CN108243647A - The new method that a kind of Midwest coal field dynamic is reclaimed in advance - Google Patents

The new method that a kind of Midwest coal field dynamic is reclaimed in advance Download PDF

Info

Publication number
CN108243647A
CN108243647A CN201810014567.2A CN201810014567A CN108243647A CN 108243647 A CN108243647 A CN 108243647A CN 201810014567 A CN201810014567 A CN 201810014567A CN 108243647 A CN108243647 A CN 108243647A
Authority
CN
China
Prior art keywords
section
field
length
depression
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810014567.2A
Other languages
Chinese (zh)
Other versions
CN108243647B (en
Inventor
陈秋计
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201810014567.2A priority Critical patent/CN108243647B/en
Publication of CN108243647A publication Critical patent/CN108243647A/en
Application granted granted Critical
Publication of CN108243647B publication Critical patent/CN108243647B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Abstract

The invention discloses a kind of new methods for being suitable for Midwest coal field dynamic and reclaiming in advance, the present invention combines the Land destruction feature of Subsidence Area, according to mining subsidence theory, using echelon dynamic pre-reclamation method, i.e., following Subsidence Area is divided into three sections, it then, can be according to field width on different sections, block of reclaiming further is divided, is administered successively.Soil is greatly decreased to lie waste the time.

Description

The new method that a kind of Midwest coal field dynamic is reclaimed in advance
Technical field
Of the present invention is to serve coal field Ecological Civilization Construction needs, is adapted to Midwest plain type mining area, opens The coal mine subsidence land dynamic for adopting rear earth's surface not ponding is reclaimed new method in advance.
Background technology
Exploitation of coal resources depression results in the destruction of large amount of land resources, has seriously affected the sustainable development in region. Reclaiming for damage soil also becomes the problem of current in the urgent need to address.After current land reclamation is stablized mainly for depression Soil is administered, and soil is caused to fall into disuse, and the time is long, and difficulty of governance increases.If can exploitation while, to damage soil and Shi Zhili can not only control environmental degradation, but also can improve land utilization ratio, to promoting Sustainable Development in Mining Areas will Play important facilitation.Therefore, the research hotspot that dynamic is reclaimed in advance as the field in recent years, but focus on east Gao Qian more Water level mining area, it is less to the research of central and west regions.In China in Midwest region of no relief, land use pattern is mostly to plough, Groundwater level is relatively low, does not occur long-term ponding after subsidence.The slope change and crack that depression is caused, cause nutrient flow It loses, farmland quality declines.The emphasis of improvement is control land deterioration, reduces soil and falls into disuse the time, is provided for final land reclamation Basis.
Invention content
The object of the present invention is to provide the new method that a kind of Midwest coal field dynamic is reclaimed in advance, the present invention combines Subsidence Area Land destruction feature, according to mining subsidence theory, using echelon dynamic pre-reclamation method, following Subsidence Area is divided into three Then section, on different sections, according to field width, further divides block of reclaiming, is administered, substantially subtracted successively Few soil lies waste the time.
The technical scheme is that the new method that a kind of Midwest coal field dynamic is reclaimed in advance, includes the following steps
(1) section partition is administered
Following Subsidence Area is divided into three sections, it then, can be according to field width, further on different sections Division is reclaimed block, is administered successively;
First section (L1):Open-off cut side depression boundary (S1) to sinker (S under first earth's surface maximum2), length uses Following formula is estimated:
L1=H*ctg (δ0)+H*ctg(ψ3) (1)
Second section (L2):Basin part, on principal section is moved towards, sinker (S under first maximum2) to the last one ground Sinker (S under table maximum3), length is estimated using following formula:
L2=D2=D-D1-D3=D-2*H*ctg (ψ3) (2)
Third section (L3):Sinker (S under first earth's surface the last one maximum3) to stopping adopting side depression boundary (S4), it is long Degree estimates that length is identical with the first section using following formula,
L3=H*ctg (δ0)+H*ctg(ψ3) (3)
In formula, L1、L2、L3Horizontal length of respectively first, second, third section on the principal section of Subsidence Area, δ0For side Boundary angle, ψ3For angle of full subsidence, H coal seams buried depth, D represents coal working face strike length, D1, D2And D3Respective area is represented respectively Length of the section on bearing;(2) Secondary Reclamation Time selects
First section Secondary Reclamation Time:The open-off cut moment is set as T0=0, stope fltting speed is V, when back production work It is advanced to Ds1During length, moment T1=Ds1/ V=1.4H/V, works as T1Moment or face advanced distance are more than 1.4H, Ke Yijin The work of reclaiming of the first section of row;
Second section Secondary Reclamation Time:Distance away from stope is more than H*ctg (ψ3) basin bottom part point can be answered It cultivates, if it is considered that the length of field, the first field Secondary Reclamation Time of the second section can be calculated according to the following formula:
T21=T1+Dt1/V (3)
In formula, Dt1For length of first field on section is moved towards, follow-up field, and so on;
Third section Secondary Reclamation Time:It is calculated according to the following formula:
T3=T2In+1.4H/V formulas, T2It reclaims the end time for the second section
(3) reclamation measures design
It for first and third section, is reclaimed using terrace-type, the section structure of terraced fields can be according to the additional of depression generation The gradient is calculated, and the additional gradient that depression generates can calculate according to the following formula:
α=arctag (W0/L1)(deg) (4)
In formula, α is the gradient, W caused by depression0For earth's surface maximum sinking value;
The management measure of depression in the second section ground, should fragment carry out, reach maximum value to moving towards and being inclined to Basin bottom part point, using prepartion of land mode inside field, eliminate local elevation difference, it is smooth to reach field face;Due to being inclined to There are still certain hillside fields in this section of direction, administering method with the first section, terraced fields field face layout as far as possible with the firstth area Section linking;
Third section administers analytic process with the first section.
The present invention can reduce the uncultivated time in soil, the conservation of soil and water, keep the productivity in soil, realize " while opening Side is adopted to reclaim " target.
Description of the drawings
Fig. 1 is that echelon dynamic is reclaimed section partition schematic diagram in advance.
In figure:A coal seams location of starting cut;B is coal seam Ting Cai positions;D represents coal working face strike length;L1It is first Horizontal length of the section on the principal section of Subsidence Area, D1Expression and L1Walking upward length in the corresponding coal seam of section;L2It is second Horizontal length of the section on the principal section of Subsidence Area, D2Expression and L2Walking upward length in the corresponding coal seam of section;L3For third Horizontal length of the section on the principal section of Subsidence Area, D3Expression and L3Walking upward length in the corresponding coal seam of section;δ0For boundary Angle, ψ3For angle of full subsidence, H coal seams buried depth.S1, S2, S3, S4, represent the separation of each section, wherein S1And S4It is influenced for depression Boundary point, wherein S2And S3Basin bottom boundaries point for subsidence basin.
Specific embodiment
As shown in Figure 1, the new method that a kind of Midwest coal field dynamic is reclaimed in advance, includes the following steps that (1) administers section It divides
With reference to the Land destruction feature of Subsidence Area, according to mining subsidence theory, the present invention uses the echelon dynamic side of reclaiming in advance Method, that is, following Subsidence Area is divided into three sections, then, on different sections, can further be drawn according to field width Divide block of reclaiming.It is administered successively.As shown in Figure 1.
First section (L1):Open-off cut side depression boundary (S1) to sinker (S under first earth's surface maximum2).Using following formula Estimate its length on principal section is moved towards.
L1=H*ctg (δ0)+H*ctg(ψ3) (1)
In formula, L1For horizontal length of first section on the principal section of Subsidence Area, δ0For rim angle, ψ3For angle of full subsidence, H coal seams buried depth.
Second section (L2):Basin part, on principal section is moved towards, sinker (S under first maximum2) to the last one ground Sinker (S under table maximum3).Length is estimated using following formula:
L2=D2=D-D1-D3=D-2*H*ctg (ψ3) (2)
In formula, L2For horizontal length of second section on the principal section of Subsidence Area.ψ3For angle of full subsidence, H coal seams buried depth, D Represent coal working face strike length, D1, D2And D3Length of the respective section on bearing is represented respectively.
Third section (L3):Sinker (S under first earth's surface the last one maximum3) to stopping adopting side depression boundary (S4).It is long Degree is identical with the first section.
L3=H*ctg (δ0)+H*ctg(ψ3) (3)
In formula, L3For horizontal length of the third section on the principal section of Subsidence Area, δ0For rim angle, ψ3For angle of full subsidence, H coal seams buried depth.
(2) Secondary Reclamation Time selects
First section Secondary Reclamation Time.According to dynamic depression theory and site observation date, open and cut when stope distance The length D of eyes1During=1.4*H (H coal seams buried depth), first maximum sinking value of subsidence basin is close to theoretical maximum (W0), this Locate value 0.98W0.The open-off cut moment is set as T0=0, stope fltting speed is V.Then when actual mining is advanced to Ds1 During length, at this time at the time of T1=Ds1/ V=1.4H/V.Due to follow-up residual deformation (0.02W0) when needing persistently considerably long Between, if waiting complete stabilities, need to fall into a long wait, soil is caused to fall into disuse, quality degradation.So work as T1Moment (or work Face advance distance is more than 1.4H), the work of reclaiming of the first section can be carried out.
Second section Secondary Reclamation Time.According to exploitation mining subsidence deformation rule, during trends exploitation, when exploitation length After reaching sufficient mining, sinker is constantly moved forward with the propulsion of working face under earth's surface maximum.It can be approximately considered, reach After super sufficient mining, the distance of follow-up maximum lower sinker lag coal working face is H*ctg (ψ3).Therefore, away from actual mining The distance in face is more than H*ctg (ψ3) basin bottom part point can reclaim.If it is considered that the length of field, the first of the second section Field Secondary Reclamation Time can be calculated according to the following formula:
T21=T1+Dt1/V (3)
In formula, Dt1For the length on section is moved towards of the first field, follow-up field, and so on.
Third section Secondary Reclamation Time.This section, which may be considered, to stop adopting rear landform movement and deformation coverage.Secondary Reclamation Time It can be calculated according to the following formula:
T3=T2+1.4H/V
In formula, T2It reclaims the end time for the second section.
(3) reclamation measures design
For first and third section, positioned at the edge of subsidence basin, different parts depression depth is different, and earth's surface occurs one Grade.Such section, is reclaimed using terrace-type.The section structure of terraced fields can be counted according to the additional gradient that depression generates It calculates.The additional gradient that depression generates can calculate according to the following formula:
α=arctag (W0/L1)(deg) (4)
In formula, α is the gradient caused by depression,
W0For earth's surface maximum sinking value
It is required according to terrace construction technology, it is with carrying out depression terraced set forth herein following standard with reference to relevant achievement in research Field is reclaimed design.
1 terraced fields of table are reclaimed cross dimensions table
It is less than 10 ° in view of the additional gradient that general region of no relief depression generates, so not having herein to the hillside fields for releasing souls from purgatory 10 ° It is related to.In addition, terrace construction using level terraced field based on, if it is considered that residual settlement, can build the reversed terrace within 1 °.
The management measure of depression in the second section ground, should fragment carry out.Reach maximum value to moving towards and being inclined to Basin bottom part point, using prepartion of land mode inside field, eliminate local elevation difference, it is smooth to reach field face.Due to being inclined to There are still certain hillside fields in aspect this section, administering method with the first section, terraced fields field face layout as far as possible with the firstth area Section linking.
Third section administers analytic process with the first section.
(4) points for attention
(1) before developing programs, the emotionally condition of adopting moved towards and be inclined to is analyzed first, if trend is not achieved fully It adopts, administering layout should be changed.
(2) opportunity is administered other than considering mining subsidence factor, and the season of growth of crop should also be considered.Work of reclaiming is done Fortunately after crops harvesting, the not field time carries out.
(3) earth's surface deformation process is complicated, it is proposed that treating that Subsidence Area sets monitoring point, compared before reclaiming practical sinking in advance Meter sinking obtains difference, is properly reclaimed opportunity according to monitor value selection.Analysis of cases
Certain mining area is located at the Shanxi Province southeast, ground elevation H0=900m, topography are flat.Mine mainly exploits 3# coal seams, Coal seam mean obliquity α=4 ° belong to flat seam, coal seam buried depth H=320m, coal seam average thickness m=6.5m.Design uses Fully mechanized mining method is mined, and caving method management top plate simulates the long L=2200m of coal working face, width D=300m working faces push away Into speed V=2m/d, subsidence factor q=0.86, δ0=67 °, ψ3=72 °.The T between exploitation at the moment0=0.It is managed according to mining subsidence Refer to it is mentioned above go out river harnessing ideas, calculate the critical technical parameter reclaimed in advance of working face dynamic.
(1) first section
First section is in earth surface length:L1=H*ctg (δ0)+H*ctg(ψ3)=240m
Administer the time:T1=1.4*320/2=224 (d)
The working face moves towards and tendency reaches sufficient mining, and earth's surface maximum sinking value can be calculated according to the following formula:
W0=m*q*cos α=5.58m
The additional gradient that depression generates:
α=arctag (W0/L1)=2.35 °
Control measures is used to reclaim for terrace-type, wherein terraced fields field face width 30m, the high 1m of the raised path through fields, 85 ° of the raised path through fields gradient.
(2) second sections
The length L of second section2=1992m.Because the second section is longer, so being further subdivided into four blocks, each Section 500m or so, the first block L21The improvement time:
T21=T1+Dt1/ V=224+500/2=474 (d)
Because in this section, trend and tendency reach super sufficient mining, and basin part is carried out using prepartion of land mode It administers.The field width of basin part can use following formula approximate calculation:D=300-2*104=92m.It is inclined to the management of sloping land in direction Measure is the same as the first section.
(3) third section
Strike length is the same as the first section L3=240m administers time T3=224+1992/2+224=1444 (d), improvement are arranged It applies with the first section.
(4) performance analysis
It is administered according to traditional mode, needs to be answered after waiting for entire working face mining completion and subsidence stabilization It cultivates.For present case, conventional method needs to administer after waiting for 5.2 years.Dynamic pre-reclamation method is after 0.6 year, you can Carry out and administer, reduce the uncultivated 4.6 years time.Illustrate that dynamic pre-reclamation method can be greatly decreased soil and lie waste the time.

Claims (3)

1. a kind of new method that Midwest coal field dynamic is reclaimed in advance, it is characterized in that including the following steps:
(1) section partition is administered
Following Subsidence Area is divided into three sections, then, on different sections, can further be divided according to field width It reclaims block, is administered successively;
First section (L1):Open-off cut side depression boundary (S1) to sinker (S under first earth's surface maximum2), length uses following formula Estimation:
L1=H*ctg (δ0)+H*ctg(ψ3) (1)
Second section (L2):Basin part, on principal section is moved towards, sinker (S under first maximum2) to the last one earth's surface most Sinker (S lower greatly3), length is estimated using following formula:
L2=D2=D-D1-D3=D-2*H*ctg (ψ3) (2)
Third section (L3):Sinker (S under first earth's surface the last one maximum3) to stopping adopting side depression boundary (S4), length is adopted It is estimated with following formula, length is identical with the first section,
L3=H*ctg (δ0)+H*ctg(ψ3) (3)
In formula, L1、L2、L3Horizontal length of respectively first, second, third section on the principal section of Subsidence Area, δ0For rim angle, ψ3For angle of full subsidence, H coal seams buried depth, D represents coal working face strike length, D1, D2And D3Represent respective section in coal respectively Layer walks upward length;
(2) Secondary Reclamation Time selects
First section Secondary Reclamation Time:The open-off cut moment is set as T0=0, stope fltting speed is V, when actual mining pushes away Enter Ds1During length, moment T1=Ds1/ V=1.4H/V, works as T1Moment or face advanced distance are more than 1.4H, can carry out the The work of reclaiming of one section;
Second section Secondary Reclamation Time:Distance away from stope is more than H*ctg (ψ3) basin bottom part point can reclaim, such as Fruit considers the length of field, and the first field Secondary Reclamation Time of the second section can be calculated according to the following formula:
T21=T1+Dt1/V (3)
In formula, Dt1For length of first field on section is moved towards, follow-up field, and so on;
Third section Secondary Reclamation Time:It is calculated according to the following formula:
T3=T2In+1.4H/V formulas, T2It reclaims the end time for the second section
(3) reclamation measures design
It for first and third section, is reclaimed using terrace-type, the section structure of terraced fields can be according to the additional gradient of depression generation It is calculated, the additional gradient that depression generates can calculate according to the following formula:
α=arctag (W0/L1)(deg) (4)
In formula, α is the gradient, W caused by depression0For earth's surface maximum sinking value;
The management measure of depression in the second section ground, should fragment carry out, reach the basin of maximum value to moving towards and being inclined to Bottom point using prepartion of land mode inside field, eliminates local elevation difference, it is smooth to reach field face;Due in tendency direction There are still certain hillside fields, administering method in this section to hold in the mouth with the first section, terraced fields field face layout with the first section as far as possible It connects;
Third section administers analytic process with the first section.
2. the new method that coal field dynamic in Midwest as shown in claim 1 is reclaimed in advance, it is characterized in that, step (3) terraced fields Section structure is:When depression, which adds gradient a, is spent for 1-5, field face width be 30-40m, raised path through fields height be 1.0-2.3m, the raised path through fields The gradient is 70-85 degree.
3. the new method that coal field dynamic in Midwest as shown in claim 1 is reclaimed in advance, it is characterized in that, step (3) terraced fields Section structure is:When depression, which adds gradient a, is spent for 5-10, field face width be 20-30m, raised path through fields height be 1.5-4.3m, the raised path through fields The gradient is 55-75 degree.
CN201810014567.2A 2018-01-08 2018-01-08 A kind of new method that coal field dynamic in Midwest is reclaimed in advance Active CN108243647B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810014567.2A CN108243647B (en) 2018-01-08 2018-01-08 A kind of new method that coal field dynamic in Midwest is reclaimed in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810014567.2A CN108243647B (en) 2018-01-08 2018-01-08 A kind of new method that coal field dynamic in Midwest is reclaimed in advance

Publications (2)

Publication Number Publication Date
CN108243647A true CN108243647A (en) 2018-07-06
CN108243647B CN108243647B (en) 2019-09-10

Family

ID=62726056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810014567.2A Active CN108243647B (en) 2018-01-08 2018-01-08 A kind of new method that coal field dynamic in Midwest is reclaimed in advance

Country Status (1)

Country Link
CN (1) CN108243647B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924376A (en) * 2019-11-25 2020-03-27 陕煤集团神木红柳林矿业有限公司 West aeolian sand area coal mining subsidence land treatment method
CN112685824A (en) * 2021-01-12 2021-04-20 西安科技大学 Terrace type reclamation parameter optimization method considering mining subsidence deformation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU791284A1 (en) * 1979-06-19 1980-12-30 Украинский Научно-Исследовательский Институт Лесного Хозяйства И Агролесомелиорации Им. Г.Н. Высоцкого Method of developing slopes for forest ranges
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) New process for recultivating glebe in mine subsidence area
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN102609782A (en) * 2012-01-10 2012-07-25 中国矿业大学(北京) Optimization method of simultaneous harvest and reclamation opportunity based on mining subsidence simulation and second ploughing rate
CN104850911A (en) * 2015-05-26 2015-08-19 西安科技大学 Coal mining subsidence dynamic prediction method based on self-adaptive space-time integral grid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU791284A1 (en) * 1979-06-19 1980-12-30 Украинский Научно-Исследовательский Институт Лесного Хозяйства И Агролесомелиорации Им. Г.Н. Высоцкого Method of developing slopes for forest ranges
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) New process for recultivating glebe in mine subsidence area
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN102609782A (en) * 2012-01-10 2012-07-25 中国矿业大学(北京) Optimization method of simultaneous harvest and reclamation opportunity based on mining subsidence simulation and second ploughing rate
CN104850911A (en) * 2015-05-26 2015-08-19 西安科技大学 Coal mining subsidence dynamic prediction method based on self-adaptive space-time integral grid

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
付梅臣等: "矿区生态复垦中表土剥离及其工艺", 《金属矿山》 *
李太启: "刘桥二矿动态塌陷区预复垦治理方法", 《矿山测量》 *
董祥林等: "矿区塌陷地梯次动态复垦研究", 《中国地质灾害与防治学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924376A (en) * 2019-11-25 2020-03-27 陕煤集团神木红柳林矿业有限公司 West aeolian sand area coal mining subsidence land treatment method
CN112685824A (en) * 2021-01-12 2021-04-20 西安科技大学 Terrace type reclamation parameter optimization method considering mining subsidence deformation

Also Published As

Publication number Publication date
CN108243647B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN103039147B (en) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN106961864B (en) A kind of the alkaline land improving system and its modification method of wells connecting with canals
CN104480974B (en) Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond
CN107989612B (en) A kind of high ground-water level coal field dynamic is reclaimed new method in advance
CN103235853B (en) Adopt the multiple base pool layout method based on earthwork balance in limit for coal-mining subsidence rand
CN109451905B (en) Slope-changing and slowing method for land improvement of hills and mountains
CN109372511B (en) Method for dynamically filling coal mining subsidence land by using yellow river silt
CN105248007A (en) Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land
CN102747757A (en) Rainwater collection and using method for desertification area
CN106717218A (en) A kind of mining collapse area agricultural is reclaimed comprehensive processing method
CN108243647B (en) A kind of new method that coal field dynamic in Midwest is reclaimed in advance
CN110889163A (en) Method for treating coal mining collapse wide and large cracks in loess hilly area
CN101138287A (en) Desert greening water and soil conservation method and structure
CN204435430U (en) A kind of reverse row being applicable to upstream type Tailings Dam oozes system and upstream type Tailings Dam
CN108661073A (en) A kind of barrier wall structure and its construction method
CN105340408A (en) Afforestation and soil preparation method for rocky barren mountains in semi-arid regions
CN105672198B (en) A kind of reservoir inundation submergence area restores abandoned land to cultivation structure and its construction method with making
CN106285683A (en) Mine reclamation stores water pumping method bottom openpit or Subsidence Area
CN207354947U (en) A kind of new terraced fields suitable for being transformed plateau escarpment
CN110688609B (en) Loess tableland shallow groundwater recharge-discharge unit dividing method
CN105123004B (en) Soil body configuration and land control method in a kind of discarded ground second ploughing
CN109797730B (en) Comprehensive compaction filling method for filling and land building in loess hilly gully region
CN110178474A (en) Hilly area field building method
CN112685824B (en) Terrace type reclamation parameter optimization method considering mining subsidence deformation
CN205726953U (en) A kind of salt-soda soil hidden pipe salt discharge equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant