CN108333049A - A kind of buried chamber first loads the test model excavated afterwards and test method - Google Patents

A kind of buried chamber first loads the test model excavated afterwards and test method Download PDF

Info

Publication number
CN108333049A
CN108333049A CN201810426302.3A CN201810426302A CN108333049A CN 108333049 A CN108333049 A CN 108333049A CN 201810426302 A CN201810426302 A CN 201810426302A CN 108333049 A CN108333049 A CN 108333049A
Authority
CN
China
Prior art keywords
chamber
carrier pipe
heating wire
rigid carrier
test model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810426302.3A
Other languages
Chinese (zh)
Other versions
CN108333049B (en
Inventor
高富强
黄强
杨修飞
刘利兵
贾尚星
杨波
何怡
刘翠然
李聪玲
刘欢欢
刘鹏
史百齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Institute of Science and Technology
Original Assignee
Luoyang Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Institute of Science and Technology filed Critical Luoyang Institute of Science and Technology
Priority to CN201810426302.3A priority Critical patent/CN108333049B/en
Publication of CN108333049A publication Critical patent/CN108333049A/en
Application granted granted Critical
Publication of CN108333049B publication Critical patent/CN108333049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Pathology (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to subterranean body construction test field, specifically a kind of buried chamber first loads the test model excavated afterwards and test method.The model of the present invention includes country rock simulated block, through the gib mechanism for being opened in country rock and simulating chamber in the block simulation chamber and being arranged in chamber simulates chamber, gib mechanism includes rigid carrier pipe corresponding with chamber simulation chamber shape, paraffin layer is equipped on the outer wall of rigid carrier pipe, for paraffin melting layer being simulated the heating wire of adit digging unloading and multiple de-waxing holes for being directed into the paraffin after melting in rigidity carrying tube cavity.The present invention can solve the disadvantage that correctly reflect adit digging and stress loading sequence in the prior art, to allow experimental model to reflect the burst region and range of true surrounding rock of chamber, and then provide accurate reference to the construction of practical adit digging.

Description

A kind of buried chamber first loads the test model excavated afterwards and test method
Technical field
The present invention relates to subterranean body construction test field, specifically a kind of buried chamber first loads the examination excavated afterwards Test model and test method.
Background technology
With the fast development of traffic engineering, mining engineering, unit in charge of construction needs to have built largely in mountain area and underground Chamber space.But since underground engineering environment is complicated, the excavation of chamber easily causes the deterioration of peripheral rock, and country rock pine occurs Phenomena such as dynamic, rupture and dropstone, it can occur to cave on a large scale when serious, jeopardize building and using for underground engineering.Using mould Type experiment method, by simulate adit digging with predict country rock bursting form and range be a kind of feasible method.
When underground chamber excavates, edge stress gradually unloads, and country rock generates radial or circumferential rupture zone, burst region Size and form determine the intensity and mode of underground chamber supporting.Many scholars attempt to obtain by way of model test The range that surrounding rock of chamber destroys, due to the limitation of experimental condition, they mostly use greatly the mode of " first punch, load afterwards ", but should There is the shortcomings that cannot correctly reflecting adit digging and stress loading sequence in method, and cause experimental model that cannot reflect true cave The burst region and range of room country rock can not provide practice of construction accurate reference.
Invention content
The present invention is intended to provide a kind of buried chamber first loads the test model excavated afterwards and test method, it is existing to solve The shortcomings that cannot correctly reflecting adit digging and stress loading sequence in technology, to allow experimental model to reflect true chamber The burst region and range of country rock, and then provide accurate reference to the construction of practical adit digging.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of buried chamber first loads to be excavated afterwards Test model, including country rock simulated block, simulate chamber in the block simulation chamber and be arranged in chamber mould through being opened in country rock Gib mechanism in quasi- chamber, gib mechanism includes rigid carrier pipe corresponding with chamber simulation chamber shape, rigid Property carrier pipe outer wall be equipped with paraffin layer, for by paraffin melting layer with simulate adit digging unloading heating wire and be used for Paraffin after thawing is directed into multiple de-waxing holes in rigidity carrying tube cavity.
Preferably, in the shape of a spiral on the outer wall for being located at rigid carrier pipe, the both ends of heating wire are respectively provided with heating wire respectively Outside country rock simulated block, power supply and the switch for controlling heating wire energization are connected between the both ends of heating wire.
Preferably, the quantity of heating wire is more, and the both ends of any one heating wire are equipped with the heating wire in rigidity The corresponding mark of distributing position in carrier pipe.
Preferably, rigid carrier pipe is made of non-conductive polyethylene duroplasts material.
Preferably, country rock simulated block is cuboid, and chamber is simulated chamber and is distributed along the length or width direction of country rock simulated block.
Preferably, chamber simulation chamber in such a way that gib mechanism and country rock simulated block are using layering building one at Type.
A kind of buried chamber first loads the test method excavated afterwards, includes the following steps:
1), first the shape preformed rigid carrier pipe of chamber is excavated according to test intended, and be spaced on the tube wall of rigid carrier pipe Multiple de-waxing holes are opened up, then heating wire is set on the outer wall of rigid carrier pipe in a manner of coiled coil, are finally held rigidly It carries and uniformly pours paraffin layer on the outer wall of pipe, obtain gib mechanism;
2), according to 8-12:2.5:1 mass ratio weighs husky, cement and water respectively, will be added after husky and cement uniform stirring Water simultaneously is again stirring for that mixture uniformly is made;
3), first by the die horizontal of open top place, take part steps 2)In obtained mix layered be backfilled to mold Bottom is simultaneously tamped, then by step 1)In gib mechanism obtained be placed in mold and positioned at compacting layer on, will be interim The end of heating wire in supporting mechanism is placed on other than mold, takes remainder step 2)In mix layered backfill obtained To in grinding tool and tamping, finally by mold plastic sealing pack, after after 26-30 days curing periods, demoulding sampling obtains buried chamber First load the test model excavated afterwards;
4), by step 3)In buried chamber obtained first load the test model that excavates afterwards and be mounted on special three-dimensional loading equipemtn On, six faces for first loading the test model excavated afterwards to buried chamber by the pressure head of special three-dimensional loading equipemtn carry out uniformly External load, until reach specify load after stop external load and steady load;
5), according to experiment adit digging sequence, successively to the electric heating wire electrified regulation being arranged in rigid carrier pipe, make rigidity Paraffin layer segmentation in carrier pipe is melted and is flowed into rigid support tube by de-waxing hole, is realized by the thawing of paraffin layer interim Supporting mechanism simulates chamber the unloading of cavity wall, to simulate adit digging process;
6), buried chamber first loaded to the test model excavated afterwards removed from special three-dimensional loading equipemtn, by temporary support machine Structure is simulated in chamber from chamber and is dug out, and country rock simulated block is broken to and recorded the destroyed area and range of country rock simulated block.
Advantageous effect
The present invention utilize paraffin electrified regulation after rapid melting the characteristics of, realize three received strength condition drag chamber excavation, Have many advantages, such as that speed of application is fast, safe, easy to operate;It, can be to test model in three directions when experiment It loads simultaneously, also can independently adjust the size that three directions are further applied load, realize that surrounding rock of chamber is broken under different surrounding rock stress condition Bad experimental study.
Description of the drawings
Fig. 1 is the three load stress diagrams of the country rock simulated block of the present invention during the test;
Fig. 2 is the structural schematic diagram of the gib mechanism part of the present invention;
It is marked in figure:1, country rock simulated block, 2, gib mechanism, 201, heating wire, 202, power supply, 203, switch, 204, row Wax hole, 205, paraffin layer, 206, rigid carrier pipe, 3, chamber simulate chamber.
Specific implementation mode
As shown in Figures 1 and 2, a kind of buried chamber of the invention first loads the test model excavated afterwards, including country rock mould Quasi- block 1, the interim branch simulated chamber 207 through the chamber being opened in country rock simulated block 1 and be arranged in chamber simulates chamber 207 Protect mechanism 2.
The shape of country rock simulated block 1 is cuboid, and chamber simulates length or width direction of the chamber 207 along country rock simulated block 1 Distribution, country rock simulated block 1 are made up using husky, cement and the mixed uniformly mixture of water of building, husky, cement and water Mass ratio is 8-12:2.5:1, when be modeled rock mass strength it is big when, husky accounting gets the small value, otherwise take large values.
Gib mechanism 2 includes rigid carrier pipe 206 corresponding with chamber simulation 207 shape of chamber, in rigid carrying The outer wall of pipe 206 be equipped with paraffin layer 205, for by paraffin layer 205 melt with simulate adit digging unloading heating wire 201 with And for the paraffin after melting to be directed into multiple de-waxing holes 204 in 206 inner cavity of rigid carrier pipe.It is logical that chamber simulates chamber 207 It crosses gib mechanism 2 to be integrally formed by the way of being layered building with country rock simulated block 1, with right by gib mechanism 2 The inner wall that chamber simulates chamber 207 loads support force, and the wherein paraffin layer 205 in gib mechanism 2 is equal by the way of pouring It is even to be covered on the outer surface of rigid carrier pipe 206, it is powered to heating up by heating wire 201 and melts paraffin layer 205, the stone of thawing The mode that wax in-line arrangement wax hole 204 flows into rigid carrier pipe 206 realizes the unloading for chamber inner wall support force of gib mechanism 2 It carries, achievees the effect that simulate adit digging process.
Rigid carrier pipe 206 in the present embodiment is made of non-conductive polyethylene duroplasts material.Heating wire 201 counts Amount is more, and more heating wire 201 are respectively in the shape of a spiral on the outer wall for being located at rigid carrier pipe 206, any one heating wire 201 both ends are arranged in the form of enameled wire outside country rock simulated block 1 respectively, and electricity is connected between the both ends of heating wire 201 Source 202 and the switch 203 being powered for controlling heating wire 201.The both ends of any one heating wire 201 are equipped with and the electric heating Distributing position corresponding mark of the silk 201 in rigid carrier pipe 206 in practical operation, can support rigid according to more resistance wires Property carrier pipe 206 on distributing position set mark to the colors such as red orange red malachite royal purple, can also make number plate mark 1,2, 3, the numbers such as 4,5.
A kind of buried chamber of the present invention first loads the test method excavated afterwards, includes the following steps:
1), first the shape preformed rigid carrier pipe 206 of chamber is excavated according to test intended, and in the tube wall of rigid carrier pipe 206 On open up multiple de-waxing holes 204 in a manner of embarking on journey in column, de-waxing hole 204 may be configured as taper, and small end is carried towards rigidity The center of pipe 206 carries out guiding role appropriate to enter in rigid carrier pipe 206 to the paraffin layer 205 after thawing;Then Heating wire 201 is set on the outer wall of rigid carrier pipe 206 in a manner of coiled coil, and ensure it is each pound heating wire 201 mutually not Contact draws at the both ends of each heating wire 201 with the insulating forms of enameled wire;Finally in the outer wall of rigid carrier pipe 206 On uniformly pour paraffin layer 205, obtain gib mechanism 2;
2), according to 8-12:2.5:1 mass ratio weighs husky, cement and water respectively, first passes through blender and stirs husky and cement It mixes uniformly, water is then added into husky and cement and is again stirring for support mixture and is spare;
3), the die horizontal of open top placed.Mold in the present embodiment is spelled using No. 45 steel plates of high intensity by bolt Support is connect, mold includes bottom plate, front side board, back side panel, left plate and right plate, in bottom plate, front side board, back side panel, left side Plate and the corresponding link position of right plate are respectively equipped with flange and bolt hole.In splicing, bottom plate is placed on level On ground, installation left side side plate, and screw the connection bolt between side plate and bottom plate;Then, front and back side plate is installed respectively, is screwed Connection bolt between front and back side plate and left side side plate and bottom plate;Finally, installation right side side plate, and be allowed to and front and back side plate and bottom Plate securely connects.
After the completion of mold splices, part steps 2 are taken first)In obtained mix layered be backfilled to mold bottom and ram Real, backfill amount is roughly equivalent to the half of mold height;Then by step 1)In gib mechanism 2 obtained be placed on mold In and positioned at compacting layer on, the end of the heating wire 201 in gib mechanism 2 is placed on other than mold, to avoid electric heating The both ends of silk 201, with country rock simulated block 1, take remainder step 2 by envelope)In obtained mix layered be backfilled in grinding tool And tamp, finally by mold plastic sealing pack, after after 26-30 days curing periods, demoulding sampling obtains after buried chamber first loads The test model of excavation;
4), by step 3)In buried chamber obtained first load the test model that excavates afterwards and be mounted on special three-dimensional loading equipemtn On, six faces for first loading the test model excavated afterwards to buried chamber by the pressure head of special three-dimensional loading equipemtn carry out uniformly External load, until reach specify load after stop external load and steady load;
5), according to experiment adit digging sequence, successively to the electric heating wire electrified regulation being arranged in rigid carrier pipe 206, make The segmentation of paraffin layer 205 in rigid carrier pipe 206 is melted and is flowed into rigid support tube by de-waxing hole 204, and paraffin layer is passed through 205 thawing realizes that chamber is simulated the unloading of 207 inner wall of chamber by gib mechanism 2, to simulate adit digging process.
6), after adit digging simulation process, buried chamber is first loaded to the test model that excavates afterwards from special three It is removed on loading equipemtn, gib mechanism 2 is slowly simulated from chamber in chamber 207 and is dug out, finally by country rock simulated block 1 It is broken and is cleared up by receipt and hairbrush, applied by the destroyed area and ranging from buried chamber that record country rock simulated block 1 Supporting in work provides reference frame.

Claims (7)

1. a kind of buried chamber first loads the test model excavated afterwards, it is characterised in that:Including country rock simulated block(1), through opening It is located at country rock simulated block(1)In chamber simulate chamber(3)And setting simulates chamber in chamber(3)In gib mechanism(2), Gib mechanism(2)Including simulating chamber with chamber(3)The corresponding rigid carrier pipe of shape(206), in rigid carrier pipe (206)Outer wall be equipped with paraffin layer(205), for by paraffin layer(205)Melt to simulate the heating wire of adit digging unloading (201)And for the paraffin after melting to be directed into rigid carrier pipe(206)Multiple de-waxing holes in inner cavity(204).
2. a kind of buried chamber according to claim 1 first loads the test model excavated afterwards, it is characterised in that:Heating wire (201)In the shape of a spiral around being located at rigid carrier pipe(206)Outer wall on, heating wire(201)Both ends be arranged at country rock respectively Simulated block(1)Outside, heating wire(201)Both ends between be connected with power supply(202)And for controlling heating wire(201)It is powered Switch(203).
3. a kind of buried chamber according to claim 2 first loads the test model excavated afterwards, it is characterised in that:Heating wire (201)Quantity be more, any one heating wire(201)Both ends be equipped with and the heating wire(201)In rigid carrier pipe (206)On the corresponding mark of distributing position.
4. a kind of buried chamber according to claim 2 first loads the test model excavated afterwards, it is characterised in that:Rigid carrier pipe (206)It is made of non-conductive polyethylene duroplasts material.
5. a kind of buried chamber according to claim 1 first loads the test model excavated afterwards, it is characterised in that:Country rock mould Quasi- block(1)For cuboid, chamber simulates chamber(3)Along country rock simulated block(1)Length or width direction distribution.
6. a kind of buried chamber according to claim 1 first loads the test model excavated afterwards, it is characterised in that:Chamber mould Quasi- chamber(3)Pass through gib mechanism(2)With country rock simulated block(1)It is integrally formed by the way of being layered building.
7. a kind of buried chamber of test model progress excavated afterwards that first loaded by buried chamber described in claim 1 first loads The test method excavated afterwards, it is characterised in that:Include the following steps:
1), first according to test intended excavate chamber shape preformed rigid carrier pipe(206), and in rigid carrier pipe(206)'s Interval opens up multiple de-waxing holes on tube wall(204), then in rigid carrier pipe(206)Outer wall on be arranged in a manner of coiled coil Heating wire(201), finally in rigid carrier pipe(206)Outer wall on uniformly pour paraffin layer(205), obtain temporary support machine Structure(2);
2), according to 8-12:2.5:1 mass ratio weighs husky, cement and water respectively, will be added after husky and cement uniform stirring Water simultaneously is again stirring for that mixture uniformly is made;
3), first by the die horizontal of open top place, take part steps 2)In obtained mix layered be backfilled to mold Bottom is simultaneously tamped, then by step 1)In gib mechanism obtained(2)It places in a mold and on compacting layer, will face When supporting mechanism(2)On heating wire(201)End be placed on other than mold, take remainder step 2)In mixing obtained It in material back-filling in layers to grinding tool and tamps, finally by mold plastic sealing pack, after after 26-30 days curing periods, demoulding sampling is made It obtains buried chamber and first loads the test model excavated afterwards;
4), by step 3)In buried chamber obtained first load the test model that excavates afterwards and be mounted on special three-dimensional loading equipemtn On, six faces for first loading the test model excavated afterwards to buried chamber by the pressure head of special three-dimensional loading equipemtn carry out uniformly External load, until reach specify load after stop external load and steady load;
5), according to experiment adit digging sequence, successively to be arranged in rigid carrier pipe(206)On electric heating wire electrified regulation, Make rigid carrier pipe(206)On paraffin layer(205)Segmentation melts and passes through de-waxing hole(204)It flows into rigid support tube, leads to Cross paraffin layer(205)Thawing realize gib mechanism(2)Chamber is simulated to chamber(3)The unloading of inner wall is opened with simulating chamber Digging process;
6), buried chamber first loaded to the test model excavated afterwards removed from special three-dimensional loading equipemtn, by temporary support machine Structure(2)Chamber is simulated from chamber(3)In dig out, by country rock simulated block(1)It breaks and records country rock simulated block(1)Destroyed area and Range.
CN201810426302.3A 2018-05-07 2018-05-07 Test model and test method for loading and then excavating deep underground chamber Active CN108333049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810426302.3A CN108333049B (en) 2018-05-07 2018-05-07 Test model and test method for loading and then excavating deep underground chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810426302.3A CN108333049B (en) 2018-05-07 2018-05-07 Test model and test method for loading and then excavating deep underground chamber

Publications (2)

Publication Number Publication Date
CN108333049A true CN108333049A (en) 2018-07-27
CN108333049B CN108333049B (en) 2024-01-26

Family

ID=62934942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810426302.3A Active CN108333049B (en) 2018-05-07 2018-05-07 Test model and test method for loading and then excavating deep underground chamber

Country Status (1)

Country Link
CN (1) CN108333049B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108918254A (en) * 2018-08-21 2018-11-30 中铁第勘察设计院集团有限公司 Simulate the experimental rig and method of Shield-bored tunnels section of jurisdiction primary stress
CN109269907A (en) * 2018-11-09 2019-01-25 中南大学 A kind of rock mass inner excavation unloading model experimental provision and its application method
CN110275008A (en) * 2019-06-11 2019-09-24 同济大学 A kind of contactless tunnel excavation physical model and test method of analog rainfall
CN114047078A (en) * 2021-10-18 2022-02-15 中南大学 Dynamic excavation unloading test device and test method under true three-dimensional stress state

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0138446A1 (en) * 1983-10-17 1985-04-24 Inco Limited Ground support coating
JPH05107166A (en) * 1991-10-18 1993-04-27 Ngk Insulators Ltd Method for evaluating and testing strength of ceramic parts for insert
US20080216584A1 (en) * 2007-03-09 2008-09-11 Younane Abousleiman Test cell for applying a shear stress to a test specimen
CN103278360A (en) * 2013-05-17 2013-09-04 山东科技大学 Reserved chamber simulating test piece manufacturing die assembly and method used for manufacturing test piece
JP2013245546A (en) * 2012-05-30 2013-12-09 Hitachi Zosen Corp Tunnel excavation method
CN103616287A (en) * 2013-11-28 2014-03-05 湖南大学 Laboratory model testing device for tunnel excavation
CN203656527U (en) * 2014-01-07 2014-06-18 洛阳理工学院 Steel arch strain meter fixing device
CN103915030A (en) * 2014-04-24 2014-07-09 湖南大学 Underground engineering tunneling model test device with expanding and contracting function
CN104614242A (en) * 2015-02-01 2015-05-13 东华理工大学 Excavation and surrounding rock stress and strain monitoring model testing device for rock-soil chamber under complicated conditions, and method thereof
CN205805579U (en) * 2016-05-26 2016-12-14 西安科技大学 Coal mine inclined shaft dark cave section excavation supporting constructing structure
CN206114438U (en) * 2016-10-21 2017-04-19 辽宁工程技术大学 Tailings dam model test case based on freeze -thaw cycle effect
CN106771058A (en) * 2016-12-01 2017-05-31 中国矿业大学 A kind of experimental technique of the comprehensive tunneling process in simulation tunnel
CN106996903A (en) * 2017-05-09 2017-08-01 洛阳理工学院 A kind of experimental rig and method for being used to simulate buried Tunnel Rockburst
CN107807051A (en) * 2017-11-23 2018-03-16 中南大学 Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment
CN208239202U (en) * 2018-05-07 2018-12-14 洛阳理工学院 A kind of buried chamber first loads the test model excavated afterwards

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0138446A1 (en) * 1983-10-17 1985-04-24 Inco Limited Ground support coating
JPH05107166A (en) * 1991-10-18 1993-04-27 Ngk Insulators Ltd Method for evaluating and testing strength of ceramic parts for insert
US20080216584A1 (en) * 2007-03-09 2008-09-11 Younane Abousleiman Test cell for applying a shear stress to a test specimen
JP2013245546A (en) * 2012-05-30 2013-12-09 Hitachi Zosen Corp Tunnel excavation method
CN103278360A (en) * 2013-05-17 2013-09-04 山东科技大学 Reserved chamber simulating test piece manufacturing die assembly and method used for manufacturing test piece
CN103616287A (en) * 2013-11-28 2014-03-05 湖南大学 Laboratory model testing device for tunnel excavation
CN203656527U (en) * 2014-01-07 2014-06-18 洛阳理工学院 Steel arch strain meter fixing device
CN103915030A (en) * 2014-04-24 2014-07-09 湖南大学 Underground engineering tunneling model test device with expanding and contracting function
CN104614242A (en) * 2015-02-01 2015-05-13 东华理工大学 Excavation and surrounding rock stress and strain monitoring model testing device for rock-soil chamber under complicated conditions, and method thereof
CN205805579U (en) * 2016-05-26 2016-12-14 西安科技大学 Coal mine inclined shaft dark cave section excavation supporting constructing structure
CN206114438U (en) * 2016-10-21 2017-04-19 辽宁工程技术大学 Tailings dam model test case based on freeze -thaw cycle effect
CN106771058A (en) * 2016-12-01 2017-05-31 中国矿业大学 A kind of experimental technique of the comprehensive tunneling process in simulation tunnel
CN106996903A (en) * 2017-05-09 2017-08-01 洛阳理工学院 A kind of experimental rig and method for being used to simulate buried Tunnel Rockburst
CN107807051A (en) * 2017-11-23 2018-03-16 中南大学 Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment
CN208239202U (en) * 2018-05-07 2018-12-14 洛阳理工学院 A kind of buried chamber first loads the test model excavated afterwards

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
GANGYE GUO: "Mechanism for Controlling Floor Heave of Mining Roadways Using Reinforcing Roof and Sidewalls in Underground Coal Mine", 《SUSTAINABILITY》, pages 1 - 15 *
周辉 等: "岩爆物理模拟试验研究现状及思考", 《岩石力学与工程学报》, vol. 34, no. 5, pages 915 - 923 *
高富强 等: "露天煤矿爆破震动的模型试验及数值计算", 《煤矿安全》, vol. 48, no. 1, pages 55 - 58 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108918254A (en) * 2018-08-21 2018-11-30 中铁第勘察设计院集团有限公司 Simulate the experimental rig and method of Shield-bored tunnels section of jurisdiction primary stress
CN109269907A (en) * 2018-11-09 2019-01-25 中南大学 A kind of rock mass inner excavation unloading model experimental provision and its application method
CN110275008A (en) * 2019-06-11 2019-09-24 同济大学 A kind of contactless tunnel excavation physical model and test method of analog rainfall
CN110275008B (en) * 2019-06-11 2021-03-26 同济大学 Non-contact tunnel excavation physical model capable of simulating rainfall and test method
CN114047078A (en) * 2021-10-18 2022-02-15 中南大学 Dynamic excavation unloading test device and test method under true three-dimensional stress state

Also Published As

Publication number Publication date
CN108333049B (en) 2024-01-26

Similar Documents

Publication Publication Date Title
CN108333049A (en) A kind of buried chamber first loads the test model excavated afterwards and test method
CN103616287B (en) A kind of tunnel excavation indoor model test device
CN105673049B (en) Empty horizontal tunnel model test device and method after a kind of simulation lining wall
CN103915030B (en) The underground works driving model test apparatus of the scalable function of a kind of tool
CN108625865A (en) A kind of test method of simulation shield tunnel construction
CN105043938B (en) A kind of repeatable saturated sand osmotic grouting test model utilized and its application
CN107354961A (en) Variation rigidity prestressed anchor Rods In Tied Double Retaining Walls soil arching effect pilot model apparatus and method
CN114894514B (en) Test system and test method for arch tunnel active support bearing structure model
CN208239202U (en) A kind of buried chamber first loads the test model excavated afterwards
CN206891876U (en) Shearing test device
CN113235341A (en) Construction method for adding high-speed railway subgrade to existing high-speed railway in parallel
CN107063894A (en) Shearing test device and the method that shearing test is carried out using described device
CN208239223U (en) A kind of test model for simulating deep tunnel Blasting Excavation
CN205422740U (en) Horizontal tunnel model test device in cavity behind simulation lining wall
CN108426779A (en) The structural cracks experiment simulator and method of underground engineering under high hydraulic condition
CN207109887U (en) Variation rigidity prestressed anchor Rods In Tied Double Retaining Walls soil arching effect pilot model apparatus
CN111537431A (en) Liquid CO2Phase change fracturing effect similar simulation experiment device and experiment method
CN112730730B (en) Model test device and test method for highway underlying burning coal bed
CN108918254A (en) Simulate the experimental rig and method of Shield-bored tunnels section of jurisdiction primary stress
CN215332882U (en) Test device for simulating shield tunnel segment assembly and backfill grouting
CN114935465A (en) System for simulating disturbance of shield construction to existing pile foundation and implementation method
CN114720167A (en) Testing device and testing method for underground rock tunnel surrounding rock lining structure
CN105675363B (en) A kind of method simulated deep rock mass and excavate operation
CN207780018U (en) test model for simulating underground engineering construction
CN217655116U (en) Model test device for simulating influence of karst cave filling loss on tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant