CN109615205A - Electric instrument design work management method, platform and the system quickly delivered - Google Patents

Electric instrument design work management method, platform and the system quickly delivered Download PDF

Info

Publication number
CN109615205A
CN109615205A CN201811467190.2A CN201811467190A CN109615205A CN 109615205 A CN109615205 A CN 109615205A CN 201811467190 A CN201811467190 A CN 201811467190A CN 109615205 A CN109615205 A CN 109615205A
Authority
CN
China
Prior art keywords
server
task
subtask
contract
electric instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811467190.2A
Other languages
Chinese (zh)
Inventor
王�琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fuka Industrial Development Co Ltd
Original Assignee
Shanghai Fuka Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Fuka Industrial Development Co Ltd filed Critical Shanghai Fuka Industrial Development Co Ltd
Priority to CN201811467190.2A priority Critical patent/CN109615205A/en
Publication of CN109615205A publication Critical patent/CN109615205A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Abstract

The invention discloses electric instrument design work management method, platform and systems that one kind is quickly delivered, which comprises meets packet side and registers personal account, registers individual skill attribute information;The party awarding the contract issues electric instrument design object demand and trustship Project Cost;Server establishes project work stream and task groups according to electric instrument design object demand;Server executes workflow, and the subtask in task groups is sent to the user terminal for meeting Bao Fang being consistent with its technical attributes;Connect the instruction that packet side sends registration subtask;It meets Bao Fang and completes task upload delivery result in mandatory period;The server notice party awarding the contract carries out an acceptance inspection to delivery result;The delivery result of all task groups of Server Consolidation, the notice party awarding the contract complete information, according to the workload of the subtask of completion and the party awarding the contract, meet Bao Fang and close the account.The present invention proposes flexibly controllable Workflow management method, and the process of electric instrument design work is formed to the operation flow of standardization, standardization, it is ensured that quickly delivers.

Description

Electric instrument design work management method, platform and the system quickly delivered
Technical field
The present invention relates to computer application technology, the electric instrument design work manager quickly delivered in particular to one kind Method, platform and system.
Background technique
Electric instrument design work is designed according to the work requirements and associated materials of input, and design original text of completion etc. is delivered The process of destination file.Traditional electric instrument design work mainly includes three important stages, is client's release tasks first, by visitor Family provides statement of requirements document and associated materials, recruits electric instrument design engineer, after linking up clear requirement details with engineer, branch Pay corresponding expense;Subsequently into the design phase, document material is designed engineer according to demand, and design is submitted after the completion of design Destination file;After client receives delivery result file, carry out an acceptance inspection inspection, design engineer cooperation modify it is perfect, then by Client carries out an acceptance inspection, and pays remaining working cost.Currently, the bottleneck for influencing electric instrument design work efficiency essentially consists in demand communication With the two links that cooperate, it is directed between a large amount of engineer and client, the communication between engineer and engineer Work.On the one hand artificial link up is easy to omit or misread requirement details, on the other hand links up confirmation repeatedly and takes a long time, thus Cause the delay of delivery time.
Summary of the invention
Technical problems based on background technology, the invention proposes the electric instrument design work management that one kind is quickly delivered The distribution of electric instrument design work, delivery process are passed through computer platform pipe by standardization process by method, platform and system Reason, the party awarding the contract interact with internet between Bao Fang is connect, and project's finish time is limited to task in such a way that reasonable task is split Within time limit, electric instrument design objective is quickly delivered to realize.
In order to achieve the above objectives, the electric instrument design work management method that one kind that the present invention refers to quickly is delivered, it is special Place is that the method is by the party awarding the contract, meets three Bao Fang, administrator roles using computer software platform as medium completion The process of electric instrument design work management, to connect the project demands file that Bao Fang is received in compliance with requirement, including project technology major mentions Condition, client URS (user requirements specification book)/SPEC (product requirement specification book) and the P&ID (pipeline and instrument flow chart) of confession As task starting point, include the following steps:
1) Bao Fang is met by user terminal in server registration individual's account, registers individual skill attribute information;
2) party awarding the contract issues electric instrument design object demand and trustship Project Cost to server by client terminal;
3) server laterally decompose to electric instrument design object and longitudinal direction is decomposed, build according to electric instrument design object demand Mesh workflow of setting up the project and task groups, and it is sent to client terminal;Project workflow and task groups are modified by the party awarding the contract, after will confirm that Project work stream and task groups are sent to server;
4) server executes workflow, in order release tasks group, and the subtask in task groups is sent to and its skill What art attribute was consistent connects the user terminal of Bao Fang;
5) it meets Bao Fang and subtask information is obtained by user terminal, and registration is sent to server by user terminal and is appointed The instruction of business;Subtask is distributed to registration task and meets Bao Fang by server, and mandatory period is arranged, and guarantees all subtasks The completion time limit meets the requirement of workflow;
6) it meets Bao Fang and confirms the subtask for receiving distribution by user terminal, task is completed in mandatory period and to service Device uploads delivery result;Server notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal;
7) after party awarding the contract's examination passes through, return step 4), until all task groups are checked and accepted in workflow;
8) delivery result of all task groups of Server Consolidation notifies the party awarding the contract to complete information by client terminal, according to The workload of the subtask of completion and the party awarding the contract meet Bao Fang and close the account;Administrator by server to work management process into Row control, safeguards computer software platform and data.
Preferably, electric instrument design object is carried out in the step 3) laterally decomposing the work referred to according to electric instrument design object Make content and scale, task groups are split as several subtasks that can be executed parallel;Longitudinal point is carried out to electric instrument design object Solution refers to the workflow according to electric instrument design object, appoints according to son of the sequencing to processes different in task groups and task groups Business is ranked up, the output of preamble subtask therein as a result, input material as postorder subtask, thus composition automatically into The workflow of row subtask circulation.
Preferably, the mistake that server notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal in the step 6) The suggestion for revision based on subtask is submitted by client terminal by Cheng Zhong, the party awarding the contract, and suggestion for revision is sent to accordingly by server User terminal meets Bao Fang and modifies to task, and submits modified delivery result, service to server by user terminal Modified delivery result is sent to client terminal by device.
Preferably, after the party awarding the contract checks and accepts and passes through in the step 7), server is according to the completion of subtask each in task groups Situation is updated workflow, in the step 8) in the delivery result of Server Consolidation include finished item workflow, When issuing identical items again for the party awarding the contract, project demands are added in this workflow.
Preferably, server distributes subtask to the specific steps packet for meeting Bao Fang of registration task in the step 5) It includes:
51) server receives each user terminal registration instruction, is screened according to the technical label for meeting Bao Fang satisfactory Bao Fang is met, and is sorted according to the running parameter for meeting Bao Fang, is formed and alternatively connects the list of packet side;
52) server meets Bao Fang according to alternatively connecing packet side's tab sequential and be distributed to all tasks, and specified time is arranged Within mandatory period, connect Bao Fang by user terminal to server send confirmation order instruction, server receive confirmation order It instructs and starts timing;
It is less than number of tasks if 53) alternatively connect the number in the list of packet side and be greater than 0 or is not received in specified time all really Recognize order instruction, then server sends distribution failure command and the instruction that asks for a postponement to client terminal, goes to step 54), if alternatively Connecing the number in the list of packet side is 0, then server sends distribution failure command to client terminal, and project terminates;
54) party awarding the contract receives distribution failure command and the instruction that asks for a postponement by client terminal, sends and agrees to server Delay instruction or project END instruction, server receives instruction of agreeing to delay then according to alternatively connecing packet side's tab sequential and will own Task, which is distributed to, meets Bao Fang, and according to alternatively connecing packet side's number resets mandatory period.
Preferably, the task groups of the workflow include instrument design and electrical design, the instrument according to sequencing It include key task: instrument selection and control program, including non-critical task in design objective group: the design of instrument gantry, cable Type selecting, control cabinet design, gas circuit distribution and flammable/toxic gas system;Include key task in the electrical design task groups: Power supply system and comprehensive wiring, including non-critical task: lighting system, lightning protection earthing system, security system, fire alarm system System, intelligent building system and motor control center.
Preferably, the individual skill attribute information include: the type of skill, technical division of labor, business scope, using tool, Possess qualification, the working experience time limit, the running parameter for meeting Bao Fang is calculated according to individual skill attribute information, gives out a contract for a project for server The information and document material of electric instrument design object demand are issued by client terminal in side.
The present invention also proposes a kind of electric instrument design work management platform quickly delivered, and is characterized in that, described flat Platform includes server, at least one client terminal and at least one user terminal;
The client terminal: for the electric instrument design object of the party awarding the contract to be sent to server, item of payment expense receives And it checks and accepts and comes from server delivery result;
The user terminal: for obtaining mission bit stream, the instruction for sending registration task, confirmation reception for meeting packet side user The task of distribution completes task in mandatory period and uploads delivery result to server from the requirement of server download items;
The server: for being mentioned in the project demands file for meeting Bao Fang and being received in compliance with requirement, including project technology major Condition, client URS (user requirements specification book)/SPEC (product requirement specification book) and the P&ID (pipeline and instrument flow chart) of confession After start execution task, according to client terminal issue electric instrument design object, task is decomposed, be based on workflow template structure Build project work stream;Workflow is executed, issues subtask in order, and manage to subtask;Current subtask is passed through User terminal distributes to the different packet sides that connects and executes design work;The task result received from server is carried out whole Close, as corresponding electric instrument design object as a result, and the party awarding the contract is sent to by client terminal, according to the work of the subtask of completion Work amount and the party awarding the contract meet Bao Fang and close the account.
Further, the server includes:
Task workflow management services device: the electric instrument design object submitted for receiving the party awarding the contract from client terminal, by item Mesh resolves into several subtasks, constructs project work stream based on template, and open each ring according to project work stream executive condition Subtask is distributed to the matched user terminal for meeting Bao Fang and carries out specific design work, worked according to subtask by knot task Progress and term of delivery adjustment subtask distribution;
Workflow template management server inquires work for preservation and maintenance work stream template data and index information Flow template;
Document storage server, for storing the mission requirements associated documents and meet Bao Fang that the party awarding the contract submits from client terminal From the task delivery result file of user terminal uploads;
Management server is modified, submits task to check and accept suggestion for revision from client terminal for the party awarding the contract, meets Bao Fang and pass through use Family terminal checks suggestion for revision and feeds back modification result phase.
Based on the above-mentioned electric instrument design work management method quickly delivered, the present invention also proposes a kind of electric instrument design work pipe Reason system including memory, processor and is stored in the computer program that can be run in the memory and on the processor, The step of processor realizes the above method when being configured as executing the computer program.
Compared with prior art, electric instrument design work management method, platform and system that the present invention quickly delivers, utilize conjunction Workload accounting method and flexibly controllable task cutting method are managed, the process of electric instrument design work is formed into standardization, specification On the one hand the operation flow of change avoids the confirmation repeatedly to wide variety of conventional demand, reduces the ditch of client and design engineer Logical workload;On the other hand it ensure that the delivery quality of task entirety when multidigit engineer completes parallel, and which thereby enhance and appoint Speed is completed in business, it is ensured that is quickly delivered.
Detailed description of the invention
Fig. 1 is the flow chart for the electric instrument design work management method that the present invention quickly delivers.
Fig. 2 is work process flow figure.
Fig. 3 is the structural block diagram for the management platform that the present invention quickly delivers.
Fig. 4 is the structural block diagram of task workflow management services device in Fig. 3.
In figure: client terminal 1, user terminal 2, server 3, task workflow management services device 31, workflow construct mould Block 31-1, task manage module 31-2, task allocating module 31-3, workflow template management server 32, file storage service Device 33 modifies management server 34.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and embodiments, but the embodiment should not be construed as pair Limitation of the invention.
The present invention proposes a kind of electric instrument design work management method quickly delivered, based on client terminal 1, user terminal 2, Server 3 is realized.Client terminal 1 be it is multiple, issue electric instrument design object for the different parties awarding the contract.User terminal 2 be it is multiple, for not Design objective is obtained with packet side user is met, uploads delivery result.Server 3 connects with client terminal 1,2 signal of user terminal respectively It connects, workflow and job schedule is managed, and the tasks correlation clothes such as file management, Workflow Management, modification management are provided Business.
The method is by the party awarding the contract, meets three Bao Fang, administrator roles using computer software platform as medium completion The process of electric instrument design work management, to connect the project demands file that Bao Fang is received in compliance with requirement, including project technology major mentions Condition, client URS (user requirements specification book)/SPEC (product requirement specification book) and the P&ID (pipeline and instrument flow chart) of confession As task starting point, the wherein party awarding the contract: electric instrument design requirement is issued by client terminal 1, has been designed from the reception of client terminal 1 At result document;It meets Bao Fang: electric instrument design objective is received by user terminal 2, the result text completed is submitted from user terminal 2 Shelves;Administrator: managing work management process by server 3, safeguards computer software platform and data, specifically includes Following steps, as shown in Figure 1:
1) register technique attribute information meets Bao Fang and registers personal account in server 3 by user terminal 2, registers personal skill Art attribute information;Individual skill attribute information include: the type of skill, technical division of labor, business scope, using tool (i.e. technical bid Label), possess qualification, the working experience time limit, the work ginseng for meeting Bao Fang is calculated according to individual skill attribute information for server 3 Number.
2) the demand party awarding the contract is submitted to issue electric instrument design object demand and trustship project to server 3 by client terminal 1 Expense.Electric instrument design object demand includes condition, client URS (user requirements specification book)/SPEC that project technology major provides (product requirement specification book) and P&ID (pipeline and instrument flow chart), the party awarding the contract issue electric instrument design object by client terminal 1 The information and document material of demand.
The party awarding the contract passes through the instrument design object demand file, after server 3 receives demand file, root of conducting electricity on client terminal 1 According to filename back page title.The party awarding the contract only need to provide above-mentioned necessary information, other detailed requirements information according to system prompt It is included in electric instrument design object file, the party awarding the contract does not need to provide greater demand information, reduces demand to the greatest extent and links up work Amount.Server 3 according to electric instrument design object demand amount of calculation and overall expenses, amount of calculation can with design the page, Number of devices or design original text be measurement unit, by overall work amount with mandatory period, set connect the operating rate cutting of packet side as Several tasks, the mandatory period of each task are within the specified time at distribution task moment.Setting connects the work of packet side Rate is the workload completed in the reasonable mandatory period set according to the working efficiency of electric instrument design engineer.Server 3 Overall expenses is sent to client terminal 1, after the reimbursement of expense message for receiving the return of client terminal 1, into next step.
3) establish workflow server 3 according to electric instrument design object demand, electric instrument design object laterally decompose and It is longitudinal to decompose, project work stream and task groups are established, and be sent to client terminal 1;Project workflow and task are modified by the party awarding the contract Group, project work stream and task groups after will confirm that are sent to server 3.Electric instrument design object laterally decompose and is referred to According to the action and scale of electric instrument design object, task groups are split as several subtasks that can be executed parallel;To electricity Instrument design object carries out longitudinal workflow decomposed and referred to according to electric instrument design object, to task groups and appoints according to sequencing The subtask of different processes is ranked up in business group, and the output of preamble subtask therein is as a result, as the defeated of postorder subtask Enter material, thus the automatic workflow for carrying out subtask circulation of composition.
The electric instrument designing workflows that the present embodiment proposes include the task groups instrument design of longitudinal arrangement and electrically set It counts, includes several subtasks in each task groups.Some subtasks are essential options, referred to as key task, some subtasks are Option, referred to as non-critical task.Workflow of the system default output comprising all subtasks selects to modify for the party awarding the contract, if hair Bao Fang provides workflow in electric instrument design object demand, then exports the party awarding the contract and provide workflow.Complete workflow information Table is as follows, the task groups including arranging according to input and output logical order and the key task in each task groups, non-pass Key task;The type of each subtask, action description, input item, output item, key link label, using tool (with connect Packet side's technical label is corresponding).
1 workflow information table of table
After server 3 completes Task-decomposing, the party awarding the contract can be adjusted on the basis of decomposition result respectively by client terminal 1 Subtask and workflow, including modification, increase, each subtask of deletion, carry out customized editor to subtask.The party awarding the contract can also be with The subtask workflow editted is saved into template, subsequent use is facilitated.Each subtask can appoint according to practical in workflow Business demand is adjusted, the subtask of certain non-key links, situation can be deleted according to demand, or is incorporated into associated crucial son On the other hand task can also increase new subtask in workflow.Meet work process flow figure such as Fig. 2 after packet side determines It is shown.
4) release tasks server 3 executes workflow, in order release tasks group, and the subtask in task groups is sent To the user terminal 2 for meeting Bao Fang being consistent with its technical attributes.For example, by subtask control program be sent to AutoCAD, PPT technical label meets Bao Fang, and subtask power supply system is sent to and meets Bao Fang with AutoCAD, Excel technical label, Subtask comprehensive wiring is sent to and meets Bao Fang with AutoCAD technical label.Meeting packet side must have the subtask all It is required that technical label rather than one of them or several technical labels.
Server 3 is based on workflow execution state, and the subtask of current link is opened, and is appointed according to the son currently opened The mission requirements matching of business suitably meets Bao Fang, and the specific requirement of each subtask is not quite similar, therefore each subtask exists It requires to match the task again when unlatching and suitably meets Bao Fang.
5) registration task meets Bao Fang and obtains subtask information by user terminal 2, and passes through user terminal 2 to server 3 Send the instruction of registration subtask;Subtask is distributed to registration task and meets Bao Fang by server 3, and mandatory period is arranged, and protects The completion time limit for demonstrate,proving all subtasks meets the requirement of workflow.It meets Bao Fang and receives the task letter newly issued in user terminal 2 After breath, it is ready the complete design task in fixed time limit, then can send the instruction for the subtask of registering to server 3.
51) server 3 receives each registration of user terminal 2 instruction, is screened and is met the requirements according to the technical label for meeting Bao Fang Meet Bao Fang, and sorted according to the running parameter for meeting Bao Fang, formed and alternatively connects the list of packet side;
52) server 3 meets Bao Fang according to alternatively connecing packet side's tab sequential and be distributed to all tasks, and specified time is arranged Within mandatory period, connect Bao Fang by user terminal 2 to server 3 send confirmation order instruction, server 3 receive confirmation connects Single instrction simultaneously starts timing;
It is less than number of tasks if 53) alternatively connect the number in the list of packet side and be greater than 0 or is not received in specified time all really Recognize order instruction, then server 3 sends distribution failure command and the instruction that asks for a postponement to client terminal 1, goes to step 54), if standby It is 0 that choosing, which connects the number in the list of packet side, then server 3 sends distribution failure command to client terminal 1, and project terminates;
54) party awarding the contract receives distribution failure command and the instruction that asks for a postponement by client terminal 1, sends together to server 3 Meaning extension instruction or project END instruction, the reception of server 3 is agreed to delay to instruct then will according to the alternative packet side's tab sequential that connects All tasks, which are distributed to, meets Bao Fang, and according to alternatively connecing packet side's number resets mandatory period.
6) execution task connects the subtask that Bao Fang receives distribution by the confirmation of user terminal 2, completes to appoint in mandatory period It is engaged in and uploads delivery result to server 3;Server 3 notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal 1.It connects After Bao Fang receives the task of distribution by the confirmation of user terminal 2, electric instrument design object demand is downloaded from server 3, in the task phase It limits interior complete design task and uploads delivery result to server 3, delivery result is determined according to the type of subtask, such as 1 institute of table Show.
If meet Bao Fang actively abandons task in mandatory period, task is abandoned to the transmission of server 3 by user terminal 2 Instruction, server 3 judge whether to need task-delay according to mandatory period remaining time and average operating rate, are then to client Terminal 1 sends the instruction that asks for a postponement, and otherwise redistributes this task;The party awarding the contract is asked for a postponement by the reception of client terminal 1 Instruction returns and agrees to delay that then server 3 redistributes this task for instruction, currently will meet packet side and be detached from the task, by this What the subtask for connecing Bao Fangwei submission was reassigned to next sequence in queue meets Bao Fang, and the user terminal 2 of Bao Fang is connect to substitute Send task allocation information;The party awarding the contract returns to project END instruction, and then server 3 to 1 transmission expense of client terminal returns instruction.
