CN108230805A - A kind of power emergency based on scene structure drills deduction system - Google Patents

A kind of power emergency based on scene structure drills deduction system Download PDF

Info

Publication number
CN108230805A
CN108230805A CN201711429905.0A CN201711429905A CN108230805A CN 108230805 A CN108230805 A CN 108230805A CN 201711429905 A CN201711429905 A CN 201711429905A CN 108230805 A CN108230805 A CN 108230805A
Authority
CN
China
Prior art keywords
rehearsal
scene
emergency
module
script
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711429905.0A
Other languages
Chinese (zh)
Other versions
CN108230805B (en
Inventor
于振
王学军
李涛
门永生
刘超
冯杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Global Energy Interconnection Research Institute
Original Assignee
State Grid Corp of China SGCC
Global Energy Interconnection Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Global Energy Interconnection Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201711429905.0A priority Critical patent/CN108230805B/en
Publication of CN108230805A publication Critical patent/CN108230805A/en
Application granted granted Critical
Publication of CN108230805B publication Critical patent/CN108230805B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of power emergencies based on scene structure to drill deduction system, should be included based on the power emergency rehearsal deduction system that scene is built:Scene library model construction module, for building scene library model according to natural calamity information, power grid accident information and emergency preplan;Data processing module is drilled, for according to scene library model, generation rehearsal script and the corresponding standard rehearsal result of rehearsal script;Interactive module is sent to user, and obtain counter-measure input by user for that will drill script;Scheduling of resource module, for according to counter-measure, generating emergency resources setting information;Scene drills module, for according to counter-measure and emergency resources setting information, daily record and rehearsal result to be drilled in generation;Evaluation module is drilled, is compared for result will to be drilled with standard rehearsal result, generation rehearsal assessment result.By applying the present invention, the operating of emergency mechanism can be examined, rehearsal expense is reduced, is realized and is repeated to drill and drill assessment, and realize the simulated maneuver of various disaster scenes.

Description

A kind of power emergency based on scene structure drills deduction system
Technical field
The present invention relates to power safety technique fields, and in particular to a kind of power emergency based on scene structure, which is drilled, deduces System.
Background technology
Emergency drilling and training are the important contents of contingency management work, when emergency event occurs, fast recovery of power supply Ability ensures the normal production and living of resident, is the important duty of power supply enterprise and electric power first-aid department.In order to improve emergent rob The efficiency of work is repaiied, improves the ability of emergency disposal, other than increasing repairing manpower with goods and materials, it is also necessary to solve rationally commander The problem of formulation of scheme, the rational management of emergency resources etc..Emergency drilling and training can improve emergency commands at different levels And rescue personnel to the qualification and respond of meet an urgent need responsibility and flow, promote interdepartmental cooperation, so as to effectively Reduce accident caused by casualties and property loss.By the rehearsal of diversified forms, reached " examine prediction scheme, Break-in mechanism tempers troop and educates the public " purpose, greatly strengthen crew and meet an urgent need consciousness and emergency disposal ability.
But current emergency drilling mainly in a manner of pressing predetermined scripts combat exercise based on, this mode lacks Flexibility, personnel perform task according to the instruction of advance layout, really emergency mechanism can not be examined to operate, and trainer meets an urgent need energy Power;And this mode spends larger, it is impossible to carry out multiplicating rehearsal, it is impossible to compare the consequence of a variety of rescue methods;This Outside, since large scale disasters especially natural calamity majority is plyability disaster, with scale is big, range is wide, situation is complicated, loss The features such as serious, combat exercise can not real simulation whole disaster scenes.
Invention content
The technical problem to be solved in the present invention is combat exercise mode of the prior art is overcome to lack flexibility, can not Really examine emergency mechanism operating, trainer's emergency capability;Drill it is costly, can not realize multiplicating rehearsal, it is impossible to it is right Than drilling result;And the problem of all disaster scenes can not being drilled.
According in a first aspect, an embodiment of the present invention provides a kind of power emergency rehearsals built based on scene to deduce system System, including:Scene library model construction module, rehearsal data processing module, interactive module, scheduling of resource module, scene rehearsal mould Block and rehearsal evaluation module, wherein, scene library model construction module is used for according to natural calamity information, power grid accident information And emergency preplan structure scene library model;The rehearsal data processing module is used for according to scene library model, generation rehearsal Script and the corresponding standard rehearsal of the rehearsal script by the rehearsal script as a result, and be sent to the interactive module;It is described Interactive module is used to the rehearsal script being sent to user, and obtain counter-measure input by user, by the counter-measure It is sent to the scene rehearsal module;The scheduling of resource module is used for according to the counter-measure, to phase in emergent resources bank The emergency resources answered are configured, and emergency resources setting information is sent to the scene and drills module;The scene rehearsal Module is used for according to the counter-measure and the emergency resources setting information, generation rehearsal daily record and rehearsal result;It is described to drill Practice evaluation module to be used to the rehearsal result and standard rehearsal result being compared, generation rehearsal assessment result.
With reference to first aspect, in first aspect first embodiment, scene library model construction module includes:Event Scenario models build submodule, for according to the natural calamity information and the power grid accident information architecture event scene mould Type;Task Circumstance model construction submodule, for building Task Circumstance model according to the emergency preplan.
With reference to first aspect, in first aspect second embodiment, the rehearsal data processing module is additionally operable to basis The natural calamity information and the power grid accident information generate secondary derivative accident information, and according to the secondary derivative accident Information updates the rehearsal script.
With reference to first aspect, in first aspect third embodiment, the power emergency rehearsal based on scene structure Deduction system further includes:Scene library model modification module, for according to the rehearsal script and counter-measure, described in update Scene library model.
According to second aspect, an embodiment of the present invention provides a kind of power emergencies based on scene structure to drill deduction side Method, including:Scene library model is built according to natural calamity information, power grid accident information and emergency preplan;According to the scene library Model, generation rehearsal script and the corresponding standard rehearsal result of the rehearsal script;The rehearsal script is sent to user, and Obtain the counter-measure input by user;According to the counter-measure, corresponding emergency resources in emergent resources bank are carried out Setting generates emergency resources setting information;According to the counter-measure and the emergency resources setting information, generation rehearsal daily record And rehearsal result;The rehearsal result and standard rehearsal result are compared, generation rehearsal assessment result.
It is described to be believed according to natural calamity information, power grid accident in second aspect first embodiment with reference to second aspect Breath and emergency preplan structure scene library model, including:According to the natural calamity information and the power grid accident information architecture thing Part scenario models;Task Circumstance model is built according to the emergency preplan.
It is described according to scene library model, generation rehearsal in second aspect second embodiment with reference to second aspect Script and the corresponding standard rehearsal result of the rehearsal script further include:According to the natural calamity information and the power grid accident Information generates secondary derivative accident information, and updates the rehearsal script according to the secondary derivative accident information.
With reference to second aspect, in second aspect third embodiment, the power emergency rehearsal based on scene structure Deduction method further includes:According to the rehearsal script and the counter-measure, scene library model is updated.
It is described non-temporary an embodiment of the present invention provides a kind of non-transient computer readable storage medium storing program for executing according to the third aspect State computer-readable recording medium storage computer instruction, the computer instruction are used to that the computer to be made to perform first aspect Or the power emergency based on scene structure described in any one optional mode of first aspect drills deduction method.
According to fourth aspect, an embodiment of the present invention provides a kind of computer program product, the computer program product Including the calculation procedure being stored on non-transient computer readable storage medium storing program for executing, the computer program includes program instruction, when When described program instruction is computer-executed, make any one of the computer execution second aspect or second aspect optional The power emergency based on scene structure described in mode drills deduction method.
Technical solution of the present invention has the following advantages that:
It is drilled by scene library model construction module, rehearsal data processing module, interactive module, scheduling of resource module, scene Practice module and drill the setting of evaluation module, natural calamity and power grid accident are subjected to Scene Simulation, and according to the reply of user Measure carries out corresponding emergency drilling, and emergency drilling result is assessed.It realizes to the operating of power emergency mechanism and people The inspection of member's emergency processing;And repetition rehearsal and the assessment to drilling result are realized, so as to effectively reduce rehearsal expense;And The simulated maneuver of various disaster scenes can be achieved.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of the power emergency rehearsal deduction system based on scene structure in the embodiment of the present invention;
Fig. 2 is another structural representation of the power emergency rehearsal deduction system based on scene structure in the embodiment of the present invention Figure;
Fig. 3 is another structural representation of the power emergency rehearsal deduction system based on scene structure in the embodiment of the present invention Figure;
Fig. 4 is the flow chart of the power emergency rehearsal deduction method based on scene structure in the embodiment of the present invention;
Fig. 5 is another flow chart of the power emergency rehearsal deduction method based on scene structure in the embodiment of the present invention;
Fig. 6 is another flow chart of the power emergency rehearsal deduction method based on scene structure in the embodiment of the present invention;
Fig. 7 is another flow chart of the power emergency rehearsal deduction method based on scene structure in the embodiment of the present invention;
Fig. 8 is the structure diagram of electronic equipment in the embodiment of the present invention.
Specific embodiment
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's all other embodiments obtained without making creative work, shall fall within the protection scope of the present invention.
As long as in addition, technical characteristic involved in invention described below different embodiments non-structure each other It can be combined with each other into conflict.
Embodiment 1
The embodiment of the present invention provides a kind of power emergency based on scene structure and drills deduction system, as shown in Figure 1, packet It includes:Scene library model construction module 1, rehearsal data processing module 2, interactive module 3, scheduling of resource module 4, scene rehearsal module 5 and rehearsal evaluation module 6, wherein, scene library model construction module 1 be used for according to natural calamity information, power grid accident information and Emergency preplan structure scene library model;Data processing module 2 is drilled to be used for according to scene library model, generation rehearsal script and rehearsal The corresponding standard rehearsal of script by rehearsal script as a result, and be sent to interactive module 3;Interactive module 3 is sent out for that will drill script User is given, and obtains counter-measure input by user, counter-measure is sent to scene rehearsal module 5;Scheduling of resource module 4 For according to counter-measure, being configured, and emergency resources setting information is sent out to corresponding emergency resources in emergent resources bank It send to scene and drills module 5;Scene rehearsal module 5 was used for according to counter-measure and emergency resources setting information, generation rehearsal day Will and rehearsal result;Rehearsal evaluation module 6 is compared for that will drill result with standard rehearsal result, generation rehearsal assessment knot Fruit.
Pass through the collaborative work between above-mentioned modules, the power emergency based on scene structure of the embodiment of the present invention Deduction system is drilled, natural calamity and power grid accident are subjected to Scene Simulation, and corresponding according to the progress of the counter-measure of user Emergency drilling, and emergency drilling result is assessed.Realize the inspection to the operating of power emergency mechanism and personnel's emergency processing It tests;And repetition rehearsal and the assessment to drilling result are realized, so as to effectively reduce rehearsal expense;And it can realize various disasters The simulated maneuver of scene.
In a preferred embodiment, as shown in Fig. 2, above-mentioned scene library model construction module 1 includes:Event scenario models structure Submodule 11 is built, for according to natural calamity information and power grid accident information architecture event scenario models;Task Circumstance model structure Submodule 12 is built, for building Task Circumstance model according to emergency preplan.
Specifically, when for simulation natural calamity or power grid burst accident occur for above-mentioned event scenario models, the scene of the accident Various scenes and risk;After above-mentioned Task Circumstance model sends natural calamity or power grid burst accident for simulation, answered preset All kinds of accident counter-measures included in anxious prediction scheme.
In a preferred embodiment, above-mentioned rehearsal data processing module 2 is additionally operable to according to natural calamity information and power grid thing Therefore information generates secondary derivative accident information, and according to secondary derivative accident information update rehearsal script.
Specifically, when natural calamity or power grid accident actually occur, accident tends to lead to other accidents in itself Occur.Such as electric power fire incident often brings other accidents, for example causes the burning of other combustibles, so as to cause The injuries such as boiling hot that personnel suffocate, burn, gathering of people area electric power burn, this kind of accident being induced is above-mentioned secondary derivative accident.
Specifically, in one embodiment, the interaction of above-mentioned 3 realization system of interactive module and the user that takes part in a performance, provides nature calamity The rehearsal script of evil and electric power accident, while can be with to taking part in a performance user, and receive treatment measures of the user to all kinds of accidents of taking part in a performance Multiple users that take part in a performance carry out message and send and receive interaction in real time, and type of interaction includes word interaction and interactive voice.In addition, Above-mentioned interactive module 3 further includes rehearsal and puts question to interaction submodule, for surrounding rehearsal event during emergency drilling, for tool The emergent question information prepared needed for the examination subject of body realizes creating, modification, delete, inquiry, browsing, sending out for question information The functions such as send and answer.The question information specifically includes:Stem is putd question to, Key for Reference is putd question to, puts question to the contents such as the scope of application.
Specifically, above-mentioned scheduling of resource module 4 emergency resources are configured including to emergency resources examination & approval, provide and The simulation of allocation process.
Specifically, the rehearsal daily record that above-mentioned scene rehearsal module 5 generates refers to all behaviour of user that takes part in a performance during drilling It notes down, the contents such as user's action plan that answer and user is putd question to submit that user submits.The rehearsal daily record specifically includes: User terminal operations record screen, user's word message interactive log, user speech session recording, user are answered the question daily record, user Daily record is submitted in action.It is to drill result by performance situation real-time record storage of each user during rehearsal.
Specifically, the reference content of the above-mentioned generation of rehearsal evaluation module 6 rehearsal assessment result includes:It is expected action and user Practical action comparison situation, user's interaction scenario, situation of answering the question, message browsing situation, user operation records etc..
In a preferred embodiment, as shown in figure 3, the above-mentioned power emergency rehearsal deduction system based on scene structure also wraps It includes:Scene library model modification module 7, for according to rehearsal script and counter-measure, update scene library model.
Specifically, above-mentioned scene library model is updated, scene when occurring due to scene library model for simulated accident, In practice when natural calamity or electric power accident induce secondary derivative accident, and according to accident is taken corresponding counter-measure it Afterwards, accident scenarios also can update scene library model with change.Such as electric power accident causes fire in inflammable and explosive region, After taking fire suppression measures, corresponding fire scenario will disappear, and scene is rescued into personnel.
Embodiment 2
The present invention is applied example and provides a kind of power emergency rehearsal deduction method built based on scene, as shown in figure 4, including:
Step S1:Scene library model is built according to natural calamity information, power grid accident information and emergency preplan.
Step S2:According to scene library model, generation rehearsal script and the corresponding standard rehearsal result of rehearsal script.
Step S3:Rehearsal script is sent to user, and obtain counter-measure input by user;
Step S4:According to counter-measure, corresponding emergency resources in emergent resources bank are configured, generate emergency resources Setting information.
Step S5:According to counter-measure and emergency resources setting information, generation rehearsal daily record and rehearsal result.
Step S6:Rehearsal result and standard rehearsal result are compared, generation rehearsal assessment result.
By above-mentioned steps S1 to step S6, the power emergency based on scene structure of the embodiment of the present invention drills deduction side Natural calamity and power grid accident are carried out Scene Simulation, and carry out corresponding emergency drilling according to the counter-measure of user by method, and Emergency drilling result is assessed.Realize the inspection to the operating of power emergency mechanism and personnel's emergency processing;And it realizes Rehearsal and the assessment to drilling result are repeated, so as to effectively reduce rehearsal expense;And it can realize the simulation of various disaster scenes Rehearsal.
In a preferred embodiment, as shown in figure 5, above-mentioned step S1, according to natural calamity information, power grid accident information And emergency preplan structure scene library model, it specifically includes:
Step S11:According to natural calamity information and power grid accident information architecture event scenario models.
Step S12:Task Circumstance model is built according to emergency preplan.
Specifically, when for simulation natural calamity or power grid burst accident occur for above-mentioned event scenario models, the scene of the accident Various scenes and risk;After above-mentioned Task Circumstance model sends natural calamity or power grid burst accident for simulation, answered preset All kinds of accident counter-measures included in anxious prediction scheme.
In a preferred embodiment, it is as shown in fig. 6, above-mentioned according to scene library model, generation rehearsal script and rehearsal script Corresponding standard rehearsal result further includes:
Step S21:Secondary derivative accident information is generated, and according to secondary according to natural calamity information and power grid accident information Derivative accident information update rehearsal script.
Specifically, when natural calamity or power grid accident actually occur, accident tends to lead to other accidents in itself Occur.Such as electric power fire incident often brings other accidents, for example causes the burning of other combustibles, so as to cause The injuries such as boiling hot that personnel suffocate, burn, gathering of people area electric power burn, this kind of accident being induced is above-mentioned secondary derivative accident.
Specifically, in one embodiment, above-mentioned steps S3 realizes the interaction with the user that takes part in a performance, and provides natural calamity and electric power The rehearsal script of accident receives treatment measures of the user to all kinds of accidents of taking part in a performance, while can take part in a performance with multiple to the user that takes part in a performance User carries out message and sends and receives interaction in real time, and type of interaction includes word interaction and interactive voice.In addition above-mentioned steps S3 is further included:Around rehearsal event during emergency drilling, believe for the emergent enquirement prepared needed for specific examination subject Breath realizes the newly-built of question information, modification, deletes, inquiry, browsing, sends and the functions such as answer.The question information is specifically wrapped It includes:Stem is putd question to, Key for Reference is putd question to, puts question to the contents such as the scope of application.
Specifically, above-mentioned steps S4 is configured emergency resources the main examination & approval, granting and tune included to emergency resources Simulation with process.
Specifically, above-mentioned steps S5 generation rehearsal daily record refer to rehearsal in the process take part in a performance all operation notes of user, What user submitted puts question to the contents such as user's action plan of answer and user's submission.The rehearsal daily record specifically includes:User is whole Answer the question daily record, user of end operation record screen, user's word message interactive log, user speech session recording, user takes action and carries Hand over daily record.It is to drill result by performance situation real-time record storage of each user during rehearsal.
Specifically, the reference content of the rehearsal assessment result in above-mentioned steps S6 includes:It is expected action and the practical row of user Dynamic comparison situation, user's interaction scenario, situation of answering the question, message browsing situation, user operation records etc..
In a preferred embodiment, as shown in fig. 7, the above-mentioned power emergency rehearsal deduction method based on scene structure is also wrapped It includes:
Step S7:According to rehearsal script and counter-measure, update scene library model.
Specifically, above-mentioned scene library model is updated, scene when occurring due to scene library model for simulated accident, In practice when natural calamity or electric power accident induce secondary derivative accident, and according to accident is taken corresponding counter-measure it Afterwards, accident scenarios also can update scene library model with change.Such as electric power accident causes fire in inflammable and explosive region, After taking fire suppression measures, corresponding fire scenario will disappear, and scene is rescued into personnel.
Embodiment 3
The embodiment of the present invention provides a kind of non-transient computer storage medium, which is stored with computer Executable instruction, the computer executable instructions can perform the power emergency built based on scene in above-mentioned any embodiment 2 Drill deduction method.Wherein, above-mentioned storage medium can be magnetic disc, CD, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), flash memory (Flash Memory), hard disk (Hard Disk Drive, abbreviation:) or solid state disk (Solid-State Drive, SSD) etc. HDD;The storage medium may be used also To include the combination of the memory of mentioned kind.
It is that can lead to it will be understood by those skilled in the art that realizing all or part of flow in above-described embodiment method Computer program is crossed to instruct relevant hardware come what is completed, program can be stored in a computer read/write memory medium, should Program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, storage medium can be magnetic disc, CD, only Read storage memory (ROM) or random access memory (RAM) etc..
Embodiment 4
The embodiment of the present invention provides a kind of electronic equipment of the power emergency rehearsal deduction method based on scene structure, knot Structure schematic diagram is as shown in figure 8, the equipment includes:One or more processors 410 and memory 420, with a processing in Fig. 8 For device 410.
Performing the electronic equipment of power emergency rehearsal deduction method built based on scene can also include:Input unit 430 and output device 440.
Processor 410, memory 420, input unit 430 and output device 440 can pass through bus or other modes It connects, in Fig. 8 for being connected by bus.
Processor 410 can be central processing unit (Central Processing Unit, CPU).Processor 410 may be used also Think other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.General processor can be microprocessor or the processing Device can also be any conventional processor etc..
Memory 420 is used as a kind of non-transient computer readable storage medium storing program for executing, available for storing non-transient software program, non- Transient computer executable program and module are drilled such as the power emergency built based on scene in the embodiment of the present application and deduced Corresponding program instruction/the module of method, processor 410 is by running the non-transient software program being stored in memory 420, referring to Order and module, the base of various function application and data processing so as to execute server, i.e. realization above method embodiment Deduction method is drilled in the power emergency of scene structure.
Memory 420 can include storing program area and storage data field, wherein, storing program area can store operation system System, the required application program of at least one function;Storage data field can be stored to be drilled according to the power emergency built based on scene That practices the processing unit of deduction control uses created data etc..In addition, memory 420 can be deposited including high random access Reservoir, can also include non-transient memory, a for example, at least disk memory, flush memory device or other are non-transient solid State memory device.In some embodiments, memory 420 is optional including relative to the remotely located memory of processor 410, this A little remote memories can deduce control device by network connection to the power emergency rehearsal built based on scene.Above-mentioned network Example include but not limited to internet, intranet, LAN, mobile radio communication and combinations thereof.
Input unit 430 can receive the number of input or character information and generating is answered with electric power build based on scene The related user setting of processing unit of control operation and the key signals input that function control is related are deduced in anxious rehearsal.Output dress Putting 440 may include that display screen etc. shows equipment.
One or more module is stored in memory 420, when being performed by one or more processor 410, is held The method of row as Figure 4-8.
The said goods can perform the method that the embodiment of the present invention is provided, and has the corresponding function module of execution method and has Beneficial effect.The not technical detail of detailed description in embodiments of the present invention, for details, reference can be made in embodiment as Figure 4-Figure 7 Associated description.
Obviously, the above embodiments are merely examples for clarifying the description, and is not intended to limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And the obvious variation thus extended out or Among changing still in the protection domain of the invention.

Claims (10)

1. a kind of power emergency based on scene structure drills deduction system, which is characterized in that including:Scene library model construction mould Block (1), rehearsal data processing module (2), interactive module (3), scheduling of resource module (4), scene rehearsal module (5) and rehearsal are commented Estimate module (6), wherein,
Scene library model construction module (1) is for according to natural calamity information, power grid accident information and emergency preplan structure Scene library model;
The rehearsal data processing module (2) is for according to scene library model, generation rehearsal script and the rehearsal script Corresponding standard rehearsal by the rehearsal script as a result, and be sent to the interactive module (3);
The interactive module (3) by the rehearsal script for being sent to user, and obtain counter-measure input by user, by institute It states counter-measure and is sent to the scene rehearsal module (5);
The scheduling of resource module (4) is for according to the counter-measure, carrying out corresponding emergency resources in emergent resources bank Setting, and emergency resources setting information is sent to the scene rehearsal module (5);
The scene rehearsal module (5) is for according to the counter-measure and the emergency resources setting information, generation rehearsal day Will and rehearsal result;
The rehearsal evaluation module (6) is for the rehearsal result and standard rehearsal result to be compared, generation rehearsal Assessment result.
2. the power emergency according to claim 1 based on scene structure drills deduction system, which is characterized in that the feelings Scape library model construction module (1) includes:
Event scenario models structure submodule (11), for according to the natural calamity information and the power grid accident information architecture Event scenario models;
Task Circumstance model construction submodule (12), for building Task Circumstance model according to the emergency preplan.
3. the power emergency according to claim 1 based on scene structure drills deduction system, which is characterized in that described to drill Practice data processing module (2) to be additionally operable to:
Secondary derivative accident information is generated, and according to described secondary according to the natural calamity information and the power grid accident information Derivative accident information updates the rehearsal script.
4. the power emergency according to claim 3 based on scene structure drills deduction system, which is characterized in that also wraps It includes:
Scene library model modification module (7), for according to the rehearsal script and the counter-measure, updating scene library mould Type.
5. a kind of power emergency based on scene structure drills deduction method, which is characterized in that including:
Scene library model is built according to natural calamity information, power grid accident information and emergency preplan;
According to scene library model, generation rehearsal script and the corresponding standard rehearsal result of the rehearsal script;
The rehearsal script is sent to user, and obtain the counter-measure input by user;
According to the counter-measure, corresponding emergency resources in emergent resources bank are configured, generation emergency resources setting letter Breath;
According to the counter-measure and the emergency resources setting information, generation rehearsal daily record and rehearsal result;
The rehearsal result and standard rehearsal result are compared, generation rehearsal assessment result.
6. the power emergency according to claim 5 based on scene structure drills deduction method, which is characterized in that described Scene library model is built according to natural calamity information, power grid accident information and emergency preplan, including:
According to the natural calamity information and the power grid accident information architecture event scenario models;
Task Circumstance model is built according to the emergency preplan.
7. the power emergency according to claim 5 based on scene structure drills deduction method, which is characterized in that described According to scene library model, generation rehearsal script and the corresponding standard rehearsal result of the rehearsal script further include:
Secondary derivative accident information is generated, and according to described secondary according to the natural calamity information and the power grid accident information Derivative accident information updates the rehearsal script.
8. the power emergency according to claim 7 based on scene structure drills deduction method, which is characterized in that also wraps It includes:
According to the rehearsal script and the counter-measure, scene library model is updated.
9. a kind of non-transient computer readable storage medium storing program for executing, which is characterized in that the non-transient computer readable storage medium storing program for executing is deposited Store up computer instruction, when the computer instruction is executed by processor realize as described in any one of claim 5-8 based on The power emergency rehearsal deduction method of scene structure.
10. a kind of electronic equipment, which is characterized in that including:
At least one processor;And
The memory being connect at least one processor communication;Wherein, be stored with can be by described at least one for the memory The instruction that a processor performs, described instruction is performed by least one processor, so that at least one processor is held Power emergency based on scene structure of the row as described in any one of claim 5-8 drills deduction method.
CN201711429905.0A 2017-12-26 2017-12-26 Electric power emergency drilling deduction system based on scene construction Active CN108230805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711429905.0A CN108230805B (en) 2017-12-26 2017-12-26 Electric power emergency drilling deduction system based on scene construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711429905.0A CN108230805B (en) 2017-12-26 2017-12-26 Electric power emergency drilling deduction system based on scene construction

Publications (2)

Publication Number Publication Date
CN108230805A true CN108230805A (en) 2018-06-29
CN108230805B CN108230805B (en) 2020-05-08

Family

ID=62648733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711429905.0A Active CN108230805B (en) 2017-12-26 2017-12-26 Electric power emergency drilling deduction system based on scene construction

Country Status (1)

Country Link
CN (1) CN108230805B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109741208A (en) * 2018-12-14 2019-05-10 广州供电局有限公司 Large area blackout emergency first-aid repair scheme determines method and apparatus
CN111061580A (en) * 2019-12-18 2020-04-24 中信百信银行股份有限公司 Computer system emergency plan drilling method, server and system
CN111627278A (en) * 2020-04-30 2020-09-04 咸亨国际应急科技研究院(北京)有限公司 Drill training system, method and equipment
CN111985746A (en) * 2019-05-22 2020-11-24 中国石油天然气股份有限公司 Emergency drilling evaluation method and device for refining enterprise
CN112418576A (en) * 2019-08-22 2021-02-26 中国石油天然气股份有限公司 Method and system for petrochemical enterprise emergency situation construction and emergency evaluation
CN112614394A (en) * 2020-12-15 2021-04-06 中铁第四勘察设计院集团有限公司 BIM-based subway emergency training drilling system and method
CN112817571A (en) * 2021-02-24 2021-05-18 复旦大学 Man-machine-object fusion application modeling method based on scene storyboard
CN113066332A (en) * 2021-03-23 2021-07-02 广东电网有限责任公司 Low-voltage line connection training method and system
CN113095977A (en) * 2021-02-22 2021-07-09 中铁信(北京)网络技术研究院有限公司 Immersive emergency drilling and automatic evaluation method and system for rail transit station
CN113223357A (en) * 2021-03-31 2021-08-06 广东工业大学 Emergency rescue drilling system and method
CN113379326A (en) * 2020-07-08 2021-09-10 贵州电网有限责任公司 Power grid disaster emergency drilling management system based on deep neural network
CN116629628A (en) * 2023-04-26 2023-08-22 中国安全生产科学研究院 Comprehensive evaluation method for disaster prevention and reduction and accident emergency capability of regional space in rural area

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101515309A (en) * 2009-04-07 2009-08-26 华中科技大学 City emergency evacuation simulation system based on multi intelligent agent
CN101799999A (en) * 2010-04-06 2010-08-11 中国石油化工股份有限公司 Accident emergency drilling system and method
JP4921904B2 (en) * 2006-09-21 2012-04-25 株式会社東芝 Plant disaster drill
CN102722548A (en) * 2012-05-25 2012-10-10 中国电力科学研究院 Distributed type remote graphics browsing method based on province and local combination type anti-accident maneuver
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN104463695A (en) * 2014-11-25 2015-03-25 国家电网公司 Dispatching anti-accident simulating system for electric power system and method thereof
CN105023200A (en) * 2015-08-04 2015-11-04 中国南方电网有限责任公司 Power emergency drilling system and emergency drilling method thereof
CN105787611A (en) * 2014-12-22 2016-07-20 国网河南省电力公司南阳供电公司 Novel power emergency maneuver disposing method and system
CN106682246A (en) * 2015-11-05 2017-05-17 国家电网公司 Graphical design platform for power grid emergency training schemes
CN106780116A (en) * 2016-12-01 2017-05-31 全球能源互联网研究院 The construction method of power emergency drilling method, device and its scenario models, device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4921904B2 (en) * 2006-09-21 2012-04-25 株式会社東芝 Plant disaster drill
CN101515309A (en) * 2009-04-07 2009-08-26 华中科技大学 City emergency evacuation simulation system based on multi intelligent agent
CN101799999A (en) * 2010-04-06 2010-08-11 中国石油化工股份有限公司 Accident emergency drilling system and method
CN102722548A (en) * 2012-05-25 2012-10-10 中国电力科学研究院 Distributed type remote graphics browsing method based on province and local combination type anti-accident maneuver
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN104463695A (en) * 2014-11-25 2015-03-25 国家电网公司 Dispatching anti-accident simulating system for electric power system and method thereof
CN105787611A (en) * 2014-12-22 2016-07-20 国网河南省电力公司南阳供电公司 Novel power emergency maneuver disposing method and system
CN105023200A (en) * 2015-08-04 2015-11-04 中国南方电网有限责任公司 Power emergency drilling system and emergency drilling method thereof
CN106682246A (en) * 2015-11-05 2017-05-17 国家电网公司 Graphical design platform for power grid emergency training schemes
CN106780116A (en) * 2016-12-01 2017-05-31 全球能源互联网研究院 The construction method of power emergency drilling method, device and its scenario models, device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109741208A (en) * 2018-12-14 2019-05-10 广州供电局有限公司 Large area blackout emergency first-aid repair scheme determines method and apparatus
CN111985746A (en) * 2019-05-22 2020-11-24 中国石油天然气股份有限公司 Emergency drilling evaluation method and device for refining enterprise
CN112418576A (en) * 2019-08-22 2021-02-26 中国石油天然气股份有限公司 Method and system for petrochemical enterprise emergency situation construction and emergency evaluation
CN111061580A (en) * 2019-12-18 2020-04-24 中信百信银行股份有限公司 Computer system emergency plan drilling method, server and system
CN111061580B (en) * 2019-12-18 2023-09-08 中信百信银行股份有限公司 Computer system emergency plan exercise method, server and system
CN111627278A (en) * 2020-04-30 2020-09-04 咸亨国际应急科技研究院(北京)有限公司 Drill training system, method and equipment
CN113379326A (en) * 2020-07-08 2021-09-10 贵州电网有限责任公司 Power grid disaster emergency drilling management system based on deep neural network
CN113379326B (en) * 2020-07-08 2022-12-20 贵州电网有限责任公司 Power grid disaster emergency drilling management system based on deep neural network
CN112614394A (en) * 2020-12-15 2021-04-06 中铁第四勘察设计院集团有限公司 BIM-based subway emergency training drilling system and method
CN113095977A (en) * 2021-02-22 2021-07-09 中铁信(北京)网络技术研究院有限公司 Immersive emergency drilling and automatic evaluation method and system for rail transit station
CN112817571A (en) * 2021-02-24 2021-05-18 复旦大学 Man-machine-object fusion application modeling method based on scene storyboard
CN112817571B (en) * 2021-02-24 2023-06-30 复旦大学 Man-machine object fusion application modeling method based on scene storyboard
CN113066332A (en) * 2021-03-23 2021-07-02 广东电网有限责任公司 Low-voltage line connection training method and system
CN113223357A (en) * 2021-03-31 2021-08-06 广东工业大学 Emergency rescue drilling system and method
CN116629628A (en) * 2023-04-26 2023-08-22 中国安全生产科学研究院 Comprehensive evaluation method for disaster prevention and reduction and accident emergency capability of regional space in rural area

Also Published As

Publication number Publication date
CN108230805B (en) 2020-05-08

Similar Documents

Publication Publication Date Title
CN108230805A (en) A kind of power emergency based on scene structure drills deduction system
Linkov et al. Tiered approach to resilience assessment
Boin et al. Designing resilient institutions for transboundary crisis management: A time for public administration
Jensen et al. The U nited S tates' Experience with the Incident Command System: What We Think We Know and What We Need to Know More About
US10803766B1 (en) Modular training of network-based training exercises
Berardo et al. Focusing events and changes in ecologies of policy games: evidence from the Paraná River Delta
Pedercini et al. Integrated simulation for the 2030 agenda
KR102124879B1 (en) Trainning system for railway power supply
Rasch et al. Exploring wildfire-prone community trust in wildfire management agencies
Thorvaldsdóttir et al. Disaster-function management: Basic principles
Medina et al. The potential of agent based models for testing city evacuation strategies under a flood event
Hellar et al. NeoCITIES: A simulated command and control task environment for experimental research
Low et al. Enterprise risk management and the performance of local contractors in Singapore
KR102589517B1 (en) Simulation training and evaluation system for fire fighting activity on-scene command system
Labaka et al. Implementation methodology of the resilience framework
de Treville et al. Applying operations management logic and tools to save lives: A case study of the World Health Organization's global drug facility
Noran Towards a collaborative network paradigm for emergency services
Smith et al. Disaster and exercise performance information collection tool: Capturing observations in four minutes or less
Rosqvist et al. A reference decision model of first responders' decision-making
Holand et al. A structured and dynamic model for emergency management exercises
Reissberg The Advanced Syntegration as the Most Effective and Efficient Tool for Large‐Scale Disaster Response Coordination
CN108833454B (en) Teaching Internet of things training system and method
Tran et al. Misinformation in crises: A conceptual framework for examining human-machine interactions
Maceda et al. System Design for Disaster Risk Damage Assessment
KR102672179B1 (en) System for Providing training contents to strengthen response capabilities for fire fighting activity on-scene commander

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 102209 18 Riverside Avenue, Changping District science and Technology City, Beijing

Applicant after: Global energy Internet Institute, Inc.

Applicant after: State Grid Corporation of China

Address before: 102209 18 Riverside Avenue, Changping District science and Technology City, Beijing

Applicant before: Global energy Internet Institute, Inc.

Applicant before: State Grid Corporation of China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant