CN108280631A - A kind of front end development task management-control method and system - Google Patents

A kind of front end development task management-control method and system Download PDF

Info

Publication number
CN108280631A
CN108280631A CN201810137803.XA CN201810137803A CN108280631A CN 108280631 A CN108280631 A CN 108280631A CN 201810137803 A CN201810137803 A CN 201810137803A CN 108280631 A CN108280631 A CN 108280631A
Authority
CN
China
Prior art keywords
page
engineer
task
development
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810137803.XA
Other languages
Chinese (zh)
Inventor
王�琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hollow Science And Technology Co Ltd
Original Assignee
Wuhan Hollow Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hollow Science And Technology Co Ltd filed Critical Wuhan Hollow Science And Technology Co Ltd
Priority to CN201810137803.XA priority Critical patent/CN108280631A/en
Publication of CN108280631A publication Critical patent/CN108280631A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/10Requirements analysis; Specification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of front end development task management-control method and systems, and wherein method includes carrying out demand analysis, and analysis result is fed back to client according to the mission requirements for receiving client's publication, confirms that task releases news by client;According to the confirmation message of client, development task is opened and distributed, the development task is divided by the page, and is distributed each page to each user according to mission requirements description, carries out page development;According to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.It can effectively improve the working efficiency of software development task through the invention, reduce the difficulty for realizing development goal.

