CN207296347U - A kind of new type scaffold eye plugging structure - Google Patents
A kind of new type scaffold eye plugging structure Download PDFInfo
- Publication number
- CN207296347U CN207296347U CN201721300840.5U CN201721300840U CN207296347U CN 207296347 U CN207296347 U CN 207296347U CN 201721300840 U CN201721300840 U CN 201721300840U CN 207296347 U CN207296347 U CN 207296347U
- Authority
- CN
- China
- Prior art keywords
- wall
- scaffold eye
- waterproof
- pea gravel
- gravel concreten
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of new type scaffold eye plugging structure, it includes pea gravel concreten, and the pea gravel concreten is filled in scaffold intraocular part, and it is tentatively blocked;The scaffold eye is located inside wall, and runs through whole wall;There is polyethylene polypropylene fiber composite sheet in the outer tire layer of pea gravel concreten, set waterproof mortar in the outer layer spraying of polyethylene polypropylene fiber composite sheet, anticracking grout is sprayed in the outer layer of waterproof mortar, exterior wall putty and coating are smeared in the outer layer of anticracking grout.Carry out the waterproof closure of scaffold eye, then the brushing waterproof mortar on waterproof material, exterior wall decoration and finishing construction is finally carried out again, since the new material can be combined effectively and waterproof effect is good with concrete wall surface, can effectively prevent the generation of external wall seepage phenomenon.
Description
Technical field
A kind of novel external wall scaffold eye plugging structure is the utility model is related to, is applicable in industrial and civil architecture agent structure exterior wall
The closure mode of scaffold eye, prevents exterior wall and seeps water because the closure of scaffold eye is not tight.
Background technology
At present in industrial and civil architecture agent structure, the attached wall connection of builder's jack, causes in exterior wall work progress
Produce scaffold eye.General scaffold eye closure mode is first to block scaffold eye using pea gravel concreten, then smears one layer and prevent
Water sand is starched, and in exterior wall decoration and finishing, first smears one layer of waterproof mortar, is anticracking grout outside waterproof mortar, then Puttying is brushed
Material.If waterproof mortar smear it is not in place or after the waterproof mortar smeared cannot be effectively with previously having smeared waterproof mortar be combined, pole
Phenomena such as being also easy to produce external wall seepage, the final quality for influencing agent structure, numerous troubles is caused to resident family.
Utility model content
Technical problem to be solved in the utility model is a kind of new waterproof material of increase, carries out the anti-of scaffold eye
Water seal is blocked up, then the brushing waterproof mortar on waterproof material, finally carries out exterior wall decoration and finishing construction again, since this is new
Material can effectively be combined with concrete wall surface and waterproof effect is good, can effectively prevent the generation of external wall seepage phenomenon.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:A kind of new type scaffold eye
Plugging structure, it includes pea gravel concreten, and the pea gravel concreten is filled in scaffold intraocular part, and it is tentatively sealed
It is stifled;The scaffold eye is located inside wall, and runs through whole wall;There is polyethylene polypropylene in the outer tire layer of pea gravel concreten
Composite of water-proof coiled material, sets waterproof mortar in the outer layer spraying of polyethylene polypropylene fiber composite sheet, is sprayed in the outer layer of waterproof mortar
Anticracking grout is applied, exterior wall putty and coating are smeared in the outer layer of anticracking grout.
The lap of splice after the polyethylene polypropylene fiber composite sheet cutting with wall around is 2 ~ 5cm.
The thickness of the waterproof mortar is 1 ~ 2mm.
The thickness of the anticracking grout is 0.5 ~ 1mm.
The thickness of the exterior wall putty and coating is 0.7 ~ 0.9mm.
The utility model has the advantages that:
1st, exterior wall scaffold eye plugging structure provided by the utility model, at external scaffolding attached wall position, with polyethylene third
Synthetic fibre composite of water-proof coiled material substitutes waterproof mortar, can be very good solution exterior wall scaffold eye and produces infiltration because blocking not tight
Problem, reaching prevents external wall seepage from producing crack, the problem of influencing structural stability.The utility model makes and using easy to be fast
Victory, cost are low, can be promoted the use of on a large scale in practice in engineering.
2nd, above-mentioned exterior wall scaffold eye closure mode is directly pasted using polyethylene polypropylene fiber composite sheet when in use
In concrete surface, pass through effective the problem of bonding, effectively preventing external wall seepage in adhesive surface.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the profile of the utility model.
Fig. 2 is the floor plan of the utility model.
In figure:It is wall 1, pea gravel concreten 2, scaffold eye 3, polyethylene polypropylene fiber composite sheet 4, waterproof mortar 5, anti-
Split mortar 6, exterior wall putty and coating 7.
Embodiment
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Referring to Fig. 1-2, a kind of new type scaffold eye plugging structure, it includes pea gravel concreten 2, the pea gravel concreten 2
It is filled in inside scaffold eye 3, and it is tentatively blocked;The scaffold eye 3 is located inside wall 1, and through whole
Wall 1;There is polyethylene polypropylene fiber composite sheet 4 in the outer tire layer of pea gravel concreten 2, rolled up in polyethylene polypropylene composite water-proof
The outer layer spraying of material 4 sets waterproof mortar 5, sprays anticracking grout 6 in the outer layer of waterproof mortar 5, is smeared in the outer layer of anticracking grout 6
Exterior wall putty and coating 7.
Further, after the polyethylene polypropylene fiber composite sheet 4 is cut with the lap of splice of wall around for 2 ~
5cm。
Further, the thickness of the waterproof mortar 5 is 1 ~ 2mm.
Further, the thickness of the anticracking grout 6 is 0.5 ~ 1mm.
Further, the thickness of the exterior wall putty and coating 7 is 0.7 ~ 0.9mm.
The use of the utility model and work progress are as follows:
It is compound anti-in the outer tire layer polyethylene polypropylene of pea gravel concreten 2 after the ophthalmically acceptable pea gravel concreten 2 of scaffold blocks
Water coiled material 4, then by normal operational procedure construction waterproof mortar 5, anticracking grout 6 and exterior wall putty and coating 7.By above-mentioned
Construction procedure, can preferably solve building construction seepage problem because caused by the closure of exterior wall scaffold eye is not tight, reach
To the problem of preventing because of external wall seepage formation crack, influence stable structure.The utility model constructing operation is simple, cost is low, makes
With working well, can be promoted the use of on a large scale in practice in engineering.
One specific embodiment of the utility model:
The utility model is made of pea gravel concreten 2, polyethylene polypropylene fiber composite sheet 4, waterproof mortar 5.Microlith mixes
Solidifying soil 2, polyethylene polypropylene fiber composite sheet 4 are the critical materials of scaffold eye closure waterproof, and pea gravel concreten 2 is using than wall
The concrete of the high grade of body concrete blocked, and polyethylene polypropylene fiber composite sheet 4 is taken after cutting with wall around
Spreading degree is 2 ~ 5cm, is pasted onto after the completion of the construction of pea gravel concreten 2 on pea gravel concreten 2, then directly in polyethylene polypropylene
Brushing waterproof mortar 5 on composite of water-proof coiled material 4, after waiting the painting of waterproof mortar 5 to wipe, then carries out the rendering of exterior coating on request.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model
System, the technical solution that the scope of protection of the utility model should be recorded with claim, including the technical solution that claim is recorded
The equivalents of middle technical characteristic are protection domain.Equivalent substitution i.e. within this range is improved, also in the utility model
Protection domain within.
Claims (5)
- A kind of 1. new type scaffold eye plugging structure, it is characterised in that:It includes pea gravel concreten(2), the pea gravel concreten (2)It is filled in scaffold eye(3)Inside, and it is tentatively blocked;The scaffold eye(3)Positioned at wall(1)Inside, and Through whole wall(1);In pea gravel concreten(2)Outer tire layer have polyethylene polypropylene fiber composite sheet(4), in polyethylene Polypropylene fibre composite of water-proof coiled material(4)Outer layer spraying set waterproof mortar(5), in waterproof mortar(5)Outer layer spraying anticracking grout (6), in anticracking grout(6)Outer layer smear exterior wall putty and coating(7).
- A kind of 2. new type scaffold eye plugging structure according to claim 1, it is characterised in that:The polyethylene polypropylene is compound Waterproof roll(4)With the lap of splice of wall around it is 2 ~ 5cm after cutting.
- A kind of 3. new type scaffold eye plugging structure according to claim 1, it is characterised in that:The waterproof mortar(5)'s Thickness is 1 ~ 2mm.
- A kind of 4. new type scaffold eye plugging structure according to claim 1, it is characterised in that:The anticracking grout(6)'s Thickness is 0.5 ~ 1mm.
- A kind of 5. new type scaffold eye plugging structure according to claim 1, it is characterised in that:The exterior wall putty and coating (7)Thickness be 0.7 ~ 0.9mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721300840.5U CN207296347U (en) | 2017-09-30 | 2017-09-30 | A kind of new type scaffold eye plugging structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721300840.5U CN207296347U (en) | 2017-09-30 | 2017-09-30 | A kind of new type scaffold eye plugging structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207296347U true CN207296347U (en) | 2018-05-01 |
Family
ID=62413797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721300840.5U Active CN207296347U (en) | 2017-09-30 | 2017-09-30 | A kind of new type scaffold eye plugging structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207296347U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115306178A (en) * | 2022-09-15 | 2022-11-08 | 北京天润建设有限公司 | Hole plugging method |
-
2017
- 2017-09-30 CN CN201721300840.5U patent/CN207296347U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115306178A (en) * | 2022-09-15 | 2022-11-08 | 北京天润建设有限公司 | Hole plugging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108952041A (en) | A kind of external wall Stucco finish structure and its method for repairing and constructing | |
CN103343655B (en) | Wall window construction method | |
CN103643754B (en) | The waterproof treatment structure of building wall body interface seam crossing and processing method | |
CN110016293A (en) | A kind of osmosis type rubber asphalt waterproof coating and preparation method thereof | |
CN108374566B (en) | Repairing process for leakage water on back water surface | |
CN205857593U (en) | A kind of stone material wet combining structure of anti-stone material pathological changes | |
CN113047459A (en) | Construction process for laying HDPE (high-density polyethylene) high-molecular self-adhesive film waterproof coiled material | |
CN114135068A (en) | Construction process of plastering mortar | |
CN103291027A (en) | Construction method for paining waterproof paint before cement is finally set | |
CN207296347U (en) | A kind of new type scaffold eye plugging structure | |
CN101649624B (en) | Construction method for governing basement leakage | |
CN111042350A (en) | Anti-crack construction method for plastering layers on different interfaces of building outer wall | |
CN207959291U (en) | Basement pile crown waterproof sealing structure | |
CN101008192A (en) | Construction method of outer wall insulation system adopting composite insulation surface tile | |
CN208996342U (en) | A kind of external wall Stucco finish structure | |
CN202500347U (en) | Building outer wall waterproof leakage mending reinforcement structure | |
CN212001695U (en) | Outer wall waterproof construction | |
TWI714068B (en) | Building foundation waterproof construction method | |
CN104234249A (en) | Construction method of outer heat insulation wall using polyurethane hard foam composite boards | |
CN104612398A (en) | Construction method for crack protection at position of brickwork rear embedded wire tube | |
CN205975704U (en) | Basement wall structure | |
CN216766298U (en) | Be used for waterproof protective layer of basement | |
CN107780442A (en) | The high slope advance water stop construction method combined with soil nailing | |
CN110409747A (en) | Ground waterproof construction method | |
CN203669147U (en) | Waterproof processing structure for building wall interface seam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |