CN108280631A - A kind of front end development task management-control method and system - Google Patents
A kind of front end development task management-control method and system Download PDFInfo
- Publication number
- CN108280631A CN108280631A CN201810137803.XA CN201810137803A CN108280631A CN 108280631 A CN108280631 A CN 108280631A CN 201810137803 A CN201810137803 A CN 201810137803A CN 108280631 A CN108280631 A CN 108280631A
- Authority
- CN
- China
- Prior art keywords
- page
- engineer
- task
- development
- client
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/10—Requirements analysis; Specification techniques
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Software Systems (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of front end development task management-control method and systems, and wherein method includes carrying out demand analysis, and analysis result is fed back to client according to the mission requirements for receiving client's publication, confirms that task releases news by client;According to the confirmation message of client, development task is opened and distributed, the development task is divided by the page, and is distributed each page to each user according to mission requirements description, carries out page development;According to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.It can effectively improve the working efficiency of software development task through the invention, reduce the difficulty for realizing development goal.
Description
Technical field
The present invention relates to computer application technologies, and in particular to a kind of front end development task management-control method and system.
Background technology
The common workflow of traditional software development task is divided into 3 stages, first demand analysis stage substantially, by producing
Product are handled or product designer links up with software users, understand and arrange demand, are formed software requirement and are illustrated document, so
Complete product prototype design according to demand afterwards;Followed by development phase, Software Development Engineer team illustrate document according to demand
It is developed with product prototype, development process gradually submits code, carries out unit or module testing, finally carries out code whole
It closes, carries out combined debugging;It is finally test phase, system integrated testability is carried out by Test Engineer team and each module is surveyed
Examination carries out improvement and optimization to code according to test result, is finally tested and checked and accepted by software users.For Internet application
Software systems, user interface (UI) part often also needs to special designer and designs user interface of software, then transfers to
Front end Developmental Engineer develops according to user-interface design original text.In entire software development task, management and control focuses on
Two aspects, one, Software Development Engineer is wanted and product design personnel and software end user are adequately linked up, it is accurate entirely
The understanding software requirement in face;Two, want close fit between Developmental Engineer and Test Engineer, co-ordination, make exploitation into
Degree is controllable.
At present for software systems, the especially exploitation of software fore-end, agile development pattern, Huo Zheyin are mainly used
Enter software project management mechanism and tool, carries out the management and control of front end development task.Problem here is that:
(1) requirement description is inaccurate, it is necessary to and it is artificial repeatedly link up repeatedly, requirement description is gradually refined, is reached
The consistent understanding of demand moving party (product designer and/or software users) and Developmental Engineer;
(2) personnel coordinate defective tightness, it is necessary to according to the overall planning of the work progress and project of each engineer of team, weight
New adjustment personnel and the division of labor;
The working efficiency of above problem meeting strong influence software development task, increases the difficulty for realizing development goal, and
It is likely to result in the failure of project.
Invention content
The present invention for the technical problems in the prior art, provides a kind of comprehensive, efficient front end development task pipe
Control method and system.
The technical solution that the present invention solves above-mentioned technical problem is as follows:
One aspect of the present invention provides a kind of front end development task management-control method, includes the following steps:
Step 1, according to the mission requirements for receiving client's publication, demand analysis is carried out, and analysis result is fed back into client,
Confirm that task releases news by client;
Step 2, according to the confirmation message of client, development task is opened and distributed, the development task is carried out by the page
It divides, and is distributed each page to each user according to mission requirements description, carry out page development;
Step 3, according to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.
Further, the mission requirements of client's publication include front end page UI design original text files and requirement description content.
Further, the demand analysis includes analyzing front end page II design original text files, what the task of listing included
Each page, and the technology requirement for combining requirement description content to provide, calculate overall work amount, estimated duration and expense.
Further, the distribution development task includes the following steps:
Step 401, incoming task analysis result, including task essential information and task design original text document and design original text include
All pages essential information, all page infos are put into page listings, it is each in page listings if page listings are P
The call number of a page is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
Step 402, according to task essential information, matched engineer, reading are searched for from engineer's information database
Information with engineer is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E,
The call number of each engineer is i in engineer's list, and each engineer is E (i) in engineer's list E, in engineer's list
Storage engineer's sum is n;
Step 403, compare m and n, if m >=n, then follow the steps 404, it is no to then follow the steps 407;
Step 404, a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % transports for modulus
It calculates;If b=0,405 are thened follow the steps, it is no to then follow the steps 406;
Step 405, P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
Step 406, P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*
I+i), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P
(a*i+b), the total a page;
Step 407, P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M
+ 1 and engineer later, not assignment page;
Wherein, the matching condition of the matched engineer of search described in step 402 is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
Further, the step 3 further includes, if user test does not pass through, the page of the exploitation is returned to correspondence
User, it is desirable that change and resubmit, the user test include from code specification, page completeness carry out page development matter
Measure examination.
Based on the above method, another aspect of the present invention provides a kind of front end development task managing and control system, including visitor
Family terminal, server end and user terminal;
The server end includes:
Requirement analysis module, the mission requirements for being issued by client terminal according to client carry out demand analysis, and will
Analysis result feeds back to client terminal, confirms that task releases news by client;
Development task is opened and distributed to task allocating module, by the development task for the confirmation message according to client
It is divided by the page, and describes to distribute each page to each user terminal according to mission requirements, page is carried out by relative users
Face is developed;
Confirmation module, for according to the delivery request of user terminal and the test of client terminal and confirmation as a result, to
Family terminal pays development cost.
Further, the client terminal is used for release tasks demand, the standard masterplate for showing requirement description, guiding visitor
Family confirms the specification requirements content of acquiescence, modify or supplement;
The mission requirements include front end page UI design original text files and requirement description content;
The standard form include task definition be related to page type, development technique, coding criterion, page effect and
For the supplementary explanation of design original text file.
Further, the requirement analysis module is used to analyze front end page UI design original text files, lists task packet
Each page included, and the technology requirement for combining requirement description content to provide, calculate overall work amount, estimated duration and expense.
Further, the task allocating module is specifically used for:
Incoming task analysis result, including task essential information and task design original text document and design original text all pages for including
All page infos are put into page listings by the essential information in face, if page listings are P, each page in page listings
Call number is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
According to task essential information, matched engineer is searched for from engineer's information database, reads matching engineer
Information, be put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, engineer's row
The call number of each engineer is i in table, and each engineer is E (i) in engineer's list E, and engineering is stored in engineer's list
Teacher's sum is n;
Compare m and n, if m >=n;
A=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;
P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+i), total a
+ 1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i+b), altogether
The a page;
P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1 and it
Engineer afterwards, not assignment page;
Wherein, the matching condition of the matched engineer of search is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
Further, the user terminal for user for receiving an assignment and submitting development result.
The beneficial effects of the invention are as follows:It can effectively improve the working efficiency of software development task through the invention, reduce
It realizes the difficulty of development goal, realizes the management and control of efficient front end page task development task comprehensively.
Description of the drawings
Fig. 1 is the method for the present invention flow diagram;
Fig. 2 is method for allocating tasks flow chart of the present invention;
Fig. 3 is present system structural schematic diagram.
Specific implementation mode
Principles and features of the present invention are described below in conjunction with example, the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
Fig. 1 is the method for the present invention flow diagram.As shown in Figure 1, a kind of front end development task management-control method, workflow
It is as follows:
(1) demand is issued
Client is in client terminal release tasks demand, including front end page UI design original text files and front end requirement description
Hold.Client terminal show requirement description standard masterplate, guiding client the specification requirements content of acquiescence is confirmed, change or
Supplement.Requirement description standard masterplate includes that content is related to page type, development technique, coding criterion, page effect, is directed to design
The contents such as the supplementary explanation of original text.
(2) demand is analyzed
After server end receives the mission requirements that client sends, UI design original text files are analyzed first, list task
Including each page, and the technology requirement for combining requirement description to provide calculates overall work amount, estimated duration and expense.Then,
Obtained demand analysis result is back to client terminal by server end.Client receives demand analysis as a result, such as in client terminal
Fruit confirms related work amount, duration and expense, then operates unlatching task, otherwise, changes and issues demand again.
(3) task is opened
Client notifies server end in client terminal trustship task expense.After server end checks account number to money success,
Task status is changed to open state, and starts timing.
(4) task is distributed
Server end analysis result according to demand, workload is divided by the page, according still further to the technology of requirement description
It is required that searching suitable user from the registration user of storage, then, each page is distributed into matched user, and will appoint
Business information is pushed to the user terminal of corresponding user.
(5) page is developed
User receives the mission bit stream of distribution in user terminal, designs original text according to demand and demand information develops specific page
Face.After the completion of exploitation, the page of completion is sent to client terminal, and submitted to server end and deliver application.
(6) test page
Client carries out the page after client terminal receives the page of delivery, from code specification, page completeness etc. and opens
Quality test is sent out, if test passes through, carries out confirmation examination, otherwise returns to corresponding user terminal requirement modification and again
It submits.
(7) confirm and check and accept
Client checks and accepts task in client terminal operation acknowledgement, and sends the message that task is completed to server end.Server
After termination receives the task completion message of client, by expense from task trustship bill payment to user account.
Method for allocating tasks:
During above-mentioned link (4) distribution task, the algorithm description of use is as follows, as shown in Figure 2:
A) incoming task analysis result, including task essential information (mission number, task names, technology require etc.) and times
Business design original text document and the essential information (page number, Page Name etc.) for designing all pages that original text includes, all page letters
Breath is put into page listings.If page listings are P, the call number of each page is j in page listings, each page in page listings P
Face is P (j).The page sum stored in page listings is m.
B) according to task essential information, matched engineer is searched for from engineer's information database, reads matching engineering
The information of teacher is put into engineer's list.Matching condition is:Whether 1 Engineers technical field meets the technology requirement of task;2 works
Cheng Shi credit scorings are qualified;Whether 3 engineers are currently active.Engineer's list carries out positive sequence by credit rating.If engineering
Shi Liebiao is E, the call number of each engineer is i in engineer's list, and each engineer is E (i), work in engineer's list E
It is n that engineer's sum is stored in journey Shi Liebiao.
C) compare m and n, if m>=n then executes (4), otherwise executes (7).
D) a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation.If
B=0 then executes (5), otherwise executes (6).
E) P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page.
F) P and E, preceding b engineer (the 1st to b) are traversed, the page that engineer E (i) is distributed is P (a*i+i-a)
To P (a*i+i), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+
1) to P (a*i+b), the total a page.
G) P and E, preceding m engineer (the 1st to m) are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page
Face;M+1 and engineer later, not assignment page.
The embodiment of the present invention also provides a kind of front end development task managing and control system, as shown in figure 3, whole including multiple clients
End, multiple user terminals and server end, client terminal issue demand, initiation task for client, obtain development result and terminate
Task;User terminal receives an assignment for user and submits development result;Server end respectively with client terminal, user terminal signal
Connection, analyzes mission requirements, is allocated to task, shows simultaneously management role development progress.
Specifically, task initiation is with flow is terminated:Client issues demand in client terminal, and then server end is to task
Demand is analyzed, and analysis result is back to client terminal, and client confirms mission bit stream in client terminal, if nothing
Method confirms, needs to remodify demand and submit, if it is confirmed that it is errorless, then open task;Server end assigns the task to use
Family, and mission bit stream is sent to the user terminal of corresponding user, user's selection receives an assignment;After the completion of user task, user
Delivery task application, server end is submitted to test delivery result in user terminal, it, will test if test does not pass through
As a result user terminal is fed back to, is modified exploitation to task again, if test passes through, delivery result is pushed into client
Terminal, client end task after client terminal receives delivery result and confirms examination.
On the basis of above technical scheme, it is preferred that client terminal shows the standard masterplate of requirement description, at client's end
After end submits design original text and fills in requirement description according to standard masterplate, server end is analyzed according to the desired content of task,
And the information such as analysis result, including workload, expense and duration are back to client terminal, confirm for client.
On the basis of above technical scheme, it is preferred that server end stores user information, and task is opened in client terminal
Afterwards, server end analysis result according to demand, workload is divided by the page, according still further to the technology requirement of requirement description,
Suitable user is searched from the registration user of storage, then, each page is distributed into matched user, and by mission bit stream
It is pushed to the user terminal of corresponding user.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of front end development task management-control method, which is characterized in that include the following steps:
Step 1, according to the mission requirements for receiving client's publication, demand analysis is carried out, and analysis result is fed back into client, by visitor
Family confirms that task releases news;
Step 2, according to the confirmation message of client, development task is opened and is distributed, the development task is divided by the page,
And distributed each page to each user according to mission requirements description, carry out page development;
Step 3, according to the test of the delivery request of user and client and confirmation as a result, paying development cost to user.
2. a kind of front end development task management-control method according to claim 1, which is characterized in that the task of client's publication
Demand includes front end page UI design original text files and requirement description content.
3. a kind of front end development task management-control method according to claim 2, which is characterized in that the demand analysis includes pair
Front end page UI design original text files are analyzed, each page that the task of listing includes, and the skill for combining requirement description content to provide
Art requirement calculates overall work amount, estimated duration and expense.
4. a kind of front end development task management-control method according to claim 1, which is characterized in that the distribution development task
Include the following steps:
Step 401, incoming task analysis result, including task essential information and task design original text document and the design original text institute that includes
All page infos are put into page listings by the essential information for having the page, if page listings are P, each page in page listings
The call number in face is j, and each page is P (j) in page listings P, and the page sum stored in page listings is m;
Step 402, according to task essential information, matched engineer is searched for from engineer's information database, reads matching work
The information of Cheng Shi is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, engineering
The call number of each engineer is i in Shi Liebiao, and each engineer is E (i) in engineer's list E, is stored in engineer's list
Engineer's sum is n;
Step 403, compare m and n, if m >=n, then follow the steps 404, it is no to then follow the steps 407;
Step 404, a=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;Such as
Fruit b=0, thens follow the steps 405, no to then follow the steps 406;
Step 405, P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
Step 406, P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+
I), the total a+1 page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i
+ b), the total a page;
Step 407, P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1
And engineer later, not assignment page;
Wherein, the matching condition of the matched engineer of search described in step 402 is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
5. a kind of front end development task management-control method according to claim 1, which is characterized in that the step 3 further includes, if
User test does not pass through, then the page of the exploitation is returned to corresponding user, it is desirable that and it changes and resubmits, the user
Test includes carrying out page development quality test from code specification, page completeness.
6. a kind of front end development task managing and control system, which is characterized in that including client terminal, server end and user terminal;
The server end includes:
Requirement analysis module, the mission requirements for being issued by client terminal according to client carry out demand analysis, and will analysis
As a result client terminal is fed back to, confirms that task releases news by client;
Development task is opened and distributed to task allocating module for the confirmation message according to client, and the development task is pressed page
Face is divided, and describes to distribute each page to each user terminal according to mission requirements, and carrying out the page by relative users opens
Hair;
Confirmation module is used for according to the delivery request of user terminal and the test of client terminal and confirmation as a result, to user's end
End payment development cost.
7. a kind of front end development task managing and control system according to claim 6, which is characterized in that the client terminal is for sending out
Cloth mission requirements, the standard masterplate for showing requirement description, guiding client confirm the specification requirements content of acquiescence, repair
Change or supplements;
The mission requirements include front end page UI design original text files and requirement description content;
The standard form include task definition be related to page type, development technique, coding criterion, page effect and be directed to
Design the supplementary explanation of original text file.
8. a kind of front end development task managing and control system according to claim 7, which is characterized in that the requirement analysis module is used
It is analyzed in front end page UI design original text files, each page that the task of listing includes, and requirement description content is combined to provide
Technology requirement, calculate overall work amount, estimated duration and expense.
9. a kind of front end development task managing and control system according to claim 6, which is characterized in that the task allocating module tool
Body is used for:
Incoming task analysis result, including task essential information and task design original text document and design original text all pages for including
All page infos are put into page listings by essential information, if page listings are P, the index of each page in page listings
Number it is j, each page is P (j) in page listings P, and the page sum stored in page listings is m;
According to task essential information, matched engineer is searched for from engineer's information database, reads the letter of matching engineer
Breath, is put into engineer's list;Engineer's list carries out positive sequence by credit rating;If engineer's list is E, in engineer's list
The call number of each engineer is i, and each engineer is E (i) in engineer's list E, and it is total that engineer is stored in engineer's list
Number is n;
Compare m and n, if m >=n;
A=m/n is calculated ,/to divide exactly operation, as a result downward round numbers;B=m%n is calculated, % is modulo operation;
P and E is traversed, engineer E (i) institutes assignment page is P (a*i-a+1) to P (a*i), the total a page;
P and E, preceding b engineer are traversed, the page that engineer E (i) is distributed is P (a*i+i-a) to P (a*i+i), and total a+1 is a
The page;B+1 to n-th engineer, the page that engineer E (i) is distributed are P (a*i+b-a+1) to P (a*i+b), and total a is a
The page;
P and E, preceding m engineer are traversed, engineer E (i) institutes assignment page is P (i), totally 1 page;M+1 and later
Engineer, not assignment page;
Wherein, the matching condition of the matched engineer of search is:
1) whether Engineers technical field meets the technology requirement of task;
2) engineer's credit scoring is qualified;
3) whether engineer is currently active.
10. a kind of front end development task managing and control system according to claim 6, which is characterized in that the user terminal is used for
It receives an assignment for user and submits development result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810137803.XA CN108280631A (en) | 2018-02-10 | 2018-02-10 | A kind of front end development task management-control method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810137803.XA CN108280631A (en) | 2018-02-10 | 2018-02-10 | A kind of front end development task management-control method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108280631A true CN108280631A (en) | 2018-07-13 |
Family
ID=62808240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810137803.XA Pending CN108280631A (en) | 2018-02-10 | 2018-02-10 | A kind of front end development task management-control method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108280631A (en) |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108876201A (en) * | 2018-07-24 | 2018-11-23 | 武汉空心科技有限公司 | Development approach, platform and the system quickly delivered |
CN108876202A (en) * | 2018-07-24 | 2018-11-23 | 武汉空心科技有限公司 | Design work management method, platform and the system quickly delivered |
CN109034611A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | Back-end software development approach, platform and the system quickly delivered |
CN109034610A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | Software development cloud platform based on different periods difference distribution mechanism |
CN109034609A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | The software product design method and system quickly delivered |
CN109102169A (en) * | 2018-07-24 | 2018-12-28 | 武汉空心科技有限公司 | Development approach and system based on function metering |
CN109102168A (en) * | 2018-07-24 | 2018-12-28 | 武汉空心科技有限公司 | Exploitation cloud platform based on page metering and timeliness control |
CN109118063A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Task based on unit time distribution develops cloud platform |
CN109118059A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Front-end software development approach, platform and the system quickly delivered |
CN109118060A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Quick development method, platform and system based on timeliness control |
CN109118062A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Based on the development approach and system for robbing single-unit |
CN109118061A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Exploitation cloud platform based on timeliness control |
CN109117366A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | The method for testing software and system quickly delivered |
CN109144480A (en) * | 2018-07-24 | 2019-01-04 | 武汉空心科技有限公司 | Working platform method, platform and the system quickly delivered |
CN109146250A (en) * | 2018-07-24 | 2019-01-04 | 武汉空心科技有限公司 | Task exploitation delivery method and system based on page metering |
CN109214646A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | The software system architecture design method and system quickly delivered |
CN109214770A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | Development approach, platform and system based on design original text metering |
CN109214645A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | Development approach and system based on module metering |
CN109242240A (en) * | 2018-07-24 | 2019-01-18 | 武汉空心科技有限公司 | Task based on unit time distribution and timeliness control develops cloud platform |
CN109240654A (en) * | 2018-07-24 | 2019-01-18 | 武汉空心科技有限公司 | Development approach and system based on template |
CN109240271A (en) * | 2018-10-18 | 2019-01-18 | 东南(福建)汽车工业有限公司 | A kind of the cloud platform test macro and method of full-vehicle control equipment |
CN109254947A (en) * | 2018-09-17 | 2019-01-22 | 深算科技(重庆)有限公司 | GPU calculation method, device and computer equipment based on block chain |
CN109255516A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | Task development approach and system based on unit time distribution |
CN109255515A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | A kind of task exploitation cloud platform based on page metering and unit time distribution |
CN109255582A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | Development approach and system based on fault tolerant mechanism |
CN109271142A (en) * | 2018-07-24 | 2019-01-25 | 武汉空心科技有限公司 | Exploitation cloud platform based on template component |
CN109343828A (en) * | 2018-09-26 | 2019-02-15 | 武汉空心科技有限公司 | The user interface of software design method and system quickly delivered |
CN109377011A (en) * | 2018-09-26 | 2019-02-22 | 武汉空心科技有限公司 | The software docking development approach and system quickly delivered |
CN109544032A (en) * | 2018-12-03 | 2019-03-29 | 上海夫卡实业发展有限公司 | Equipment design work management method, platform and the system quickly delivered |
CN109615205A (en) * | 2018-12-03 | 2019-04-12 | 上海夫卡实业发展有限公司 | Electric instrument design work management method, platform and the system quickly delivered |
CN109740850A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Industrial design work management method, platform and the system quickly delivered |
CN109740851A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Design for Automatic Control Engineering work management method, platform and the system quickly delivered |
CN109740849A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Structure design work management method, platform and the system quickly delivered |
CN109754215A (en) * | 2018-12-03 | 2019-05-14 | 上海夫卡实业发展有限公司 | Technological design work management method, platform and the system quickly delivered |
CN109816193A (en) * | 2018-12-03 | 2019-05-28 | 上海夫卡实业发展有限公司 | Architectural design work management method, platform and the system quickly delivered |
CN109992251A (en) * | 2019-04-17 | 2019-07-09 | 安徽省希灵科技服务有限公司 | A kind of software development scheme generation method of service-oriented variable |
CN110083336A (en) * | 2019-03-08 | 2019-08-02 | 江苏博敏网络科技有限公司 | A kind of method that high efficiency creation customizes website |
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN111784124A (en) * | 2020-06-12 | 2020-10-16 | 中信银行股份有限公司 | Task processing method, device and equipment and computer readable storage medium |
CN113392015A (en) * | 2021-06-25 | 2021-09-14 | 北京光启元数字科技有限公司 | Product testing method, device, equipment and medium |
CN113626066A (en) * | 2021-08-27 | 2021-11-09 | 国家超级计算无锡中心 | Method and system applied to industrial simulation platform |
CN114327378A (en) * | 2022-03-15 | 2022-04-12 | 广州弘一信息科技股份有限公司 | Project management system based on software development |
CN118674329A (en) * | 2024-08-22 | 2024-09-20 | 浙江迈新科技股份有限公司 | Low-code platform management method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106327152A (en) * | 2016-08-11 | 2017-01-11 | 宁波亦道信息科技有限公司 | Integrated iteration software development process control system and method |
CN106371840A (en) * | 2016-08-30 | 2017-02-01 | 北京航空航天大学 | Software development method and device based on crowdsourcing |
CN107146119A (en) * | 2017-07-07 | 2017-09-08 | 天津杰超科技发展有限公司 | A kind of advertisement design online trading system |
CN107678738A (en) * | 2017-10-17 | 2018-02-09 | 广州慧睿思通信息科技有限公司 | A kind of method of software quality management |
-
2018
- 2018-02-10 CN CN201810137803.XA patent/CN108280631A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106327152A (en) * | 2016-08-11 | 2017-01-11 | 宁波亦道信息科技有限公司 | Integrated iteration software development process control system and method |
CN106371840A (en) * | 2016-08-30 | 2017-02-01 | 北京航空航天大学 | Software development method and device based on crowdsourcing |
CN107146119A (en) * | 2017-07-07 | 2017-09-08 | 天津杰超科技发展有限公司 | A kind of advertisement design online trading system |
CN107678738A (en) * | 2017-10-17 | 2018-02-09 | 广州慧睿思通信息科技有限公司 | A kind of method of software quality management |
Cited By (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109255516A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | Task development approach and system based on unit time distribution |
CN109144480A (en) * | 2018-07-24 | 2019-01-04 | 武汉空心科技有限公司 | Working platform method, platform and the system quickly delivered |
CN109034611A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | Back-end software development approach, platform and the system quickly delivered |
CN108876201A (en) * | 2018-07-24 | 2018-11-23 | 武汉空心科技有限公司 | Development approach, platform and the system quickly delivered |
CN109034609A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | The software product design method and system quickly delivered |
CN109102169A (en) * | 2018-07-24 | 2018-12-28 | 武汉空心科技有限公司 | Development approach and system based on function metering |
CN109102168A (en) * | 2018-07-24 | 2018-12-28 | 武汉空心科技有限公司 | Exploitation cloud platform based on page metering and timeliness control |
CN109118063A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Task based on unit time distribution develops cloud platform |
CN109118059A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Front-end software development approach, platform and the system quickly delivered |
CN109118060A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Quick development method, platform and system based on timeliness control |
CN109118062A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Based on the development approach and system for robbing single-unit |
CN109118061A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Exploitation cloud platform based on timeliness control |
CN109117366A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | The method for testing software and system quickly delivered |
CN108876202A (en) * | 2018-07-24 | 2018-11-23 | 武汉空心科技有限公司 | Design work management method, platform and the system quickly delivered |
CN109146250A (en) * | 2018-07-24 | 2019-01-04 | 武汉空心科技有限公司 | Task exploitation delivery method and system based on page metering |
CN109214646A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | The software system architecture design method and system quickly delivered |
CN109214770A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | Development approach, platform and system based on design original text metering |
CN109255582A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | Development approach and system based on fault tolerant mechanism |
CN109242240A (en) * | 2018-07-24 | 2019-01-18 | 武汉空心科技有限公司 | Task based on unit time distribution and timeliness control develops cloud platform |
CN109240654A (en) * | 2018-07-24 | 2019-01-18 | 武汉空心科技有限公司 | Development approach and system based on template |
CN109271142A (en) * | 2018-07-24 | 2019-01-25 | 武汉空心科技有限公司 | Exploitation cloud platform based on template component |
CN109214645A (en) * | 2018-07-24 | 2019-01-15 | 武汉空心科技有限公司 | Development approach and system based on module metering |
CN109034610A (en) * | 2018-07-24 | 2018-12-18 | 武汉空心科技有限公司 | Software development cloud platform based on different periods difference distribution mechanism |
CN109255515A (en) * | 2018-07-24 | 2019-01-22 | 武汉空心科技有限公司 | A kind of task exploitation cloud platform based on page metering and unit time distribution |
CN109254947A (en) * | 2018-09-17 | 2019-01-22 | 深算科技(重庆)有限公司 | GPU calculation method, device and computer equipment based on block chain |
CN109343828A (en) * | 2018-09-26 | 2019-02-15 | 武汉空心科技有限公司 | The user interface of software design method and system quickly delivered |
CN109377011A (en) * | 2018-09-26 | 2019-02-22 | 武汉空心科技有限公司 | The software docking development approach and system quickly delivered |
CN109240271A (en) * | 2018-10-18 | 2019-01-18 | 东南(福建)汽车工业有限公司 | A kind of the cloud platform test macro and method of full-vehicle control equipment |
CN109816193A (en) * | 2018-12-03 | 2019-05-28 | 上海夫卡实业发展有限公司 | Architectural design work management method, platform and the system quickly delivered |
CN109740850A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Industrial design work management method, platform and the system quickly delivered |
CN109740851A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Design for Automatic Control Engineering work management method, platform and the system quickly delivered |
CN109740849A (en) * | 2018-12-03 | 2019-05-10 | 上海夫卡实业发展有限公司 | Structure design work management method, platform and the system quickly delivered |
CN109754215A (en) * | 2018-12-03 | 2019-05-14 | 上海夫卡实业发展有限公司 | Technological design work management method, platform and the system quickly delivered |
CN109544032A (en) * | 2018-12-03 | 2019-03-29 | 上海夫卡实业发展有限公司 | Equipment design work management method, platform and the system quickly delivered |
CN109615205A (en) * | 2018-12-03 | 2019-04-12 | 上海夫卡实业发展有限公司 | Electric instrument design work management method, platform and the system quickly delivered |
CN110083336A (en) * | 2019-03-08 | 2019-08-02 | 江苏博敏网络科技有限公司 | A kind of method that high efficiency creation customizes website |
CN109992251B (en) * | 2019-04-17 | 2024-02-23 | 上海通天晓信息技术有限公司 | Business variable-oriented software development scheme generation method |
CN109992251A (en) * | 2019-04-17 | 2019-07-09 | 安徽省希灵科技服务有限公司 | A kind of software development scheme generation method of service-oriented variable |
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN111784124A (en) * | 2020-06-12 | 2020-10-16 | 中信银行股份有限公司 | Task processing method, device and equipment and computer readable storage medium |
CN113392015A (en) * | 2021-06-25 | 2021-09-14 | 北京光启元数字科技有限公司 | Product testing method, device, equipment and medium |
CN113626066A (en) * | 2021-08-27 | 2021-11-09 | 国家超级计算无锡中心 | Method and system applied to industrial simulation platform |
CN114327378A (en) * | 2022-03-15 | 2022-04-12 | 广州弘一信息科技股份有限公司 | Project management system based on software development |
CN114327378B (en) * | 2022-03-15 | 2022-05-24 | 广州弘一信息科技股份有限公司 | Project management system based on software development |
CN118674329A (en) * | 2024-08-22 | 2024-09-20 | 浙江迈新科技股份有限公司 | Low-code platform management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108280631A (en) | A kind of front end development task management-control method and system | |
CN101330388B (en) | Synergic editing method based on synthesis integration deliberation hall | |
CN110189114A (en) | It is a kind of to divide account method based on the intelligence for unifying payment platform | |
CN109740851A (en) | Design for Automatic Control Engineering work management method, platform and the system quickly delivered | |
CN111192021A (en) | OA document approval implementation method and system | |
Ma et al. | System design and development for robotic process automation | |
WO2002097700A2 (en) | Extended web enabled multi-featured business to business computer system for rental vehicle services | |
CN105913219A (en) | Method and system used for monitoring and managing whole actuating process of electronic contract | |
WO2007005949A2 (en) | Dispute resolution processing method and system | |
CN109740849A (en) | Structure design work management method, platform and the system quickly delivered | |
CN109522527A (en) | A method of site construction technology establishment is carried out using software systems | |
CN100530090C (en) | Apparatus and method for determining the reuse value of a service component | |
CN109754215A (en) | Technological design work management method, platform and the system quickly delivered | |
CN109741028A (en) | Asset management auxiliary shoring system and its management method | |
CN109978502A (en) | Automatic budget method, system and computer storage medium are changed in engineering design | |
CN109740850A (en) | Industrial design work management method, platform and the system quickly delivered | |
Ali et al. | Architectural knowledge management in global software development: a review | |
CN109102168A (en) | Exploitation cloud platform based on page metering and timeliness control | |
CN109101222A (en) | A kind of 24 hours front end development platforms quickly delivered | |
CN109242240A (en) | Task based on unit time distribution and timeliness control develops cloud platform | |
CN117591079A (en) | Design construction method of enterprise-level integrated operation management system | |
CN109118060A (en) | Quick development method, platform and system based on timeliness control | |
CN109255515A (en) | A kind of task exploitation cloud platform based on page metering and unit time distribution | |
US20060143125A1 (en) | Method and system for electronic billing and reconciliation | |
CN109816193A (en) | Architectural design work management method, platform and the system quickly delivered |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180713 |
|
RJ01 | Rejection of invention patent application after publication |