CN104481018B - House ornamentation toilet tube edge floor drain handling process - Google Patents
House ornamentation toilet tube edge floor drain handling process Download PDFInfo
- Publication number
- CN104481018B CN104481018B CN201410630749.4A CN201410630749A CN104481018B CN 104481018 B CN104481018 B CN 104481018B CN 201410630749 A CN201410630749 A CN 201410630749A CN 104481018 B CN104481018 B CN 104481018B
- Authority
- CN
- China
- Prior art keywords
- handling process
- floor drain
- tube edge
- groove
- house ornamentation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
- E03F5/0409—Devices for preventing seepage around the floor drain
Abstract
The present invention proposes a kind of house ornamentation toilet tube edge floor drain handling process, comprises the steps:S1, on root of pipeline surrounding concrete floor, pick and dig out one groove, remove groove in scum silica frost, wash;S2, under humid conditions with interface waterproofing agent to 12 road of groove brushing;S3, by multi-functional emulsion and accelerated cement by weight (0.3 0.5):After 1 ratio is mixed into rubber pureed, compacting, floating is inserted in groove;S4, after the solidification of recessed slot packing, in the solid marine glue of root of pipeline and its two deferent of surrounding brushing.This technique at least three road waterproof layers:The waterproof layer of the solid marine glue of the mixed layer of interface waterproof oxidant layer, multi-functional emulsion and accelerated cement, pipe.Triple waterproofs, effect are very excellent, long service life.
Description
Technical field
The present invention relates to building material technical field, and in particular to a kind of house ornamentation toilet tube edge floor drain handling process.
Background technology
In house ornamentation waterproof, the process of the tube edge of the plastic material such as water power PVC, PP is to affect in whole water-proof system
Individual key point.Such as:The tube edge of downcomer, the tube edge of wall pipe, the tube edge of main blow-off pipe.Engineering construction takes hole by smart steel or opens
Then plastic tube is passed through basic unit, or is embedded in basic unit by chisel, and such tube edge and basic unit there is a larger gap,
Such gap construction party is mainly repaired by conventional cement mortar.Due to ordinary mortar poor adhesive force, it is impossible to
Cutting face and plastic pipe are bondd well, and tube edge vibrations are frequently, and ordinary mortar is rigid material, is thus easy to make
Into coming off for mortar and tube edge is filled up, the passage of a leak is formed.
Content of the invention
In view of this, be to solve above-mentioned technical problem, it is an object of the invention to propose a kind of will suppression rust, waterproof, heat-insulated
Three functions are integrated, and need to only purchase a kind of coating and can reach three roofing effects during construction, and with excellent attachment
The house ornamentation toilet tube edge floor drain handling process of ability.
The technical scheme that adopted of house ornamentation toilet tube edge floor drain handling process of the present invention for:
A kind of house ornamentation toilet tube edge floor drain handling process, comprises the steps:
S1, on root of pipeline surrounding concrete floor, pick and dig out one groove, remove groove in scum silica frost, wash;
S2, under humid conditions with interface waterproofing agent to groove brushing 1-2 roads;
S3, by multi-functional emulsion and accelerated cement by weight (0.3-0.5):1 ratio is mixed into rubber pureed
Afterwards, compacting, floating is inserted in groove;
S4, after the solidification of recessed slot packing, in the solid marine glue of root of pipeline and its two deferent of surrounding brushing.
Preferably, S1 further grooves are the conical socket for standing upside down.
Preferably, by weight 0.375 in S3:1 ratio mixing.
Preferably, mylar is pressed from both sides in the middle of the solid marine glue of two deferents of brushing in S4.
Further, also include step S5, consolidate brushing waterproofing slurry on marine glue in pipe.
Further, also include step S6, carry out closing water test after 24 hours.
The beneficial effect of this technique is:
1st, this interface waterproofing agent can greatly strengthen leak stopping king with their bonding energy on plastic pipe and the basal plane that chisels
Power.Interface waterproofing agent also has good waterproof effect.
2nd, the mixture of multi-functional emulsion and accelerated cement, can form a waterproof packed layer with flexible densification,
The stress that tube edge vibrations are produced can be resisted.
3rd, managing solid marine glue and accelerated cement, floor and plastic tube has extraordinary cementitiousness, itself has again to go out very much
The pliability of color, can offset the stress that water pipe frequently shakes generation.
4th, this technique at least three road waterproof layers:Mixed layer, the pipe of interface waterproof oxidant layer, multi-functional emulsion and accelerated cement
Gu the waterproof layer of marine glue.Triple waterproofs, effect are very excellent, long service life.
Description of the drawings
Fig. 1 be using present invention process after structural representation;
Fig. 2 is the structural representation of 2 mylar of embodiment in present invention process;
Fig. 3 is the structural representation in present invention process after the process of 2 mylar of embodiment.
Specific embodiment
Below by specific embodiment, the present invention is described in detail, but the purposes of these exemplary embodiments and
Purpose is only used for enumerating the present invention, not constitutes any type of any restriction, more non-general to the real protection scope of the present invention
Protection scope of the present invention is confined to this.
Embodiment 1
A kind of house ornamentation toilet tube edge floor drain handling process, comprises the steps:
Shown in S1, reference Fig. 1, on 11 root surrounding concrete floor 12 of plastic conduit, picked to dig out with chisel and fallen together
Vertical conical socket 13, depth and width are determined on a case-by-case basis, and more wide in principle deeper make an appointment.But depth is usually no more than building
/ 3rd of plate thickness.Scum silica frost in groove is removed, is washed.
S2, under humid conditions with interface waterproofing agent to groove brushing 1-2 roads;The interface waterproofing agent is by liquid and powder body
Composition, wherein powder body is made up of following component and mass parts:Waterproof glue 370-450 parts;Defoamer 1-2 parts;Preservative 1-2
Part;Wetting agent 1-2 parts;Water 550-630 parts;Powder body is made up of following component and mass parts:Cement 800-1000 parts;Sand 400-
600 parts;Triple superphosphate 400-600 parts;Acrylic acid rubber powder 10-20 parts.Wherein raw material components can be obtained from city's mid-sales.During use,
Liquid and powder body are uniformly mixed.Can be with further reference to the interface waterproofing agent disclosed in CN103030425A.
S3, by multi-functional emulsion and accelerated cement by weight 0.3:After 1 ratio is mixed into rubber pureed, by which
Insert compacting in groove, floating;Multi-functional emulsion can select Dongguan City, and this wins the limited public affairs of sharp Polymeric Waterproof Materials For Building Applications science and technology
The SPR106 of department.
S4, after the solidification of recessed slot packing, in the solid marine glue of root of pipeline and its two deferent of surrounding brushing.The solid waterproof of the pipe
Glue includes that powder and liquid material, wherein powder are made up of following component and weight portion:Cement 450-550;Sand 80-120;Triple superphosphate 280-
300;Water reducer 2-4;Calcium formate 4-6;Anti-crack fiber 0.5-1.5;Wherein liquid material is made up of following component and weight portion:Emulsion
750-850;Defoamer 1-3;Preservative 1-3;Wetting agent 1-3;Adhesive accelerant 1-3;Thickening agent 2-4;Water 180-200.Wherein
Raw material components can be obtained from city's mid-sales.During use, liquid material and powder are uniformly mixed.
Finally, water test is closed after 24 hours.
The beneficial effect of this technique is:
1st, this interface waterproofing agent can greatly strengthen leak stopping king with their bonding energy on plastic pipe and the basal plane that chisels
Power.Interface waterproofing agent also has good waterproof effect.
2nd, the mixture of multi-functional emulsion and accelerated cement, can form a waterproof packed layer with flexible densification,
The stress that tube edge vibrations are produced can be resisted.
3rd, managing solid marine glue and accelerated cement, floor and plastic tube has extraordinary cementitiousness, itself has again to go out very much
The pliability of color, can offset the stress that water pipe frequently shakes generation.
4th, shown in Figure 1, this technique has three road waterproof layers:Interface waterproof oxidant layer 1, multi-functional emulsion and accelerated cement
The waterproof layer of the solid marine glue 3 of mixed layer 2, pipe.Triple waterproofs, effect are very excellent, long service life.
Embodiment 2
Reference embodiment 1, as different from Example 1:
First, in the S4 of embodiment 1, shown in Figure 1, two deferents of brushing are consolidated.I.e.
After first brushing the solid marine glue 3 of the first deferent, mylar 14 is put, on mylar, then apply the solid marine glue 3 of the second deferent.Wherein
As shown in Fig. 2 the square cloth of a usually block length, its processing mode is mylar:A folding line 15 is initially formed, is divided into
A1 faces and A2 faces;Then a plurality of torn edges 16 perpendicular to folding line 15 is equidistantly formed in A1 faces;Finally by A2 rolls into cylinder, will
A1 faces are launched around folding line 15, are formed shown in Fig. 3.
Then, also include S5 after S4, consolidate brushing waterproofing slurry on marine glue in pipe.The waterproofing slurry 1 be also by powder body and
Liquid is constituted, and wherein powder body is made up of following component and weight portion:Cement 400-600;Sand 200-240;Triple superphosphate 250-300;Knot
Water preparation 4-6;Rubber powder 4-6;Wherein liquid is made up of following component and weight portion:Emulsion 300-500;Wetting agent 0.8-1.2;Froth breaking
Agent 2-4;Preservative 2-4;Adhesion promoter 1.5-2.5;Synthesis vegetable esters 25-35;Deionized water 550-570.Wherein raw material group
Divide and can obtain from city's mid-sales.For example, the cement can adopt 42.5 cement of China Resources;The sand can be adopted
70-100 mesh sand;The triple superphosphate can adopt 200 mesh triple superphosphate;Described bear water agent can adopt section outstanding person company 600D;Described
Rubber powder can adopt the 6021E of Bao Chen chemical companies;The emulsion can adopt the S400F of BASF AG;The wetting agent
The X-405 of Dow Chemical can be adopted;The defoamer can adopt the W086 of this company of hamming;The preservative can be with
LXE using Rhom and Hass;The adhesion promoter can adopt the CG-907 of Chen Gong companies;The synthesis vegetable esters can
With the synthesis vegetable esters using the production of Suzhou Yi Gete companies.
Finally, in the same manner as in Example 1, carry out closing water test after 24 hours.
The beneficial effect of this technique is, in addition to first 3 points of embodiment 1,
4th point:This technique has four road waterproof layers:Mixed layer, the pipe of interface waterproof oxidant layer, multi-functional emulsion and accelerated cement
Gu the waterproof layer of marine glue and the water resistant solution bed of material.Quadruple waterproof, effect are more excellent, and service life is longer.
Embodiment 3
With reference to embodiment 2, and implement unlike 2, in S3, multi-functional emulsion and accelerated cement are by weight 0.5:1
Ratio mixes.
It should be appreciated that the protection model that the purposes of these embodiments is merely to illustrate the present invention and is not intended to limit the present invention
Enclose.Additionally, it will also be appreciated that after the technology contents for having read the present invention, those skilled in the art can make each to the present invention
Plant and change, change and/or modification, all these equivalent form of value equally falls within the guarantor limited by the application appended claims
Within the scope of shield.
Claims (6)
1. a kind of house ornamentation toilet tube edge floor drain handling process, it is characterised in that comprise the steps:
S1, on root of pipeline surrounding concrete floor, pick and dig out one groove, remove groove in scum silica frost, wash;
S2, under humid conditions with interface waterproofing agent to groove brushing 1-2 roads;
S3, by multi-functional emulsion and accelerated cement by weight (0.3-0.5):After 1 ratio is mixed into rubber pureed, will
Which inserts compacting in groove, floating;
S4, after the solidification of recessed slot packing, in the solid marine glue of root of pipeline and its two deferent of surrounding brushing;Pipe Gu Fangshuijiaobao
Powder and liquid material is included, wherein powder is made up of following component and weight portion:Cement 450-550;Sand 80-120;Triple superphosphate 280-300;
Water reducer 2-4;Calcium formate 4-6;Anti-crack fiber 0.5-1.5;Wherein liquid material is made up of following component and weight portion:Emulsion 750-
850;Defoamer 1-3;Preservative 1-3;Wetting agent 1-3;Adhesive accelerant 1-3;Thickening agent 2-4;Water 180-200.
2. house ornamentation toilet tube edge floor drain handling process according to claim 1, it is characterised in that S1 further grooves are for standing upside down
Conical socket.
3. house ornamentation toilet tube edge floor drain handling process according to claim 1, it is characterised in that in S3 by weight
0.375:1 ratio mixing.
4. house ornamentation toilet tube edge floor drain handling process according to claim 1, it is characterised in that two roads that brushes in S4
Mylar is pressed from both sides in the middle of the solid marine glue of pipe.
5. house ornamentation toilet tube edge floor drain handling process according to claim 1, it is characterised in that also include step S5,
Brushing waterproofing slurry on the solid marine glue of pipe;The waterproofing slurry is made up of powder body and liquid, wherein powder body by following component and
Weight portion is constituted:Cement 400-600;Sand 200-240;Triple superphosphate 250-300;Water reducer 4-6;Rubber powder 4-6;Wherein liquid is by as follows
Component and weight portion composition:Emulsion 300-500;Wetting agent 0.8-1.2;Defoamer 2-4;Preservative 2-4;Adhesion promoter 1.5-
2.5;Synthesis vegetable esters 25-35;Deionized water 550-570.
6. house ornamentation toilet tube edge floor drain handling process according to claim 1, it is characterised in that also include step S6,
Carry out closing water test after 24 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410630749.4A CN104481018B (en) | 2014-11-10 | 2014-11-10 | House ornamentation toilet tube edge floor drain handling process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410630749.4A CN104481018B (en) | 2014-11-10 | 2014-11-10 | House ornamentation toilet tube edge floor drain handling process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104481018A CN104481018A (en) | 2015-04-01 |
CN104481018B true CN104481018B (en) | 2017-03-15 |
Family
ID=52755614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410630749.4A Expired - Fee Related CN104481018B (en) | 2014-11-10 | 2014-11-10 | House ornamentation toilet tube edge floor drain handling process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104481018B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859282B (en) * | 2017-11-17 | 2019-08-30 | 苏州闪电防水科技有限公司 | The dedicated infiltration rapid-maintenance technique in hotel toilet |
CN108277932B (en) * | 2018-01-16 | 2020-05-08 | 厦门防水博士建筑工程有限公司 | Pipe edge water leakage repairing process |
CN108343164A (en) * | 2018-01-31 | 2018-07-31 | 刘志宏 | A kind of expansion joint percolating water repairerment technique |
CN108868176B (en) * | 2018-06-14 | 2020-04-28 | 厦门防水博士建筑工程有限公司 | Construction method of kitchen and bathroom water leakage repairing system |
CN108867894B (en) * | 2018-06-14 | 2020-03-24 | 厦门防水博士建筑工程有限公司 | Waterproof standard construction process for finely decorated kitchen and toilet |
CN109695284A (en) * | 2018-12-29 | 2019-04-30 | 许钱会 | A kind of dark drain structure for building |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102627432A (en) * | 2012-04-26 | 2012-08-08 | 昆明滇宝防水建材有限公司 | Modified polymer cement waterproof mortar |
CN103030425A (en) * | 2013-01-09 | 2013-04-10 | 厦门防水博士建筑工程有限公司 | Interface waterproofing agent |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2222185Y (en) * | 1995-05-23 | 1996-03-13 | 唐立英 | Leakage-proof pipe for building |
JPH10185009A (en) * | 1996-12-20 | 1998-07-14 | Sekisui House Ltd | Split seat packing for floor through hole part and hole filling structure |
CN1851185A (en) * | 2006-05-31 | 2006-10-25 | 张晶 | Pipeline and floor joint position water proof construction method |
CN203258206U (en) * | 2013-05-14 | 2013-10-30 | 中国建筑第八工程局有限公司 | Through floor pipeline leakage-prevention structure with sleeve |
-
2014
- 2014-11-10 CN CN201410630749.4A patent/CN104481018B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102627432A (en) * | 2012-04-26 | 2012-08-08 | 昆明滇宝防水建材有限公司 | Modified polymer cement waterproof mortar |
CN103030425A (en) * | 2013-01-09 | 2013-04-10 | 厦门防水博士建筑工程有限公司 | Interface waterproofing agent |
Non-Patent Citations (1)
Title |
---|
某高档住宅小区地下车库顶板防水施工工艺;乔军,周书丰等;《中国建筑防水》;20111031;第29-30页第2节主要防水材料介绍,第32-33页第4节管根防水施工工艺,以及图7-15 * |
Also Published As
Publication number | Publication date |
---|---|
CN104481018A (en) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104481018B (en) | House ornamentation toilet tube edge floor drain handling process | |
CN103554850B (en) | A kind of environment-friendlytype type anti-cracking corrosion-resistant waterproof material and preparation method thereof | |
CN103046513A (en) | Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting | |
CN103553538A (en) | Non-destructive waterproof agent for architectural indoor deep penetration curing | |
CN206801581U (en) | A kind of tunnel lining structure defect reinforcing device | |
CN205558920U (en) | Fissured repair structure of last lining cutting of tunnel wall | |
CN205502257U (en) | Leak protection water structure | |
CN106048886A (en) | Plant-fiber ecological felt and preparation method thereof | |
CN102888959A (en) | Method for constructing external wall by using premixed dry mortar | |
CN104612398B (en) | Sunken wire tube position prevention and cure of crack construction method after masonry | |
CN106193646A (en) | A kind of composite reinforcing structure of the concrete outsourcing carbon cloth to beams of concrete | |
CN204533836U (en) | Pipeline through-flooring leakage-resistant device | |
CN202936907U (en) | Hydrophobic rock wool board thermal insulating wall body structure | |
CN206538953U (en) | Structure of plastering is exempted from a kind of Novel interior wall gypsum bottoming | |
CN206175889U (en) | Pipeline socket joint connection structure | |
CN104234249A (en) | Construction method of outer heat insulation wall using polyurethane hard foam composite boards | |
CN205062857U (en) | Side wall water proof structure | |
CN107188463A (en) | A kind of bentonite adhesive and its construction method for external wall waterproof layer protection board | |
CN104234425A (en) | Plastering omitting process for shear wall structure | |
CN206015921U (en) | Drain pipe waterproof construction | |
CN206616676U (en) | A kind of toilet floor drain position waterproof construction | |
CN209025303U (en) | A kind of building-block that shockproof effect is good | |
CN202482897U (en) | Concrete structure | |
CN205857713U (en) | Hole mould is hung in a kind of canalization | |
CN207296347U (en) | A kind of new type scaffold eye plugging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20211110 |