CN108252531A - It is a kind of to be used for the restorative procedure of historical building metope and reparation structure - Google Patents

It is a kind of to be used for the restorative procedure of historical building metope and reparation structure Download PDF

Info

Publication number
CN108252531A
CN108252531A CN201810130573.4A CN201810130573A CN108252531A CN 108252531 A CN108252531 A CN 108252531A CN 201810130573 A CN201810130573 A CN 201810130573A CN 108252531 A CN108252531 A CN 108252531A
Authority
CN
China
Prior art keywords
fixed plate
layer
wall
historical building
face brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810130573.4A
Other languages
Chinese (zh)
Inventor
吴振邦
高顺宏
柯景波
毕余松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Residential Group Construction And Development Co Ltd
Original Assignee
Shanghai Residential Group Construction And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Residential Group Construction And Development Co Ltd filed Critical Shanghai Residential Group Construction And Development Co Ltd
Priority to CN201810130573.4A priority Critical patent/CN108252531A/en
Publication of CN108252531A publication Critical patent/CN108252531A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0296Repairing or restoring facades

Abstract

It is used to, to the restorative procedure of historical building metope and reparation structure, include the following steps the present invention provides a kind of:S1 detaches original face brick from cement sand bed;S2 polishes the side of cement mortar layer separation face brick, and passes through organic solvent and the cement sand bed polished is cleaned;S3 has been polished into S2 and ground glue is smeared on cement sand bed, and ground glue has been flattened;S4, the sticking glass fabric on ground glue;S5 uniformly smears putty on glass fabric, and putty is caused to penetrate glass fabric, forms putty layer;S6 connects new face brick in the putty layer into S5.A kind of restorative procedure and reparation structure for historical building metope provided by the invention can keep historical building metope to have higher ornamental value.

Description

It is a kind of to be used for the restorative procedure of historical building metope and reparation structure
Technical field
The invention belongs to building fields, are related to a kind of be used for the restorative procedure of historical building metope and reparation structure.
Background technology
In China there are many building of foreign style that eighties of last century leaves, although these buildings have used water on wall Mud adhesive layer and cement sand bed and face brick, conventional structure is that cement adhesive layer is smeared on wall, then in cement Cement sand bed is smeared on adhesive layer, face brick is finally connected on cement sand bed, so that building seems beautiful and big Side, but as time goes by so that different degrees of burn into rupture etc. has occurred in these historical building surfaces, so as to need These historical buildings are repaired, so as to prevent the ornamental value of historical building from reducing.
Invention content
It is used for the purpose of the present invention is to provide a kind of to the restorative procedure of historical building metope and reparation structure, it is intended to solve The problem of certainly historical building metope causes historical building ornamental value low due to long neglected and in disrepair.
In order to solve the above technical problems, the present invention provides a kind of restorative procedure being used for historical building metope, including Following steps:
S1 detaches original face brick from cement sand bed;
S2 polishes the side of cement mortar layer separation face brick, and passes through organic solvent to the cement mortar that has polished Layer is cleaned;
S3 has been polished into S2 and ground glue is smeared on cement sand bed, and ground glue has been flattened;
S4 is paved with glass fabric on ground glue, and causes the side of glass fabric is fixed with ground glue to bond;
S5 uniformly smears putty on the opposite side of glass fabric, forms putty layer, and cause putty layer and glass fibers The opposite side for tieing up cloth fixes bonding;
S6 connects new face brick in the putty layer into S5.
The present invention is further arranged to, and after the completion of the S5, putty layer is reinforced.
The present invention is further arranged to, and the reinforcement means includes:
S51 punches putty layer, and cause the hole sequentially pass through ground glue, cement sand bed, cement adhesive layer and Wall;
S52 is inserted into standing screw in the hole into S51, and the hold-doun nut of standing screw one end is contradicted to putty On layer, the other end is pierced by wall;
S53 is threadedly coupled positioning screw cap, and rotational positioning nut causes positioning screw cap on the standing screw for be pierced by wall It contradicts on wall;
S54 smears polymer mortar in putty layer, forms polymer mortar layer, and polymer mortar layer is located at fixed spiral shell The periphery of cap, and so that side of the polymer mortar layer far from wall and side of the hold-doun nut far from wall are coplanar.
The present invention is further arranged to, and before being inserted into standing screw in the S52, the with through-hole is placed in putty layer One fixed plate, standing screw pass through putty layer after passing through the through-hole in the first fixed plate, until hold-doun nut is by the first fixed plate It is pushed against in putty layer.
The present invention is further arranged to, and the second fixed plate with through-hole, fixed spiral shell are placed in the opposite side of the wall Bar passes through the second fixed plate by the through-hole, and the second fixed plate can be pushed against wall by rotational positioning nut by positioning screw cap On.
The present invention is further arranged to, and after the completion of first fixed plate is placed, steel wire is spread in the first fixed plate, Then standing screw is sequentially passed through into steel wire and the first fixed plate.
The present invention is further arranged to, and has been further included after face brick is sticked in the S6:
S61, the injecting structure glue between face brick and polymer mortar layer.
The present invention is further arranged to, and has been further included after the completion of the S61:
S62 carries out joint filling processing between adjacent tile.
The present invention also provides a kind of reparation structure being used for historical building metope, the fixation spiral shell including passing through wall Bar, positioning screw cap, the first fixed plate and the second fixed plate, one end of the standing screw are fixedly installed hold-doun nut, separately One end separates with the positioning screw cap and is threadedly coupled, and the standing screw sequentially passes through first fixed plate and described second Fixed plate, first fixed plate can be pushed against by the hold-doun nut in the side of the wall, and second fixed plate can It is pushed against by the positioning screw cap in the opposite side of the wall.
The present invention is further arranged to, and has further included steel wire, and the steel wire is located at the fixed spiral shell when repairing metope Between cap and first fixed plate.
Compared with prior art, it is used to tie the restorative procedure of historical building metope and reparation the present invention provides a kind of Structure is to detach original face brick from cement sand bed first, then to cement when the metope for repairing historical building Screed is polished and is cleaned, and ground glue is smeared in cleaning after completing, and sets glass fabric and putty on ground glue successively Layer, wherein glass fabric are paved on ground glue, while putty layer is also to be paved on glass fabric, so just in cement Form one layer of waterproof layer on the outer surface of screed, then after new face brick is fixed on the waterproof layer, you can completion is gone through The metope reparation of history building;Wherein when face brick is directly connected on cement sand bed, rainwater etc. can be penetrated into directly Enter between cement sand bed and face brick, at the same the water penetrated between face brick and cement sand bed be relatively difficult to volatilize it is scattered It loses, therefore will be applied between cement sand bed and face brick the long period, bonding between face brick and cement sand bed Stability has carried out lasting damage, and is provided between cement sand bed and face brick after waterproof layer, since waterproof layer exists Preferably extraneous rainwater etc. can be resisted during use, so it is prevented that rain penetration is to cement sand bed On, while residual quantity of the rainwater between face brick and waterproof layer also can be preferably reduced, it is viscous between face brick and waterproof layer Knot degree generates small effect, and such face brick can be continually and steadily connected on wall;It is selected simultaneously according to actual demand The face brick of same or similar color and shape is repaired on metope with the face brick of original stripping, is so repaired after completing Metope can be restored to original shape to the full extent so that the ornamental value of historical building has obtained sufficient holding.
Description of the drawings
Fig. 1 is a kind of flow diagram being used for the restorative procedure of historical building metope of one embodiment of the invention;
Fig. 2 is a kind of structure diagram being used for the reparation structure of historical building metope of one embodiment of the invention.
Wherein, 1, cement sand bed;2nd, putty layer;3rd, wall;4th, standing screw;5th, hold-doun nut;6th, positioning screw cap;7、 Polymer mortar layer;8th, the first fixed plate;9th, the second fixed plate;10th, steel wire.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to a kind of reparation side being used for historical building metope proposed by the present invention Method and reparation structure are described in further detail.According to following explanation and claims, advantages and features of the invention will more It is clear.It should be noted that attached drawing is using very simplified form and uses non-accurate ratio, only to convenient, apparent Ground aids in illustrating the purpose of the embodiment of the present invention.The same or similar reference numeral represents the same or similar component in attached drawing.
A kind of restorative procedure being used for historical building metope, as shown in Figure 1, including the following steps:
S1 detaches face brick from cement sand bed 1;
S2, the side that cement sand bed 1 has been detached to face brick polish, and pass through organic solvent to the cement mortar that has polished Layer 1 is cleaned;
S3 has been polished into S2 and ground glue is smeared on cement sand bed 1, and ground glue has been flattened;
S4 is paved with glass fabric on ground glue, and causes the side of glass fabric is fixed with ground glue to bond;
S5 uniformly smears putty on the opposite side of glass fabric, forms putty layer 2, and cause putty layer 2 and glass The opposite side of fiber cloth, which is fixed, to be bonded;
S6 connects new face brick in the putty layer 2 into S5.
After the completion of the S5, putty layer 2 is reinforced, the reinforcement means includes:
S51 punches putty layer 2, and cause the hole sequentially pass through ground glue, cement sand bed 1, cement adhesive layer with And wall 3;
S52 is inserted into standing screw 4 in the hole into S51, and the hold-doun nut 5 of 4 one end of standing screw is contradicted to greasy In sublayer 2, the other end is pierced by wall 3;
S53 is threadedly coupled positioning screw cap 6, and rotational positioning nut 6 is so that positioning on the standing screw 4 for be pierced by wall 3 Nut 6 is contradicted on wall 3;
S54 smears polymer mortar in putty layer 2, forms polymer mortar layer 7, and polymer mortar layer 7, which is located at, to be fixed The periphery of nut 5, and so that polymer mortar layer 7 is coplanar away from the side of wall 3 with hold-doun nut 5 away from the side of wall 3.
Before being inserted into standing screw 4 in the S52, the first fixed plate 8 with through-hole, fixed spiral shell are placed in putty layer 2 Bar 4 passes through putty layer 2 after passing through the through-hole in the first fixed plate 8, until the first fixed plate 8 is pushed against putty by hold-doun nut 5 On layer 2.The second fixed plate 9 with through-hole is placed in the opposite side of the wall 3, and standing screw 4 passes through the by the through-hole Second fixed plate 9 can be pushed against on wall 3 by two fixed plates 9, rotational positioning nut 6 by positioning screw cap 6.
After the completion of first fixed plate 8 is placed, steel wire 10 is spread in the first fixed plate 8, then by standing screw 4 Sequentially pass through 10 and first fixed plate 8 of steel wire.
It has been further included after face brick is sticked in the S6:
S61, the injecting structure glue between face brick and polymer mortar layer 7;
S62 carries out joint filling processing between adjacent tile.
It is used for the present invention also provides a kind of to the reparation structure of historical building metope, as shown in Fig. 2, including across wall 3 standing screw 4, positioning screw cap 6, the first fixed plate 8 and the second fixed plate 9, one end fixed setting of the standing screw 4 There is hold-doun nut 5, the other end is separated with the positioning screw cap 6 and is threadedly coupled, and the standing screw 4 sequentially passes through described first Fixed plate 8 and second fixed plate 9, first fixed plate 8 can be pushed against by the hold-doun nut 5 in the wall 3 Side, second fixed plate 9 can be pushed against by the positioning screw cap 6 in the opposite side of the wall 3.
Steel wire 10 is further included, the steel wire 10 is located at the hold-doun nut 5 and consolidates with described first when repairing metope Between fixed board 8.
In conclusion a kind of restorative procedure and reparation structure for historical building metope provided by the invention, is being repaiied It is to remove the face brick of original old from cement sand bed 1 first when multiple historical building metope, the then water to having removed It carries out polishing processing in silt particle pulp layer 1, so that it is more smooth on cement sand bed 1, it polishes after completing by organic molten Agent is cleaned, and wherein organic solvent can be ethyl alcohol, ether etc., and the present embodiment is preferably ethyl alcohol;Clean the backward water of completion Ground glue is uniformly smeared in silt particle pulp layer 1, it is then fixed on ground glue to bond glass fabric so that glass fabric is paved with ground Glue then in glass fabric surface smear double putty, forms putty layer 2, at this time the both sides of glass fabric respectively with ground Glue and putty layer 2, which are fixed, to be bonded.
It is punched in putty layer 2 towards the direction perpendicular with metope, and the hole is caused to sequentially pass through cement mortar The first fixed plate 8 with through-hole is placed into putty layer 2 by layer 1, cement adhesive layer and wall 3, punching after completing, and So that the through-hole of the first fixed plate 8 is overlapped with the hole in putty layer 2, it, will then in 8 upper berth layer of steel wire net 10 of the first fixed plate Standing screw 4 sequentially passes through steel wire 10, the first fixed plate 8, putty layer 2, cement sand bed 1, cement adhesive layer and wall 3, continue to move to standing screw 4 and so that the hold-doun nut 5 of 4 end of standing screw is contradicted on steel wire 10, steel wire 10 supports It touches in the first fixed plate 8, and the first fixed plate 8 will be clamped in putty layer 2;The other end of standing screw 4 is pierced by simultaneously The opposite side of wall 3 has been arrived, the second fixed plate 9 has been covered on standing screw 4 at this time, is then threadedly coupled on standing screw 4 Positioning screw cap 6, and pass through positioning screw cap 6 and second fixed plate 9 is pushed against on wall 3, complete the fixation of standing screw 4, first The position of 8 and second fixed plate 9 of plate is fixed.
Continue to smear polymer mortar in putty layer 2, and it is solid so that polymer mortar is distributed in hold-doun nut 5 and first The periphery of fixed board 8, while polymer mortar passes through steel wire 10 so that steel wire 10 is located in 7 structure of polymer mortar layer, most Eventually so that the thickness of polymer mortar layer 7 and the consistency of thickness of the first fixed plate 8 and hold-doun nut 5, this makes it possible to smooth New face brick is pasted on polymer mortar layer 7.
After face brick is attached on polymer mortar layer 7, knot is injected in the gap between polymer mortar layer 7 and face brick Structure glue, gap between adjacent face brick carries out joint filling processing after injection is completed, wherein it is preferred that by structure glue into Row joint filling completes the reparation of historical building metope, wherein when each piece of face brick is repaired, the model of selected face brick is Through color with the color of original face brick and model as close as so the ornamental value of the historical building of reparation out is with regard to energy Enough it is maximally maintained.
It wherein, can be in cement sand bed 1 by polymer mortar layer 7, glass fabric, putty layer 2 and ground glue One layer of waterproof layer is formed on surface, is exactly rainwater due to stability cohesive between original face brick and cement sand bed 1 is poor Etc. structures can penetrate between face brick and cement sand bed 1 after be capable of the residual of long period and to face brick and cement bonded sand Bonding stability between pulp layer 1 generates deleterious effect, is to pass through waterproof layer between this stylish face brick and cement sand bed 1 It is attached, the effect that rainwater is thus preferably prevented to generate, improves the positional stability of face brick;Moreover, Due between face brick and polymer mortar layer 7 there is structure glue to carry out waterproof, face brick is penetrated into preventing so as to reduce Water between water layer, while gap of the structure glue also between adjacent face brick has carried out joint filling, so allows for rainwater Deng resist better, fundamentally improve the stability of face brick position.
After the metope reparation of historical building is completed, the both ends of standing screw 4 are the both sides for being located at wall 3 respectively, One end of standing screw 4 is pushed against by the second fixed plate 9 on wall 3 simultaneously, and the other end is pushed against greasy by the first fixed plate 8 In sublayer 2, the positional stability for so allowing for putty layer 2 is higher, has higher structural strength, and the position of face brick is stablized Property is also improved;Moreover, since steel wire 10 is clipped between the first fixed plate 8 and hold-doun nut 5, while steel Silk screen 10 is distributed across in 7 structure of polymer mortar layer, passes through 10 polymer mortar layer 7 of steel wire and fixed spiral shell in this way Connective stability higher between bar 4 improves the positional stability of polymer mortar layer 7.Simultaneously because 8 He of the first fixed plate Second fixed plate 9 has the area of bigger, after contradicting so between wall 3 and putty layer 2, can preferably prevent from fixing Screw rod 4 shakes, and improves the positional stability of standing screw 4.
It should be noted that each embodiment is described by the way of progressive in this specification, each embodiment emphasis is said Bright is all difference from other examples, and just to refer each other for identical similar portion between each embodiment.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of restorative procedure being used for historical building metope, which is characterized in that include the following steps:
S1 detaches original face brick from cement sand bed;
S2 polishes the side of cement mortar layer separation face brick, and pass through organic solvent to the cement sand bed that has polished into Row cleaning;
S3 has been polished into S2 and ground glue is smeared on cement sand bed, and ground glue has been flattened;
S4 is paved with glass fabric on ground glue, and causes the side of glass fabric is fixed with ground glue to bond;
S5 uniformly smears putty on the opposite side of glass fabric, forms putty layer, and cause putty layer and glass fabric Opposite side fix bond;
S6 connects new face brick in the putty layer into S5.
2. a kind of restorative procedure being used for historical building metope according to claim 1, which is characterized in that the S5 is complete Cheng Hou reinforces putty layer.
A kind of 3. restorative procedure being used for historical building metope according to claim 2, which is characterized in that the reinforcing Method includes:
S51 punches putty layer, and the hole is caused to sequentially pass through ground glue, cement sand bed, cement adhesive layer and wall Body;
S52 is inserted into standing screw in the hole into S51, and the hold-doun nut of standing screw one end is contradicted onto putty layer, The other end is pierced by wall;
S53 is threadedly coupled positioning screw cap, and rotational positioning nut causes positioning screw cap to contradict on the standing screw for be pierced by wall Onto wall;
S54 smears polymer mortar in putty layer, forms polymer mortar layer, and polymer mortar layer is located at hold-doun nut Periphery, and so that side of the polymer mortar layer far from wall and side of the hold-doun nut far from wall are coplanar.
A kind of 4. restorative procedure being used for historical building metope according to claim 3, which is characterized in that the S52 Before middle insertion standing screw, the first fixed plate with through-hole is placed in putty layer, standing screw is passed through in the first fixed plate Through-hole after pass through putty layer, until the first fixed plate is pushed against in putty layer by hold-doun nut.
5. a kind of restorative procedure being used for historical building metope according to claim 4, which is characterized in that in the wall The opposite side of body is placed with the second fixed plate with through-hole, and standing screw passes through the second fixed plate, rotational positioning by the through-hole Second fixed plate can be pushed against on wall by nut by positioning screw cap.
6. a kind of restorative procedure being used for historical building metope according to claim 4, which is characterized in that described first After the completion of fixed plate is placed, steel wire is spread in the first fixed plate, standing screw is then sequentially passed through into steel wire and the One fixed plate.
7. a kind of restorative procedure being used for historical building metope according to claim 3, which is characterized in that in the S6 It has been further included after sticking face brick:
S61, the injecting structure glue between face brick and polymer mortar layer.
A kind of 8. restorative procedure being used for historical building metope according to claim 7, which is characterized in that the S61 It has further included after the completion:
S62 carries out joint filling processing between adjacent tile.
9. a kind of reparation structure being used for historical building metope, which is characterized in that standing screw, positioning including passing through wall Nut, the first fixed plate and the second fixed plate, one end of the standing screw are fixedly installed hold-doun nut, the other end and institute It states positioning screw cap and separates threaded connection, the standing screw sequentially passes through first fixed plate and second fixed plate, First fixed plate can be pushed against by the hold-doun nut in the side of the wall, and second fixed plate can be by described Positioning screw cap is pushed against in the opposite side of the wall.
10. a kind of reparation structure being used for historical building metope according to claim 9, which is characterized in that further include There is steel wire, the steel wire is between the hold-doun nut and first fixed plate when repairing metope.
CN201810130573.4A 2018-02-08 2018-02-08 It is a kind of to be used for the restorative procedure of historical building metope and reparation structure Pending CN108252531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810130573.4A CN108252531A (en) 2018-02-08 2018-02-08 It is a kind of to be used for the restorative procedure of historical building metope and reparation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810130573.4A CN108252531A (en) 2018-02-08 2018-02-08 It is a kind of to be used for the restorative procedure of historical building metope and reparation structure

Publications (1)

Publication Number Publication Date
CN108252531A true CN108252531A (en) 2018-07-06

Family

ID=62744783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810130573.4A Pending CN108252531A (en) 2018-02-08 2018-02-08 It is a kind of to be used for the restorative procedure of historical building metope and reparation structure

Country Status (1)

Country Link
CN (1) CN108252531A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441130A (en) * 2018-09-12 2019-03-08 上海市建筑装饰工程集团有限公司 Historical building exterior wall cobblestone painting metope does aging method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139766A (en) * 2003-11-07 2005-06-02 Seiichi Nishimura Falling preventive method of existing mortar
JP2007113342A (en) * 2005-10-24 2007-05-10 Chiken Kogyo:Kk Method of reinforcing foundation
CN101245620A (en) * 2008-03-25 2008-08-20 河南国基建设集团有限公司 Non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving construction method
CN202578022U (en) * 2012-05-14 2012-12-05 武汉大学 Bearing wall reinforcing body
CN204983724U (en) * 2015-08-01 2016-01-20 陕西省建筑科学研究院 Existing brickwork wall reinforced structure based on fibre web
CN205894730U (en) * 2016-06-21 2017-01-18 广东省建筑科学研究院集团股份有限公司 Carbon cloth reinforced structure is pasted to reinforced concrete roof beam
CN206616879U (en) * 2017-03-06 2017-11-07 重庆祥富机电技术服务有限公司 A kind of cracking of wall surface repairs structure
CN107448006A (en) * 2017-08-25 2017-12-08 广东省建筑科学研究院集团股份有限公司 A kind of reinforced concrete beam column node Strengthened By Cfrp Sheet structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005139766A (en) * 2003-11-07 2005-06-02 Seiichi Nishimura Falling preventive method of existing mortar
JP2007113342A (en) * 2005-10-24 2007-05-10 Chiken Kogyo:Kk Method of reinforcing foundation
CN101245620A (en) * 2008-03-25 2008-08-20 河南国基建设集团有限公司 Non-net polyphenyl plate cast-in-place concrete exterior wall heat-preserving construction method
CN202578022U (en) * 2012-05-14 2012-12-05 武汉大学 Bearing wall reinforcing body
CN204983724U (en) * 2015-08-01 2016-01-20 陕西省建筑科学研究院 Existing brickwork wall reinforced structure based on fibre web
CN205894730U (en) * 2016-06-21 2017-01-18 广东省建筑科学研究院集团股份有限公司 Carbon cloth reinforced structure is pasted to reinforced concrete roof beam
CN206616879U (en) * 2017-03-06 2017-11-07 重庆祥富机电技术服务有限公司 A kind of cracking of wall surface repairs structure
CN107448006A (en) * 2017-08-25 2017-12-08 广东省建筑科学研究院集团股份有限公司 A kind of reinforced concrete beam column node Strengthened By Cfrp Sheet structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441130A (en) * 2018-09-12 2019-03-08 上海市建筑装饰工程集团有限公司 Historical building exterior wall cobblestone painting metope does aging method
CN109441130B (en) * 2018-09-12 2021-08-27 上海市建筑装饰工程集团有限公司 Antique finishing method for cobblestone painted wall surface of outer wall of historical building

Similar Documents

Publication Publication Date Title
CN1978843A (en) Construction method for reinforcing steel-bar net mortar thin layer
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
WO2020253134A1 (en) Grc plate repairing method
CN108252531A (en) It is a kind of to be used for the restorative procedure of historical building metope and reparation structure
KR101392477B1 (en) Repacking of asphalt concrete pavement method
EP3186453B1 (en) Method for producing water-sealed surfaces from cement-based materials
CN108104287B (en) Concrete structure and the segmentation casting method for utilizing the concrete structure
CN108455903A (en) A kind of repair materials and restorative procedure of historical building metope
CN103837383A (en) Test method of anchoring performance of pre-stress carbon fiber sheet material double flat plate type anchorage device
CN210164074U (en) PTB (polystyrene board) mortar filling assembled type one-way superimposed sheet bottom close-joint structure
WO2017177749A1 (en) Building reinforcement structure and building reinforcement method
CN206174293U (en) Prefabricated constructional column
CN203201102U (en) Repairing structure for repairing ceramic floor tile ground
CN205577465U (en) Utilize device of FRP reinforcing concrete shear force wall
CN201245806Y (en) Plastic coiled material bonding cement
CN107401224A (en) A kind of wallboard crack resistence piece structure and its construction method
CN211949245U (en) Roof stone flashing structure
KR100323119B1 (en) Shingle structure, waterproofing structure of asphalt sheet and the method using the same
CN112815153A (en) Waterproof treatment method for root of through-wall or floor pipeline
CN205314466U (en) Take dampproofing ground plate brick of self -adhesive layer
CN215671281U (en) Concrete surface defect repairing structure
CN108396946A (en) A kind of mud polished for architecture indoor wall cement smears device
CN110821101A (en) Construction method for paint outer wall line pressing groove
CN207714689U (en) A kind of orange peel line terrace
CN110318522A (en) A kind of quick paving structure of compound ceramic tile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180706

RJ01 Rejection of invention patent application after publication