CN109118059A - Front-end software development approach, platform and the system quickly delivered - Google Patents
Front-end software development approach, platform and the system quickly delivered Download PDFInfo
- Publication number
- CN109118059A CN109118059A CN201810818437.4A CN201810818437A CN109118059A CN 109118059 A CN109118059 A CN 109118059A CN 201810818437 A CN201810818437 A CN 201810818437A CN 109118059 A CN109118059 A CN 109118059A
- Authority
- CN
- China
- Prior art keywords
- task
- server
- engineer
- development
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Stored Programmes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses front-end software development approach, platform and systems that one kind is quickly delivered, server calculates development amount and overall development expense by the front-end software exploration project demand that client terminal is sent according to client in the method, and front-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and receives registration instruction;The engineer that all working task distributes to registration task is developed, and mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;It checks whether task code is all submitted on time after task expiration of time limit, is then to send project to client terminal to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failed message.The present invention improves development rate, it is ensured that quickly delivers.
Description
Technical field
The present invention relates to computer application technology, the front-end software development approach quickly delivered in particular to one kind,
Platform and system.
Background technique
Development platform has accumulated a large amount of engineers, and exploitation service can be provided for client.Traditional development platform is mainly wrapped
Three important stages are included, are client's release tasks first, software design original text is provided by client and interaction illustrates document, recruit exploitation
Engineer pays corresponding expense after linking up clear requirement details with engineer;Subsequently into development phase, Developmental Engineer's root
It is developed according to design original text and requirement documents, code is submitted in development process, integrates code after the completion of exploitation, consigns to visitor
Family;Client receives deliver code after, carry out last test, Developmental Engineer's cooperation is modified perfect, then is carried out by client
It checks and accepts, pays remaining development cost.It links up and assists currently, the bottleneck for influencing platform development task working efficiency essentially consists in demand
With the two links are developed, it is directed between a large amount of engineer and client, the communication work between engineer and engineer.
On the one hand artificial link up is easy to omit or misread requirement details, on the other hand links up confirmation repeatedly and takes a long time, to cause
The delay of delivery time.
Summary of the invention
Technical problems based on background technology, the invention proposes the front-end software exploitation sides that one kind is quickly delivered
Method, platform and system, by standardization process by response speed ultimate attainmentization of client development demand, with reasonable task fractionation side
Project's finish time is limited within mandatory period by formula, quickly delivers development task to realize.
In order to achieve the above objectives, the technical solution adopted in the present invention the following steps are included:
1) client issues front-end software exploration project demand to server by client terminal;
2) server calculates development amount and overall development expense according to front-end software exploration project demand, and by front end
Development project is decomposed into several tasks;
3) server provides mission bit stream to engineer user by user terminal, and receives the report from engineer user
Name instruction;
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged,
Guarantee that all working task is completed in mandatory period;
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server;
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to send out to client terminal
Project is sent to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user
Terminal sends project and completes failed message.
Preferably, front-end software exploration project demand includes software Pages Design original text, terminal type, page number in step 1)
Amount, technical label.
It preferably, is that front end is soft by the method that front-end software exploration project is decomposed into several tasks in step 2)
Part exploration project is to develop the page or software function or software module or software design original text or interface quantity as metering
Unit calculates development amount, and it is several tasks that overall development workload, which is developed rate cutting with specified time, averagely,.
Preferably, the specific steps of step 4) include:
41) after server receives registration instruction, satisfactory engineering is screened according to the technical label of engineer user
Teacher user, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and is arranged
Mandatory period, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order and refers to
It enables and starts timing;
43) if the number in alternative engineer's list is greater than 0 and is less than number of tasks or does not receive in specified time all really
Recognize order instruction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternatively
Number in engineer's list is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to prolong
Phase instruction or project END instruction, server receive instruction of agreeing to delay then according to alternative engineer's tab sequential by all works
It is distributed to engineer user as task, and mandatory period is reset according to alternative engineer's number.
Preferably, in step 5), if engineer user's business time limit in office in actively abandon task, pass through user terminal to
Assignment instructions are abandoned in server transmission, and server develops rate according to mandatory period remaining time and averagely and judges whether to need to appoint
Business is delayed, and is, is sent the instruction that asks for a postponement to client terminal, is otherwise redistributed this task;Client passes through client terminal
Reception asks for a postponement instruction, returns and agrees to delay that then server redistributes this task for instruction, returns to project END instruction
Then server sends expense to client terminal and returns instruction.
Preferably, after server sends project completion message to client terminal in step 6), project enters quality guarantee period, is setting
In the quality guarantee time limit set, client submits the suggestion for revision of task based access control by client terminal, and suggestion for revision is sent to by server
Corresponding user terminal, engineer user modify to task, and submit modified generation to server by user terminal
Modified code is deployed to test environment and sends page access address and code downloading ground to client terminal by code, server
Location.
Preferably, after the quality guarantee time limit, server according to task carry out disbursement and sattlement, by task settlement amounts pay to
The specified account of the corresponding user terminal of the task, and clearing message is sent to user terminal.
The present invention also proposes a kind of front-end software development platform quickly delivered, including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing front-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from clothes
Device downloading exploitation of being engaged in requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to front-end software exploration project demand, and will
Front-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and
Receive the registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and
Mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In task
It checks whether task code is all submitted on time after expiration of time limit, is then to send project to client terminal to complete message, server
Disbursement and sattlement is carried out according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failure
Message.
Further, server includes
Task management server calculates development amount for receiving front-end development project demand and overall development takes
With, after receiving reimbursement of expense message, development amount is decomposed into several tasks, according to task development progress and
The term of delivery adjusts task distribution;
Document storage server, for storing front-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to front-end software exploration project demand, for user's end
End uploads development result code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to
User terminal and the modification result phase for receiving feedback.
Based on the above-mentioned front-end software development approach quickly delivered, the present invention also proposes a kind of front-end software development system,
Including memory, processor and it is stored in the computer program that can be run in the memory and on the processor, the processing
The step of device realizes upper the method when being configured as executing the computer program.
Compared with prior art, front-end software development approach, platform and system that the present invention quickly delivers, using reasonable
Development amount accounting method and flexibly controllable task cutting method, the exploitation that front-end software, back-end software, software are docked
Process forms the operation flow of standardization, standardization, on the one hand avoids the confirmation repeatedly to wide variety of conventional demand, reduces visitor
The communication workload at family and engineer;The delivery quality of task entirety when on the other hand ensure that multidigit engineer's concurrent development,
And which thereby enhance task development rate, it is ensured that quickly deliver.
Detailed description of the invention
Fig. 1 is the flow chart for the front-end software development approach that the present invention quickly delivers.
Fig. 2 is the structural block diagram for the front-end software development platform that the present invention quickly delivers.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples.
As shown in Figure 1, the present invention proposes a kind of front-end software development approach quickly delivered, the specific steps of the method
Include:
1) client issues front-end software exploration project demand to server by client terminal;
It includes software Pages Design original text, terminal type, page quantity, technical bid that front-end software, which develops exploration project demand,
Label, wherein design original text type option is PSD format, Sketch format and Jpeg/Png format, terminal type option is electricity
Brain end, mobile phone terminal and computer+mobile phone terminal;Technical label option includes several mainstream front-end technology frames, such as basis H5, VUE,
React.js, Angular.js etc..
Client uploads demand file by client terminal, after server receives demand file, according to filename back page
Title.Client only need to provide above-mentioned necessary information according to system prompt, other detailed requirements information are included in design documentation,
Client does not need to provide greater demand information, reduces demand to the greatest extent and links up workload.
2) server calculates development amount and overall development expense according to front-end software exploration project demand, and by front end
Development project is decomposed into several tasks;
Calculating development amount can be to develop the page, software function or software module or software design original text as metering
Unit, it is several tasks, the task of each task that overall development workload, which is developed rate cutting with mandatory period, averagely,
Time limit is within the specified time at distribution task moment.
By taking page type is measurement unit calculating development amount as an example.Page type includes content pages, homepage, long page
Face, pop-up and Tab pages.All types of page workloads, which are set, takes relative value by standard of content pages, i.e. content pages workload is 1 mark
Quasi- page, homepage and long page workload are 2.75 standard pages, pop-up workload is 0.3 standard page, Tab pages of workload is 0.4 mark
Quasi- page.Wherein pop-up and Tab pages are page Adjunct content, without uploading individually designed original text.According to client upload design original text and
After overall development workload is calculated in page quantity, by overall development workload divided by the average exploitation of Software Development Engineer
Rate obtains task number.For example, overall development workload is 20 standard pages, averagely exploitation rate is 5~7 pages/day,
The parameter can adjust according to the actual situation, then be 4 tasks by the project cutting, the mandatory period of each task is set as 20
Hour or any time limit within 24 hours, guarantee that overall development workload is completed within 24 hours with this.Server according to
The quantity of all kinds of pages, calculates overall development expense in the demand that client submits, after client's payment expense, in service end-apparatus hair
Cloth mission bit stream.The unit price that platform defines every class page is 200 yuan/standard page, page type that task based access control includes, work
Amount standard and quantity, last calculating task whole cost.
Task is divided into level-one task, second task, three-level task ... according to complexity by server, respectively with level-one
Engineer, second level engineer, three-level engineer match.When server release tasks, by level-one task, second task, three-level
The corresponding user terminal for being distributed to level-one engineer, second level engineer, three-level engineer of task, the task of low level are issued simultaneously
To high level engineer.
After client passes through platform bill payment expense, server opens flow of task, and to currently can order engineer
User terminal sends mission bit stream.Server is simultaneously according to the technological frame of project demands, selection and technical requirements matched generation
Code template, creates the initial code frame of the project, is each page creation then according to the page info in project demands
Initial directory and initial code file.
3) server provides mission bit stream to engineer user by user terminal, and receives the report from engineer user
Name instruction;
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged,
Guarantee that all working task is completed in mandatory period;
41) after server receives registration instruction, satisfactory engineering is screened according to the technical label of engineer user
Teacher user, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and is arranged
Mandatory period, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order and refers to
It enables and starts timing;
43) if the number in alternative engineer's list is greater than 0 and is less than number of tasks or does not receive in specified time all really
Recognize order instruction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternatively
Number in engineer's list is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to prolong
Phase instruction or project END instruction, server receive instruction of agreeing to delay then according to alternative engineer's tab sequential by all works
It is distributed to engineer user as task, and mandatory period is reset according to alternative engineer's number.
When due to release tasks, server has been sent to the Developmental Engineer user of appropriate level, engineering according to task rank
Teacher user registers the task of appropriate level or the task of low level, when server distributes task, by level-one task, two in charge of a grade
Business, three-level task are respectively allocated to appropriate level or high level engineer user.
For example, client has issued the front-end software development task an of enterprise web site, the demand submitted according to client and soft
Part user-interface design original text, task distribution condition are as follows:
The page | Task rank | Description | Distribute engineer |
Website homepage | Level-one task | Homepage and website common portion interface | Level-one engineer A |
Product introduction | Second task | Product classification and various product introduction | Level-one engineer B |
Introduction of enterprises | Second task | Introduction of enterprises, leader's speech, contact method, about us | Second level engineer C |
News dynamic | Second task | Each column news Dynamic Display | Second level engineer D |
Management backstage | Second task | Website setting, information publication | Second level engineer E |
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server;
Engineer is after user terminal receives the task message of distribution, from the design original text text of server downloading corresponding page
Part, and the initial code of synchronous task, based on design original text, the development specifications according to as defined in platform is developed.Development specifications from
The realization of code spice, page layout and front end various elements, component has carried out detailed regulation, it is desirable that in design original text
Identifiable principle is unified to be standardized exploitation according to platform development specification.
If actively abandoning task in engineer user's business time limit in office, abandon appointing to server transmission by user terminal
Business instruction, it is then to visitor that server, which develops rate according to mandatory period remaining time and averagely and judges whether to need task-delay,
Family terminal sends the instruction that asks for a postponement, and otherwise redistributes this task;Client receives the finger that asks for a postponement by client terminal
It enables, returns and agree to that then server redistributes this task for extension instruction, is detached from the task for current engineer, by the engineering
The page that teacher does not submit is reassigned to Other Engineering teacher in queue, sends task distribution letter to the user terminal of substitute engineer
Breath;The END instruction of return project then server to client terminal send expense return instruction.
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to send out to client terminal
Project is sent to complete message, server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user
Terminal sends project and completes failed message.
Server stores the code that engineer user sends, and code is deployed to test environment and sends page to client terminal
Face access address and code download address.Server sends project to client terminal and completes message, and server is carried out according to task
Disbursement and sattlement, and clearing message is sent to user terminal.
After server sends project completion message to client terminal, project enters quality guarantee period, within the quality guarantee time limit of setting,
Client submits the suggestion for revision of task based access control by client terminal, and suggestion for revision is sent to corresponding user terminal by server,
Engineer user modifies to task, and submits modified code to server by user terminal, and server will be modified
Code afterwards is deployed to test environment and sends page access address and code download address to client terminal.
Client after client terminal receives page completion information, check by the page access address that access server provides
Test delivery results page.If it find that the problem of modification and perfection in need, be published to server for suggestion for revision.Client can also
With the code download address provided by server, page code is all completed in downloading.Server receives client's submission
When suggestion for revision, amendment advice message is sent to corresponding user terminal.Engineer is according to the suggestion for revision received, to the page
It modifies, then submits modified page code to server.
After the quality guarantee time limit, server carries out disbursement and sattlement according to task, and task settlement amounts are paid to the task
The specified account of corresponding user terminal, and clearing message is sent to user terminal.
As shown in Fig. 2, the present invention also proposes a kind of front-end software development platform quickly delivered, including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing front-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from clothes
Device downloading exploitation of being engaged in requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to front-end software exploration project demand, and will
Front-end software exploration project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and
Receive the registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and
Mandatory period is set, guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In task
It checks whether task code is all submitted on time after expiration of time limit, is then to send project to client terminal to complete message, server
Disbursement and sattlement is carried out according to task, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failure
Message.
Further, server includes
Task management server calculates development amount for receiving front-end development project demand and overall development takes
With development amount being decomposed into several tasks, according to task development progress and delivery after receiving reimbursement of expense message
Time limit adjusts task distribution;
Document storage server, for storing front-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to front-end software exploration project demand, for user's end
End uploads development result code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to
User terminal and the modification result phase for receiving feedback.
Based on the above-mentioned front-end software development approach quickly delivered, the present invention also proposes a kind of software development system, including
Memory, processor and it is stored in the computer program that can be run in the memory and on the processor, the processor quilt
The step of realizing upper the method when being configured to execute the computer program.
Claims (10)
1. the front-end software development approach that one kind is quickly delivered, it is characterised in that: described method includes following steps:
1) client issues front-end software exploration project demand to server by client terminal;
2) server calculates development amount and overall development expense according to front-end software exploration project demand, and by front-end software
Exploration project is decomposed into several tasks;
3) server provides mission bit stream to engineer user by user terminal, and receives the registration from engineer user and refer to
It enables;
4) server develops the engineer that all working task distributes to registration task, and mandatory period is arranged, and guarantees
All working task is completed in mandatory period;
5) after completing assignment task in engineer user's business time limit in office, task code is uploaded to server;
6) server checks whether task code is all submitted on time after task expiration of time limit, is then to client terminal sending item
Mesh completes message, and server carries out disbursement and sattlement according to task, and sends clearing message to user terminal;Otherwise to user terminal
Transmission project completes failed message.
2. the front-end software development approach according to claim 1 quickly delivered, it is characterised in that: front end is soft in step 1)
Part exploration project demand includes software Pages Design original text, terminal type, page quantity, technical label.
3. the front-end software development approach according to claim 1 quickly delivered, it is characterised in that: by front end in step 2)
The method that development project is decomposed into several tasks is by front-end software exploration project to develop the page or software
Function or software module or software design original text or interface quantity are that measurement unit calculates development amount, by overall development
Workload is with specified time, averagely exploitation rate cutting is several tasks.
4. the front-end software development approach according to claim 1 quickly delivered, it is characterised in that: the specific step of step 4)
Suddenly include:
41) after server receives registration instruction, satisfactory Utility Engineers are screened according to the technical label of engineer user
Family, and sorted according to the running parameter of engineer user, form alternative engineer's list;
42) all working task is distributed to engineer user according to alternative engineer's tab sequential by server, and task is arranged
Time limit, engineer user send confirmation order instruction to server by user terminal, and server receives confirmation order instruction simultaneously
Start timing;
43) if the number in alternative engineer's list is less than number of tasks greater than 0 or does not receive whole confirmations in specified time and connects
Single instrction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 44), if alternative engineering
Number in Shi Liebiao is 0, then server sends distribution failure command to client terminal, and project terminates;
44) client receives distribution failure command and the instruction that asks for a postponement by client terminal, sends to server and agrees to delay to refer to
It enables or project END instruction, server receives instruction of agreeing to delay and then appointed all working according to alternative engineer's tab sequential
Business is distributed to engineer user, and resets mandatory period according to alternative engineer's number.
5. the front-end software development approach according to claim 1 quickly delivered, it is characterised in that: in step 5), if work
Cheng Shi user actively abandons task in mandatory period, then abandons assignment instructions to server transmission by user terminal, service
Device develops rate according to mandatory period remaining time and averagely and judges whether to need task-delay, is, asks to client terminal transmission
It asks extension to instruct, otherwise redistributes this task;Client receives the instruction that asks for a postponement by client terminal, returns and agrees to prolong
Then server redistributes this task for phase instruction, and returning to project END instruction, then server is moved back to client terminal transmission expense
Also instruct.
6. the front-end software development approach according to claim 1 quickly delivered, it is characterised in that: server in step 6)
After sending project completion message to client terminal, project enters quality guarantee period, and within the quality guarantee time limit of setting, client passes through client's end
The suggestion for revision of task based access control is submitted at end, and suggestion for revision is sent to corresponding user terminal by server, and engineer user is to appointing
Business is modified, and submits modified code to server by user terminal, and modified code is deployed to by server
It tests environment and sends page access address and code download address to client terminal.
7. the front-end software development approach according to claim 6 quickly delivered, it is characterised in that: the quality guarantee time limit terminates
Afterwards, server according to task carry out disbursement and sattlement, by task settlement amounts pay to the corresponding user terminal of the task specify
Account, and clearing message is sent to user terminal.
8. the front-end software development platform that one kind is quickly delivered, it is characterised in that: including
Client terminal pays overall development expense, checks and accepts exploitation code for issuing front-end software exploration project demand;
User terminal, for obtaining the task of mission bit stream, the instruction for sending registration task, confirmation reception distribution, from server
Downloading exploitation requires, and development task is completed in mandatory period and to server upload code;
Server, for calculating development amount and overall development expense according to front-end software exploration project demand, and by front end
Development project is decomposed into several tasks;Mission bit stream is provided to engineer user by user terminal, and is received
Registration instruction from engineer user;The engineer that all working task distributes to registration task is developed, and is arranged
Mandatory period guarantees that all working task is completed in mandatory period;Receive the task code that engineer uploads;In mandatory period
After at the expiration check task code whether all submits on time, be then to client terminal send project complete message, server according to
Task carries out disbursement and sattlement, and sends clearing message to user terminal;Otherwise project is sent to user terminal complete failed message.
9. the front-end software development platform according to claim 7 quickly delivered, it is characterised in that: the server includes
Task management server is used for receiving front-end development project demand, calculates development amount and overall development expense,
After receiving reimbursement of expense message, development amount is decomposed into several tasks, according to task development progress and delivery period
Limit the distribution of adjustment task;
Document storage server, for storing front-end software exploration project demand file;
Code administration server, for creating initial skeleton code according to front-end software exploration project demand, on user terminal
It spreads and sends out object code, and code is deployed to test environment and is called for client terminal;
Management server is modified, task test modifications opinion is submitted for receiving client terminal, suggestion for revision is sent to user
Terminal and the modification result phase for receiving feedback.
10. the system of front-end software development approach that one kind is quickly delivered, including memory, processor and it is stored in the storage
In device and the computer program that can run on the processor, it is characterised in that: the processor is configured as executing the computer
It is realized when program such as the step of any one of claim 1~7 the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810818437.4A CN109118059A (en) | 2018-07-24 | 2018-07-24 | Front-end software development approach, platform and the system quickly delivered |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810818437.4A CN109118059A (en) | 2018-07-24 | 2018-07-24 | Front-end software development approach, platform and the system quickly delivered |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109118059A true CN109118059A (en) | 2019-01-01 |
Family
ID=64863194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810818437.4A Pending CN109118059A (en) | 2018-07-24 | 2018-07-24 | Front-end software development approach, platform and the system quickly delivered |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109118059A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN112330372A (en) * | 2020-11-30 | 2021-02-05 | 武汉空心科技有限公司 | Software development working platform task cost estimation method |
CN113487161A (en) * | 2021-06-30 | 2021-10-08 | 武汉空心科技有限公司 | Engineer skill proficiency evaluation system and method based on working platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106371840A (en) * | 2016-08-30 | 2017-02-01 | 北京航空航天大学 | Software development method and device based on crowdsourcing |
US9704117B1 (en) * | 2013-03-15 | 2017-07-11 | Teletracking Technologies, Inc. | Display of hospital transport information on a portable device |
CN107577469A (en) * | 2017-08-21 | 2018-01-12 | 厦门悦讯教育科技有限公司 | A kind of Software package method for release management |
CN108280631A (en) * | 2018-02-10 | 2018-07-13 | 武汉空心科技有限公司 | A kind of front end development task management-control method and system |
-
2018
- 2018-07-24 CN CN201810818437.4A patent/CN109118059A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9704117B1 (en) * | 2013-03-15 | 2017-07-11 | Teletracking Technologies, Inc. | Display of hospital transport information on a portable device |
CN106371840A (en) * | 2016-08-30 | 2017-02-01 | 北京航空航天大学 | Software development method and device based on crowdsourcing |
CN107577469A (en) * | 2017-08-21 | 2018-01-12 | 厦门悦讯教育科技有限公司 | A kind of Software package method for release management |
CN108280631A (en) * | 2018-02-10 | 2018-07-13 | 武汉空心科技有限公司 | A kind of front end development task management-control method and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111314413A (en) * | 2019-12-17 | 2020-06-19 | 武汉空心科技有限公司 | Task allocation device for a work platform |
CN112330372A (en) * | 2020-11-30 | 2021-02-05 | 武汉空心科技有限公司 | Software development working platform task cost estimation method |
CN113487161A (en) * | 2021-06-30 | 2021-10-08 | 武汉空心科技有限公司 | Engineer skill proficiency evaluation system and method based on working platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108876201A (en) | Development approach, platform and the system quickly delivered | |
CN109034611A (en) | Back-end software development approach, platform and the system quickly delivered | |
CN109271142A (en) | Exploitation cloud platform based on template component | |
CN108876202A (en) | Design work management method, platform and the system quickly delivered | |
CN109118059A (en) | Front-end software development approach, platform and the system quickly delivered | |
CN103309946B (en) | Multimedia file processing method, Apparatus and system | |
CN109146251A (en) | Component- based development method and system | |
WO2002101510A2 (en) | System architecture and method for energy industry trading and transaction management | |
CN109144480A (en) | Working platform method, platform and the system quickly delivered | |
CN104281901A (en) | Tax declaration method based on WEB technology | |
CN109118063A (en) | Task based on unit time distribution develops cloud platform | |
CN104021449A (en) | Conglomerate report file merging method and device based on open platform system | |
CN109214645A (en) | Development approach and system based on module metering | |
CN105243582A (en) | Financial cloud based XBRL accounting software standard data interface system and method | |
CN109034610A (en) | Software development cloud platform based on different periods difference distribution mechanism | |
CN109101222A (en) | A kind of 24 hours front end development platforms quickly delivered | |
CN109377011A (en) | The software docking development approach and system quickly delivered | |
CN115358204A (en) | Report generation method and device, electronic equipment and storage medium | |
CN109102168A (en) | Exploitation cloud platform based on page metering and timeliness control | |
CN103927626A (en) | Method and system for project management | |
CN109118062A (en) | Based on the development approach and system for robbing single-unit | |
CN109118060A (en) | Quick development method, platform and system based on timeliness control | |
CN109242240A (en) | Task based on unit time distribution and timeliness control develops cloud platform | |
AU2011204930B2 (en) | Capturing and processing data generated in an ERP interim phase | |
CN109255515A (en) | A kind of task exploitation cloud platform based on page metering and unit time distribution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190101 |