Description

A kind of front end development task management-control method and system
Technical field
The present invention relates to computer application technologies, and in particular to a kind of front end development task management-control method and system.
Background technology
The common workflow of traditional software development task is divided into 3 stages, first demand analysis stage substantially, by producing Product are handled or product designer links up with software users, understand and arrange demand, are formed software requirement and are illustrated document, so Complete product prototype design according to demand afterwards;Followed by development phase, Software Development Engineer team illustrate document according to demand It is developed with product prototype, development process gradually submits code, carries out unit or module testing, finally carries out code whole It closes, carries out combined debugging;It is finally test phase, system integrated testability is carried out by Test Engineer team and each module is surveyed Examination carries out improvement and optimization to code according to test result, is finally tested and checked and accepted by software users.For Internet application Software systems, user interface (UI) part often also needs to special designer and designs user interface of software, then transfers to Front end Developmental Engineer develops according to user-interface design original text.In entire software development task, management and control focuses on Two aspects, one, Software Development Engineer is wanted and product design personnel and software end user are adequately linked up, it is accurate entirely The understanding software requirement in face;Two, want close fit between Developmental Engineer and Test Engineer, co-ordination, make exploitation into Degree is controllable.
At present for software systems, the especially exploitation of software fore-end, agile development pattern, Huo Zheyin are mainly used Enter software project management mechanism and tool, carries out the management and control of front end development task.Problem here is that:
(1) requirement description is inaccurate, it is necessary to and it is artificial repeatedly link up repeatedly, requirement description is gradually refined, is reached The consistent understanding of demand moving party (product designer and/or software users) and Developmental Engineer;
(2) personnel coordinate defective tightness, it is necessary to according to the overall planning of the work progress and project of each engineer of team, weight New adjustment personnel and the division of labor;
The working efficiency of above problem meeting strong influence software development task, increases the difficulty for realizing development goal, and It is likely to result in the failure of project.
Invention content
The present invention for the technical problems in the prior art, provides a kind of comprehensive, efficient front end development task pipe Control method and system.
The technical solution that the present invention solves above-mentioned technical problem is as follows:
One aspect of the present invention provides a kind of front end development task management-control method, includes the following steps:
Step 1, according to the mission requirements for receiving client's publication, demand analysis is carried out, and analysis result is fed back into client, Confirm that task releases news by client;
Step 2, according to the confirmation message of client, development task is opened and distributed, the development task is carried out by the page It divides, and is distributed each page to each user according to mission requirements description, carry out page development;
Step 3, according to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.
Further, the mission requirements of client's publication include front end page UI design original text files and requirement description content.
Further, the demand analysis includes analyzing front end page II design original text files, what the task of listing included Each page, and the technology requirement for combining requirement description content to provide, calculate overall work amount, estimated duration and expense.
Further, the distribution development task includes the following steps:
Step 401, incoming task analysis result, including task essential information and task design original text document and design original text include All pages essential information, all page infos are put into page listings, it is each in page listings if page listings are P The call number of a page is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
Step 402, according to task essential information, matched engineer, reading are searched for from engineer's information database Information with engineer is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, The call number of each engineer is i in engineer's list, and each engineer is E (i) in engineer's list E, in engineer's list Storage engineer's sum is n;
Step 403, compare m and n, if m >=n, then follow the steps 404, it is no to then follow the steps 407;
Step 404, a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % transports for modulus It calculates;If b=0,405 are thened follow the steps, it is no to then follow the steps 406;
Step 405, P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
Step 406, P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a* I+i), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i+b), the total a page;
Step 407, P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M + 1 and engineer later, not assignment page;
Wherein, the matching condition of the matched engineer of search described in step 402 is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
Further, the step 3 further includes, if user test does not pass through, the page of the exploitation is returned to correspondence User, it is desirable that change and resubmit, the user test include from code specification, page completeness carry out page development matter Measure examination.
Based on the above method, another aspect of the present invention provides a kind of front end development task managing and control system, including visitor Family terminal, server end and user terminal;
The server end includes:
Requirement analysis module, the mission requirements for being issued by client terminal according to client carry out demand analysis, and will Analysis result feeds back to client terminal, confirms that task releases news by client;
Development task is opened and distributed to task allocating module, by the development task for the confirmation message according to client It is divided by the page, and describes to distribute each page to each user terminal according to mission requirements, page is carried out by relative users Face is developed;
Confirmation module, for according to the delivery request of user terminal and the test of client terminal and confirmation as a result, to Family terminal pays development cost.
Further, the client terminal is used for release tasks demand, the standard masterplate for showing requirement description, guiding visitor Family confirms the specification requirements content of acquiescence, modify or supplement;
The mission requirements include front end page UI design original text files and requirement description content;
The standard form include task definition be related to page type, development technique, coding criterion, page effect and For the supplementary explanation of design original text file.
Further, the requirement analysis module is used to analyze front end page UI design original text files, lists task packet Each page included, and the technology requirement for combining requirement description content to provide, calculate overall work amount, estimated duration and expense.
Further, the task allocating module is specifically used for:
Incoming task analysis result, including task essential information and task design original text document and design original text all pages for including All page infos are put into page listings by the essential information in face, if page listings are P, each page in page listings Call number is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
According to task essential information, matched engineer is searched for from engineer's information database, reads matching engineer Information, be put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, engineer's row The call number of each engineer is i in table, and each engineer is E (i) in engineer's list E, and engineering is stored in engineer's list Teacher's sum is n;
Compare m and n, if m >=n;
A=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;
P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+i), total a + 1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i+b), altogether The a page;
P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1 and it Engineer afterwards, not assignment page;
Wherein, the matching condition of the matched engineer of search is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
Further, the user terminal for user for receiving an assignment and submitting development result.
The beneficial effects of the invention are as follows:It can effectively improve the working efficiency of software development task through the invention, reduce It realizes the difficulty of development goal, realizes the management and control of efficient front end page task development task comprehensively.
Description of the drawings
Fig. 1 is the method for the present invention flow diagram;
Fig. 2 is method for allocating tasks flow chart of the present invention;
Fig. 3 is present system structural schematic diagram.
Specific implementation mode
Principles and features of the present invention are described below in conjunction with example, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
Fig. 1 is the method for the present invention flow diagram.As shown in Figure 1, a kind of front end development task management-control method, workflow It is as follows:
(1) demand is issued
Client is in client terminal release tasks demand, including front end page UI design original text files and front end requirement description Hold.Client terminal show requirement description standard masterplate, guiding client the specification requirements content of acquiescence is confirmed, change or Supplement.Requirement description standard masterplate includes that content is related to page type, development technique, coding criterion, page effect, is directed to design The contents such as the supplementary explanation of original text.
(2) demand is analyzed
After server end receives the mission requirements that client sends, UI design original text files are analyzed first, list task Including each page, and the technology requirement for combining requirement description to provide calculates overall work amount, estimated duration and expense.Then, Obtained demand analysis result is back to client terminal by server end.Client receives demand analysis as a result, such as in client terminal Fruit confirms related work amount, duration and expense, then operates unlatching task, otherwise, changes and issues demand again.
(3) task is opened
Client notifies server end in client terminal trustship task expense.After server end checks account number to money success, Task status is changed to open state, and starts timing.
(4) task is distributed
Server end analysis result according to demand, workload is divided by the page, according still further to the technology of requirement description It is required that searching suitable user from the registration user of storage, then, each page is distributed into matched user, and will appoint Business information is pushed to the user terminal of corresponding user.
(5) page is developed
User receives the mission bit stream of distribution in user terminal, designs original text according to demand and demand information develops specific page Face.After the completion of exploitation, the page of completion is sent to client terminal, and submitted to server end and deliver application.
(6) test page
Client carries out the page after client terminal receives the page of delivery, from code specification, page completeness etc. and opens Quality test is sent out, if test passes through, carries out confirmation examination, otherwise returns to corresponding user terminal requirement modification and again It submits.
(7) confirm and check and accept
Client checks and accepts task in client terminal operation acknowledgement, and sends the message that task is completed to server end.Server After termination receives the task completion message of client, by expense from task trustship bill payment to user account.
Method for allocating tasks:
During above-mentioned link (4) distribution task, the algorithm description of use is as follows, as shown in Figure 2:
A) incoming task analysis result, including task essential information (mission number, task names, technology require etc.) and times Business design original text document and the essential information (page number, Page Name etc.) for designing all pages that original text includes, all page letters Breath is put into page listings.If page listings are P, the call number of each page is j in page listings, each page in page listings P Face is P (j).The page sum stored in page listings is m.
B) according to task essential information, matched engineer is searched for from engineer's information database, reads matching engineering The information of teacher is put into engineer's list.Matching condition is:Whether 1 Engineers technical field meets the technology requirement of task;2 works Cheng Shi credit scorings are qualified;Whether 3 engineers are currently active.Engineer's list carries out positive sequence by credit rating.If engineering Shi Liebiao is E, the call number of each engineer is i in engineer's list, and each engineer is E (i), work in engineer's list E It is n that engineer's sum is stored in journey Shi Liebiao.
C) compare m and n, if m>=n then executes (4), otherwise executes (7).
D) a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation.If B=0 then executes (5), otherwise executes (6).
E) P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page.
F) P and E, preceding b engineer (the 1st to b) are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) To P (a*i+i), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+ 1) to P (a*i+b), the total a page.
G) P and E, preceding m engineer (the 1st to m) are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page Face;M+1 and engineer later, not assignment page.
The embodiment of the present invention also provides a kind of front end development task managing and control system, as shown in figure 3, whole including multiple clients End, multiple user terminals and server end, client terminal issue demand, initiation task for client, obtain development result and terminate Task;User terminal receives an assignment for user and submits development result;Server end respectively with client terminal, user terminal signal Connection, analyzes mission requirements, is allocated to task, shows simultaneously management role development progress.
Specifically, task initiation is with flow is terminated:Client issues demand in client terminal, and then server end is to task Demand is analyzed, and analysis result is back to client terminal, and client confirms mission bit stream in client terminal, if nothing Method confirms, needs to remodify demand and submit, if it is confirmed that it is errorless, then open task;Server end assigns the task to use Family, and mission bit stream is sent to the user terminal of corresponding user, user's selection receives an assignment;After the completion of user task, user Delivery task application, server end is submitted to test delivery result in user terminal, it, will test if test does not pass through As a result user terminal is fed back to, is modified exploitation to task again, if test passes through, delivery result is pushed into client Terminal, client end task after client terminal receives delivery result and confirms examination.
On the basis of above technical scheme, it is preferred that client terminal shows the standard masterplate of requirement description, at client's end After end submits design original text and fills in requirement description according to standard masterplate, server end is analyzed according to the desired content of task, And the information such as analysis result, including workload, expense and duration are back to client terminal, confirm for client.
On the basis of above technical scheme, it is preferred that server end stores user information, and task is opened in client terminal Afterwards, server end analysis result according to demand, workload is divided by the page, according still further to the technology requirement of requirement description, Suitable user is searched from the registration user of storage, then, each page is distributed into matched user, and by mission bit stream It is pushed to the user terminal of corresponding user.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of front end development task management-control method, which is characterized in that include the following steps:
Step 1, according to the mission requirements for receiving client's publication, demand analysis is carried out, and analysis result is fed back into client, by visitor Family confirms that task releases news;
Step 2, according to the confirmation message of client, development task is opened and is distributed, the development task is divided by the page, And distributed each page to each user according to mission requirements description, carry out page development;
Step 3, according to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.
2. a kind of front end development task management-control method according to claim 1, which is characterized in that the task of client's publication Demand includes front end page UI design original text files and requirement description content.
3. a kind of front end development task management-control method according to claim 2, which is characterized in that the demand analysis includes pair Front end page UI design original text files are analyzed, each page that the task of listing includes, and the skill for combining requirement description content to provide Art requirement calculates overall work amount, estimated duration and expense.
4. a kind of front end development task management-control method according to claim 1, which is characterized in that the distribution development task Include the following steps:
Step 401, incoming task analysis result, including task essential information and task design original text document and the design original text institute that includes All page infos are put into page listings by the essential information for having the page, if page listings are P, each page in page listings The call number in face is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
Step 402, according to task essential information, matched engineer is searched for from engineer's information database, reads matching work The information of Cheng Shi is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, engineering The call number of each engineer is i in Shi Liebiao, and each engineer is E (i) in engineer's list E, is stored in engineer's list Engineer's sum is n;
Step 403, compare m and n, if m >=n, then follow the steps 404, it is no to then follow the steps 407;
Step 404, a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;Such as Fruit b=0, thens follow the steps 405, no to then follow the steps 406;
Step 405, P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
Step 406, P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+ I), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i + b), the total a page;
Step 407, P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1 And engineer later, not assignment page;
Wherein, the matching condition of the matched engineer of search described in step 402 is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
5. a kind of front end development task management-control method according to claim 1, which is characterized in that the step 3 further includes, if User test does not pass through, then the page of the exploitation is returned to corresponding user, it is desirable that and it changes and resubmits, the user Test includes carrying out page development quality test from code specification, page completeness.
6. a kind of front end development task managing and control system, which is characterized in that including client terminal, server end and user terminal;
The server end includes:
Requirement analysis module, the mission requirements for being issued by client terminal according to client carry out demand analysis, and will analysis As a result client terminal is fed back to, confirms that task releases news by client;
Development task is opened and distributed to task allocating module for the confirmation message according to client, and the development task is pressed page Face is divided, and describes to distribute each page to each user terminal according to mission requirements, and carrying out the page by relative users opens Hair;
Confirmation module is used for according to the delivery request of user terminal and the test of client terminal and confirmation as a result, to user's end End payment development cost.
7. a kind of front end development task managing and control system according to claim 6, which is characterized in that the client terminal is for sending out Cloth mission requirements, the standard masterplate for showing requirement description, guiding client confirm the specification requirements content of acquiescence, repair Change or supplements;
The mission requirements include front end page UI design original text files and requirement description content;
The standard form include task definition be related to page type, development technique, coding criterion, page effect and be directed to Design the supplementary explanation of original text file.
8. a kind of front end development task managing and control system according to claim 7, which is characterized in that the requirement analysis module is used It is analyzed in front end page UI design original text files, each page that the task of listing includes, and requirement description content is combined to provide Technology requirement, calculate overall work amount, estimated duration and expense.
9. a kind of front end development task managing and control system according to claim 6, which is characterized in that the task allocating module tool Body is used for:
Incoming task analysis result, including task essential information and task design original text document and design original text all pages for including All page infos are put into page listings by essential information, if page listings are P, the index of each page in page listings Number it is j, each page is P (j) in page listings P, and the page sum stored in page listings is m;
According to task essential information, matched engineer is searched for from engineer's information database, reads the letter of matching engineer Breath, is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, in engineer's list The call number of each engineer is i, and each engineer is E (i) in engineer's list E, and it is total that engineer is stored in engineer's list Number is n;
Compare m and n, if m >=n;
A=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;
P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+i), and total a+1 is a The page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i+b), and total a is a The page;
P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1 and later Engineer, not assignment page;
Wherein, the matching condition of the matched engineer of search is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
10. a kind of front end development task managing and control system according to claim 6, which is characterized in that the user terminal is used for It receives an assignment for user and submits development result.
CN201810137803.XA 2018-02-10 2018-02-10 A kind of front end development task management-control method and system Pending CN108280631A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810137803.XA CN108280631A (en) 2018-02-10 2018-02-10 A kind of front end development task management-control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810137803.XA CN108280631A (en) 2018-02-10 2018-02-10 A kind of front end development task management-control method and system

Publications (1)

Publication Number Publication Date
CN108280631A true CN108280631A (en) 2018-07-13

Family

ID=62808240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810137803.XA Pending CN108280631A (en) 2018-02-10 2018-02-10 A kind of front end development task management-control method and system

Country Status (1)

Country Link
CN (1) CN108280631A (en)

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876201A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Development approach, platform and the system quickly delivered
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered
CN109034611A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Back-end software development approach, platform and the system quickly delivered
CN109034610A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Software development cloud platform based on different periods difference distribution mechanism
CN109034609A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 The software product design method and system quickly delivered
CN109102169A (en) * 2018-07-24 2018-12-28 武汉空心科技有限公司 Development approach and system based on function metering
CN109102168A (en) * 2018-07-24 2018-12-28 武汉空心科技有限公司 Exploitation cloud platform based on page metering and timeliness control
CN109118063A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Task based on unit time distribution develops cloud platform
CN109118059A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Front-end software development approach, platform and the system quickly delivered
CN109118060A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Quick development method, platform and system based on timeliness control
CN109118062A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Based on the development approach and system for robbing single-unit
CN109118061A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Exploitation cloud platform based on timeliness control
CN109117366A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 The method for testing software and system quickly delivered
CN109144480A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Working platform method, platform and the system quickly delivered
CN109146250A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Task exploitation delivery method and system based on page metering
CN109214646A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 The software system architecture design method and system quickly delivered
CN109214770A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach, platform and system based on design original text metering
CN109214645A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach and system based on module metering
CN109242240A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Task based on unit time distribution and timeliness control develops cloud platform
CN109240654A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Development approach and system based on template
CN109240271A (en) * 2018-10-18 2019-01-18 东南(福建)汽车工业有限公司 A kind of the cloud platform test macro and method of full-vehicle control equipment
CN109254947A (en) * 2018-09-17 2019-01-22 深算科技(重庆)有限公司 GPU calculation method, device and computer equipment based on block chain
CN109255516A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 Task development approach and system based on unit time distribution
CN109255515A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 A kind of task exploitation cloud platform based on page metering and unit time distribution
CN109255582A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 Development approach and system based on fault tolerant mechanism
CN109271142A (en) * 2018-07-24 2019-01-25 武汉空心科技有限公司 Exploitation cloud platform based on template component
CN109343828A (en) * 2018-09-26 2019-02-15 武汉空心科技有限公司 The user interface of software design method and system quickly delivered
CN109377011A (en) * 2018-09-26 2019-02-22 武汉空心科技有限公司 The software docking development approach and system quickly delivered
CN109544032A (en) * 2018-12-03 2019-03-29 上海夫卡实业发展有限公司 Equipment design work management method, platform and the system quickly delivered
CN109615205A (en) * 2018-12-03 2019-04-12 上海夫卡实业发展有限公司 Electric instrument design work management method, platform and the system quickly delivered
CN109740850A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Industrial design work management method, platform and the system quickly delivered
CN109740851A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Design for Automatic Control Engineering work management method, platform and the system quickly delivered
CN109740849A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Structure design work management method, platform and the system quickly delivered
CN109754215A (en) * 2018-12-03 2019-05-14 上海夫卡实业发展有限公司 Technological design work management method, platform and the system quickly delivered
CN109816193A (en) * 2018-12-03 2019-05-28 上海夫卡实业发展有限公司 Architectural design work management method, platform and the system quickly delivered
CN109992251A (en) * 2019-04-17 2019-07-09 安徽省希灵科技服务有限公司 A kind of software development scheme generation method of service-oriented variable
CN110083336A (en) * 2019-03-08 2019-08-02 江苏博敏网络科技有限公司 A kind of method that high efficiency creation customizes website
CN111314413A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Task allocation device for a work platform
CN111784124A (en) * 2020-06-12 2020-10-16 中信银行股份有限公司 Task processing method, device and equipment and computer readable storage medium
CN113392015A (en) * 2021-06-25 2021-09-14 北京光启元数字科技有限公司 Product testing method, device, equipment and medium
CN113626066A (en) * 2021-08-27 2021-11-09 国家超级计算无锡中心 Method and system applied to industrial simulation platform
CN114327378A (en) * 2022-03-15 2022-04-12 广州弘一信息科技股份有限公司 Project management system based on software development
CN118674329A (en) * 2024-08-22 2024-09-20 浙江迈新科技股份有限公司 Low-code platform management method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327152A (en) * 2016-08-11 2017-01-11 宁波亦道信息科技有限公司 Integrated iteration software development process control system and method
CN106371840A (en) * 2016-08-30 2017-02-01 北京航空航天大学 Software development method and device based on crowdsourcing
CN107146119A (en) * 2017-07-07 2017-09-08 天津杰超科技发展有限公司 A kind of advertisement design online trading system
CN107678738A (en) * 2017-10-17 2018-02-09 广州慧睿思通信息科技有限公司 A kind of method of software quality management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327152A (en) * 2016-08-11 2017-01-11 宁波亦道信息科技有限公司 Integrated iteration software development process control system and method
CN106371840A (en) * 2016-08-30 2017-02-01 北京航空航天大学 Software development method and device based on crowdsourcing
CN107146119A (en) * 2017-07-07 2017-09-08 天津杰超科技发展有限公司 A kind of advertisement design online trading system
CN107678738A (en) * 2017-10-17 2018-02-09 广州慧睿思通信息科技有限公司 A kind of method of software quality management

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255516A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 Task development approach and system based on unit time distribution
CN109144480A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Working platform method, platform and the system quickly delivered
CN109034611A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Back-end software development approach, platform and the system quickly delivered
CN108876201A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Development approach, platform and the system quickly delivered
CN109034609A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 The software product design method and system quickly delivered
CN109102169A (en) * 2018-07-24 2018-12-28 武汉空心科技有限公司 Development approach and system based on function metering
CN109102168A (en) * 2018-07-24 2018-12-28 武汉空心科技有限公司 Exploitation cloud platform based on page metering and timeliness control
CN109118063A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Task based on unit time distribution develops cloud platform
CN109118059A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Front-end software development approach, platform and the system quickly delivered
CN109118060A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Quick development method, platform and system based on timeliness control
CN109118062A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Based on the development approach and system for robbing single-unit
CN109118061A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 Exploitation cloud platform based on timeliness control
CN109117366A (en) * 2018-07-24 2019-01-01 武汉空心科技有限公司 The method for testing software and system quickly delivered
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered
CN109146250A (en) * 2018-07-24 2019-01-04 武汉空心科技有限公司 Task exploitation delivery method and system based on page metering
CN109214646A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 The software system architecture design method and system quickly delivered
CN109214770A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach, platform and system based on design original text metering
CN109255582A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 Development approach and system based on fault tolerant mechanism
CN109242240A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Task based on unit time distribution and timeliness control develops cloud platform
CN109240654A (en) * 2018-07-24 2019-01-18 武汉空心科技有限公司 Development approach and system based on template
CN109271142A (en) * 2018-07-24 2019-01-25 武汉空心科技有限公司 Exploitation cloud platform based on template component
CN109214645A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach and system based on module metering
CN109034610A (en) * 2018-07-24 2018-12-18 武汉空心科技有限公司 Software development cloud platform based on different periods difference distribution mechanism
CN109255515A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 A kind of task exploitation cloud platform based on page metering and unit time distribution
CN109254947A (en) * 2018-09-17 2019-01-22 深算科技(重庆)有限公司 GPU calculation method, device and computer equipment based on block chain
CN109343828A (en) * 2018-09-26 2019-02-15 武汉空心科技有限公司 The user interface of software design method and system quickly delivered
CN109377011A (en) * 2018-09-26 2019-02-22 武汉空心科技有限公司 The software docking development approach and system quickly delivered
CN109240271A (en) * 2018-10-18 2019-01-18 东南(福建)汽车工业有限公司 A kind of the cloud platform test macro and method of full-vehicle control equipment
CN109816193A (en) * 2018-12-03 2019-05-28 上海夫卡实业发展有限公司 Architectural design work management method, platform and the system quickly delivered
CN109740850A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Industrial design work management method, platform and the system quickly delivered
CN109740851A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Design for Automatic Control Engineering work management method, platform and the system quickly delivered
CN109740849A (en) * 2018-12-03 2019-05-10 上海夫卡实业发展有限公司 Structure design work management method, platform and the system quickly delivered
CN109754215A (en) * 2018-12-03 2019-05-14 上海夫卡实业发展有限公司 Technological design work management method, platform and the system quickly delivered
CN109544032A (en) * 2018-12-03 2019-03-29 上海夫卡实业发展有限公司 Equipment design work management method, platform and the system quickly delivered
CN109615205A (en) * 2018-12-03 2019-04-12 上海夫卡实业发展有限公司 Electric instrument design work management method, platform and the system quickly delivered
CN110083336A (en) * 2019-03-08 2019-08-02 江苏博敏网络科技有限公司 A kind of method that high efficiency creation customizes website
CN109992251B (en) * 2019-04-17 2024-02-23 上海通天晓信息技术有限公司 Business variable-oriented software development scheme generation method
CN109992251A (en) * 2019-04-17 2019-07-09 安徽省希灵科技服务有限公司 A kind of software development scheme generation method of service-oriented variable
CN111314413A (en) * 2019-12-17 2020-06-19 武汉空心科技有限公司 Task allocation device for a work platform
CN111784124A (en) * 2020-06-12 2020-10-16 中信银行股份有限公司 Task processing method, device and equipment and computer readable storage medium
CN113392015A (en) * 2021-06-25 2021-09-14 北京光启元数字科技有限公司 Product testing method, device, equipment and medium
CN113626066A (en) * 2021-08-27 2021-11-09 国家超级计算无锡中心 Method and system applied to industrial simulation platform
CN114327378A (en) * 2022-03-15 2022-04-12 广州弘一信息科技股份有限公司 Project management system based on software development
CN114327378B (en) * 2022-03-15 2022-05-24 广州弘一信息科技股份有限公司 Project management system based on software development
CN118674329A (en) * 2024-08-22 2024-09-20 浙江迈新科技股份有限公司 Low-code platform management method and system

Similar Documents

Publication Publication Date Title
CN108280631A (en) A kind of front end development task management-control method and system
CN101330388B (en) Synergic editing method based on synthesis integration deliberation hall
CN110189114A (en) It is a kind of to divide account method based on the intelligence for unifying payment platform
CN109740851A (en) Design for Automatic Control Engineering work management method, platform and the system quickly delivered
CN111192021A (en) OA document approval implementation method and system
Ma et al. System design and development for robotic process automation
WO2002097700A2 (en) Extended web enabled multi-featured business to business computer system for rental vehicle services
CN105913219A (en) Method and system used for monitoring and managing whole actuating process of electronic contract
WO2007005949A2 (en) Dispute resolution processing method and system
CN109740849A (en) Structure design work management method, platform and the system quickly delivered
CN109522527A (en) A method of site construction technology establishment is carried out using software systems
CN100530090C (en) Apparatus and method for determining the reuse value of a service component
CN109754215A (en) Technological design work management method, platform and the system quickly delivered
CN109741028A (en) Asset management auxiliary shoring system and its management method
CN109978502A (en) Automatic budget method, system and computer storage medium are changed in engineering design
CN109740850A (en) Industrial design work management method, platform and the system quickly delivered
Ali et al. Architectural knowledge management in global software development: a review
CN109102168A (en) Exploitation cloud platform based on page metering and timeliness control
CN109101222A (en) A kind of 24 hours front end development platforms quickly delivered
CN109242240A (en) Task based on unit time distribution and timeliness control develops cloud platform
CN117591079A (en) Design construction method of enterprise-level integrated operation management system
CN109118060A (en) Quick development method, platform and system based on timeliness control
CN109255515A (en) A kind of task exploitation cloud platform based on page metering and unit time distribution
US20060143125A1 (en) Method and system for electronic billing and reconciliation
CN109816193A (en) Architectural design work management method, platform and the system quickly delivered

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713

RJ01 Rejection of invention patent application after publication