During server 3 notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal 1, the party awarding the contract passes through visitor Family terminal 1 submits the suggestion for revision based on subtask, and suggestion for revision is sent to corresponding user terminal 2, meets Bao Fang by server 3 It modifies to task, and modified delivery result is submitted to server 3 by user terminal 2, server 3 will be modified Delivery result is sent to client terminal 1.
7) after the examination of the execution workflow party awarding the contract passes through, return step 4), until all task groups are checked and accepted in workflow.
8) delivery result that delivery service device 3 integrates all task groups is integrated, notifies the party awarding the contract to complete by client terminal 1 Information according to the workload of the subtask of completion and the party awarding the contract, meets Bao Fang and closes the account.
Server 3 receives all task groups delivery results, checks whether the deadline of task meets mandatory period requirement, It is then to complete message to 1 transmission project of client terminal, server 3 carries out disbursement and sattlement according to task, and sends to user terminal 2 Settle accounts message;Otherwise project is sent to user terminal 2 complete failed message.
The present invention also proposes that a kind of management platform quickly delivered for realizing the above method, the platform are to implement the above method A kind of mode, the above method can also realize by other software platform.
As shown in figure 3, the electric instrument design work management platform that one kind proposed by the present invention is quickly delivered, including server 3, At least one client terminal 1 and at least one user terminal 2.Client terminal 1: for sending the electric instrument design object of the party awarding the contract To server 3, item of payment expense receives and checks and accepts from 3 delivery result of server;User terminal 2: for for meeting Bao Fangyong Family acquisition mission bit stream, the instruction for sending registration task, confirmation receive distributing for task, require from 3 download items of server, In mandatory period completion task and to server 3 upload delivery result;Server 3: for being received in compliance with requirement meeting Bao Fang Project demands file, the condition provided including project technology major, client URS (user requirements specification book)/SPEC (product specification Specification) and P&ID (pipeline and instrument flow chart) after start execution task, according to client terminal 1 issue electric instrument design item Mesh decomposes task, constructs project work stream based on workflow template;Workflow is executed, issues subtask in order, and Subtask is managed;The different packet sides that connects is distributed to by user terminal in current subtask and executes design work;To from The task result that server 3 receives is integrated, as corresponding electric instrument design object as a result, and passing through client terminal 1 is sent to the party awarding the contract, according to the workload of the subtask of completion and the party awarding the contract, meets Bao Fang and closes the account.
Server 3 includes task workflow management services device 31, workflow template management server 32, file storage service Device 33, modification management server 34.
Task workflow management services device 31: the electric instrument design object submitted for receiving the party awarding the contract from client terminal 1, it will Project decomposition constructs project work stream at several subtasks, based on template, and opens respectively according to project work stream executive condition Subtask is distributed to the matched user terminal 2 for meeting Bao Fang and carries out specific design work, according to subtask work by link subtask Make progress and term of delivery adjustment subtask distribution.Task workflow management services device 31 include workflow building module 31-1, Task manages module 31-2, task allocating module 31-3.Workflow constructs module 31-1, for platform according to mission requirements and right Workflow template is answered to generate initiating task project work stream, and for party awarding the contract's modification adjustment task items workflow;Task Module 31-2 is managed, for monitoring the executive condition of each subtask of project workflow, after opening according to project work stream mode Continuous subtask redistributes overtime subtask and meets Bao Fang, notice meets Bao Fang and modifies to the result of delivered;Task distribution Each subtask is distributed to for platform according to the demand of project subtask and suitably meets Bao Fang by module 31-3.
Workflow template management server 32 inquires work for preservation and maintenance work stream template data and index information Make stream template.Document storage server 33, for storing the mission requirements associated documents and connect that the party awarding the contract submits from client terminal 1 The task delivery result file that Bao Fangcong user terminal 2 uploads.Management server 34 is modified, is used for the party awarding the contract from client terminal 1 Submission task checks and accepts suggestion for revision, meets Bao Fang and checks suggestion for revision by user terminal 2 and feed back modification result phase.
A kind of in addition system that the present invention proposes electric instrument design work management method quickly delivered, including memory, place It manages device and is stored in the computer program that can be run in the memory and on the processor, which is configured as executing The step of above-mentioned electric instrument design work management method quickly delivered is realized when the computer program.
Although the preferred embodiment of the present invention is described above in conjunction with attached drawing, the invention is not limited to upper The specific real mode stated, the above mentioned embodiment is only schematical, is not restrictive, the common skill of this field Art personnel under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, can be with The specific transformation of many forms is made, these all belong to the scope of protection of the present invention interior.

Claims (10)

1. the electric instrument design work management method that one kind is quickly delivered, it is characterised in that: the method is by the party awarding the contract, connects packet Three side, administrator roles complete the process of electric instrument design work management using computer software platform as medium, to meet Bao Fangshou To satisfactory project demands file, condition, client URS (user requirements specification book) including the offer of project technology major/ SPEC (product requirement specification book) and P&ID (pipeline and instrument flow chart) is used as task starting point, includes the following steps:
1) it meets Bao Fang and registers personal account in server (3) by user terminal (2), register individual skill attribute information;
2) party awarding the contract issues electric instrument design object demand and trustship Project Cost to server (3) by client terminal (1);
3) server (3) laterally decompose to electric instrument design object and longitudinal direction is decomposed, establish according to electric instrument design object demand Project work stream and task groups, and it is sent to client terminal (1), project workflow and task groups are modified by the party awarding the contract, after will confirm that Project work stream and task groups be sent to server (3);
4) server (3) executes workflow, in order release tasks group, and the subtask in task groups is sent to and its technology What attribute was consistent connects the user terminal (2) of Bao Fang;
5) it meets Bao Fang and obtains subtask information by user terminal (2), and sent and reported to server (3) by user terminal (2) The instruction of name subtask;Subtask is distributed to registration task and meets Bao Fang by server (3), and mandatory period is arranged, and guarantees institute There is the completion time limit of subtask to meet the requirement of workflow;
6) subtask that Bao Fang receives distribution by user terminal (2) confirmation is connect, task is completed in mandatory period and to service Device (3) uploads delivery result;Server (3) notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal (1);
7) after party awarding the contract's examination passes through, return step 4), until all task groups are checked and accepted in workflow;
8) server (3) integrates the delivery result of all task groups, notifies the party awarding the contract to complete information, root by client terminal (1) According to workload and the party awarding the contract of the subtask of completion, meets Bao Fang and close the account;Administrator is by server (3) to work management Cheng Jinhang control, safeguards computer software platform and data.
2. the electric instrument design work management method according to claim 1 quickly delivered, it is characterised in that: the step 3) In to electric instrument design object carry out laterally decompose refer to according to the action and scale of electric instrument design object, task groups are split The subtask that can be executed parallel for several;Longitudinal work decomposed and referred to according to electric instrument design object is carried out to electric instrument design object Make process, is ranked up according to subtask of the sequencing to processes different in task groups and task groups, preamble therein is appointed Business exports the input material as a result, as postorder subtask, thus the automatic workflow for carrying out subtask circulation of composition.
3. the electric instrument design work management method according to claim 1 quickly delivered, it is characterised in that: the step 6) During middle server (3) notifies the party awarding the contract to carry out an acceptance inspection delivery result by client terminal (1), the party awarding the contract passes through client Terminal (1) submits the suggestion for revision based on subtask, and suggestion for revision is sent to corresponding user terminal (2), connect by server (3) Bao Fang modifies to task, and submits modified delivery result, server (3) to server (3) by user terminal (2) Modified delivery result is sent to client terminal (1).
4. the electric instrument design work management method according to claim 1 quickly delivered, it is characterised in that: the step 7) After middle party awarding the contract's examination passes through, server (3) is updated workflow according to the performance of subtask each in task groups, Include the workflow of finished item in the delivery result that server (3) is integrated in the step 8), issues phase again for the party awarding the contract When with project, project demands are added in this workflow.
5. the electric instrument design work management method according to claim 1 quickly delivered, it is characterised in that: the step 5) Middle server (3) by subtask distribute to registration task the specific steps for meeting Bao Fang include:
51) server (3) receives each user terminal (2) registration instruction, is screened and is met the requirements according to the technical label for meeting Bao Fang Meet Bao Fang, and sorted according to the running parameter for meeting Bao Fang, formed and alternatively connects the list of packet side;
52) server (3) meets Bao Fang according to alternatively connecing packet side's tab sequential and be distributed to all tasks, and be arranged specified time with Interior mandatory period meets Bao Fang by user terminal (2) and sends confirmation order instruction to server (3), and server (3) receives true Recognize order to instruct and start timing;
53) if the alternative number connect in the list of packet side is less than number of tasks greater than 0 or does not receive whole confirmations in specified time and connects Single instrction, then server (3) sends distribution failure command and the instruction that asks for a postponement to client terminal (1), goes to step 54), if standby It is 0 that choosing, which connects the number in the list of packet side, then server (3) sends distribution failure command to client terminal (1), and project terminates;
54) party awarding the contract receives distribution failure command and the instruction that asks for a postponement by client terminal (1), sends to server (3) same Meaning extension instruction or project END instruction, server (3) reception are agreed to delay to instruct then to connect packet side's tab sequential according to alternative All tasks are distributed to and meet Bao Fang, and according to alternatively connecing packet side's number resets mandatory period.
6. the electric instrument design work management method according to claim 2 quickly delivered, it is characterised in that: the workflow Task groups according to sequencing include instrument design and electrical design, include key task in the instrument design objective group: Instrument selection and control program, including non-critical task: the design of instrument gantry, cable type selecting, control cabinet design, gas circuit distribution and Flammable/toxic gas system;It include key task: power supply system and comprehensive wiring in the electrical design task groups, including non- Key task: lighting system, lightning protection earthing system, security system, fire alarm system, intelligent building system and motor control Center.
7. the electric instrument design work management method according to claim 1 quickly delivered, it is characterised in that: individual's skill Art attribute information include: the type of skill, technical division of labor, business scope, using tool, possess qualification, the working experience time limit, service The running parameter for meeting Bao Fang is calculated according to individual skill attribute information for device (3), and the party awarding the contract passes through client terminal (1) publication electricity The information and document material of instrument design object demand.
8. the electric instrument design work management platform that one kind is quickly delivered, it is characterised in that: the platform includes server (3), extremely A few client terminal (1) and at least one user terminal (2);
The client terminal (1): for the electric instrument design object of the party awarding the contract to be sent to server (3), item of payment expense is connect By and check and accept come from server (3) delivery result;
The user terminal (2): for obtaining mission bit stream, the instruction for sending registration task, confirmation reception for meeting packet side user The task of distribution completes task and uploads to server (3) to deliver in mandatory period from the requirement of server (3) download items As a result;
The server (3): for being provided in the project demands file for meeting Bao Fang and being received in compliance with requirement, including project technology major Condition, after client URS (user requirements specification book)/SPEC (product requirement specification book) and P&ID (pipeline and instrument flow chart) Start execution task, according to the electric instrument design object that client terminal (1) is issued, task is decomposed, is based on workflow template Construct project work stream;Workflow is executed, issues subtask in order, and manage to subtask;Current subtask is led to It crosses user terminal and distributes to the different packet sides that connect and execute design work;To from the task result that server (3) receives into Row integration, as corresponding electric instrument design object as a result, and the party awarding the contract is sent to by client terminal (1), according to the son of completion The workload of task and the party awarding the contract meet Bao Fang and close the account.
9. the electric instrument design work management platform according to claim 8 quickly delivered, it is characterised in that: the server (3) include:
Task workflow management services device (31): the electric instrument design object submitted for receiving the party awarding the contract from client terminal (1), it will Project decomposition constructs project work stream at several subtasks, based on template, and opens respectively according to project work stream executive condition Subtask is distributed to the matched user terminal (2) for meeting Bao Fang and carries out specific design work, according to subtask by link subtask Job schedule and term of delivery adjustment subtask distribution;
Workflow template management server (32) inquires work for preservation and maintenance work stream template data and index information Flow template;
Document storage server (33), for storing the mission requirements associated documents and connect that the party awarding the contract submits from client terminal (1) The task delivery result file that Bao Fangcong user terminal (2) uploads;
It modifies management server (34), submits task to check and accept suggestion for revision from client terminal (1) for the party awarding the contract, meet Bao Fang and pass through User terminal (2) checks suggestion for revision and feeds back modification result phase.
10. the electric instrument design work management system quickly delivered of one kind, including memory, processor and it is stored in the memory In and the computer program that can run on the processor, it is characterised in that: the processor is configured as executing the computer journey It is realized when sequence such as the step of any one of claim 1~7 the method.
CN201811467190.2A 2018-12-03 2018-12-03 Electric instrument design work management method, platform and the system quickly delivered Pending CN109615205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811467190.2A CN109615205A (en) 2018-12-03 2018-12-03 Electric instrument design work management method, platform and the system quickly delivered

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811467190.2A CN109615205A (en) 2018-12-03 2018-12-03 Electric instrument design work management method, platform and the system quickly delivered

Publications (1)

Publication Number Publication Date
CN109615205A true CN109615205A (en) 2019-04-12

Family

ID=66005648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811467190.2A Pending CN109615205A (en) 2018-12-03 2018-12-03 Electric instrument design work management method, platform and the system quickly delivered

Country Status (1)

Country Link
CN (1) CN109615205A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106971341A (en) * 2017-03-09 2017-07-21 庞己人 A kind of method and system for pushing information on bidding and user's participation competitive bidding
CN108280631A (en) * 2018-02-10 2018-07-13 武汉空心科技有限公司 A kind of front end development task management-control method and system
CN108876201A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Development approach, platform and the system quickly delivered
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106971341A (en) * 2017-03-09 2017-07-21 庞己人 A kind of method and system for pushing information on bidding and user's participation competitive bidding
CN108280631A (en) * 2018-02-10 2018-07-13 武汉空心科技有限公司 A kind of front end development task management-control method and system
CN108876201A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Development approach, platform and the system quickly delivered
CN108876202A (en) * 2018-07-24 2018-11-23 武汉空心科技有限公司 Design work management method, platform and the system quickly delivered

Similar Documents

Publication Publication Date Title
CN109740851A (en) Design for Automatic Control Engineering work management method, platform and the system quickly delivered
CN109740849A (en) Structure design work management method, platform and the system quickly delivered
CN109754215A (en) Technological design work management method, platform and the system quickly delivered
CN108876202A (en) Design work management method, platform and the system quickly delivered
CN108280631A (en) A kind of front end development task management-control method and system
CN106779307A (en) The data processing method and system of cubic management system
US20040064356A1 (en) Workflow method and system therefor
CN101082970A (en) Method for realizing government affairs examination and approval workflow engines system
CN109829683A (en) A kind of measures and procedures for the examination and approval and system in parallel based on traffic control stream
CN109034610A (en) Software development cloud platform based on different periods difference distribution mechanism
CN102546207A (en) Distributed centralized scheduling upgrading method and system for network element software version
CN109740850A (en) Industrial design work management method, platform and the system quickly delivered
CN104616098A (en) Task management method and system
CN109118063A (en) Task based on unit time distribution develops cloud platform
CN112686637A (en) Government affair service supply and demand docking system and method
CN105550814A (en) Civil aviation field guide service system
CN109242240A (en) Task based on unit time distribution and timeliness control develops cloud platform
CN109102168A (en) Exploitation cloud platform based on page metering and timeliness control
CN107784416A (en) A kind of task transmission type processing method
CN109615205A (en) Electric instrument design work management method, platform and the system quickly delivered
CN109816193A (en) Architectural design work management method, platform and the system quickly delivered
CN109544032A (en) Equipment design work management method, platform and the system quickly delivered
CN109118060A (en) Quick development method, platform and system based on timeliness control
CN109255515A (en) A kind of task exploitation cloud platform based on page metering and unit time distribution
CN107944743A (en) The operation and maintenance method, apparatus and system of a kind of large computer system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412