CN108104287B - Concrete structure and the segmentation casting method for utilizing the concrete structure - Google Patents

Concrete structure and the segmentation casting method for utilizing the concrete structure Download PDF

Info

Publication number
CN108104287B
CN108104287B CN201810009752.2A CN201810009752A CN108104287B CN 108104287 B CN108104287 B CN 108104287B CN 201810009752 A CN201810009752 A CN 201810009752A CN 108104287 B CN108104287 B CN 108104287B
Authority
CN
China
Prior art keywords
concrete
fitting
built
modular
construction joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810009752.2A
Other languages
Chinese (zh)
Other versions
CN108104287A (en
Inventor
陈作荣
周强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Fangcun Building Engineering Co Ltd
Original Assignee
Guangzhou Fangcun Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Fangcun Building Engineering Co Ltd filed Critical Guangzhou Fangcun Building Engineering Co Ltd
Priority to CN201810009752.2A priority Critical patent/CN108104287B/en
Publication of CN108104287A publication Critical patent/CN108104287A/en
Application granted granted Critical
Publication of CN108104287B publication Critical patent/CN108104287B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Abstract

The present invention relates to engineering construction fields, for the weak problem of construction joint attachment force, provide a kind of concrete structure and the segmentation casting method using the concrete structure, its attachment force that construction joint new-old concrete can be improved, the technical solution is as follows: a kind of concrete structure, the concrete structure includes first concrete modular with construction joint, and the first concrete modular is embedded with dismountable first built-in fitting and the second built-in fitting.A kind of segmentation casting method using above-mentioned concrete structure, comprising the following steps: (1) pour the first concrete modular, pre-buried first built-in fitting, the second built-in fitting;(2) template, the first built-in fitting, the second built-in fitting are dismantled;(3) the second concrete modular is poured;(4) concrete slurry overflowed is smoothed out.By forming reserved channel after the first built-in fitting of disassembly and the second built-in fitting on the first concrete modular, so that the second concrete modular part enters in the first concrete modular, attachment force is improved.

Description

Concrete structure and the segmentation casting method for utilizing the concrete structure
Technical field
The present invention relates to engineering construction field, more specifically, it relates to a kind of concrete structure and utilize the concrete The segmentation casting method of structure.
Background technique
In our daily construction process, due to the influence of the factors such as weather, machinery, it has in building structure It is stayed on layer and sets construction joint.Construction joint refers in concreting process, because design requirement or construction are needed to be segmented and be poured, and Formerly, seam is formed by between the concrete of after-pouring.Construction joint is not a kind of " seam " of necessary being, it is only because of elder generation Casting concrete be more than the presetting period, as soon as and there are a faying face between the concrete of after-pouring, which is referred to as Construction joint.
Segmentation pours compared with disposable cast-in-place structural, and construction joint brings certain harm to the globality of structure, this is Since the final set of the first subsurface is poured for the second time on the section Shi Yuan, there are cold seams, and new and old section cohesive force is weakened, drop The bearing capacity of low structure.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of concrete structure, has and apply The advantages of new-old concrete is completely embedded at work seam.
To achieve the above object, the present invention provides the following technical scheme that
A kind of concrete structure, the concrete structure include first concrete modular with construction joint, and described first is mixed Solidifying clay model block is embedded with dismountable first built-in fitting and the second built-in fitting, and first built-in fitting one end is stretched out and construction joint Construction joint is stretched out in adjacent surface, second built-in fitting one end, and first built-in fitting is embedded in the first concrete modular The end that is embedded in the first concrete modular with the second built-in fitting of end be detachably connected.
By adopting the above technical scheme, pass through dismountable first built-in fitting pre-buried on the first concrete modular and second Built-in fitting, simultaneously because the surface adjacent with construction joint and second built-in fitting one end are stretched out in first built-in fitting one end stretches out construction Seam, while the end that the first built-in fitting is embedded in the first concrete modular is embedded in the first concrete modular with the second built-in fitting End be detachably connected, connection is formed on the first concrete modular after dismantling the first built-in fitting and the second built-in fitting The reserved channel on construction joint and the surface adjacent with construction joint, so that pouring the second coagulation connecting with the first concrete modular When clay model block, cement grout enters reserved channel, so that the second concrete modular part enters in the first concrete modular, so that The attachment force of second concrete modular and the first concrete modular greatly improves, so that the first concrete modular and the second concrete Module is completely embedded, and improves the stability and intensity of concrete structure, simultaneously because reserved channel connection is adjacent with construction joint Surface, the concrete slurry of the second concrete modular can overflow after filling reserved channel, to facilitate observation, guarantee concrete grout Liquid enters the amount in reserved channel, guarantees the effect for improving attachment force.
Preferably, first built-in fitting passes through mating to connect with the second built-in fitting.
By adopting the above technical scheme, since the first built-in fitting and the second built-in fitting are by mating to connect, so that the After one built-in fitting is connect with the second built-in fitting, guarantee to be connected to by the first built-in fitting with the reserved channel that the second built-in fitting is formed, It is easy to disassemble simultaneously, it is easily operated.
Preferably, first built-in fitting includes the first pre-buried bar, and the first pre-buried bar is straight-bar and side wall is equipped with First spiral salient.
By adopting the above technical scheme, since the first pre-buried bar is straight-bar and side wall is equipped with the first spiral salient, so that first Pre-buried bar forms the reserved channel with spiral groove in the first concrete modular, further increases the second concrete modular Concrete slurry enters the connection area in the first concrete modular with the first concrete modular, further increases attachment force.
Preferably, second built-in fitting includes the second pre-buried bar, and the second pre-buried bar is straight-bar and side wall is equipped with Second spiral salient.
By adopting the above technical scheme, since the second pre-buried bar is straight-bar and side wall is equipped with the second spiral salient, so that second Pre-buried bar forms the reserved channel with spiral groove in the first concrete modular, further increases the second concrete modular Concrete slurry enters the connection area in the first concrete modular with the first concrete modular, further increases attachment force.
Preferably, the described first pre-buried bar is mutually perpendicular to the second pre-buried bar, is provided on the side wall of the second pre-buried bar For the mounting hole of the first pre-buried bar grafting.
By adopting the above technical scheme, it is mutually perpendicular to by the first pre-buried bar and the second pre-buried bar, in the first concrete mould The reserved channel being at right angles arranged is formed in block, so that pouring concrete slurry when the second concrete modular enters the first concrete It is at right angles distributed after module, so that the first concrete modular and the second concrete modular have stronger connection from multiple directions Power further increases connective stability.
Preferably, the described second pre-buried bar is vertically arranged with construction joint.
By adopting the above technical scheme, it is vertically arranged due to the second pre-buried bar with construction joint, so that pouring the second concrete mould When block, part is arranged in parallel with construction joint after concrete slurry enters the first concrete modular, to improve along perpendicular to construction joint Direction resist the active force that separates with the second concrete modular of the first concrete modular, guarantee to be completely embedded, raising stability.
It preferably, further include the template being close to the construction joint of the first concrete modular, the template is towards construction joint It is densely covered with protrusion on one side, second built-in fitting runs through template.
By adopting the above technical scheme, by protrusion of gathering in template, so that construction joint is rough surface, and then make It obtains when the second concrete modular pours and the connection area of construction joint increases, and then improve interface attachment force, improve stability.
In view of the deficienciess of the prior art, the second object of the present invention is to provide a kind of segmentation casting method, have The advantages of new-old concrete is completely embedded at construction joint.
A kind of segmentation casting method using above-mentioned concrete structure, comprising the following steps:
(1) installation template, pour the first concrete modular, pre-buried first built-in fitting and the second built-in fitting;
Template, the first built-in fitting and the second built-in fitting are dismantled after the initial set of (2) first concrete modulars;
(3) installation template, pour the second concrete modular connecting with the first concrete modular, to concrete slurry towards applying Work seam pressure is overflowed from the first installation of embedded parts of the first concrete modular to concrete slurry;
(4) concrete slurry for overflowing the first concrete modular smoothes out.
When by adopting the above technical scheme, by pouring the first concrete modular, pre-buried first on the first concrete modular Built-in fitting and the second built-in fitting, simultaneously because the surface adjacent with construction joint and the second built-in fitting are stretched out in first built-in fitting one end Construction joint is stretched out in one end, simultaneously because the end that the first built-in fitting is embedded in the first concrete modular is embedded in the second built-in fitting End in first concrete modular is detachably connected, with after dismantling the first built-in fitting and the second built-in fitting in the first coagulation The reserved channel on connection construction joint and the surface adjacent with construction joint is formed on clay model block;So that pouring and the first concrete mould When the second concrete modular of block connection, cement grout enters reserved channel, so that the second concrete modular part enters first In concrete modular, so that the attachment force of the second concrete modular and the first concrete modular greatly improves, so that the first coagulation Clay model block is completely embedded with the second concrete modular, improves the stability and intensity of concrete structure;Simultaneously because reserved logical Road is connected to the surface adjacent with construction joint, and the concrete slurry of the second concrete modular can overflow after filling reserved channel, with side Just it observes, guarantees that concrete slurry enters the amount in reserved channel, guarantee the effect for improving attachment force, by by the first concrete mould The concrete slurry that block overflows smoothes out, and pounds the trouble removed after avoiding concrete slurry from solidifying.
Preferably, the first concrete mould bulk strength carries out the step 3 after being greater than 2.5MPa again.
By adopting the above technical scheme, step 3 is being carried out to avoid general after the first concrete mould bulk strength is greater than 2.5MPa When the concrete slurry of second concrete modular presses towards the first concrete modular, the first concrete modular is led because of intensity deficiency Damage is caused, guarantees stability.
Preferably, it is added after the step 2, before step 3 and rinses the joint face of concrete at construction joint and keep wet Moisten and does not stay ponding.
By adopting the above technical scheme, by making to moisten at construction joint, when so that pouring the second concrete modular, concrete grout Liquid is preferably coupled with construction joint, the attachment force at construction joint is improved, so that the first concrete modular and the second concrete modular More fit closely.
In conclusion the invention has the following advantages: passing through the first built-in fitting pre-buried on the first concrete modular And second built-in fitting, it is applied with forming connection on the first concrete modular after dismantling the first built-in fitting and the second built-in fitting The reserved channel on work seam and the surface adjacent with construction joint;When so that pouring the second concrete modular, the second concrete modular Part enters in the first concrete modular, attachment force is improved, so that the first concrete modular is connect tightly with the second concrete modular It is close, improve the stability and intensity of concrete structure;Simultaneously because reserved channel is connected to the surface adjacent with construction joint, so that Concrete slurry is overflowed in reserved channel, guarantees that concrete slurry enters the amount in reserved channel, guarantees the effect for improving attachment force;It is logical It crosses the concrete slurry for overflowing the first concrete modular to smooth out, pounds the trouble removed after avoiding concrete slurry from solidifying;By First concrete mould bulk strength is carrying out step 3 after being greater than 2.5MPa to guarantee that concrete slurry is applied towards the first concrete modular When pressure, the stability of the first concrete modular;By making to moisten at construction joint, so that concrete slurry preferably joins with construction joint Knot, more to fit closely.
Detailed description of the invention
Fig. 1 is the overall structure diagram of concrete structure in the present invention;
Fig. 2 is the perspective view of the explosion of concrete structure in the present invention;
Fig. 3 is that casting method technical process figure is segmented in the present invention.
In figure: 1, the first concrete modular;11, construction joint;12, channel is reserved;13, shrinkage pool;2, the first built-in fitting;21, First pre-buried bar;22, the first spiral salient;3, the second built-in fitting;31, the second pre-buried bar;32, the second spiral salient;33, it installs Hole;4, template;41, raised.
Specific embodiment
With reference to the accompanying drawings and embodiments, the present invention will be described in detail.
Embodiment 1
A kind of concrete structure, referring to Fig.1 and Fig. 2, including the first concrete modular 1 with construction joint 11, first Dismountable first built-in fitting 2 and the second built-in fitting 3 are embedded on concrete modular 1, the first concrete modular 1 is additionally provided with tightly Paste the template 4 of construction joint 11.
Referring to Fig. 2, the first built-in fitting 2 includes the first pre-buried bar 21, and the first pre-buried bar 21 is straight-bar, the first pre-buried bar 21 The first spiral salient 22 is connected on side wall, the second built-in fitting 3 includes the second pre-buried bar 31, one on the second pre-buried bar 31 It is connected with the second spiral salient 32, the diameter of the diameter of the second pre-buried bar 31 less than the first pre-buried bar 21.
The first concrete mould is inserted into the second pre-buried bar 31 in the end that first pre-buried bar 21 is inserted into the first concrete modular 1 End in block 1 is detachably connected.
The side wall of second pre-buried bar 31 is equipped with mounting hole 33, and mounting hole 33 is inserted into the first concrete close to the second pre-buried bar 31 End in module 1, the end that the first pre-buried bar 21 is inserted into the first concrete modular 1 are plugged on the installation of the second pre-buried bar 31 In hole 33.
The first concrete modular 1 surface adjacent with construction joint 11, the second pre-buried bar are stretched out in one end of first pre-buried bar 21 Construction joint 11 is stretched out in 31 one end, and the first pre-buried bar 21 is mutually perpendicular to the second pre-buried bar 31, and the second pre-buried bar 31 and construction Seam 11 is vertical.
By the first pre-buried bar 21 of disassembly and the second pre-buried bar 31 to form reserved channel in the first concrete modular 1 12, the surface adjacent with construction joint 11 that reserved channel 12 is connected to construction joint 11 and is pierced by by the first pre-buried bar 21.
First pre-buried bar 21 and the second pre-buried bar 31 have several and are evenly distributed in the horizontal direction several along level to be formed The uniformly distributed reserved channel 12 in direction.
Protrusion 41 is densely covered in template 4, template 4 forms several densely covered shrinkage pools 13 after dismantling at construction joint 11, and second Built-in fitting 3 is slidably connected through template 4 with template 4.
By forming reserved channel 12 in the first concrete modular 1, it is close to so as to pour with the first concrete modular 1 When the second concrete modular (not shown), concrete slurry enters reserved channel 12, so that the second concrete modular part Into in the first concrete modular 1, the attachment force of the second concrete modular and the first concrete modular 1 is improved.
Since the first pre-buried bar 21 and the second pre-buried bar 31 are mutually perpendicular to, and the second pre-buried bar 31 is vertical with construction joint 11, So that reserved channel 12 includes one section of part parallel with construction joint 11, so that the concrete slurry of the second concrete modular enters One section of coupling part parallel with construction joint 11 is formed after in first concrete modular 1, greatly improves the first concrete mould Block 1 and the second concrete modular resist the ability being separated from each other, so that the first concrete modular 1 is connect with the second concrete modular Closely, it reduces and is endangered caused by existing because of construction joint 11.
Due to forming shrinkage pool 13 at construction joint 11, so that the connection of the first concrete modular 1 and the second concrete modular is made Increased with area, improves attachment force.
Embodiment 2
A kind of segmentation casting method of the concrete structure of Application Example 1, comprising:
Specific construction step, referring to Fig. 3.
S001 installation template pours the first concrete modular, pre-buried first built-in fitting and the second built-in fitting.
It is required according to construction drawing, installation template, the first built-in fitting and the second built-in fitting end is mating to connect, Then then the end by the second built-in fitting far from the first built-in fitting pours the first concrete mould through template tentatively to fix Block adjusts the angle of the second built-in fitting with pre-buried first built-in fitting and the second built-in fitting while pouring, guarantee that second is pre- Embedded part is vertical with the construction joint of the first concrete modular.
Template, the first built-in fitting and the second built-in fitting are dismantled after S002 the first concrete modular initial set.
The first concrete modular initial set after, form removal, then rotate the first pre-buried bar so that the first pre-buried bar along The track of first spiral salient screws out, so that the first pre-buried bar is separated with the second pre-buried bar, after splitting out the first pre-buried bar, rotation Turn the second pre-buried bar so that the second pre-buried bar along the second spiral salient track screw out, by disassembly the first pre-buried bar and Second pre-buried bar on the first concrete modular there are have spiral groove reserved channel, by template be arranged protrusion with There are shrinkage pools in the first concrete modular after form removal.
S003 installation template pours the second concrete modular connecting with the first concrete modular, to concrete slurry court Construction joint presses to be overflowed from the first installation of embedded parts of the first concrete modular to concrete slurry.
It is required according to construction drawing, the template for the second concrete modular being close to the first concrete modular is installed, then The second concrete modular is poured, is inserted into screw conveyor in the concrete slurry of the second concrete modular, by concrete grout Liquid presses towards the first concrete modular, so that concrete slurry enters in the reserved channel of the first concrete modular, and always Pressure can stop pressing after concrete slurry is overflowed on the surface adjacent with the construction joint of the first concrete modular, then right Concrete slurry carries out tamping processing.
Bleeding cement, film, the loose sandstone, weakness of the construction seam surface of the first concrete modular of removing are also needed before pouring Concrete layer, greasy dirt etc., avoiding sundries from forming separating interface leads to the first concrete modular and the second concrete modular attachment force Decline.
After cleaning out, the first concrete modular is rinsed with clear water, so that the construction joint of the first concrete modular keeps wet Profit, but need to guarantee that the first concrete modular does not stay ponding when pouring, so that the concrete slurry of the second concrete modular and the One concrete modular more preferably combines.
It also needs to guarantee that the first concrete mould bulk strength is greater than the side 2.5MPa and can construct before pouring, to guarantee to mix second When the concrete slurry of solidifying clay model block presses towards the first concrete modular, the first concrete modular is resisted with enough intensity Pressure avoids the first concrete modular of damage.
The concrete slurry that S004 overflows the first concrete modular smoothes out.
Since the concrete slurry of the second concrete modular is depressed into far from the reserved channel in the first concrete modular One end of construction joint is overflowed, and is needed in time to smooth out the concrete slurry for overflowing part, be solidified to avoid the concrete slurry of spilling, Lead to the subsequent trouble pounded and removed.
After the solidification of the second concrete modular, the reserved logical of the first concrete modular is connected to by the second concrete modular Part in road so that the first concrete modular is fitted closely with the second concrete modular, and there is stronger resistance mutually to divide From ability so that segmentation pour after, the construction joint between the first concrete modular and the second concrete modular is completely embedded, and is subtracted It is endangered caused by few presence because of construction joint.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of concrete structure, it is characterized in that: the concrete structure includes the first concrete modular with construction joint (11) (1), first concrete modular (1) is embedded with dismountable first built-in fitting (2) and the second built-in fitting (3), and described One built-in fitting (2) one end, which is stretched out, stretches out construction joint with construction joint (11) adjacent surface, described second built-in fitting (3) one end (11), first built-in fitting (2) is embedded in the first concrete modular (1) end and the second built-in fitting (3) are embedded in the End in one concrete modular (1) is detachably connected;First built-in fitting (2) is matched with the second built-in fitting (3) by grafting It closes to connect.
2. concrete structure according to claim 1, it is characterized in that: first built-in fitting (2) includes the first pre-buried bar (21), the described first pre-buried bar (21) is straight-bar and side wall is equipped with the first spiral salient (22).
3. concrete structure according to claim 2, it is characterized in that: second built-in fitting (3) includes the second pre-buried bar (31), the described second pre-buried bar (31) is straight-bar and side wall is equipped with the second spiral salient (32).
4. concrete structure according to claim 3, it is characterized in that: the first pre-buried bar (21) and the second pre-buried bar (31) it is mutually perpendicular to, the mounting hole (33) for the first pre-buried bar (21) grafting is provided on the side wall of the second pre-buried bar (31).
5. concrete structure according to claim 4, it is characterized in that: the second pre-buried bar (31) and construction joint (11) are hung down Straight setting.
6. concrete structure according to claim 1, it is characterized in that: further including the construction with the first concrete modular (1) The template (4) that (11) are close to is stitched, the template (4) is densely covered with raised (41) on one side towards construction joint (11), and described second is pre- Embedded part (3) runs through template (4).
7. a kind of segmentation casting method using any concrete structure of claim 1-6, it is characterized in that: including following Step:
(1) installation template, pour the first concrete modular, pre-buried first built-in fitting and the second built-in fitting;
Template, the first built-in fitting and the second built-in fitting are dismantled after the initial set of (2) first concrete modulars;
(3) installation template, pour the second concrete modular connecting with the first concrete modular, to concrete slurry towards construction joint Pressure is overflowed from the first installation of embedded parts of the first concrete modular to concrete slurry;
(4) concrete slurry for overflowing the first concrete modular smoothes out.
8. segmentation casting method according to claim 7, it is characterized in that: after the first concrete mould bulk strength is greater than 2.5MPa Step (3) are carried out again.
9. segmentation casting method according to claim 7, it is characterized in that: adding after step (2), before step (3) Enter to rinse the joint face of concrete at construction joint and keeps wet and do not stay ponding.
CN201810009752.2A 2018-01-05 2018-01-05 Concrete structure and the segmentation casting method for utilizing the concrete structure Active CN108104287B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810009752.2A CN108104287B (en) 2018-01-05 2018-01-05 Concrete structure and the segmentation casting method for utilizing the concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810009752.2A CN108104287B (en) 2018-01-05 2018-01-05 Concrete structure and the segmentation casting method for utilizing the concrete structure

Publications (2)

Publication Number Publication Date
CN108104287A CN108104287A (en) 2018-06-01
CN108104287B true CN108104287B (en) 2019-07-16

Family

ID=62219629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810009752.2A Active CN108104287B (en) 2018-01-05 2018-01-05 Concrete structure and the segmentation casting method for utilizing the concrete structure

Country Status (1)

Country Link
CN (1) CN108104287B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173128B (en) * 2020-02-25 2020-09-04 江苏丰阳建设工程有限公司 Concrete structure applied to segmental casting method
CN112497426A (en) * 2020-11-17 2021-03-16 台州和源建设有限公司 Pouring method of building concrete floor
CN114809632A (en) * 2022-03-28 2022-07-29 中国建筑第四工程局有限公司 Upright post construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503872B (en) * 2009-03-09 2010-12-29 天津市建工工程总承包有限公司 Reservation method for ultra-long concrete ground construction joint
CN105735364B (en) * 2016-03-03 2017-12-26 上海东方雨虹防水工程有限公司 Concrete joint waterproof system, construction method and the protection component for the system
CN206144184U (en) * 2016-09-26 2017-05-03 中建八局第四建设有限公司 Construction joint built -in slip casting pipe
CN107542170A (en) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 A kind of cast in situ ferroconcrete wall or beam construction joint surface construction method

Also Published As

Publication number Publication date
CN108104287A (en) 2018-06-01

Similar Documents

Publication Publication Date Title
CN108104287B (en) Concrete structure and the segmentation casting method for utilizing the concrete structure
CN105113425B (en) A kind of construction method of efficiently assembled steel reinforced concrete combination beam
CN104264872B (en) Composite cast-in-situ outer wall and construction method thereof
CN106499070B (en) The construction method of connecting sewing between assembled architecture component and component
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN105888077B (en) Fabricated shear wall attachment device and its construction method
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN105133492B (en) Concrete bridge deck with channels at bottom
CN212926718U (en) Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN207919780U (en) The plugging system of toilet bath room floor sewer pipe preformed hole
CN108222656A (en) The construction method of Prefabricated enclosure wall
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN104389362B (en) The implementation that clear-water concrete shear wall is constructed with interior filling wall junction
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
CN206319404U (en) A kind of building precast exterior sheathing
CN207419752U (en) One kind can the anti-bank of assembled precast concrete
CN107724675A (en) A kind of reinforced concrete member post-cast strip shaped device
CN103628406B (en) Frame bridge butted part Construction for waterproofing treatment method
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork
CN210483050U (en) Concrete bolt sleeve
CN107989205A (en) The plugging system of toilet bath room floor sewer pipe preformed hole
CN210633836U (en) Grouting pipeline structure of prefabricated shear wall
CN108104166A (en) A kind of ground well body structure and construction method
CN209244008U (en) A kind of water-tight exterior wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant