CN205857713U - Hole mould is hung in a kind of canalization - Google Patents

Hole mould is hung in a kind of canalization Download PDF

Info

Publication number
CN205857713U
CN205857713U CN201620588464.3U CN201620588464U CN205857713U CN 205857713 U CN205857713 U CN 205857713U CN 201620588464 U CN201620588464 U CN 201620588464U CN 205857713 U CN205857713 U CN 205857713U
Authority
CN
China
Prior art keywords
steel
hole
facing
hang
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620588464.3U
Other languages
Chinese (zh)
Inventor
单宝龙
张志安
侯雪强
张彦坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201620588464.3U priority Critical patent/CN205857713U/en
Application granted granted Critical
Publication of CN205857713U publication Critical patent/CN205857713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of canalization and hang hole mould, including steel hoop and hang hole steel facing, described steel hoop connects with hanging hole steel facing, described hang hole steel facing opened arc groove radian and steel hoop radian with plan install through-flooring outer diameter tube consistent, described steel hoop respectively arranges two groups of symmetry with hanging hole steel facing, and two groups of steel hoops are connected by connecting bolt and attaching nut respectively with the both sides hanging hole steel facing.This utility model simple in construction, easy to operate, use can be had enough to meet the need, make storey slings hole Forming Quality be protected, it is to avoid pick chiseler after form removal in a large number and make and risk of leakage.

Description

Hole mould is hung in a kind of canalization
Technical field
This utility model relates to the realm of building construction, and hole mould is hung in specifically a kind of canalization.
Background technology
Hang hole and refer in construction, roofing therein, balcony, kitchen, toilet etc. are had the hole that pipeline is reserved The floating process of closure.To the roofing in construction when hanging hole, kitchen, toilet, when piping shaft hole to be provided carries out hanging hole, Hole must be cleaned out, must water after hole installs template moistening.Adding on a small quantity with being not less than C20 concrete Reality is stirred in extender pouring, and the preferably less than floor face 10-20mm of the hole after pouring must not touch pipeline in 24 hours.Treat that concrete is steady Gu after, in addition it is also necessary to surface, hole is processed, surface, hole and floor level is made to seem clean and tidy.Some special engineering, Also to do dabbing before hanging hole at hole, add waterproof layer etc. and process.
It is difficult, fixing insecure that tradition hangs formwork erection in the construction of hole, easily causes hanging and sinks at hole, causes floor face not Put down and need the later stage to pick chisel process, and expense material of taking a lot of work.
Utility model content
The purpose of this utility model is to provide a kind of simple in construction, easy to operate, can have enough to meet the need use, make storey slings hole become Type quality is protected, it is to avoid the canalization picking chiseler's work and risk of leakage after form removal in a large number hangs hole mould, to solve the above-mentioned back of the body The problem proposed in scape technology.
For achieving the above object, the following technical scheme of this utility model offer:
Hole mould is hung in a kind of canalization, including steel hoop with hang hole steel facing, and described steel hoop and hang hole steel facing and connect, Described hang hole steel facing opened arc groove radian and steel hoop radian with plan install through-flooring outer diameter tube consistent, described steel Anchor ear respectively arranges two groups of symmetry with hanging hole steel facing, and two groups of steel hoops pass through connecting bolt respectively with the both sides hanging hole steel facing Connect with attaching nut.
As further program of the utility model: be provided with hole in the middle of described steel hoop two flank.
As this utility model further scheme: described in hang hole steel facing and steel hoop whole by being welded to connect formation Body.
As this utility model further scheme: be provided with pad between described connecting bolt and attaching nut.
Compared with prior art, the beneficial effects of the utility model are: simple in construction, easy to operate, can have enough to meet the need use, make Storey slings hole Forming Quality is protected, it is to avoid picks chiseler after form removal in a large number and makees and risk of leakage.
Accompanying drawing explanation
Fig. 1 is the structural representation that hole mould is hung in canalization.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to Fig. 1, in this utility model embodiment, hole mould is hung in a kind of canalization, including steel hoop 1, hangs steel face, hole Plate 2, connecting bolt 3, attaching nut 4 and pad 5, described steel hoop 1 and hang hole steel facing 2 and connect, described in hang hole steel facing 2 institute Opening arc groove radian and steel hoop 1 radian, install through-flooring outer diameter tube with plan consistent, described steel hoop 1 with hang steel face, hole Plate 2 respectively arranges two groups of symmetry, and two groups of steel hoops 1 pass through connecting bolt 3 and attaching nut respectively with the both sides hanging hole steel facing 2 4 connect, and are provided with pad 5 between described connecting bolt 3 and attaching nut 4.
When making mould, hang hole steel facing 2 and steel hoop 1 respectively makes identical two panels, hang the opened arc groove of hole steel facing 2 Radian and steel hoop 1 radian are consistent with plan installation through-flooring outer diameter tube, and 1 liang of flank central aperture of steel hoop will hang hole steel Panel 2 welds formation entirety with steel hoop 1.
Operation principle of the present utility model is: is embraced by the two panels fixture being welded into entirety during use and pastes after pipe laying Tight floor, is connected to tighten with attaching nut through pad 5 and the perforate of steel hoop flank institute by connecting bolt 3 and fixes.
This utility model simple in construction, easy to operate, use can be had enough to meet the need, make storey slings hole Forming Quality be protected, keep away Pick chiseler after having exempted from form removal in a large number to make and risk of leakage.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this practicality in other specific forms new Type.Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting Involved claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (4)

1. a hole mould is hung in canalization, including steel hoop (1) with hang hole steel facing (2), it is characterised in that described steel hoop (1) and hang hole steel facing (2) connect, described in hang hole steel facing (2) opened arc groove radian and steel hoop (1) radian and plan Installing through-flooring outer diameter tube consistent, described steel hoop (1) and hang hole steel facing (2) and respectively arrange symmetrical two groups, two groups of steel are embraced Bind round (1) and hang the both sides of hole steel facing (2) respectively by connecting bolt (3) and attaching nut (4) connection.
Hole mould is hung in canalization the most according to claim 1, it is characterised in that set in the middle of described steel hoop (1) two flank Porose.
Hole mould is hung in canalization the most according to claim 1, it is characterised in that described in hang hole steel facing (2) and steel hoop (1) by being welded to connect formation entirety.
Hole mould is hung in canalization the most according to claim 1, it is characterised in that described connecting bolt (3) and attaching nut (4) pad (5) it is provided with between.
CN201620588464.3U 2016-06-17 2016-06-17 Hole mould is hung in a kind of canalization Expired - Fee Related CN205857713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620588464.3U CN205857713U (en) 2016-06-17 2016-06-17 Hole mould is hung in a kind of canalization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620588464.3U CN205857713U (en) 2016-06-17 2016-06-17 Hole mould is hung in a kind of canalization

Publications (1)

Publication Number Publication Date
CN205857713U true CN205857713U (en) 2017-01-04

Family

ID=57636506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620588464.3U Expired - Fee Related CN205857713U (en) 2016-06-17 2016-06-17 Hole mould is hung in a kind of canalization

Country Status (1)

Country Link
CN (1) CN205857713U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541567A (en) * 2019-09-20 2019-12-06 中国五冶集团有限公司 Plugging die for pipeline hanging hole gap and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541567A (en) * 2019-09-20 2019-12-06 中国五冶集团有限公司 Plugging die for pipeline hanging hole gap and construction method

Similar Documents

Publication Publication Date Title
CN205841994U (en) A kind of new indoor drainage system combined water proof pipe collar
CN103437556B (en) Building water supply and drainage and heating engineering waterproofing and insulation construction method
CN205776886U (en) Concrete composite wall body structure
CN104533046A (en) Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN104481018A (en) Home decoration toilet pipe-side floor drain treatment process
CN204252330U (en) A kind of light porous inner partition plate anti-cracking structure
CN202510847U (en) Hole-plugging construction structure for pipeline passing through floor slab in waterish room
CN205857713U (en) Hole mould is hung in a kind of canalization
CN209011398U (en) A kind of dry-hang stone curtain wall sleeve
CN204609206U (en) Adopt the cladding cement based artificial flat-plate stone combined with wet combining
CN203924353U (en) Screw built-in fitting
CN206070797U (en) A kind of thermal-insulating and anti-cracking external wall structure
CN205742817U (en) A kind of external wall plate of waterproof heat insulation
CN204081186U (en) A kind of space truss structure is used for the steel structure modularization tier of local-style dwelling houses
CN207032723U (en) A kind of aerated concrete block work structure
CN215802143U (en) Secondary drainage stagnant water structure
CN205444506U (en) Internal drainage structure of foam concrete wall
CN203905365U (en) Bathroom wall stone installation structure for high-rise buildings
CN103967146A (en) Fireproof insulation board
CN208719582U (en) A kind of architectural engineering feed pipe channel fixing device
CN208971095U (en) 90 degree of elbow built-in fittings of pre-buried PVC finished product
CN208633453U (en) A kind of packet standpipe
CN110094578A (en) A kind of new waterproof casing and its construction method
CN205531001U (en) Interior composite wall panel who establishes tube seat
CN201420394Y (en) Die for making pipeline reserved holes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20170617