CN108331260A - Half grout sleeve with detection hole and grouting plumpness detection method and benefit paste-making method - Google Patents

Half grout sleeve with detection hole and grouting plumpness detection method and benefit paste-making method Download PDF

Info

Publication number
CN108331260A
CN108331260A CN201810096995.4A CN201810096995A CN108331260A CN 108331260 A CN108331260 A CN 108331260A CN 201810096995 A CN201810096995 A CN 201810096995A CN 108331260 A CN108331260 A CN 108331260A
Authority
CN
China
Prior art keywords
sleeve
grouting
detection
hole
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810096995.4A
Other languages
Chinese (zh)
Other versions
CN108331260B (en
Inventor
顾盛
范毅
张军
吴立勇
吴玉龙
解华继
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Founding Building Industry Co Ltd
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Original Assignee
Suzhou Founding Building Industry Co Ltd
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Founding Building Industry Co Ltd, KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER filed Critical Suzhou Founding Building Industry Co Ltd
Priority to CN201810096995.4A priority Critical patent/CN108331260B/en
Publication of CN108331260A publication Critical patent/CN108331260A/en
Application granted granted Critical
Publication of CN108331260B publication Critical patent/CN108331260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of half grout sleeve with detection hole and grouting plumpness detection method and benefit paste-making method, half grout sleeve is used for Vertical bar connection, there are one detection holes for setting on half grout sleeve, between detection hole is arranged at the top of slurry outlet and half grout sleeve.The grouting plumpness detection method includes:The probe pipeline of industrial endoscope and water filling hose are stretched into sleeve inner from detection hole, grouting plumpness is determined to peeping water filling in the grouting defect progress of sleeve inner by the cooperation of industrial endoscope, syringe and water filling hose.The benefit paste-making method includes:It is drilled to pulp channel using drilling device, pulp channel is made to penetrate through, supplementary irrigation slurry is carried out from pulp channel, from sense channel pulp.Half grout sleeve provided by the invention with detection hole is reasonable for structure, easily prepared, and detection hole can realize that a hole is dual-purpose, and subsequent detection is facilitated to repair;The method of the invention has the advantages that measuring speed is fast, precision is high, overall cost is low.

Description

Half grout sleeve with detection hole and grouting plumpness detection method and benefit paste-making method
Technical field
The present invention relates to assembled architecture fields, and in particular to a kind of half grout sleeve with detection hole and grouting are full It spends detection method and mends paste-making method.
Background technology
Prefabricated assembled concrete structure has construction speed as a kind of structure type meeting industrialized production Degree is fast, labor intensity is low, noise pollution and wet construction is few and the advantages such as product quality is easy to control, it has also become domestic and international construction industry The main flow direction of development.
In assembled arthitecutral structure, especially in prefabricated concrete structure, component connection is to ensure that structure is whole The key node of quality.Reinforced bar sleeve grouting connection is common bar connecting form, sleeve in prefabricated concrete structure It is in the milk and is connected as concealed work, the plumpness of strength cement-based grouting material directly influences prefabricated concrete structure in grout sleeve Quality and safety.But may be because personnel's lack of skill, misoperation in work progress or lack a sense of responsibility, it leads Spillage, running pulp phenomenon is caused to happen occasionally, the appearance of this phenomenon has seriously affected grouting quality, the case where " filling discontented " occurs, Cause fatal constructional deficiency.Therefore, in grout sleeve the detection method of strength cement-based grouting material plumpness and find be in the milk Benefit paste-making method when insufficient is building trade extensive concern and urgent problem to be solved.
The detection method of the plumpness of sleeve grouting at present is broadly divided into inside member exterior nondestructive determination and grout sleeve The method of pre-buried sensor.Member exterior lossless detection method is mainly supercritical ultrasonics technology and Impact echo, due to reinforced bar sleeve Connection structure replaces for multilayer dielectricity, and detection environment is complicated, and strength cement-based grouting material is very thin in radial thickness, and generally 5 ㎜~ 6 ㎜ cause existing engineering lossless detection method that can not effectively detect it.Publication No. is in CN105223344A State's patent document proposes a kind of device and method of pre-buried sensor detection reinforced bar sleeve grouting plumpness:By damping vibration Sensor is embedded in the bottom of reinforced bar sleeve grout outlet, and sleeve grouting construction passes through detection after the completion or after grouting material solidification Whether the attenuation of sensor signal wave amplitude comes whether discriminating sensor is coated by grouting material, full to detect grouting material.But Being this method has the shortcomings that following three:(1) can only qualitative detection, the turgor of grouting material can not quantitatively be divided Analysis brings difficulty for the result judgement in later stage;(2) damping vibration sensor must be installed in place before grouting construction, sensor Once embedment sleeve cannot be reused, if to all sleeve whole placement sensors in engineering, the later stage carries out random It takes a sample test, then testing cost is excessively high, each side is difficult to receive, if arranging a limited number of sensors at random before grouting construction, Construction party learns test point in advance according to sensing station, will be directed to known test point well construction, finally lose with The meaning of machine sampling observation, and still buried security risk.(3) in progress when plastering construction, wall part will must be stretched out Sensor is cut off, time-consuming and laborious to ensure the planarization of wall.
In addition, when both the above detection method carries out late detection after grouting material solidification, even if finding sleeve grouting not It fills, can not also carry out in-situ repair, entire prefabricated components can only be replaced or pick to dig out by underproof grout sleeve to come again It replaces new grout sleeve or is connected using reinforcement welding, then chiseled out with new concrete or strength cement-based grouting material to picking Concrete is repaired.This method for repairing and mending can not only result in waste of resources, and can also influence the progress of next process, cause Construction delay.
Publication No. is that the Chinese patent literature of CN105865568A, CN106836657A propose a kind of bar connecting use Repair apparatus when grout sleeve non-destructive ration examining device, grouting are insufficient and method, its essence is simply in grout sleeve On to increase patching material input pipe, patching material output channel, detection liquid input tube road, detection liquid output pipe road total Four newly-increased pipelines are counted, input liquid volume metrical instrument, output liquid volume measuring instrument and confession are then utilized when Site Detection Water installations, will input the volume of liquid and the volume of output liquid makes the difference and obtains the liquid volume being trapped in grout sleeve, from And judge sleeve inner grouting material plumpness situation, if grouting is not full, pass through patching material input channel using grouter Patching material is injected into grout sleeve, and the detection liquid displacement that will be left in grout sleeve comes out, and needs in the repairing The outlet of material output channel is sampled at times, until patching material output channel stablizes the close of the patching material of discharge It spends and injects the density of patching material into grout sleeve and quite or when reaching setting density stop repairing.Above-mentioned apparatus and side Method seems simple possible, there are in fact following disadvantage and can lead to the erroneous judgement of testing result:(1) to grout sleeve itself For, four holes are added above slurry outlet for plugging four pipelines, the number of openings is excessively likely to result in grouting set The decline of cylinder mechanical property, brings major safety risks.(2) for the prefabricated components manufacturing, that is added on sleeve is all kinds of Pipeline is excessive, and original grout lines and pulp pipeline will have six roots of sensation pipeline in addition while centralized arrangement is in prefabricated components Sleeve portion, if it is double sleeve, then number of tubes will also be double, this, which will undoubtedly vibrate to concreting, brings very greatly Inconvenience, to influence production efficiency and component quality.(3) field detecting device is complicated, input liquid volume metrical instrument, defeated It is cumbersome and inconvenient to carry to go out the device contexts assembly and adjustment such as liquid volume metrical instrument and water supply installation.(4) quantitative inspection Survey method is not associated with engineering reality, and there may be large errors for testing result, be easy to cause erroneous judgement;The above method passes through delay Liquid volume in grout sleeve judges that the turgor of grouting, this partially liq have not crossed slurry outlet and be full of sleeve Cavity area in interior cavity area and pulp pipeline, since grouting material viscosity is larger, after the completion of grouting, grout outlet blocks Tightly, even if stream of slurry in sleeve is empty, in the pulp pipeline of horizontal direction still can there are grouting materials, but in pulp pipeline The final form of grouting material can not determine that the volume of i.e. cavity area in pulp pipeline is unknown, and the above method is directly used The liquid volume in grout sleeve is trapped in measure the not turgor of grouting, does not consider remaining grouting in pulp pipeline The volume metering error that material strip comes, it is easy to cause to judge by accident.(5) it is not selection when mending slurry will again to carry out after detection liquid extraction Slurry is mended, but is gone out by patching material by liquid displacement is detected;When the above-mentioned repair apparatus of onsite application and method, material is repaired The density that material output channel stablizes discharge patching material can not be detected fast and accurately, and the lasting benefit slurry of blindness be easy to cause filling The waste of slurry increases cost.
Invention content
It is full the purpose of the present invention is in view of the above technical problems, providing a kind of half grout sleeve with detection hole and grouting Full scale detection method and benefit paste-making method, half grout sleeve is reasonable for structure, easily prepared, and detection hole can realize that a hole is dual-purpose, side Just subsequent detection is repaired, and there is extensive market prospects and promotional value, detection method provided by the invention to have measuring speed Soon, the advantage that precision is high, overall cost is low, benefit paste-making method provided by the invention can carry out in situ repair after grouting material solidification It mends.
In order to solve the above technical problem, the present invention provides a kind of half grout sleeve with detection hole is used for levels The Vertical bar connection of prefabricated components, including sleeve body, the sleeve body are tubular structure, opening at the top of sleeve body It is provided with threaded hole at mouthful, the sleeve body surface is disposed with slurry outlet and grout hole, the slurry outlet from top to bottom It is additionally provided with detection hole on sleeve body surface between threaded hole.
Further, convex hole rib is additionally provided on the sleeve body inner wall, the convex hole rib is screw thread or shearing resistance Bolt.
Further, the first rubber stopper is provided in the detection hole, first rubber stopper made in prefabricated components It is filled in journey.
Further, the second rubber stopper is provided in the grout hole, second rubber stopper is in half grout sleeve conduct It is filled in when sample indwelling.
A kind of half grout sleeve grouting plumpness detection method with detection hole, including peeped in half grout sleeve, industry Mirror, syringe, water filling hose and rubber stopper;
Half grout sleeve is used for the Vertical bar connection of levels prefabricated components, and half grout sleeve includes sleeve sheet Body, the sleeve body are tubular structure, and the opening at the top of sleeve body is provided with threaded hole, the threaded hole and first Prefabricated components vertical reinforcement is screwed on, and the sleeve body is set on the second prefabricated components vertical reinforcement, the sleeve body table Face is disposed with slurry outlet and grout hole from top to bottom, and the slurry outlet connect to form pulp channel with grout outlet, the filling Slurry hole connect to form grouting channel with grout pipe, is additionally provided on the sleeve body surface between the slurry outlet and threaded hole Detection hole, the detection hole connect to form sense channel with detection pipe;
The rubber stopper includes the first rubber stopper and the second rubber stopper, and the first rubber stopper is in prefabricated components manufacturing process It is arranged in the detection hole of half grout sleeve, the filling in half grout sleeve as sample indwelling is arranged in second rubber stopper It starches in hole;
The industrial endoscope includes probe pipeline, and the probe pipeline both ends are separately connected endoscope host and interior peep Mirror is popped one's head in;
The dispensing end of the water filling hose and syringe connects;
Detection method includes the following steps for it:
A, after the half grout sleeve grouting being preset in prefabricated components terminates and cures, by the rubber stopper in detection hole It takes out;
B, and then by the endoscope probe of industrial endoscope it is stretched into from sense channel, by the control to endoscope probe, Situation of being in the milk inside the sleeve body of endoscope probe shooting is observed, when slurry face height is more than or equal to slurry outlet bottom Height when, as full grouting, grouting plumpness be determined as qualification;When slurry face height is less than the height of slurry outlet bottom When, as insatiable hunger full irrigation is starched, and need to be continued grouting plumpness and quantitatively be detected;
C, it when being starched for insatiable hunger full irrigation, first passes through syringe and extracts detection liquid, water filling hose is then connected to injection On the dispensing end of device, and syringe is pressed, the liquid in syringe is made to enter in water filling hose, is discharged in water filling hose end When, stop pressing, by initial capacity in calibration record syringe, water filling hose is then stretched into sleeve sheet from sense channel In vivo, syringe is pressed again, is made in liquid injection sleeve body, liquid height is checked by industrial endoscope, when liquid arrives Up to slurry outlet bottom height when, stop pressing, and pass through in calibration record syringe inject after capacity, initial capacity with note The difference for penetrating rear capacity is the water injection rate of syringe, as filling defect capacity, standard grout amount and the filling of half grout sleeve The difference of defect capacity is practical grouting quantity, and the ratio between practical grouting quantity and the standard grout amount of half grout sleeve are practical fill Starch plumpness;
D, practical grouting plumpness is compared with grouting plumpness Con trolling index, if practical grouting plumpness more than etc. In grouting plumpness Con trolling index, then still it is determined as qualification, if practical grouting plumpness is less than grouting plumpness Con trolling index, Then it is determined as unqualified;
E, water filling hose is stretched into the liquid in sleeve body, then pull syringe, liquid is extracted out, reduction lacks Cavity is fallen into, detection is completed;
Further, before calculating grouting plumpness, the advanced quasi- grouting quantity calibration of rower takes half grout sleeve sample, Rubber stopper is filled in grout hole, double of grout sleeve sample sealed bottom of diaphragm seal, then double of grout sleeve sample are then passed through Product internal water flooding measures half grout sleeve sample interior water, obtains sleeve sample when reaching the height of slurry outlet bottom Sleeve sample capacity is subtracted the second prefabricated components vertical reinforcement and stretched into sleeve body and positioned at grout outlet bottom height by capacity Degree is with the volume of lower part to get to standard grout amount;
Wherein, the half grout sleeve model used in half grout sleeve sample and prefabricated components is consistent.
Further, using double of the grout sleeve sample interior water filling of syringe and water filling hose, pass through syringe graduation Obtain sleeve sample capacity.
It further, will be in detection hole before the half grout sleeve grouting end and initial set being preset in prefabricated components Rubber stopper takes out, and then stretches into the endoscope probe of industrial endoscope from sense channel, passes through the control to endoscope probe System, the sleeve body inside grouting situation of observation endoscope probe shooting, when slurry face height is more than or equal to slurry outlet bottom When the height in portion, as full grouting;When slurry face height is less than the height of slurry outlet bottom, as insatiable hunger full irrigation is starched, when When being starched for insatiable hunger full irrigation, rubber stopper is got back into detection hole, continues to be in the milk from grouting channel, observation pulp channel, pulp channel When inside having slurry spilling, as mends slurry and terminate.
Further, when the end that the second prefabricated components vertical reinforcement stretches into sleeve body is not wrapped by grouting material completely When covering, reinforcement location inside sleeve body that can be by observing endoscope probe shooting judges whether reinforcing bar is wanted according to the rules It asks in the insertion sleeve of foot length.
A kind of benefit paste-making method of half grout sleeve with detection hole, when half grout sleeve being preset in prefabricated components fills After slurry terminates and cures, include the following steps:It is drilled first to pulp channel using drilling device, by cured slurry It smashes and clears up, pulp channel is made to penetrate through, then supplementary irrigation slurry is carried out from pulp channel, when slurry is discharged from sense channel It completes to mend slurry work.
Beneficial effects of the present invention:
1, half grout sleeve with detection hole only adds a detection hole above the slurry outlet of conventional grout sleeve, both It can guarantee the mechanical property of sleeve entirety, and will not make troubles the manufacturing process of prefabricated components, and do not increase sleeve The cost of manufacture of production cost and prefabricated components.
2, newly-increased detection hole may be implemented that a hole is dual-purpose, can not only be used for detection device when the detection of grouting material plumpness Stretch into channel, can also be used as be in the milk it is not full in the case of carry out mend slurry gas vent (slurry outlet).
3, field detecting device is light and easy to operate, and detection method is convenient, and common testing staff is after simple training It can be on duty.
4, live randomness detection may be implemented in the present invention, and need to only take out the rubber stopper in detection hole can examine It surveys, without arranging measuring point in advance before grouting construction, virtually increases random checking dynamics, advantageously ensure that reinforcing bar set The quality of cylinder grouting connection and safety.
5, the case where sleeve inner can directly being reflected using endoscope, qualitative detection turgor, and can shine It mutually records, photo can be attached on examining report, increase the intuitive of examining report;Water flood is peeped using interior, can be quantified The turgor for detecting grouting, increase the public trust of examining report with it is authoritative.
6, detection method of the invention, by the progress of endoscopic observation water filling, is finally filled to when carrying out water filling detection Until slurry outlet bottom, so as to avoid the error brought of uncertainty of pulp pipeline inner cavity body product.
7, the not full grout sleeve that is in the milk found for late detection, it is only necessary to drilling device at slurry outlet Drill, grouting material disintegrating slag cleared up in duct while drilling until barrel bore, using slurry outlet as when mending slurry into Hole is starched, using detection hole as the gas vent (slurry outlet) mended when starching, you can carry out in-situ repair.Injection is passed through before repairing Device and water filling hose will detect liquid extraction, it is only necessary to just can reach connection request after directly filling up the gap that do not fill, save Grouting material.
8, during grouting construction, or before grouting material initial set, unit in charge of construction or supervisor can also use the present invention's Method carries out qualitative detection to grouting quality, if finding, grouting is not full, still can utilize original grout hole and pulp Hole carries out benefit slurry, improves grouting quality.
Description of the drawings
Fig. 1 is the half grout sleeve schematic diagram of the present invention;
Fig. 2 is the half grout sleeve schematic diagram of another embodiment of the present invention;
Structural schematic diagram when Fig. 3 is standard grout of the present invention;
Fig. 4 is the schematic diagram when present invention does not fill slurry and water filling detection;
Schematic diagram when Fig. 5 is spillage of the present invention and water filling detection;
Fig. 6 is operating process schematic diagram of the present invention.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments, so that those skilled in the art can To more fully understand the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
Shown in referring to Fig.1, an embodiment of half grout sleeve of the invention with detection hole is used for the prefabricated structure of levels The Vertical bar connection of part, with sleeve body 1, sleeve body is tubular structure, the opening setting at the top of sleeve body There is threaded hole 2, sleeve body surface is disposed with slurry outlet 3 and grout hole 4 from top to bottom, between slurry outlet and threaded hole Sleeve body surface on be additionally provided with detection hole 5, the grouting situation in sleeve body can be seen by detection hole It examines, and grouting plumpness can be measured by detection hole, due to half grout sleeve grout outlet bottom of Vertical bar connection There are certain distances with barrel bore top edge in portion, and terminating the part after grout outlet blocks in grouting forms closed cavity, subsequently Grouting material can not continue into, and ultimately form permanent cavity, and enough operation skies are left in sleeve inner for detection device Between.In this embodiment, detection hole, slurry outlet and grout hole can be in a straight line.
With reference to shown in Fig. 2, in one embodiment, detection hole can be on a no longer straight line, to detect with slurry outlet and grout hole Hole may be at sleeve body on the annular surface any position between threaded hole and slurry outlet.
With reference to shown in Fig. 3, half grout sleeve in use, threaded hole for being screwed on the first prefabricated components vertical reinforcement 6, For sleeve body for being set in the second prefabricated components vertical reinforcement 7, sleeve body surface sets gradually slurry outlet from top to bottom And grout hole, slurry outlet connect to form pulp channel with grout outlet 8, grout hole connect to form grouting channel with grout pipe 9, slurry Material can enter from grouting channel in sleeve body, and be overflowed from pulp channel, after being trapped in the slurry curing in sleeve body Sleeve body and the second prefabricated components vertical reinforcement are fixed;A kind of standard type after slurry curing is shown in Fig. 3.
Wherein, detection hole connect to form sense channel with detection pipe 10, can be observed in sleeve body by detection hole Grouting situation, and grouting plumpness can be measured by detection hole.There are one the quantity of the detection hole, quantity The mechanical property of sleeve entirety had not only been can guarantee with position is opened up, but also will not have been made troubles the manufacturing process of prefabricated components, had not been increased The production cost of jacketed cylinder and the cost of manufacture of prefabricated components are a kind of accessories that can be widelyd popularize and use.
With reference to shown in Fig. 4, when worker lacks a sense of responsibility, there is the problems such as construction is lazy, grouting does not complete just to be stopped in advance When operation, slurry exists only in the sleeve body of grout hole and slurry outlet bottom part down, and slurry face height A can not be reached out Hole bottom margin is starched, slurry is also not present in pulp channel, is a kind of insatiable hunger full irrigation slurry, existing defects.
Referring to Figure 5, it is fluidised form at grouting construction initial stage because of slurry, when the first prefabricated components and the second prefabricated structure When horizontal joint (sitting pulp layer) between part does not carry out peripheral seal work, there are spillage risks for slurry, when slurry spillage, Slurry top surface in sleeve body can sink, and slurry face height A can not also reach slurry outlet bottom margin, form another kind not Full grouting, existing defects risk.
It is additionally provided with convex hole rib on above-mentioned sleeve body inner wall, after slurry curing, between sleeve body and slurry Shearing greatly improves, and firmness increases, not easily to fall off, the bonding strength between effective guarantee prefabricated components;Convex hole rib can be with It is simple in structure for screw thread or shearing bolt, and do not influence grouting quantity.
In grouting, first have to ensure that detection hole can not be blocked by slurry, therefore the first rubber is arranged in detection hole Plug, slurry can form negative pressure space, slurry will not pour in detection hole, have in perfusion in the sleeve body above slurry outlet Effect ensures the unimpeded of detection hole, that is, also ensures the unimpeded of sense channel.
And the first rubber stopper can just be filled in prefabricated components manufacturing process, be integrated with sleeve body setting Finished product is sold.
The second rubber stopper is also provided in the grout hole of sleeve body, which can be in half grouting set Cylinder is filled in when being used as sample indwelling, is formed and is blocked, and pulp bottom hole portion is calculated between sleeve body by blocking to detect Capacity, the standard grout amount of as half grout sleeve.When detection calculates standard grout amount, syringe and water filling may be used Double of grout sleeve sample interior water filling of hose, obtains sleeve sample capacity, certainly while water filling by syringe graduation Industrial endoscope can also be used to carry out real time inspection to water filling height, cause liquid from pulp so as to avoid blindness water filling The error that hole elution band comes.
With reference to shown in Fig. 6, in an embodiment of the grouting plumpness detection method of the present invention, using above-described embodiment In half grout sleeve and rubber stopper and industrial endoscope, syringe and water filling hose;
Industrial endoscope includes probe pipeline, and probe pipeline both ends are separately connected endoscope host and endoscope probe, lead to The control for crossing endoscope host, enables to endoscope probe to be rotated at any angle, realizes effective observation and claps According to;
The dispensing end of water filling hose and syringe connects, and is used for the pumping of liquid, and water filling hose is convenient for filling in sleeve manually In ontology;
Terminate and be detected after curing specifically, this method is the half grout sleeve grouting being preset in prefabricated components, Steps are as follows for its detection method:
The rubber stopper in detection hole is taken out first;Then the endoscope probe of industrial endoscope is stretched from sense channel Enter, by the control to endoscope probe, situation of being in the milk inside the sleeve body of observation endoscope probe shooting, the figure of shooting Piece can be used as the foundation that subsequent detection unit carries out result evaluation, photo be attached to as the image observed in real time On examining report, increase the intuitive and authenticity of examining report;When sleeve body inner pulp charge level height is more than or equal to When the height of slurry outlet bottom, as full grouting, grouting plumpness is determined as qualification;When slurry face height is less than slurry outlet When the height of bottom, as insatiable hunger full irrigation is starched, and need to be continued grouting plumpness and quantitatively be detected;
Wherein, reinforcement location inside sleeve body can also be taken using endoscope probe, when the second prefabricated components are perpendicular When the end stretched into sleeve body to reinforcing bar is not coated by grouting material completely, you can to observe reinforcing bar, judge reinforcing bar with this Whether require according to the rules in the insertion sleeve of foot length.
It is judged as that insatiable hunger full irrigation is starched after above-mentioned detection, and grouting plumpness need to be carried out when quantitatively detecting, first passes through syringe Detection liquid is extracted, then water filling hose is connected on the dispensing end of syringe, and press syringe, is made in syringe Liquid enters in water filling hose, when water filling hose end is discharged, stops pressing, this operation can avoid empty in water filling hose Setting leads to the generation of water filling error, improves accuracy of detection;It is then that water filling is soft by initial capacity in calibration record syringe Pipe is stretched into from sense channel in sleeve body, presses syringe again, is made in liquid injection sleeve body, by being peeped in industry Mirror checks liquid height, and the uncertainty that pulp pipeline inner cavity body accumulates is avoided to bring measurement error, with reference to Fig. 4 and Fig. 5 institutes Show, when liquid reaches the height of slurry outlet bottom, stops pressing, and by capacity after being injected in calibration record syringe, just The difference of beginning capacity and capacity after injection is the water injection rate of syringe, and as filling defect capacity, the standard of half grout sleeve fills Slurry amount and the difference of filling defect capacity are practical grouting quantity, the ratio between the standard grout amount of practical grouting quantity and half grout sleeve As practical grouting plumpness, which is easy to operate, high certainty of measurement, and carries and use convenient for building-site, detection at This is extremely low;
In order to be more accurate obtain detection data, calculate be in the milk plumpness before, it is also necessary to carry out standard grout amount mark It is fixed, half grout sleeve sample is taken, rubber stopper is filled in grout hole, then passes through double of grout sleeve sample bottom of diaphragm seal Portion seals, then double of grout sleeve sample interior water filling, when reaching the height of slurry outlet bottom, measures half grout sleeve sample Water inside product, obtains sleeve sample capacity, sleeve sample capacity, which is subtracted the second prefabricated components vertical reinforcement, stretches into sleeve sheet In vivo and positioned at grout outlet bottom level with the volume of lower part to get to standard grout amount;
Wherein, the half grout sleeve model used in half grout sleeve sample and prefabricated components is consistent, with ensure to compare Accuracy.
Measurement can be compared with grouting plumpness Con trolling index, if practical grouting is full after obtaining practical grouting plumpness Full scale is more than or equal to grouting plumpness Con trolling index, then is still determined as qualification, if practical grouting plumpness is less than grouting plumpness Con trolling index, then be determined as it is unqualified, compared by the calculating of plumpness can avoid erroneous judgement situation appearance, increase detection The public trust of report and authority;
Live randomness detection may be implemented in above-mentioned detection method, need to only take out the rubber stopper in detection hole Be detected, without arranging measuring point in advance before grouting construction, virtually increase random checking dynamics, there is no because (grouting quality except measuring point can not be examined the problem of arranging measuring point in advance and construction party is caused to ignore grouting quality except measuring point Survey), advantageously ensure that quality and the safety of reinforced bar sleeve grouting connection.
And in order to ensure the durability subsequently used, water filling hose is stretched into the liquid in sleeve body, is then taken out Syringe is drawn, liquid is extracted out, restores defect cavity, completes detection, the liquid holdup of injection is avoided to sleeve body and stretches The the second prefabricated components vertical reinforcement entered in sleeve causes quality to influence;
It when being determined as unqualified, can carry out studying for a second time courses one has flunked operation, in an embodiment of the benefit paste-making method of the present invention In, carry out benefit slurry using following steps:It is drilled to pulp channel using drilling device, is cleared up while drilling first Grouting material disintegrating slag is up to barrel bore in duct, using slurry outlet as the slurry-feeding hole mended when starching, when detection hole is starched as benefit Gas vent (slurry outlet), you can carry out in-situ repair, then carry out supplementary irrigation slurry from pulp channel, when slurry is arranged from sense channel It completes to mend slurry work when going out.Liquid extraction will be detected by syringe and water filling hose before repairing, it is only necessary to directly will not The gap filled just can reach connection request after filling up, save grouting material.
Certainly this mends paste-making method and can also be used before not detecting plumpness, when construction party voluntarily judges very likely not It when qualified, is directly studied for a second time courses one has flunked using above-mentioned benefit paste-making method, to achieve the effect that high quality is built.
In another embodiment, the present invention or unit in charge of construction or supervisor also workable method, it is pre- when being preset in Half grout sleeve grouting in component processed terminates and before initial set, the rubber stopper in detection hole is taken out, then by industrial endoscope Endoscope probe stretched into from sense channel, pass through the control to endoscope probe, observation endoscope probe shooting sleeve sheet Internal portion's grouting situation, when slurry face height is more than or equal to the height of slurry outlet bottom, as full grouting;Work as slurry When charge level height is less than the height of slurry outlet bottom, as insatiable hunger full irrigation is starched, and when being starched for insatiable hunger full irrigation, rubber stopper is got back into In detection hole, continue to be in the milk from grouting channel, observe pulp channel, when having slurry spilling in pulp channel, as mends slurry knot Beam.This method enables to unit in charge of construction or management list voluntarily to carry out qualitative detection to grouting quality, if finding grouting insatiable hunger It is full, then benefit slurry still can be carried out using original grout hole and slurry outlet, improve grouting quality.
Above example is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection scope of the present invention It is without being limited thereto.Those skilled in the art on the basis of the present invention made by equivalent substitute or transformation, the present invention Within protection domain.Protection scope of the present invention is subject to claims.

Claims (10)

1. a kind of half grout sleeve with detection hole is used for the Vertical bar connection of levels prefabricated components, which is characterized in that packet Sleeve body is included, the sleeve body is tubular structure, and the opening at the top of sleeve body is provided with threaded hole, the sleeve sheet Body surface face is disposed with slurry outlet and grout hole from top to bottom, on the sleeve body surface between the slurry outlet and threaded hole It is additionally provided with detection hole.
2. half grout sleeve with detection hole as described in claim 1, which is characterized in that also set on the sleeve body inner wall It is equipped with convex hole rib, the convex hole rib is screw thread or shearing bolt.
3. half grout sleeve with detection hole as described in claim 1, which is characterized in that be provided with first in the detection hole Rubber stopper, first rubber stopper are filled in prefabricated components manufacturing process.
4. half grout sleeve with detection hole as described in claim 1, which is characterized in that be provided with second in the grout hole Rubber stopper, second rubber stopper are filled in when half grout sleeve is as sample indwelling.
The plumpness detection method 5. a kind of half grout sleeve with detection hole is in the milk, which is characterized in that including half grout sleeve, work Sight glass, syringe, water filling hose and rubber stopper in the industry;
Half grout sleeve is used for the Vertical bar connection of levels prefabricated components, and half grout sleeve includes sleeve body, institute It is tubular structure to state sleeve body, and the opening at the top of sleeve body is provided with threaded hole, the threaded hole and the first prefabricated structure Part vertical reinforcement is screwed on, and the sleeve body is set on the second prefabricated components vertical reinforcement, and the sleeve body surface is from upper Slurry outlet and grout hole are disposed under, the slurry outlet connect to form pulp channel with grout outlet, the grout hole with Grout pipe connects to form grouting channel, and detection hole is additionally provided on the sleeve body surface between the slurry outlet and threaded hole, The detection hole connect to form sense channel with detection pipe;
The rubber stopper includes the first rubber stopper and the second rubber stopper, and the first rubber stopper is arranged in prefabricated components manufacturing process In the detection hole of half grout sleeve, second rubber stopper is arranged in the grout hole as half grout sleeve of sample indwelling;
The industrial endoscope includes probe pipeline, and the probe pipeline both ends are separately connected endoscope host and endoscope is visited Head;
The dispensing end of the water filling hose and syringe connects;
Detection method includes the following steps for it:
A, after the half grout sleeve grouting being preset in prefabricated components terminates and cures, the rubber stopper in detection hole is taken out;
B, and then by the endoscope probe of industrial endoscope it is stretched into from sense channel, passes through the control to endoscope probe, observation Grouting situation inside the sleeve body of endoscope probe shooting, when slurry face height is more than or equal to the height of slurry outlet bottom When, as full grouting, grouting plumpness is determined as qualification;When slurry face height is less than the height of slurry outlet bottom, as Insatiable hunger full irrigation is starched, and need to be continued grouting plumpness and quantitatively be detected;
C, it when being starched for insatiable hunger full irrigation, first passes through syringe and extracts detection liquid, water filling hose is then connected to syringe On dispensing end, and syringe is pressed, the liquid in syringe is made to enter in water filling hose, when water filling hose end is discharged, stopped It only presses, by initial capacity in calibration record syringe, then stretches into water filling hose in sleeve body from sense channel, then Secondary pressing syringe makes in liquid injection sleeve body, liquid height is checked by industrial endoscope, when liquid reaches slurry outlet When the height of bottom, stop pressing, and pass through capacity after being injected in calibration record syringe, initial capacity and capacity after injection Difference is the water injection rate of syringe, as filling defect capacity, standard grout amount and the filling defect capacity of half grout sleeve Difference is practical grouting quantity, and the ratio between practical grouting quantity and the standard grout amount of half grout sleeve are practical grouting plumpness;
D, practical grouting plumpness is compared with grouting plumpness Con trolling index, if practical grouting plumpness is more than or equal to grouting Plumpness Con trolling index, then be still determined as qualification, if practical grouting plumpness is less than grouting plumpness Con trolling index, is determined as It is unqualified;
E, water filling hose is stretched into the liquid in sleeve body, then pull syringe, liquid is extracted out, reduction defect is empty Chamber completes detection.
6. the half grout sleeve grouting plumpness detection method with detection hole as claimed in claim 5, which is characterized in that counting Before calculating grouting plumpness, the advanced quasi- grouting quantity calibration of rower takes half grout sleeve sample, rubber stopper is filled in grout hole, Then double of grout sleeve sample sealed bottom, then double of grout sleeve sample interior water filling, when the height for reaching slurry outlet bottom When spending, half grout sleeve sample interior water is measured, sleeve sample capacity is obtained, sleeve sample capacity is subtracted into the second prefabricated structure Part vertical reinforcement stretch into sleeve body and positioned at grout outlet bottom level with the volume of lower part to get to standard grout amount;
Wherein, the half grout sleeve model used in half grout sleeve sample and prefabricated components is consistent.
7. the half grout sleeve grouting plumpness detection method with detection hole as claimed in claim 6, which is characterized in that use Double of the grout sleeve sample interior water filling of syringe and water filling hose, sleeve sample capacity is obtained by syringe graduation.
8. the half grout sleeve grouting plumpness detection method with detection hole as claimed in claim 5, which is characterized in that when pre- The half grout sleeve grouting being located in prefabricated components terminates and before initial set, the rubber stopper in detection hole is taken out, then will be industrial The endoscope probe of endoscope is stretched into from sense channel, and by the control to endoscope probe, observation endoscope probe is shot Grouting situation inside sleeve body, when slurry face height is more than or equal to the height of slurry outlet bottom, as full grouting; When slurry face height is less than the height of slurry outlet bottom, as insatiable hunger full irrigation is starched, when being starched for insatiable hunger full irrigation, by rubber stopper plug It returns in detection hole, continues to be in the milk from grouting channel, observe pulp channel, when having slurry spilling in pulp channel, as mend slurry knot Beam.
9. half grout sleeve with detection hole is in the milk plumpness detection method as claimed in claim 5, which is characterized in that when the It, can be by observing endoscope when the end that two prefabricated components vertical reinforcements stretch into sleeve body is not coated by grouting material completely Reinforcement location inside the sleeve body of shooting of popping one's head in, judges whether reinforcing bar requires in the insertion sleeve of foot length according to the rules.
10. a kind of benefit paste-making method of half grout sleeve with detection hole, which is characterized in that when half filling being preset in prefabricated components Sleeve grouting is starched to terminate and after solidification, include the following steps:It is drilled, will be cured to pulp channel using drilling device first Slurry smash and clear up, make pulp channel penetrate through, then from pulp channel carry out supplementary irrigation slurry, when slurry from sense channel be discharged When complete mend slurry work.
CN201810096995.4A 2018-01-31 2018-01-31 Half grout sleeve grouting plumpness detection method with detection hole Active CN108331260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810096995.4A CN108331260B (en) 2018-01-31 2018-01-31 Half grout sleeve grouting plumpness detection method with detection hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810096995.4A CN108331260B (en) 2018-01-31 2018-01-31 Half grout sleeve grouting plumpness detection method with detection hole

Publications (2)

Publication Number Publication Date
CN108331260A true CN108331260A (en) 2018-07-27
CN108331260B CN108331260B (en) 2019-09-03

Family

ID=62927740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810096995.4A Active CN108331260B (en) 2018-01-31 2018-01-31 Half grout sleeve grouting plumpness detection method with detection hole

Country Status (1)

Country Link
CN (1) CN108331260B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108982535A (en) * 2018-08-01 2018-12-11 昆山市建设工程质量检测中心 Sleeve grouting plumpness detection method based on endoscope three-dimensional dimension measuring technique
CN109098468A (en) * 2018-09-11 2018-12-28 上海市建筑科学研究院 Supplementary irrigation method is injected in drilling for sleeve grouting defect
CN109099986A (en) * 2018-09-06 2018-12-28 北京市建筑设计研究院有限公司 The visual detection and bracing means and method of reinforcing bar connection grout sleeve
CN109211909A (en) * 2018-11-12 2019-01-15 上海市建筑科学研究院 A kind of detection method of the sleeve grouting plumpness based on drill core pore-forming
CN109339343A (en) * 2018-09-27 2019-02-15 北京市建筑设计研究院有限公司 Precast concrete grout sleeve
CN109707109A (en) * 2019-01-25 2019-05-03 上海市建筑科学研究院 Sleeve supplementary irrigation regulation method based on different grouting depth of defect
CN109750795A (en) * 2019-01-18 2019-05-14 浙江大学 A kind of grout sleeve with detection pipe and its be in the milk plumpness detection and benefit paste-making method
CN109900697A (en) * 2019-01-18 2019-06-18 浙江大学 Half grout sleeve turgor check device of one kind and application method
CN110145073A (en) * 2019-05-31 2019-08-20 马世强 Exempt from slip casting reinforcing steel bar connecting sleeve tube
CN110261403A (en) * 2019-05-06 2019-09-20 昆山市建设工程质量检测中心 A kind of device and method for grouting construction stage detection sleeve grouting full weight
CN110514263A (en) * 2019-08-25 2019-11-29 唐昌辉 Standard curve is established to the detection method of grout sleeve pulp noodle height
CN112014548A (en) * 2020-08-04 2020-12-01 上海建工集团股份有限公司 Slurry filling fullness detection device and method in mechanical sleeve grouting construction stage
CN112252592A (en) * 2020-10-28 2021-01-22 长沙理工大学 Grouting sleeve device with intelligent detection assembly
CN112780026A (en) * 2020-12-24 2021-05-11 上海建工集团股份有限公司 Device and method for improving grouting fullness of sleeve
CN113668897A (en) * 2021-09-26 2021-11-19 昆山市建设工程质量检测中心 Low-pressure filling and renovating method for slurry leakage of communication cavity at bottom of prefabricated shear wall
CN114319917A (en) * 2021-04-14 2022-04-12 昆山匹希通检测科技有限公司 Single-hole filling and renovating method aiming at sleeve grouting defects
CN114775913A (en) * 2022-06-01 2022-07-22 昆山市建设工程质量检测中心 Visual grout supplementing method for sleeve grouting defects
CN114856201A (en) * 2022-06-02 2022-08-05 昆山市建设工程质量检测中心 Preparation method of grout supplementing hole for repairing sleeve grouting defects
CN115075563A (en) * 2022-06-01 2022-09-20 昆山市建设工程质量检测中心 Sleeve slurry-replenishing anti-backflow control method based on visual monitoring along slurry outlet pore passage
CN115961785A (en) * 2022-12-30 2023-04-14 昆山市建设工程质量检测中心 Method for adjusting extending position of grout supplementing pipe for semi-grouting sleeve grouting repair and remediation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827610B1 (en) * 2007-09-05 2008-05-23 와이앤케이텍 주식회사 A grouting system and the method using endoscopy
CN105865568A (en) * 2016-04-12 2016-08-17 北京市建筑设计研究院有限公司 Device for nondestructive quantitative detection of steel bar connecting grouting sleeve
CN106677437A (en) * 2017-01-20 2017-05-17 周建 Rebar connecting grout sleeve with standby holes and sleeve connection quality detecting method
CN106836657A (en) * 2017-03-17 2017-06-13 北京市建筑设计研究院有限公司 The repair apparatus and method of bar connecting grout sleeve or device when being in the milk not enough
CN107288268A (en) * 2017-06-27 2017-10-24 浙江大学 Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint
CN206928522U (en) * 2017-06-20 2018-01-26 北京汇丰鸿信科技有限公司 It is easy to check the grout sleeve of Grouted density
CN207863311U (en) * 2018-01-31 2018-09-14 昆山市建设工程质量检测中心 Half grout sleeve with detection hole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827610B1 (en) * 2007-09-05 2008-05-23 와이앤케이텍 주식회사 A grouting system and the method using endoscopy
CN105865568A (en) * 2016-04-12 2016-08-17 北京市建筑设计研究院有限公司 Device for nondestructive quantitative detection of steel bar connecting grouting sleeve
CN106677437A (en) * 2017-01-20 2017-05-17 周建 Rebar connecting grout sleeve with standby holes and sleeve connection quality detecting method
CN106836657A (en) * 2017-03-17 2017-06-13 北京市建筑设计研究院有限公司 The repair apparatus and method of bar connecting grout sleeve or device when being in the milk not enough
CN206928522U (en) * 2017-06-20 2018-01-26 北京汇丰鸿信科技有限公司 It is easy to check the grout sleeve of Grouted density
CN107288268A (en) * 2017-06-27 2017-10-24 浙江大学 Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint
CN207863311U (en) * 2018-01-31 2018-09-14 昆山市建设工程质量检测中心 Half grout sleeve with detection hole

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108982535B (en) * 2018-08-01 2019-03-19 昆山市建设工程质量检测中心 Sleeve grouting plumpness detection method based on endoscope three-dimensional dimension measuring technique
CN108982535A (en) * 2018-08-01 2018-12-11 昆山市建设工程质量检测中心 Sleeve grouting plumpness detection method based on endoscope three-dimensional dimension measuring technique
CN109099986A (en) * 2018-09-06 2018-12-28 北京市建筑设计研究院有限公司 The visual detection and bracing means and method of reinforcing bar connection grout sleeve
CN109098468A (en) * 2018-09-11 2018-12-28 上海市建筑科学研究院 Supplementary irrigation method is injected in drilling for sleeve grouting defect
CN109098468B (en) * 2018-09-11 2021-04-27 上海市建筑科学研究院 Drilling injection filling method aiming at sleeve grouting defect
CN109339343A (en) * 2018-09-27 2019-02-15 北京市建筑设计研究院有限公司 Precast concrete grout sleeve
CN109211909B (en) * 2018-11-12 2021-01-22 上海市建筑科学研究院 Sleeve grouting fullness detection method based on core drilling pore-forming
CN109211909A (en) * 2018-11-12 2019-01-15 上海市建筑科学研究院 A kind of detection method of the sleeve grouting plumpness based on drill core pore-forming
CN109900697A (en) * 2019-01-18 2019-06-18 浙江大学 Half grout sleeve turgor check device of one kind and application method
CN109750795B (en) * 2019-01-18 2024-04-19 浙江大学 Grouting sleeve with detection pipe and grouting fullness detection and slurry supplementing method thereof
CN109750795A (en) * 2019-01-18 2019-05-14 浙江大学 A kind of grout sleeve with detection pipe and its be in the milk plumpness detection and benefit paste-making method
CN109707109B (en) * 2019-01-25 2020-12-22 上海市建筑科学研究院 Sleeve filling and renovating method based on different grouting defect depths
CN109707109A (en) * 2019-01-25 2019-05-03 上海市建筑科学研究院 Sleeve supplementary irrigation regulation method based on different grouting depth of defect
CN110261403A (en) * 2019-05-06 2019-09-20 昆山市建设工程质量检测中心 A kind of device and method for grouting construction stage detection sleeve grouting full weight
CN110261403B (en) * 2019-05-06 2020-04-10 昆山市建设工程质量检测中心 Device and method for detecting grouting fullness of sleeve in grouting construction stage
CN110145073A (en) * 2019-05-31 2019-08-20 马世强 Exempt from slip casting reinforcing steel bar connecting sleeve tube
CN110514263A (en) * 2019-08-25 2019-11-29 唐昌辉 Standard curve is established to the detection method of grout sleeve pulp noodle height
CN112014548A (en) * 2020-08-04 2020-12-01 上海建工集团股份有限公司 Slurry filling fullness detection device and method in mechanical sleeve grouting construction stage
CN112252592A (en) * 2020-10-28 2021-01-22 长沙理工大学 Grouting sleeve device with intelligent detection assembly
CN112780026A (en) * 2020-12-24 2021-05-11 上海建工集团股份有限公司 Device and method for improving grouting fullness of sleeve
CN114319917A (en) * 2021-04-14 2022-04-12 昆山匹希通检测科技有限公司 Single-hole filling and renovating method aiming at sleeve grouting defects
CN114319917B (en) * 2021-04-14 2022-12-30 昆山匹希通检测科技有限公司 Single-hole filling and renovating method aiming at sleeve grouting defects
CN113668897A (en) * 2021-09-26 2021-11-19 昆山市建设工程质量检测中心 Low-pressure filling and renovating method for slurry leakage of communication cavity at bottom of prefabricated shear wall
CN113668897B (en) * 2021-09-26 2022-05-31 昆山市建设工程质量检测中心 Low-pressure filling and renovating method for slurry leakage of communication cavity at bottom of prefabricated shear wall
CN114775913B (en) * 2022-06-01 2022-11-25 昆山市建设工程质量检测中心 Visual grout supplementing method for sleeve grouting defects
CN115075563A (en) * 2022-06-01 2022-09-20 昆山市建设工程质量检测中心 Sleeve slurry-replenishing anti-backflow control method based on visual monitoring along slurry outlet pore passage
CN115075563B (en) * 2022-06-01 2023-09-26 昆山市建设工程质量检测中心 Sleeve slurry supplementing and back flushing preventing control method based on visual monitoring along slurry outlet pore canal
CN114775913A (en) * 2022-06-01 2022-07-22 昆山市建设工程质量检测中心 Visual grout supplementing method for sleeve grouting defects
CN114856201A (en) * 2022-06-02 2022-08-05 昆山市建设工程质量检测中心 Preparation method of grout supplementing hole for repairing sleeve grouting defects
CN114856201B (en) * 2022-06-02 2023-09-29 昆山市建设工程质量检测中心 Preparation method of grouting hole channel for repairing sleeve grouting defect
CN115961785A (en) * 2022-12-30 2023-04-14 昆山市建设工程质量检测中心 Method for adjusting extending position of grout supplementing pipe for semi-grouting sleeve grouting repair and remediation
CN115961785B (en) * 2022-12-30 2023-09-01 昆山市建设工程质量检测中心 Grouting pipe extending position adjusting method for repairing grouting sleeve

Also Published As

Publication number Publication date
CN108331260B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN108331260B (en) Half grout sleeve grouting plumpness detection method with detection hole
CN108277926B (en) Slurry anchor connection part grouting plumpness detection method with detection hole
CN108152297B (en) Inside peep the method for water flood detection half grout sleeve of reinforcing bar grouting plumpness
CN108982535B (en) Sleeve grouting plumpness detection method based on endoscope three-dimensional dimension measuring technique
CN207863311U (en) Half grout sleeve with detection hole
CN207866729U (en) Inside peep the device of water flood detection half grout sleeve of reinforcing bar grouting plumpness
CN108519306B (en) Detection apparatus for closely knit degree of grout in grout sleeve
CN105527661A (en) Detection and leakage blocking methods of concrete building water leakage
CN108761049B (en) Device and method for detecting grouting fullness of steel bar connecting sleeve through preformed hole
WO2020119468A1 (en) Method for detecting grout plumpness of sleeve cylinder with single-sided ultrasound detection along grout outlet channel
CN108061592B (en) A method of for half grout sleeve standard grout amount of quick field calibration reinforcing bar
CN109856143A (en) A method of detection prefabricated concrete structure sleeve grouting quality
CN108918660A (en) Nondestructive detection method for sleeve grouting fullness of steel bar sleeve grouting connection joint
CN208255027U (en) A kind of sleeve grouting plumpness detection device based on pre-buried steel wire hubbing
CN108802187B (en) Grouting fullness detection method and system based on sleeve surface ultrasound
CN110514736A (en) A kind of monitoring device and its application method of assembled steel reinforced sleeve grouting compactness
CN112014548A (en) Slurry filling fullness detection device and method in mechanical sleeve grouting construction stage
CN109827886A (en) The impervious experimental method of cement concrete joint sealing material
CN111983201A (en) Electromagnetic type sleeve grouting construction stage slurry filling plumpness detection device and method
CN207863312U (en) Slurry anchor connection part with detection hole
CN110455678A (en) A kind of packaged type bridges pier stud node Grouted density detection method
CN111912867B (en) Grouting metal sleeve compactness detection device and method based on electromagnetic wave time domain reflection
CN216816399U (en) Water-stopping effect test device of deep foundation pit water-stopping curtain
CN206460020U (en) A kind of device for detecting prestressed component pore squeezing quality
CN115897491A (en) Embedded pipe earth-rock dam diaphragm wall structure and defect detection and repair method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant