A kind of mud polished for architecture indoor wall cement smears device
Technical field
The invention belongs to construction correlative technology fields, and in particular to a kind of to be used for what architecture indoor wall cement polished
Mud smears device.
Background technology
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.Construction refers to
The production activity of engineering construction implementation phase is the building course of all kinds of buildings, it may also be said to be each on design drawing
Kind lines become process in kind in specified place.It includes that basic engineering construction, main structure construction, roofworks are applied
Work, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", also cries building site.It applies
It such as finds there is historical relic or ancient tomb in work, answers safekeeping, and local relevant department's processing should be submitted a report asking in time, can continue and apply
Work.It such as finds the long-term observation point for having measuring permanent stake or geology, seismological department setting, should be protected.
It is laid on the ground or when the location of underground utilities, cable carries out earthwork construction, should obtain in advance written same in relation to administrative department
Meaning, should take measures in construction, to prevent damage pipeline, take precautions against landslide, avoid the major accident caused by excavation.Construction
It needs to be related to many work posts in the process, wherein relatively common is exactly the construction of metope building, architectural intermediate water mud wall face in front
Floating be exactly one of them relatively common construction projects, cement needs to use a kind of construction during smoothing out
Equipment, trowel.
Existing trowel technology has the following problems:During to the floating of metope, due to the use of cement slurry
In be contaminated with certain sandstone bulky grain, sandstone bulky grain cannot reject that sandstone bulky grain is more when smoothing out in this way can shadow
The effect smoothed out is rung, causes the floating of metope not smooth enough, affects the quality of monolithic architecture.
Invention content
The purpose of the present invention is to provide a kind of mud polished for architecture indoor wall cement to smear device, above-mentioned to solve
Itd is proposed in background technology during to the floating of metope, due to the use of cement slurry in be contaminated with big of certain sandstone
Grain, sandstone bulky grain cannot reject the more effect that can influence to smooth out of sandstone bulky grain when smoothing out in this way, lead to metope
Floating it is not smooth enough, affect the quality problems of monolithic architecture.
To achieve the above object, the present invention provides the following technical solutions:It is a kind of to be used for what architecture indoor wall cement polished
Mud smears device, including rejects upper cover, and the bottom for rejecting upper cover is connected with bottom and smoothes out bottom plate, and the bottom smoothes out bottom plate
Surface has been fitted and connected rubber gasket with upper cover is rejected, and covers to be provided in the rejecting and rejects hole, described to reject the two of hole
Side is both provided with mounting hole, and the corresponding position that the bottom smoothes out on bottom plate with mounting hole is provided with installation stud, the peace
The tip exterior of dress stud is located to reject is socketed with installation nut on the outside of upper cover, and connection is connected in the middle part of the rejecting upper cover
Muscle, is connected with connecting pole in the middle part of the dowel, and the other end of the connecting pole is connected with insertion pipe, and the one of the insertion pipe
End is internal to be plugged with insertion rod, and the other end of the insertion rod is connected with handle, and the other end of the handle is socketed with head protector.
Preferably, fixation connects the upper and lower ends of the connecting pole by welding with insertion pipe and dowel respectively
It connects.
Preferably, the head protector is directly socketed in the outside of handle using the elastic force of itself, and head protector can with handle
To be detached.
Preferably, the dowel is fixedly connected by welding with upper cover is rejected.
Preferably, the handle is the smooth cylindrical-shaped structure in surface.
Preferably, the outer surface that the bottom smoothes out bottom plate is smooth structure, and bottom smooth out the inner surface of bottom plate with
Rubber gasket, which leads to colloid, to carry out gluing to be adhered connecing.
Compared with prior art, the beneficial effects of the invention are as follows:It needs to grind the mud on wall when work
When flat processing, bottom is smoothed out into bottom plate first and is detached with upper cover is rejected, then will rejecting upper cover directly with the mud of wall
Contact rejects hole due to having on lid in rejecting, and rejecting hole size is certain, the sand of protrusion when moving back and forth on wall
Stone bulky grain, which can enter, rejects inside hole, then can be removed under the active force moved back and forth, very big particle can not
Into can directly be rejected with hand when rejecting inside hole, because mortar very big particle after screening is general
It is less, bottom is smoothed out into bottom plate again after rejecting and is inserted into inside the mounting hole rejected inside upper cover by installing stud, is then made
It is fixedly connected with installation nut, bottom floating bottom plate can be used to carry out floating with metope mud contacts after connection and applied
Work can cause to leave cut in metope and can not smear to avoid sandstone bulky grain is contaminated in cement slurry when smoothing out in this way
It is flat, make the performance of equipment more preferably.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the rejecting superstructure schematic diagram that the present invention is detached with bottom plate;
Fig. 3 is that the bottom of the present invention smoothes out floor structure schematic diagram;
In figure:1, upper cover is rejected;2, hole is rejected;3, insertion pipe;4, insertion rod;5, handle;6, head protector;7, stud is installed;8、
Nut is installed;9, dowel;10, connecting pole;11, bottom smoothes out bottom plate;12, rubber gasket;13, mounting hole.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of mud polished for architecture indoor wall cement is smeared
Device, including reject upper cover 1, reject upper cover 1 bottom be connected with bottom smooth out bottom plate 11, bottom smooth out bottom plate 11 surface with
It rejects upper cover and has been fitted and connected rubber gasket 12, cover to be provided in rejecting and reject hole 2, the both sides for rejecting hole 2 are both provided with
Mounting hole 13, bottom smooth out the corresponding position on bottom plate 11 with mounting hole 13 and are provided with installation stud 7, install the top of stud 7
End is external to be socketed with installation nut 8 on the outside of rejecting upper cover, rejects and is connected with dowel 9 in the middle part of upper cover, dowel 9
Middle part is connected with connecting pole 10, and the other end of connecting pole 10 is connected with insertion pipe 3, insertion is plugged with inside one end of insertion pipe 3
The other end of bar 4, insertion rod 4 is connected with handle 5, and the other end of handle 5 is socketed with head protector 6.
In order to keep connection more secured, the present embodiment, it is preferred that the upper and lower ends of connecting pole 10 respectively with insertion pipe 3 and
Dowel 9 is fixedly connected by welding.
In order to which fractionation, the present embodiment can be facilitated, it is preferred that head protector 6 is directly socketed in handle 5 using the elastic force of itself
Outside, and head protector 6 can be detached with handle 5.
In order to make connection more securely avoid operation when fall off, the present embodiment, it is preferred that dowel 9 with pick
Except upper cover is fixedly connected by welding.
In order to place the hand that frays, the present embodiment, it is preferred that handle 5 is the smooth cylindrical-shaped structure in surface.
In order to make connection more seal, the present embodiment, it is preferred that the outer surface that bottom smoothes out bottom plate 11 is smooth structure,
And bottom smoothes out the inner surface of bottom plate 11 and rubber gasket 12 leads to colloid and carries out gluing to be adhered connecing.
The operation principle and process for using of the present invention:After the present invention installs, by the handle 5 of equipment inserting by one end
Enter the inside that bar 4 is inserted into insertion pipe 3, equipment can proceed by work after insertion, and work when needs on wall
When mud carries out polishing processing, bottom is smoothed out into bottom plate 11 first and is detached with upper cover 1 is rejected, it is straight then will to reject upper cover 1
The mud contacts with wall are connect, reject hole 2 due to rejecting in upper cover 1 to have, and rejecting 2 size of hole is certain, on wall back and forth
The sandstone bulky grain of protrusion can enter and reject inside hole 2 when mobile, then can be removed under the active force moved back and forth
Fall, very big particle can be rejected directly with hand when cannot be introduced into rejecting 2 inside of hole, because mortar is by screening
Very big particle is generally less later, and bottom is smoothed out bottom plate 11 again after rejecting rejects upper cover 1 by installing the insertion of stud 7
It inside internal mounting hole 13, is then fixedly connected using installation nut 8, bottom can be used to smooth out bottom plate after connection
11 carry out floating construction with metope mud contacts, can be contaminated with big of sandstone in cement slurry to avoid when smoothing out in this way
Grain causes to leave cut in metope and can not smooth out, and makes the performance of equipment more preferably, and bottom smoothes out bottom plate 11 and rejects upper cover 1
Junction be provided with rubber gasket 12, so mud will not enter inside connecting sewing between the two when construction,
Construction is clean by equipment cleaning after terminating.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.