CN109741208A - Large area blackout emergency first-aid repair scheme determines method and apparatus - Google Patents
Large area blackout emergency first-aid repair scheme determines method and apparatus Download PDFInfo
- Publication number
- CN109741208A CN109741208A CN201811531188.7A CN201811531188A CN109741208A CN 109741208 A CN109741208 A CN 109741208A CN 201811531188 A CN201811531188 A CN 201811531188A CN 109741208 A CN109741208 A CN 109741208A
- Authority
- CN
- China
- Prior art keywords
- information
- equipment
- resource
- power outage
- numerical map
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
This application involves a kind of large area blackout emergency first-aid repair schemes to determine method and apparatus.The described method includes: obtaining the faulty equipment information of power outage, faulty equipment information includes: location information and event of failure information of the faulty equipment in numerical map, according to location information and event of failure information, matching obtains pre-stored fault case, according to fault case, the resource allocation information for determining power outage repairing, determines power outage Rush Repair Scheme according to resource allocation information.It can be improved the efficiency of power outage repairing using this method.
Description
Technical field
This application involves power grid maintenance technical fields, true more particularly to a kind of large area blackout emergency first-aid repair scheme
Determine method, apparatus, computer equipment and storage medium.
Background technique
As electricity consumption is more and more important in daily production and life, large-area power-cuts caused by frequent natural calamity generation
Event can destroy the production plan of relevant enterprise, cause the termination or delay of various occasions, the serious influence people are just
Often life, in order to improve power supply service quality, therefore, when there is power-off fault, how to improve repairing speed is asking for research
Topic.In traditional technology, when detecting power outage, it is first determined the reason of power failure, then rule of thumb to power-off event into
Row processing possibly can not adapt to using artificial experience the power outage of wide variety however, power outage is varied,
To cause the inefficiency repaired that has a power failure.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide a kind of power failure first-aid repair efficiency low problem of being able to solve
Large area blackout emergency first-aid repair scheme determines method, apparatus, computer equipment and storage medium.
A kind of large area blackout emergency first-aid repair scheme determines method, which comprises
Obtain the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment in numerical map
Location information and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, according to the resource allocation information
Determine power outage Rush Repair Scheme, the power outage Rush Repair Scheme, which is used to indicate, carries out power outage repairing.
In one of the embodiments, further include: obtain initial bit confidence of the resource to be deployed in the numerical map
Breath;Receive pre-set simulated failure example;It include simulated failure equipment and the simulation in the simulated failure example
The corresponding analog position information of faulty equipment and simulated failure event information;According to the analog position information, in the number
The simulated failure equipment is shown in map;By multiple pre-set allotment strategies to be deployed in the numerical map
Resource is deployed, and records the tune that the resource to be deployed under each allotment strategy is moved to the simulated failure equipment
With time and the corresponding maintenance time of each simulated failure event information;When simulated failures all in the numerical map are set
For when being reached by touching, according to the allotment time and the maintenance time, it is time-consuming to count the corresponding repairing of the allotment strategy;Choosing
Select the time-consuming least allotment of the repairing it is tactful carried out with the simulated failure example it is corresponding, and by the simulated failure thing
Example is converted into the fault case.
In one of the embodiments, further include: obtain motor-driven category of the resource to be deployed in the numerical map
Property information;The motor-driven attribute information is the distance that resource to be deployed described in the unit time moves in the numerical map;Root
According to the initial position message and the analog position information, the resource to be deployed and the simulated failure equipment are calculated in institute
State the range information in numerical map;According to the range information and the motor-driven attribute information, it is calculated described to be deployed
Resource is moved to the allotment time of the simulated failure equipment.
In one of the embodiments, further include: obtain action category of the resource to be deployed in the numerical map
Property information;The action attributes information be resource to be deployed described in the unit time simulation is handled in the numerical map therefore
Hinder the progress of event information;According to the action attributes information and the simulated failure event of the resource to be deployed, obtain
The corresponding maintenance time of each simulated failure event information.
In one of the embodiments, further include: obtain the Weather information and the initial position of the numerical map
The corresponding terrain information of information;According to the Weather information and the terrain information, pre-set factor list is inquired, is obtained
Factor value;The factor list be using the Weather information be record, the terrain information as field, factor value be value foundation
's;According to the action attributes information and the factor value, the practical action attribute information of the resource to be deployed is obtained;According to
The practical action attribute information of the resource to be deployed and the simulated failure event obtain each simulated failure event letter
Cease corresponding maintenance time.
In one of the embodiments, further include: define equipment in the numerical map in advance in each power outage
When display status information;When detecting the display status information of equipment described in the numerical map;According to described aobvious
Show that status information determines the event of failure information, and the position according to the equipment in the numerical map, determines institute
State location information.
In one of the embodiments, further include: the numerical map is divided into multiple outage management regions;When getting
When the faulty equipment information of power outage, the outage management region where the faulty equipment is determined;According to the position
Information and the fault time information, matching obtain the corresponding area fault example in the outage management region;According to the area
Domain fault case determines the region resource deployment information of power outage repairing, according to the area out of described outage management region
Domain resource allocation information carries out power outage repairing.
A kind of large area blackout emergency first-aid repair scheme determining device, described device include:
Event obtains module, for obtaining the faulty equipment information of power outage;The faulty equipment information includes: failure
Location information and event of failure information of the equipment in numerical map;
Matching module, for the event of failure information, matching according to the positional information and obtaining pre-stored event
Hinder example;
Dispatching module is robbed, for the resource allocation information of power outage repairing being determined, according to described according to the fault case
Resource allocation information determines that power outage Rush Repair Scheme, the power outage Rush Repair Scheme are used to indicate progress power outage and rob
It repairs.
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage
Computer program, the processor perform the steps of when executing the computer program
Obtain the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment in numerical map
Location information and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, according to the resource allocation information
Carry out power outage repairing.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
It is performed the steps of when row
Obtain the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment in numerical map
Location information and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, according to the resource allocation information
Carry out power outage repairing.
Above-mentioned large area blackout emergency first-aid repair scheme determines method, apparatus, computer equipment and storage medium, passes through
The faulty equipment information of power outage is obtained in numerical map, thus, according to the location information and event of failure of faulty equipment
Information is matched from pre-stored fault case, obtains the corresponding fault case of this power outage, thus according to event
Hinder example, determine the resource allocation information of power outage repairing, so as to which in the first time that power outage occurs, determination stops
Resource required for electricity, convenient for being deployed to resource, in addition, the speed of allotment is improved, so as to root using numerical map
When quickly determining power outage Rush Repair Scheme according to resource allocation information, to carry out power outage according to power outage Rush Repair Scheme
Repairing improves the efficiency of power outage repairing.
Detailed description of the invention
Fig. 1 is the flow diagram that large area blackout emergency first-aid repair scheme determines method in one embodiment;
Fig. 2 is the flow diagram that fault case mode is generated in one embodiment;
Fig. 3 is the flow diagram that allotment time step is calculated in one embodiment;
Fig. 4 is the flow diagram that maintenance time step is calculated in one embodiment;
Fig. 5 is the flow diagram that maintenance time step is calculated in another embodiment;
Fig. 6 is the structural block diagram of large area blackout emergency first-aid repair scheme determining device in one embodiment;
Fig. 7 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not
For limiting the application.
Large area blackout emergency first-aid repair scheme provided by the present application determines method.This method applies in terminal, eventually
End can be personal computer, laptop etc..
The corresponding application program of numerical map can be run in terminal, include that the power grid of map area is set in numerical map
Standby information, so as to when power outage occurs, determine the location information and fault time information of faulty equipment.
It, can be with according to fault case in addition, terminal after detecting power outage, can be matched to corresponding fault case
The resource allocation information of power outage repairing is determined, to complete power outage repairing by the allotment of terminal.
In one embodiment, as shown in Figure 1, providing a kind of large area blackout emergency first-aid repair scheme determination side
Method is applied to be illustrated for terminal in this way, comprising the following steps:
Step 102, the faulty equipment information of power outage is obtained.
Wherein, power outage is to cause network operation abnormal due to artificial or natural calamity, so as to cause region power failure
Accident, power outage have paroxysmal feature, therefore, it is difficult to be prevented.
Faulty equipment information is the set of equipment impacted in this power outage, includes numerical map in terminal, can
In equipment fault, to get location information and event of failure thin information of the faulty equipment in numerical map.
Specifically, when power outage occurs detection can be returned to by field detecting device or power network switch equipment
Information will test information and be converted into event of failure information, be then shown in numerical map after terminal receives detection information.With
This, after the accident of breaking down, by numerical map, available location information and event of failure information to faulty equipment.
Step 104, according to location information and event of failure information, matching obtains pre-stored fault case.
Wherein, fault case is stored in terminal, described in fault case a power outage from power failure cause, stop
The overall process of electric equipment, power failure position and power failure processing mode therefore, can be according to event when a power-off fault occurs
The location information and event of failure information for hindering equipment, are matched to corresponding fault case.
Specifically, in the terminal, can be simulated to power outage, equipment that physical simulation power outage influences and
Then the specific cause of accident of equipment simulates the human resources and maintenance of equipment resource of power supply interrupted district, complete by Resource allocation and smoothing
Cheng Yici interruption maintenance.According to the simulation process of power outage, a fault case can be saved as.
Step 106, according to fault case, the resource allocation information of power outage repairing is determined, according to resource allocation information
Determine power outage Rush Repair Scheme.
Power outage Rush Repair Scheme is used to indicate carry out power outage, i.e. Field Force can be according to power outage repairing side
Case is rapidly performed by power outage repairing.
Due to describing the overall process of power-off fault maintenance in fault case, can stop to determining in fault case
Resource allocation information when electrification is repaired only needs to determine according to resource allocation information that when being overhauled, power outage is repaired
Scheme.
Above-mentioned large area blackout emergency first-aid repair scheme determines method, by obtaining power outage in numerical map
Faulty equipment information, thus, according to the location information of faulty equipment and event of failure information, from pre-stored fault case
It is matched, obtains the corresponding fault case of this power outage, to determine the money of power outage repairing according to fault case
Source deployment information, so as to occur power outage first time, determine have a power failure required for resource, convenient for resource into
Row allotment has a power failure in addition, improving the speed of allotment using numerical map so as to quickly be determined according to resource allocation information
When accident maintenance scheme, to carry out power outage repairing according to power outage Rush Repair Scheme, power outage repairing is improved
Efficiency.
In one embodiment, specific to walk as shown in Fig. 2, providing a kind of schematic flow chart for generating fault case mode
It is rapid as follows:
Step 202, initial position message of the resource to be deployed in the numerical map is obtained.
Wherein, initial position message refers to that resource to be deployed is initial in numerical map when carrying out power-off event simulation
Position.Resource to be deployed can be randomly assigned in numerical map, can concentrate on a certain coordinate in numerical map.
Step 204, pre-set simulated failure example is received.
It include simulated failure equipment and the corresponding analog position information of simulated failure equipment and mould in simulated failure example
Quasi- event of failure information.When simulating a fault case, position and the failure cause of faulty equipment can be shown in numerical map,
The position of faulty equipment is obtained according to analog position information, and the failure cause of faulty equipment is according to simulated failure event information.
Step 206, according to analog position information, the simulated failure equipment is shown in numerical map.
When generating a simulated failure example in terminal, simulated failure example is parsed, simulated failure is obtained and sets
Standby analog position information shows simulated failure equipment in numerical map then according to analog position information.
Step 208, the resource to be deployed in numerical map is deployed by multiple pre-set allotment strategies, and
Record resource to be deployed under each allotment strategy be moved to simulated failure equipment the allotment time and each simulated failure event
The corresponding maintenance time of information.
Step 210, when simulated failure equipment all in numerical map are reached by touching, when according to allotment time and maintenance
Between, the corresponding repairing of statistics allotment strategy is time-consuming.
Wherein, simulated failure equipment is reached by touching refers to that maintenance is completed in the simulated failure equipment.
Step 212, the time-consuming least allotment of selection repairing it is tactful carried out with simulated failure example it is corresponding, and by simulated failure
Example is converted into fault case.
In the present embodiment, a kind of mode for generating fault case is provided, it is available by the generating process of fault case
The optimal allotment strategy opposite with fault case.Therefore, it when actually occurring power-off event, can be carried out according to allotment strategy
Resource allocation and smoothing feeds back power-off event with first time, and completes corresponding power-off event maintenance, stops to improve
The efficiency of electric event maintenance.
In another embodiment, as shown in figure 3, providing a kind of schematic flow chart for calculating allotment time step, specifically
Steps are as follows:
Step 302, motor-driven attribute information of the resource to be deployed in numerical map is obtained.
Wherein, motor-driven attribute information is the distance that unit time resource to be deployed moves in numerical map.
Step 304, it according to initial position message and analog position information, calculates resource and simulated failure equipment to be deployed and exists
Range information in numerical map.
Step 306, it according to range information and motor-driven attribute information, resource to be deployed is calculated is moved to simulated failure and set
The standby allotment time.
In the present embodiment, using numerical map, resource to be deployed and simulated failure equipment can be calculated in numerical map
In distance, therefore, according to distance may further calculate allotment the time.
For step 304, in one embodiment, the route planning function of numerical map can use, with initial bit confidence
Breath is starting point, and analog position information is terminal, is planned route, to select apart from shortest route, the distance for away from
From information.
In one embodiment, specific to walk as shown in figure 4, providing a kind of schematic flow chart for calculating maintenance time step
It is rapid as follows:
Step 402, action attributes information of the resource to be deployed in numerical map is obtained.
Wherein, action attributes information is that unit time resource to be deployed handles simulated failure event information in numerical map
Progress.The initial progress of a specific simulated failure equipment is 0%, when the progress of simulated failure equipment reaches 100%
Indicate that the simulated failure overhaul of the equipments finishes.
In addition, tiring out when multiple resources to be deployed handle simulated failure equipment simultaneously using by multiple action attributes information
The mode added, so that the inspection speed of simulated failure equipment be greatly improved.
Step 404, it according to the action attributes information of resource to be deployed and simulated failure event, obtains each simulated failure and sets
Standby corresponding maintenance time.
In the present embodiment, by carrying out attribute setting for each resource to be deployed, so as to simulation each simulation event
The maintenance time of barrier equipment can optimize the maintenance time of each simulated failure equipment according to the different allotment of resource to be deployed.
In an embodiment, a variety of weather conditions and orographic factor can also be set in numerical map, therefore each calculating
When the corresponding maintenance time of a simulated failure equipment, pre-set factor can be inquired according to Weather information and terrain information
List, obtains factor value, factor list be record, terrain information using Weather information as field, factor value be that value is established.So
Afterwards according to action attributes information and factor value, the practical action attribute information of resource to be deployed is obtained, then according to money to be deployed
The practical action attribute information in source and simulated failure time obtain the corresponding maintenance time of each simulated failure time device.
In another embodiment, weather conditions include: fine day, rainy day and greasy weather etc., and terrain information includes: level land, natural pond
Pool, river and mountainous region etc..So, factor list can be as shown in table 1:
Table 1
Wherein, α11、α12。。。α34It is factor value.
Therefore, after obtaining Weather information and terrain information, factor list in inquiry table 1 is available corresponding
Factor value.
In a specific embodiment, as shown in figure 5, ruling function f can be arranged in the terminal, according to ruling function f
Realize that the step of maintenance time calculates includes:
Step 502, judge whether resource to be deployed reaches simulated failure device location MAP.P.
Step 504, if it is not, going to step 502, if jumping to step 506.
Step 506, weather locating for terrain information Map.L and quasi- faulty equipment according to locating for simulated failure equipment is believed
Map.W is ceased, factor value α is inquired.
Step 508, maintenance time is calculated according to ruling function f (A, α).
Wherein, A indicates the action attributes information of resource to be deployed.
In the present embodiment, by the way that ruling function is arranged, the landform of simulated failure equipment in acquisition numerical map can be passed through
Information and Weather information carry out real-time update to the ability to act value of resource to be allocated, so as to accurately calculate simulation
The maintenance time of faulty equipment.
In one embodiment, numerical map can be shown in the display page of terminal, also, a set is determined in numerical map
The standby display status information in each power outage, then in the terminal, can be believed according to the display state in numerical map
Breath, determines event of failure information, and the position according to equipment in numerical map, determines location information.
In another embodiment, different display status informations can be indicated using different colours, such as be stopped short circuit occurs
When electric, the equipment in numerical map is shown in red, when hanger, which occurs, causes equipment to have a power failure, shows in numerical map
Therefore by visualization display numerical map, the state of power outage can be intuitively fed back, consequently facilitating as early as possible for yellow
It makes a response to power outage.
In addition, in one embodiment, numerical map can also be divided into multiple outage management regions, in outage management region
Including resource to be deployed in area's device within the domain and region, therefore, when the faulty equipment for getting power outage using numerical map
When information, the outage management region where faulty equipment is determined, then according to location information and fault time information, matching is obtained
The corresponding area fault example in outage management region determines out of outage management region and has a power failure then according to area fault example
The region resource deployment information of accident maintenance carries out power outage repairing according to region resource deployment information.
In the present embodiment, numerical map is divided into multiple zonules, facilitates in region and manages, avoid to be deployed in region
Resource is shifted on a large scale, save the cost.
It should be understood that although each step in the flow chart of Fig. 1-5 is successively shown according to the instruction of arrow,
These steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps
Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 1-5
Part steps may include that perhaps these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps
Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively
It carries out, but can be at least part of the sub-step or stage of other steps or other steps in turn or alternately
It executes.
In one embodiment, as shown in fig. 6, providing a kind of determining dress of large area blackout emergency first-aid repair scheme
It sets, comprising: event obtains module 602, matching module 604 and robs dispatching module 606, in which:
Event obtains module 602, for obtaining the faulty equipment information of power outage;The faulty equipment information includes:
Location information and event of failure information of the faulty equipment in numerical map;
Matching module 604, for the event of failure information, matching to obtain pre-stored according to the positional information
Fault case;
Dispatching module 606 is robbed, for determining the resource allocation information of power outage repairing according to the fault case, according to
The resource allocation information determines that power outage Rush Repair Scheme, the power outage Rush Repair Scheme are used to indicate carry out power outage
Repairing.
In one of the embodiments, further include example generation module, for obtain resource to be deployed it is described digitally
Initial position message in figure;Receive pre-set simulated failure example;It include simulated failure in the simulated failure example
Equipment and the corresponding analog position information of the simulated failure equipment and simulated failure event information;According to the analog position
Information shows the simulated failure equipment in the numerical map;By multiple pre-set allotment strategies to the number
Resource to be deployed in word map is deployed, and record the resource to be deployed under each allotment strategy be moved to it is described
The allotment time of simulated failure equipment and the corresponding maintenance time of each simulated failure equipment;When institute in the numerical map
When having simulated failure equipment to be reached by touching, according to the allotment time and the maintenance time, it is corresponding to count the allotment strategy
Repairing it is time-consuming;The time-consuming least allotment strategy of the repairing is selected to carry out with the simulated failure example corresponding, and will
The simulated failure example is converted into the fault case.
Example generation module is also used to obtain the resource to be deployed in the numerical map in one of the embodiments,
In motor-driven attribute information;The motor-driven attribute information is that resource to be deployed described in the unit time moves in the numerical map
Distance;According to the initial position message and the analog position information, the resource to be deployed and simulation event are calculated
Hinder range information of the equipment in the numerical map;According to the range information and the motor-driven attribute information, it is calculated
The resource to be deployed is moved to the allotment time of the simulated failure equipment.
Example generation module is also used to obtain the resource to be deployed in the numerical map in one of the embodiments,
In action attributes information;The action attributes information is that resource to be deployed described in the unit time is handled in the numerical map
The progress of the simulated failure event information;According to the action attributes information of the resource to be deployed and the simulated failure
Event obtains the corresponding maintenance time of each simulated failure equipment.
Example generation module is also used to obtain Weather information and the institute of the numerical map in one of the embodiments,
State the corresponding terrain information of initial position message;According to the Weather information and the terrain information, inquire it is pre-set because
Plain list, obtains factor value;It is record, the terrain information as field, factor that the factor list, which is using the Weather information,
Value is established for value;According to the action attributes information and the factor value, the practical action category of the resource to be deployed is obtained
Property information;According to the practical action attribute information of the resource to be deployed and the simulated failure event, each mould is obtained
The quasi- corresponding maintenance time of faulty equipment.
Event obtains module 602 in one of the embodiments, is also used to define equipment in the numerical map in advance
Display status information in each power outage;Detect the display status information of equipment described in the numerical map
When;The event of failure information is determined according to the display status information, and according to the equipment in the numerical map
Position, determine the location information.
District management module in one of the embodiments, for the numerical map to be divided into multiple outage management areas
Domain;When getting the faulty equipment information of power outage, the outage management region where the faulty equipment is determined;Root
According to the location information and the fault time information, matching obtains the corresponding area fault example in the outage management region;
According to the area fault example, the region resource deployment information of power outage repairing is determined out of described outage management region,
Power outage repairing is carried out according to the region resource deployment information.
Specific restriction about large area blackout emergency first-aid repair scheme determining device may refer to above for big
Area power outage emergency first-aid repair scheme determines the restriction of method, and details are not described herein.Above-mentioned large area blackout emergency is robbed
Repairing the modules in scheme determining device can realize fully or partially through software, hardware and combinations thereof.Above-mentioned each module
It can be embedded in the form of hardware or independently of in the processor in computer equipment, computer can also be stored in a software form
In memory in equipment, the corresponding operation of the above modules is executed in order to which processor calls.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction
Composition can be as shown in Figure 7.The computer equipment include by system bus connect processor, memory, network interface and
Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment
Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data
Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating
The database of machine equipment is for storing fault case data.The network interface of the computer equipment is used to pass through with external terminal
Network connection communication.To realize that a kind of large area blackout emergency first-aid repair scheme is true when the computer program is executed by processor
Determine method.
It will be understood by those skilled in the art that structure shown in Fig. 7, only part relevant to application scheme is tied
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor perform the steps of when executing computer program
Obtain the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment in numerical map
Location information and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, according to the resource allocation information
Determine power outage Rush Repair Scheme, the power outage Rush Repair Scheme, which is used to indicate, carries out power outage repairing.
In one embodiment, acquisition resource to be deployed is also performed the steps of when processor executes computer program to exist
Initial position message in the numerical map;Receive pre-set simulated failure example;It is wrapped in the simulated failure example
Include simulated failure equipment and the corresponding analog position information of the simulated failure equipment and simulated failure event information;According to institute
Analog position information is stated, the simulated failure equipment is shown in the numerical map;Pass through multiple pre-set allotment plans
Slightly the resource to be deployed in the numerical map is deployed, and records the resource to be deployed under each allotment strategy
It is moved to allotment time and the corresponding maintenance time of each simulated failure equipment of the simulated failure equipment;When the number
When all simulated failure equipment are reached by touching in word map, according to the allotment time and the maintenance time, the tune is counted
It is time-consuming with the corresponding repairing of strategy;The time-consuming least allotment strategy of the repairing is selected to carry out with the simulated failure example
It is corresponding, and the fault case is converted by the simulated failure example.
In one embodiment, it is also performed the steps of when processor executes computer program and obtains the money to be deployed
Motor-driven attribute information of the source in the numerical map;The motor-driven attribute information is resource to be deployed described in the unit time in institute
State the distance moved in numerical map;According to the initial position message and the analog position information, calculate described to be deployed
The range information of resource and the simulated failure equipment in the numerical map;According to the range information and the motor-driven category
Property information, is calculated the allotment time that the resource to be deployed is moved to the simulated failure equipment.
In one embodiment, it is also performed the steps of when processor executes computer program and obtains the money to be deployed
Action attributes information of the source in the numerical map;The action attributes information is resource to be deployed described in the unit time in institute
State the progress that the simulated failure event information is handled in numerical map;Believed according to the action attributes of the resource to be deployed
Breath and the simulated failure event, obtain the corresponding maintenance time of each simulated failure equipment.
In one embodiment, it is also performed the steps of when processor executes computer program and obtains the numerical map
Weather information and the corresponding terrain information of the initial position message;According to the Weather information and the terrain information,
Pre-set factor list is inquired, factor value is obtained;The factor list is with the Weather information for record, the landform
Information is field, factor value is what value was established;According to the action attributes information and the factor value, the money to be deployed is obtained
The practical action attribute information in source;According to the practical action attribute information of the resource to be deployed and the simulated failure thing
Part obtains the corresponding maintenance time of each simulated failure equipment.
In one embodiment, processor execute computer program when also perform the steps of in advance it is described digitally
Display status information of the equipment in each power outage is defined in figure;Detect the described of equipment described in the numerical map
When display status information;The event of failure information is determined according to the display status information, and according to the equipment in institute
The position in numerical map is stated, determines the location information.
In one embodiment, it is also performed the steps of when processor executes computer program by the numerical map point
For multiple outage management regions;When getting the faulty equipment information of power outage, the institute where the faulty equipment is determined
State outage management region;According to the positional information with the fault time information, matches and obtain the outage management region pair
The area fault example answered;According to the area fault example, power outage repairing is determined out of described outage management region
Region resource deployment information carries out power outage repairing according to the region resource deployment information.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program performs the steps of when being executed by processor
Obtain the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment in numerical map
Location information and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, according to the resource allocation information
Determine power outage Rush Repair Scheme, the power outage Rush Repair Scheme, which is used to indicate, carries out power outage repairing.
In one embodiment, it is also performed the steps of when computer program is executed by processor and obtains resource to be deployed
Initial position message in the numerical map;Receive pre-set simulated failure example;In the simulated failure example
Including simulated failure equipment and the corresponding analog position information of the simulated failure equipment and simulated failure event information;According to
The analog position information shows the simulated failure equipment in the numerical map;Pass through multiple pre-set allotments
Strategy deploys the resource to be deployed in the numerical map, and records the money to be deployed under each allotment strategy
Source is moved to allotment time and the corresponding maintenance time of each simulated failure equipment of the simulated failure equipment;When described
When all simulated failure equipment are reached by touching in numerical map, according to the allotment time and the maintenance time, described in statistics
The corresponding repairing of allotment strategy is time-consuming;Select the time-consuming least allotment strategy of the repairing and the simulated failure example into
Row corresponds to, and converts the fault case for the simulated failure example.
In one embodiment, it is described to be deployed that acquisition is also performed the steps of when computer program is executed by processor
Motor-driven attribute information of the resource in the numerical map;The motor-driven attribute information is that resource to be deployed described in the unit time exists
The distance moved in the numerical map;According to the initial position message and the analog position information, calculate described wait adjust
Range information with resource and the simulated failure equipment in the numerical map;According to the range information and described motor-driven
The allotment time that the resource to be deployed is moved to the simulated failure equipment is calculated in attribute information.
In one embodiment, it is described to be deployed that acquisition is also performed the steps of when computer program is executed by processor
Action attributes information of the resource in the numerical map;The action attributes information is that resource to be deployed described in the unit time exists
The progress of the simulated failure event information is handled in the numerical map;According to the action attributes of the resource to be deployed
Information and the simulated failure event obtain the corresponding maintenance time of each simulated failure equipment.
In one embodiment, it is described digitally that acquisition is also performed the steps of when computer program is executed by processor
The Weather information of figure and the corresponding terrain information of the initial position message;Believed according to the Weather information and the landform
Breath, inquires pre-set factor list, obtains factor value;It is record that the factor list, which is with the Weather information, described
Terrain information is field, factor value is what value was established;According to the action attributes information and the factor value, obtain described wait adjust
Practical action attribute information with resource;According to the practical action attribute information of the resource to be deployed and simulation event
Barrier event obtains the corresponding maintenance time of each simulated failure equipment.
In one embodiment, it is also performed the steps of when computer program is executed by processor in advance in the number
Display status information of the equipment in each power outage is defined in map;Detect the institute of equipment described in the numerical map
When stating display status information;The event of failure information is determined according to the display status information, and is existed according to the equipment
Position in the numerical map determines the location information.
In one embodiment, it is also performed the steps of when computer program is executed by processor by the numerical map
It is divided into multiple outage management regions;When getting the faulty equipment information of power outage, where determining the faulty equipment
The outage management region;According to the positional information with the fault time information, matches and obtain the outage management region
Corresponding area fault example;According to the area fault example, power outage repairing is determined out of described outage management region
Region resource deployment information, according to the region resource deployment information carry out power outage repairing.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer
In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein,
To any reference of memory, storage, database or other media used in each embodiment provided herein,
Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing
Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application
Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.
Claims (10)
1. a kind of large area blackout emergency first-aid repair scheme determines method, which comprises
Obtain the faulty equipment information of power outage;The faulty equipment information includes: position of the faulty equipment in numerical map
Confidence breath and event of failure information;
According to the positional information with the event of failure information, matches and obtain pre-stored fault case;
According to the fault case, the resource allocation information of power outage repairing is determined, determined according to the resource allocation information
Power outage Rush Repair Scheme, the power outage Rush Repair Scheme, which is used to indicate, carries out power outage repairing.
2. large area blackout emergency first-aid repair scheme according to claim 1 determines method, which is characterized in that generate event
Hinder the mode of example, comprising:
Obtain initial position message of the resource to be deployed in the numerical map;
Receive pre-set simulated failure example;It include simulated failure equipment and the simulation in the simulated failure example
The corresponding analog position information of faulty equipment and simulated failure event information;
According to the analog position information, the simulated failure equipment is shown in the numerical map;
The resource to be deployed in the numerical map is deployed by multiple pre-set allotment strategies, and is recorded each
It is described allotment strategy under the resource to be deployed be moved to the simulated failure equipment the allotment time and each simulated failure
The corresponding maintenance time of equipment;
When simulated failure equipment all in the numerical map are reached by touching, when according to the allotment time and the maintenance
Between, it is time-consuming to count the corresponding repairing of the allotment strategy;
Select the time-consuming least allotment of the repairing it is tactful carried out with the simulated failure example it is corresponding, and by the simulation
Fault case is converted into the fault case.
3. large area blackout emergency first-aid repair scheme according to claim 2 determines method, which is characterized in that also wrap
It includes:
Obtain motor-driven attribute information of the resource to be deployed in the numerical map;When the motor-driven attribute information is unit
Between the distance that is moved in the numerical map of the resource to be deployed;
Record the allotment time that the resource to be deployed is moved to the simulated failure equipment, comprising:
According to the initial position message and the analog position information, calculates the resource to be deployed and the simulated failure is set
The standby range information in the numerical map;
According to the range information and the motor-driven attribute information, the resource to be deployed is calculated and is moved to the simulation event
Hinder the allotment time of equipment.
4. large area blackout emergency first-aid repair scheme according to claim 2 determines method, which is characterized in that also wrap
It includes:
Obtain action attributes information of the resource to be deployed in the numerical map;When the action attributes information is unit
Between the resource to be deployed the progress of the simulated failure event information is handled in the numerical map;
It is described to record the corresponding maintenance time of each simulated failure equipment, comprising:
According to the action attributes information and the simulated failure event of the resource to be deployed, obtains each simulated failure and set
Standby corresponding maintenance time.
5. large area blackout emergency first-aid repair scheme according to claim 2 determines method, which is characterized in that also wrap
It includes:
Obtain the Weather information and the corresponding terrain information of the initial position message of the numerical map;
It is described to record the corresponding maintenance time of each simulated failure equipment, comprising:
According to the Weather information and the terrain information, pre-set factor list is inquired, factor value is obtained;The factor
List be using the Weather information be record, the terrain information as field, factor value be value foundation;
According to the action attributes information and the factor value, the practical action attribute information of the resource to be deployed is obtained;
According to the practical action attribute information of the resource to be deployed and the simulated failure event, each simulation event is obtained
Hinder the corresponding maintenance time of equipment.
6. large area blackout emergency first-aid repair scheme according to any one of claims 1 to 5 determines that method, feature exist
In, further includes:
Display status information of the equipment in each power outage is defined in the numerical map in advance;
The faulty equipment information for obtaining power outage, comprising:
When detecting the display status information of equipment described in the numerical map;
The event of failure information is determined according to the display status information, and according to the equipment in the numerical map
Position, determine the location information.
7. large area blackout emergency first-aid repair scheme according to any one of claims 1 to 5 determines that method, feature exist
In, further includes:
The numerical map is divided into multiple outage management regions;
When getting the faulty equipment information of power outage, the outage management region where the faulty equipment is determined;
According to the positional information with the fault time information, matches and obtain the corresponding area fault in the outage management region
Example;
According to the area fault example, determine that the region resource of power outage repairing deploys letter out of described outage management region
Breath carries out power outage repairing according to the region resource deployment information.
8. a kind of large area blackout emergency first-aid repair scheme determining device, which is characterized in that described device includes:
Event obtains module, for obtaining the faulty equipment information of power outage;The faulty equipment information includes: faulty equipment
Location information and event of failure information in numerical map;
Matching module, for the event of failure information, matching according to the positional information and obtaining pre-stored failure thing
Example;
Dispatching module is robbed, for the resource allocation information of power outage repairing being determined, according to the resource according to the fault case
Deployment information determines power outage Rush Repair Scheme, and the power outage Rush Repair Scheme, which is used to indicate, carries out power outage repairing.
9. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor realizes any one of claims 1 to 7 institute when executing the computer program
The step of stating method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of method described in any one of claims 1 to 7 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811531188.7A CN109741208B (en) | 2018-12-14 | 2018-12-14 | Method and device for determining emergency repair scheme of large-area power failure accident |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811531188.7A CN109741208B (en) | 2018-12-14 | 2018-12-14 | Method and device for determining emergency repair scheme of large-area power failure accident |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109741208A true CN109741208A (en) | 2019-05-10 |
CN109741208B CN109741208B (en) | 2021-08-10 |
Family
ID=66358981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811531188.7A Active CN109741208B (en) | 2018-12-14 | 2018-12-14 | Method and device for determining emergency repair scheme of large-area power failure accident |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109741208B (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003232827A (en) * | 2002-02-08 | 2003-08-22 | Toko Electric Corp | Accident point orientation system |
KR20130005968A (en) * | 2011-07-08 | 2013-01-16 | 엘에스산전 주식회사 | An apparatus for displaying information of electric power system based on gis |
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitoring system of power grid breakdown first-aid repair |
CN104573887A (en) * | 2013-10-14 | 2015-04-29 | 北京电研华源电力技术有限公司 | Resource allocation optimizing method for failure repair of distribution network |
CN105447127A (en) * | 2015-11-18 | 2016-03-30 | 国网天津市电力公司 | Failure outage range visualization system and method based on power distribution automation and marketing GIS |
KR101615085B1 (en) * | 2015-08-20 | 2016-04-26 | 주식회사 베가스 | Alarm system and method for equipment abnormality |
WO2016136391A1 (en) * | 2015-02-27 | 2016-09-01 | 株式会社日立製作所 | Fault point locating device and method, electric power system monitoring system, and facility planning support system |
CN106779185A (en) * | 2016-11-30 | 2017-05-31 | 江苏省邮电规划设计院有限责任公司 | A kind of emergency traffic command methods based on harmful influence diffusion model |
CN107092965A (en) * | 2016-11-29 | 2017-08-25 | 国网浙江省电力公司杭州供电公司 | A kind of power emergency command methods and system based on fault message |
CN107358562A (en) * | 2017-07-18 | 2017-11-17 | 海南电网有限责任公司 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
CN108230805A (en) * | 2017-12-26 | 2018-06-29 | 全球能源互联网研究院有限公司 | A kind of power emergency based on scene structure drills deduction system |
CN108460468A (en) * | 2018-01-23 | 2018-08-28 | 国网江西省电力有限公司电力科学研究院 | It is a kind of public to become failure event management method and device |
CN108764619A (en) * | 2018-04-16 | 2018-11-06 | 国网安徽省电力有限公司芜湖供电公司 | It is a kind of to match the intelligent allocation method for robbing resource for electric system |
-
2018
- 2018-12-14 CN CN201811531188.7A patent/CN109741208B/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003232827A (en) * | 2002-02-08 | 2003-08-22 | Toko Electric Corp | Accident point orientation system |
KR20130005968A (en) * | 2011-07-08 | 2013-01-16 | 엘에스산전 주식회사 | An apparatus for displaying information of electric power system based on gis |
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitoring system of power grid breakdown first-aid repair |
CN104573887A (en) * | 2013-10-14 | 2015-04-29 | 北京电研华源电力技术有限公司 | Resource allocation optimizing method for failure repair of distribution network |
WO2016136391A1 (en) * | 2015-02-27 | 2016-09-01 | 株式会社日立製作所 | Fault point locating device and method, electric power system monitoring system, and facility planning support system |
KR101615085B1 (en) * | 2015-08-20 | 2016-04-26 | 주식회사 베가스 | Alarm system and method for equipment abnormality |
CN105447127A (en) * | 2015-11-18 | 2016-03-30 | 国网天津市电力公司 | Failure outage range visualization system and method based on power distribution automation and marketing GIS |
CN107092965A (en) * | 2016-11-29 | 2017-08-25 | 国网浙江省电力公司杭州供电公司 | A kind of power emergency command methods and system based on fault message |
CN106779185A (en) * | 2016-11-30 | 2017-05-31 | 江苏省邮电规划设计院有限责任公司 | A kind of emergency traffic command methods based on harmful influence diffusion model |
CN107358562A (en) * | 2017-07-18 | 2017-11-17 | 海南电网有限责任公司 | For the electric network emergency repairing flattening command system and method under Rainfall Disaster |
CN108230805A (en) * | 2017-12-26 | 2018-06-29 | 全球能源互联网研究院有限公司 | A kind of power emergency based on scene structure drills deduction system |
CN108460468A (en) * | 2018-01-23 | 2018-08-28 | 国网江西省电力有限公司电力科学研究院 | It is a kind of public to become failure event management method and device |
CN108764619A (en) * | 2018-04-16 | 2018-11-06 | 国网安徽省电力有限公司芜湖供电公司 | It is a kind of to match the intelligent allocation method for robbing resource for electric system |
Also Published As
Publication number | Publication date |
---|---|
CN109741208B (en) | 2021-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | A planning-oriented resilience assessment framework for transmission systems under typhoon disasters | |
US10832179B2 (en) | Method for constructing a future-state power grid model, device and equipment and storage medium | |
CN109784649A (en) | Overhaul work order distributing method, device, computer equipment and storage medium | |
CN108448575B (en) | Power distribution network power load analysis method and system, computer storage medium and equipment | |
CN109614527B (en) | Overhaul view generation method and device, computer equipment and storage medium | |
CN106355357B (en) | Power distribution network fault processing method and information processing system | |
CN104101791A (en) | Relay protection device fixed vale automatic test method and system | |
CN108683713A (en) | The method for pushing and pusher of fault outage information | |
CN107819611B (en) | Client test method based on IEC61850 multi-server simulation | |
CN115792505B (en) | Rail transit power supply management method and system | |
CN111461399A (en) | Method for configuring stagnation point coordinates based on fault nonlinear discrete distribution | |
CN107180291B (en) | Intelligent compiling method for new equipment starting scheme of electric power system | |
CN110580553A (en) | Unmanned repair analysis and order distribution method based on GIS map | |
KR20150118699A (en) | Method of visualizing estimating generation amount of wind power using gis base realtime weather information | |
CN112862123A (en) | Execution work order generation method and device, computer equipment and storage medium | |
Boardman | The role of integrated distribution management systems in smart grid implementations | |
CN103777092A (en) | Cloud technology based relay protection test system and method | |
CN103049374A (en) | Automatic testing method and device | |
US20210117593A1 (en) | Configurable digital twin | |
CN109741208A (en) | Large area blackout emergency first-aid repair scheme determines method and apparatus | |
CN103020290A (en) | Power grid information verifying method and system | |
CN108647234A (en) | Acquisition methods, device, computer equipment and the storage medium of scope of power outage | |
CN104091480A (en) | Transmission line condition-based maintenance simulation training method | |
CN104332992B (en) | Power distribution network looped network figure security verification method | |
CN110555597A (en) | Method and device for generating scheduling operation command ticket of power equipment and computer equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200918 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |