镜1,连杆2,第一伸缩锁定装置3,滑杆4,第二伸缩锁定装置5,探头6,滑轨锁定装置7,滑轨8,滑轨锚定桩9,主轴10,第一伸缩杆11,第二伸缩杆12,第二层曲面模板13,第一层曲面模板14,流道水平轴线15,流道侧壁竖直段16,第二层流道侧壁曲面17,第一层流道侧壁曲面18。
具体实施方式
实施例1:
参见图1中,一种航电枢纽贯流式机组流道形体控制装置,包括主轴10和滑杆4;
主轴10连接第一伸缩杆11,第一伸缩杆11上设有棱镜1,主轴10底部设有滑轨8和滑轨锁定装置7;
滑杆4顶部通过连杆2连接在第一伸缩杆11上端,滑杆4底部连接探头6。
优选方案中,所述滑轨8通过滑轨锚定桩9与流道底面平段固定连接。
优选方案中,所述棱镜1和探头6分别位于主轴10和滑杆4的轴线上。
优选方案中,所述滑杆4底部通过第二伸缩杆12连接探头6。
优选方案中,所述滑杆4的探头6通过连杆2沿主轴10的第一伸缩杆11旋转。
优选方案中,所述滑杆4底部设有第二伸缩锁定装置5,控制第二伸缩杆12。
优选方案中,所述第一伸缩杆11设有第一伸缩锁定装置3,控制第一伸缩杆11。
优选方案中,所述第一伸缩杆11和第一伸缩锁定装置3至少为1个,可以更精确控制棱镜1的位置。
优选方案中,航电枢纽贯流式机组流道形体控制装置工艺方法,所述的工艺方法包括以下步骤:
1)根据施工图绘制出轴线的三维放样坐标,确定施工控制点后,将全站仪架设在控制点,进行放样;
2)调整滑轨8,将滑轨8与流道水平轴线重合之后,将滑轨锚定桩9与流道底面平段预留的锚筋焊接固定;
3)将流道形体控制装置中的主轴10沿滑轨8滑动到需要测试的曲面圆,通过滑轨锁定装置7锁定主轴10的位置,根据设计的流道单线图已确定曲面轴心坐标,调节第一伸缩锁定装置3,确保棱镜1与当前测量曲面区段曲面轴心重合,完成流道形体控制装置定位校准,全站仪是通过棱镜1检验流道模板三维坐标定位的准确性;
4)调整第二伸缩锁定装置5,使棱镜1到探头6的距离,即探头6所在的圆半径,与当前曲面圆半径相同;
5)将已经加工成型后的流道模板吊装至步骤3)中已确定位置的曲面部位进行调整和定位,完成流道模板的安装;
6)滑杆4的探头6通过连杆2沿主轴10的第一伸缩杆11旋转,复核模板空间坐标满足流道单线图中流道线型参数要求;
7)对其他流道曲面的定位和检查时,重复步骤3)至步骤6)。
优选方案中,所述流道模板采用木质材料。
实施例2:
参见图2和图3中,在实施例1中流道形体控制装置和操作工艺的基础上,混凝土浇筑流道时,流道形体控制装置对流道曲面的检查过程如下:
1)通过实施例1将第二层曲面模板(13)和第一层曲面模板(14)安装完成后,首先混凝土浇筑第一层流道侧壁曲面(18),当第一层流道侧壁曲面(18)浇筑满后,然后混凝土继续从机组分缝向流道浇筑第二层流道侧壁曲面(17),浇筑至流道第二层曲面模板(13)和第一层曲面模板(14),最后混凝土浇筑流道侧壁竖直段(16);
2)当第一层流道侧壁曲面(18)浇筑满时,此处的混凝土流动性减少,将第一层曲面模板(14)拆除,对第一层流道侧壁曲面(18)进行人工振捣,通过设置的流道形体控制装置检查振捣后第一层流道侧壁曲面(18)混凝土的形体质量,若发现流道形体控制装置滑行时探头(6)脱空或遇到阻碍,则第一层流道侧壁曲面(18)需要重新振捣,振捣完成后,结合人工抹面确保曲面形体结构,抹面完毕后封堵第一层曲面模板(14);第一层曲面模板(14)封堵后将上部第二层流道侧壁曲面(17)全部浇筑完毕,通过附着式振捣的方式对上部第二层流道侧壁曲面(18)混凝土进行振捣;流道侧壁竖直段(16)由于弧度减小,按常规工艺完成浇筑;确保混凝土浇筑密实,表面无蜂窝麻面。
上述的实施例仅为本发明的优选技术方案,而不应视为对于本发明的限制,本发明的保护范围应以权利要求记载的技术方案,包括权利要求记载的技术方案中技术特征的等同替换方案为保护范围。即在此范围内的等同替换改进,也在本发明的保护范围之内。

Claims (2)

1.一种航电枢纽贯流式机组流道形体控制装置,其特征是:包括主轴(10)和滑杆(4);
主轴(10)连接第一伸缩杆(11),第一伸缩杆(11)上设有棱镜(1),主轴(10)底部设有滑轨(8)和滑轨锁定装置(7);
滑杆(4)顶部通过连杆(2)连接在第一伸缩杆(11)上端,滑杆(4)底部连接探头(6);
所述滑轨(8)通过滑轨锚定桩(9)与流道底面平段固定连接;
所述棱镜(1)和探头(6)分别位于主轴(10)和滑杆(4)的轴线上;
所述滑杆(4)底部通过第二伸缩杆(12)连接探头(6);
所述探头(6)通过连杆(2)沿主轴(10)的第一伸缩杆(11)旋转;
所述滑杆(4)底部设有第二伸缩锁定装置(5);
所述第一伸缩杆(11)设有第一伸缩锁定装置(3)。
2.一种采用权利要求1所述的航电枢纽贯流式机组流道形体控制装置工艺方法,其特征是:所述的工艺方法包括以下步骤:
1)根据施工图绘制出轴线的三维放样坐标,确定施工控制点后,将全站仪架设在控制点,进行放样;
2)调整滑轨(8),将滑轨(8)与流道水平轴线重合后,将滑轨锚定桩(9)与流道底面平段预留的锚筋焊接固定;
3)将流道形体控制装置中的主轴(10)沿滑轨(8)滑动到需要测试的曲面圆,通过滑轨锁定装置(7)锁定主轴(10)的位置,根据设计的流道单线图已确定曲面轴心坐标,调节第一伸缩锁定装置(3),确保棱镜(1)与当前测量曲面区段曲面轴心重合,完成流道形体控制装置定位校准;
4)调整第二伸缩锁定装置(5),使棱镜(1)到探头(6)的距离,即探头(6)所在的圆半径,与当前曲面圆半径相同;
5)将已经加工成型后的流道模板吊装至步骤3)中已确定位置的曲面部位进行调整和定位,完成流道模板的安装;
6)探头(6)通过连杆(2)沿主轴(10)的第一伸缩杆(11)旋转,复核模板空间坐标满足流道单线图中流道线型参数要求;
7)对其他流道曲面的定位和检查时,重复步骤3)至步骤6)。
CN201810086428.0A 2018-01-30 2018-01-30 航电枢纽贯流式机组流道形体控制装置及方法 Active CN108360475B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810086428.0A CN108360475B (zh) 2018-01-30 2018-01-30 航电枢纽贯流式机组流道形体控制装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810086428.0A CN108360475B (zh) 2018-01-30 2018-01-30 航电枢纽贯流式机组流道形体控制装置及方法

Publications (2)

Publication Number Publication Date
CN108360475A CN108360475A (zh) 2018-08-03
CN108360475B true CN108360475B (zh) 2023-12-01

Family

ID=63007556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810086428.0A Active CN108360475B (zh) 2018-01-30 2018-01-30 航电枢纽贯流式机组流道形体控制装置及方法

Country Status (1)

Country Link
CN (1) CN108360475B (zh)

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB146142A (en) * 1914-07-22 1920-11-04 Karl Puchner Improvements in and relating to weirs
BE781418A (fr) * 1971-04-16 1972-07-17 Ferbeck & Vincent Systeme de coffrage pour beton arme
AU5685573A (en) * 1972-06-09 1974-12-12 Ind Concrete Products Ltd Building units building units
JPH09151471A (ja) * 1995-11-30 1997-06-10 Shimizu Corp 移動型枠装置およびそれを用いた地中構造物の施工方法
JPH108714A (ja) * 1996-06-26 1998-01-13 Ii M S:Kk インバート打設用型枠
US6425186B1 (en) * 1999-03-12 2002-07-30 Michael L. Oliver Apparatus and method of surveying
NZ535776A (en) * 2004-10-06 2005-04-29 Hensch Ltd W Arcuate wall construction
CN101096846A (zh) * 2007-06-13 2008-01-02 中国水电顾问集团华东勘测设计研究院 混凝土流道渐变圆角段顶板施工的预制模板及其施工工艺
CN201031704Y (zh) * 2007-05-31 2008-03-05 中国科学院武汉岩土力学研究所 隧道无线激光放样装置
CN101864818A (zh) * 2009-04-14 2010-10-20 武汉建工股份有限公司 现浇倾斜悬弧混凝土剪力墙施工方法
CN202090328U (zh) * 2011-06-01 2011-12-28 中国葛洲坝集团股份有限公司 大断面尾水扩散段衬砌异型钢模板
KR20120013571A (ko) * 2010-08-05 2012-02-15 (주)대우건설 조력 발전소의 유입부용 강재폼 및 이를 이용한 유입부 시공방법
DE202012003122U1 (de) * 2012-03-27 2013-02-25 Hartmut Ollendiek "Saug-Drall-Rohr" oder "Saug-Drall-Mantel" zur Aufnahme einer Wasserkraftmaschine/einer Wasserturbine/eines Rotors innerhalb des "Saug-Drall-Rohres"/"Saug-Drall-Mantels" zum "freien" Aufstellen/Positionieren in Fließgewässern oder zur Nutzung von Meeresströmungen
CN203156745U (zh) * 2013-03-13 2013-08-28 中冶陕压重工设备有限公司 一种铸件毛坯划线工具
WO2013181453A2 (en) * 2012-05-30 2013-12-05 Cytojene Corp. Flow cytometer
CN203890982U (zh) * 2014-06-07 2014-10-22 中国水利水电第七工程局有限公司 隧洞底拱反弧排气翻模
CN104818792A (zh) * 2015-04-10 2015-08-05 广东电白建设集团有限公司 曲型屋面模板系统测控施工方法
CN105648991A (zh) * 2015-12-30 2016-06-08 中国水电建设集团十五工程局有限公司 水电站贯流式机组流道渐变段的施工方法
CN106245906A (zh) * 2016-08-30 2016-12-21 中国葛洲坝集团三峡建设工程有限公司 一种三维模型辅助异型模板设计与安装的方法
CN107254968A (zh) * 2017-07-11 2017-10-17 武汉大学 一种曲面建筑物的激光三维定位装置及定位施工方法
CN206928261U (zh) * 2017-03-07 2018-01-26 中国水利水电第五工程局有限公司 一种双曲面椎体的固定装置
CN207794036U (zh) * 2018-01-30 2018-08-31 中国葛洲坝集团第一工程有限公司 航电枢纽贯流式机组流道形体控制装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7300610B2 (en) * 2003-11-26 2007-11-27 Federico Loeffler-Lenz Method for forming cavities of complex configuration within concrete
WO2011079201A1 (en) * 2009-12-23 2011-06-30 Jonas Hauptman System and method for structure design

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB146142A (en) * 1914-07-22 1920-11-04 Karl Puchner Improvements in and relating to weirs
BE781418A (fr) * 1971-04-16 1972-07-17 Ferbeck & Vincent Systeme de coffrage pour beton arme
AU5685573A (en) * 1972-06-09 1974-12-12 Ind Concrete Products Ltd Building units building units
JPH09151471A (ja) * 1995-11-30 1997-06-10 Shimizu Corp 移動型枠装置およびそれを用いた地中構造物の施工方法
JPH108714A (ja) * 1996-06-26 1998-01-13 Ii M S:Kk インバート打設用型枠
US6425186B1 (en) * 1999-03-12 2002-07-30 Michael L. Oliver Apparatus and method of surveying
NZ535776A (en) * 2004-10-06 2005-04-29 Hensch Ltd W Arcuate wall construction
CN201031704Y (zh) * 2007-05-31 2008-03-05 中国科学院武汉岩土力学研究所 隧道无线激光放样装置
CN101096846A (zh) * 2007-06-13 2008-01-02 中国水电顾问集团华东勘测设计研究院 混凝土流道渐变圆角段顶板施工的预制模板及其施工工艺
CN101864818A (zh) * 2009-04-14 2010-10-20 武汉建工股份有限公司 现浇倾斜悬弧混凝土剪力墙施工方法
KR20120013571A (ko) * 2010-08-05 2012-02-15 (주)대우건설 조력 발전소의 유입부용 강재폼 및 이를 이용한 유입부 시공방법
CN202090328U (zh) * 2011-06-01 2011-12-28 中国葛洲坝集团股份有限公司 大断面尾水扩散段衬砌异型钢模板
DE202012003122U1 (de) * 2012-03-27 2013-02-25 Hartmut Ollendiek "Saug-Drall-Rohr" oder "Saug-Drall-Mantel" zur Aufnahme einer Wasserkraftmaschine/einer Wasserturbine/eines Rotors innerhalb des "Saug-Drall-Rohres"/"Saug-Drall-Mantels" zum "freien" Aufstellen/Positionieren in Fließgewässern oder zur Nutzung von Meeresströmungen
WO2013181453A2 (en) * 2012-05-30 2013-12-05 Cytojene Corp. Flow cytometer
CN203156745U (zh) * 2013-03-13 2013-08-28 中冶陕压重工设备有限公司 一种铸件毛坯划线工具
CN203890982U (zh) * 2014-06-07 2014-10-22 中国水利水电第七工程局有限公司 隧洞底拱反弧排气翻模
CN104818792A (zh) * 2015-04-10 2015-08-05 广东电白建设集团有限公司 曲型屋面模板系统测控施工方法
CN105648991A (zh) * 2015-12-30 2016-06-08 中国水电建设集团十五工程局有限公司 水电站贯流式机组流道渐变段的施工方法
CN106245906A (zh) * 2016-08-30 2016-12-21 中国葛洲坝集团三峡建设工程有限公司 一种三维模型辅助异型模板设计与安装的方法
CN206928261U (zh) * 2017-03-07 2018-01-26 中国水利水电第五工程局有限公司 一种双曲面椎体的固定装置
CN107254968A (zh) * 2017-07-11 2017-10-17 武汉大学 一种曲面建筑物的激光三维定位装置及定位施工方法
CN207794036U (zh) * 2018-01-30 2018-08-31 中国葛洲坝集团第一工程有限公司 航电枢纽贯流式机组流道形体控制装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
三维激光扫描仪在泵站流道施工质量控制中的应用;王冬梅;赵钢;吴杰;黄俊友;;水力发电(第10期);56-57 *
台儿庄泵站肘形流道施工技术;王先山;苏冠鲁;沈万和;李学格;李军;;南水北调与水利科技(第06期);393-396 *
李春.水泵现代设计方法.上海科学技术出版社,2010,204-205. *
赵山渡发电厂灯泡贯流式机组流道施工;黎玉龙;水利水电技术(第02期);53-54 *

Also Published As

Publication number Publication date
CN108360475A (zh) 2018-08-03

Similar Documents

Publication Publication Date Title
CN105965664B (zh) 一种预应力桩3d打印系统及其使用方法
CN1978838A (zh) 组合式"v"形钢管混凝土柱施工方法
CN112049146A (zh) 一种钢结构基础预埋件及其工艺流程
CN107310025A (zh) 一种预制梁梁靴的预制装置及预制方法
CN109736204A (zh) 一种短线法节段梁预制施工工艺
CN108253193B (zh) 墙体管道预埋施工方法
CN109025319A (zh) 一种预制构件对接界面质量检测及处置方法
CN102409617A (zh) 一种高桥墩的施工方法
CN204881624U (zh) 超高层建筑核心筒模板定位测量控制装置
CN206917026U (zh) 一种用于异形幕墙骨架的钢制圆盘形节点构件
CN108360475B (zh) 航电枢纽贯流式机组流道形体控制装置及方法
CN114809029A (zh) 高路堑边坡锚杆框架梁联结施工方法
CN107165317A (zh) 一种用于异形幕墙骨架的钢制圆盘形节点构件及应用方法
CN110046363B (zh) 一种混凝土结构内管道组精确预埋的施工方法
CN108312325B (zh) 一种混凝土管片振动抹面机
CN113865568A (zh) 自调平对中杆及楼面放样点的测量定位方法
CN205907609U (zh) 桥梁支撑垫石预埋孔定位辅助器具
CN109112903A (zh) 一种场段库内立柱式检查坑整体道床无轨施工技术
CN104196165B (zh) 一种超大型多腔钢结构巨柱及其制作方法
CN113021603A (zh) 一种预制装配式钻石型盖梁施工方法
CN100501109C (zh) 异形构件的虚拟四面体顶点测量定位方法
CN102061753A (zh) 点线控面法控制现浇混凝土楼板厚度
CN105089276B (zh) 一种应用板面标高控制工具的大面积混凝土板的施工方法
CN107119931B (zh) 剧院多段曲线观众席混凝土阶梯模板装置及其施工方法
CN106639500A (zh) 高风压下方形变截面多层平台烟囱一次滑模施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant