CN108764619A - It is a kind of to match the intelligent allocation method for robbing resource for electric system - Google Patents
It is a kind of to match the intelligent allocation method for robbing resource for electric system Download PDFInfo
- Publication number
- CN108764619A CN108764619A CN201810336807.0A CN201810336807A CN108764619A CN 108764619 A CN108764619 A CN 108764619A CN 201810336807 A CN201810336807 A CN 201810336807A CN 108764619 A CN108764619 A CN 108764619A
- Authority
- CN
- China
- Prior art keywords
- repairing
- distribution
- repair
- resource
- groups
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses a kind of maneuvering platform being repaired with the intelligent allocation method for robbing resource, including distribution for electric system, it is characterised in that:The concocting method is specially that commanding first obtains power supply distribution transforming information and its geographical location that repairing work order, PMS systems acquisition faulty equipment account data, the GIS platform that distribution repairing maneuvering platform generates obtain repairing job note;In the best repairing teams and groups of analysis power failure job note, recovery vehicle, repairing path;It robs platform mobile terminal by matching and places an order to most suitable repairing teams and groups repair personnel;Repair personnel rushes towards scene rush to repair and completes to repair by mobile terminal feed back on-site information.Due to the above structure, the advantage of the invention is that:1, combine closely network distributing failure emergency repair the characteristics of and the Wuhu City Hubei and Hunan Provinces Liang Jiang geographical particularity, quantify repairing task;2, reasonable distribution project resource shortens emergency repair time to the maximum extent;3, Socie-economic loss is reduced, distribution is improved comprehensively and repairs ability.
Description
Technical field
The present invention relates to electric system with resource allocation is robbed, more particularly to a kind of to be used for electric system with the intelligence for robbing resource
It can concocting method.
Background technology
Currently, in electric system distribution repairing maneuvering platform with production management system PMS, power network GIS platform, marketing
Operation system, 95598 customer service systems, power information acquisition system, EMS system, Distribution Management System DMS, dispatching management information system
The system integrations such as OMS, vehicle management system, mobile terminal system are shared, realize and seek, match, adjusting the organic of related service and system
Fusion.Platform is repaired in distribution, realizes substation, circuit, taiwan area, Yong Huji, the accurate of user's power-off event are studied and judged, to improve
Distribution Network Failure is studied and judged provides effective technological means and business support with repairing commander.
With the high speed development of intelligent grid, the scale of power distribution network becomes increasingly complex, and resource distribution is repaired in traditional distribution
The limitation of management is increasingly prominent, and repairing preparation is not in place, repairing task ranking or arrangement of time are unreasonable etc..
In view of the above-mentioned problems, being improved to existing distribution repairing scheduling of resource pattern, reasonable distribution project resource, most
Shorten to limits emergency repair time, reduce Socie-economic loss, improves distribution comprehensively and repair ability.
Invention content
The technical problem to be solved by the invention is to provide a kind of for electric system with the intelligent allocation side for robbing resource
Method, reasonable distribution project resource shorten emergency repair time to the maximum extent, reduce Socie-economic loss, improve distribution repairing comprehensively
Ability.
In order to achieve the above objectives, the technical scheme is that, it is a kind of match for electric system rob the intelligent allocation of resource
Maneuvering platform is repaired in method, including distribution, it is characterised in that:The concocting method is specially that commanding first obtains distribution
It repairs repairing work order, the PMS systems that maneuvering platform generates and obtains faulty equipment account data, GIS platform acquisition repairing job note
Power supply distribution transforming information and its geographical location;In the best repairing teams and groups of analysis power failure job note, recovery vehicle, repairing path;
It robs platform mobile terminal by matching and places an order to most suitable repairing teams and groups repair personnel;Repair personnel rushes towards scene rush to repair and passes through
Mobile terminal feed back on-site information completes repairing.
Analyzed in the concocting method the best repairing teams and groups of power failure job note, recovery vehicle, repairing path method
Specially first according to failure point coordinates failure judgement point region, suburbs are then directly assigned to for the fault point in suburbs and are stayed
Point repairing teams and groups;For the fault point in urban district, first judge whether the flowing repairing teams and groups in urban district are in idle state, and does not have
Work order is not completed directly to be assigned according to nearby principle if being in idle state;Otherwise, COMPREHENSIVE CALCULATING repairing teams and groups reach
The time of fault point and processing do not complete the Estimated Time Of Completion of work order.
The distribution repairing maneuvering platform is separately connected mobile terminal management system and vehicle management system GIS, to matching
The precise positioning and real time monitoring of net repairing resource.
A kind of to match the intelligent allocation method for robbing resource for electric system, due to the above structure, of the invention is excellent
Point is:1, combine closely network distributing failure emergency repair the characteristics of and the Wuhu City Hubei and Hunan Provinces Liang Jiang geographical particularity, quantify repairing task;
2, reasonable distribution project resource shortens emergency repair time to the maximum extent;3, Socie-economic loss is reduced, improves distribution repairing comprehensively
Ability.
Description of the drawings
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments;
Fig. 1 is a kind of flow chart for matching the intelligent allocation method for robbing resource for electric system of the present invention.
Specific implementation mode
The present invention, which makes up currently to match, robs platform to power distribution network repairing resource distribution and deficiency existing for scheduling management and control.Close knot
The geographical particularity in the characteristics of closing breakdown repair and the Wuhu City Hubei and Hunan Provinces Liang Jiang, research are to rely on distribution repairing maneuvering platform, base
Real time data is obtained in PMS systems, realizes to functions such as the reasonable disposition of breakdown repair resource and scheduling schemes, distribution is repaired
Resource, which is realized, to be accurately positioned and monitors in real time so that repairing commanding can close repairing resource within the shortest time
The command scheduling of reason shortens emergency repair time to greatest extent, improves whole first-aid repair efficiency.
Its process is specifically as shown in Figure 1:
1, repairing work order, PMS systems that distribution repairing maneuvering platform generates are obtained and obtains faulty equipment account data, GIS
Platform obtains power supply distribution transforming information and its geographical location of repairing job note;
2, by analyzing the best repairing teams and groups of power failure job note, recovery vehicle, repairing with robbing resource intelligent mixing system
Path;
3, it robs platform mobile terminal by matching and places an order to most suitable repairing teams and groups repair personnel;
4, repair personnel rushes towards scene rush to repair and by mobile terminal feed back on-site information;
5, repairing is completed.
Wherein the best repairing teams and groups of analysis power failure job note, recovery vehicle, repairing path method be specially root first
According to failure point coordinates failure judgement point region, suburbs stationary point is then directly assigned to for the fault point in suburbs and repairs teams and groups;
For the fault point in urban district, first judge whether the flowing repairing teams and groups in urban district are in idle state, and without not completing work order,
If being in idle state, directly assigned according to nearby principle;Otherwise, COMPREHENSIVE CALCULATING repairing teams and groups reach the time of fault point
The Estimated Time Of Completion of work order is not completed with processing.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way
Limitation, it is or not improved directly applying to other occasions as long as using the various improvement of technical solution of the present invention progress,
Within protection scope of the present invention.
Claims (3)
1. a kind of matching the intelligent allocation method for robbing resource for electric system, including maneuvering platform is repaired in distribution, it is characterised in that:
The concocting method is specially that repairing work order, the PMS systems that commanding's acquisition distribution repairing maneuvering platform generates first obtain
Faulty equipment account data, GIS platform are taken to obtain power supply distribution transforming information and its geographical location of repairing job note;Have a power failure in analysis
The best repairing teams and groups of job note, recovery vehicle, repairing path;It robs platform mobile terminal by matching and places an order to most suitable repairing
Teams and groups repair personnel;Repair personnel rushes towards scene rush to repair and completes to repair by mobile terminal feed back on-site information.
A kind of matching the intelligent allocation method of resource of robbing for electric system 2. according to claim 1, it is characterised in that:Institute
Analyzed in the concocting method stated the best repairing teams and groups of power failure job note, recovery vehicle, repairing path method be specially first
According to failure point coordinates failure judgement point region, suburbs stationary point is then directly assigned to for the fault point in suburbs and repairs class
Group;For the fault point in urban district, first judge whether the flowing repairing teams and groups in urban district are in idle state, and without unfinished work
It is single, if being in idle state, directly assigned according to nearby principle;Otherwise, COMPREHENSIVE CALCULATING repairing teams and groups reach fault point
Time and processing do not complete the Estimated Time Of Completion of work order.
A kind of matching the intelligent allocation method of resource of robbing for electric system 3. according to claim 1, it is characterised in that:Institute
The distribution repairing maneuvering platform stated is separately connected mobile terminal management system and vehicle management system GIS, and resource is repaired to distribution
Precise positioning and real time monitoring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810336807.0A CN108764619A (en) | 2018-04-16 | 2018-04-16 | It is a kind of to match the intelligent allocation method for robbing resource for electric system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810336807.0A CN108764619A (en) | 2018-04-16 | 2018-04-16 | It is a kind of to match the intelligent allocation method for robbing resource for electric system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108764619A true CN108764619A (en) | 2018-11-06 |
Family
ID=64010881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810336807.0A Pending CN108764619A (en) | 2018-04-16 | 2018-04-16 | It is a kind of to match the intelligent allocation method for robbing resource for electric system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108764619A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109741208A (en) * | 2018-12-14 | 2019-05-10 | 广州供电局有限公司 | Large area blackout emergency first-aid repair scheme determines method and apparatus |
CN110348775A (en) * | 2019-05-24 | 2019-10-18 | 国网浙江临海市供电有限公司 | Teams and groups, electric system base Warehouse Management System |
CN112564952A (en) * | 2020-11-27 | 2021-03-26 | 广东电网有限责任公司肇庆供电局 | Intelligent inspection system for distribution network line |
CN113487132A (en) * | 2021-06-02 | 2021-10-08 | 广东电网有限责任公司广州供电局 | Distribution network post-disaster first-aid repair resource allocation method and device and computer equipment |
CN113516307A (en) * | 2021-07-06 | 2021-10-19 | 国网福建省电力有限公司 | Method and device for estimating and predicting power disaster emergency disposal process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120173296A1 (en) * | 2011-01-03 | 2012-07-05 | Mcmullin Dale Robert | Method and system for outage restoration |
CN104077641A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Power grid operation and emergency command method and power commanding system |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN104967818A (en) * | 2015-06-18 | 2015-10-07 | 国家电网公司 | GIS-based distribution network emergency repair video command quick positioning system |
CN106203830A (en) * | 2016-07-12 | 2016-12-07 | 国网江西省电力公司南昌供电分公司 | Promote Distribution Network Failure response and the electric service system of repairing ability |
CN106339829A (en) * | 2016-11-10 | 2017-01-18 | 国网山东省电力公司济南供电公司 | Big data, Cloud, IoT and mobile internet technologies based active maintenance panorama monitoring system of power distribution network |
-
2018
- 2018-04-16 CN CN201810336807.0A patent/CN108764619A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120173296A1 (en) * | 2011-01-03 | 2012-07-05 | Mcmullin Dale Robert | Method and system for outage restoration |
CN104077641A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Power grid operation and emergency command method and power commanding system |
CN104091231A (en) * | 2014-06-30 | 2014-10-08 | 国家电网公司 | Distribution network fault repairing commanding and processing system and method |
CN104967818A (en) * | 2015-06-18 | 2015-10-07 | 国家电网公司 | GIS-based distribution network emergency repair video command quick positioning system |
CN106203830A (en) * | 2016-07-12 | 2016-12-07 | 国网江西省电力公司南昌供电分公司 | Promote Distribution Network Failure response and the electric service system of repairing ability |
CN106339829A (en) * | 2016-11-10 | 2017-01-18 | 国网山东省电力公司济南供电公司 | Big data, Cloud, IoT and mobile internet technologies based active maintenance panorama monitoring system of power distribution network |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109741208A (en) * | 2018-12-14 | 2019-05-10 | 广州供电局有限公司 | Large area blackout emergency first-aid repair scheme determines method and apparatus |
CN110348775A (en) * | 2019-05-24 | 2019-10-18 | 国网浙江临海市供电有限公司 | Teams and groups, electric system base Warehouse Management System |
CN112564952A (en) * | 2020-11-27 | 2021-03-26 | 广东电网有限责任公司肇庆供电局 | Intelligent inspection system for distribution network line |
CN113487132A (en) * | 2021-06-02 | 2021-10-08 | 广东电网有限责任公司广州供电局 | Distribution network post-disaster first-aid repair resource allocation method and device and computer equipment |
CN113516307A (en) * | 2021-07-06 | 2021-10-19 | 国网福建省电力有限公司 | Method and device for estimating and predicting power disaster emergency disposal process |
CN113516307B (en) * | 2021-07-06 | 2022-08-05 | 国网福建省电力有限公司 | Method and device for estimating and predicting power disaster emergency disposal process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108764619A (en) | It is a kind of to match the intelligent allocation method for robbing resource for electric system | |
CN102722764B (en) | Integration network optimization computer-aided decision support System | |
CN103986227A (en) | Electric power distribution network operation monitoring method and system based on GIS platform | |
CN105046398A (en) | System and method for intelligently carrying out business expansion aided installation | |
CN102496068A (en) | Power supply scheme auxiliary generation method based on GIS (geographic information system) | |
CN102938101A (en) | Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal | |
CN103400205A (en) | System and method for managing energy efficiency of power distribution network on basis of reactive optimized coordination control | |
CN102244677A (en) | Green energy Cloud computing method and system | |
CN106849055A (en) | A kind of power distribution network repairing stationary point optimization method based on data analysis | |
CN104573848A (en) | Power demand prediction and planning and reliability-based power distribution network construction method | |
CN102723780B (en) | Energy management system for distribution network of power system | |
CN109934360A (en) | Substation fault repairs system and method | |
CN105447175A (en) | Power grid model sharing method applicable to distributed computation of power system | |
CN106130189A (en) | Job site temporary power condition monitoring system and method | |
CN105048456A (en) | Loss-reducing and energy-saving management method and system applied to intelligent metering platform | |
CN110580553A (en) | Unmanned repair analysis and order distribution method based on GIS map | |
CN105071376A (en) | Method for implementing integrated framework of main distribution network | |
CN105844418A (en) | Business expansion intelligent mobile terminal | |
CN105207216B (en) | A kind of method and system of the business enlarging scheme based on power supply network | |
CN107248962B (en) | Communication switching method and device for power grid information acquisition | |
CN105335824B (en) | Distribution network failure repairing command methods and system based on data center | |
CN102510073B (en) | Data exchanging system of large power consumption interaction system/ distribution automation master station system | |
CN104573986B (en) | One realizes GCRMS and electrical network multi-source operation system interoperability integrated approach | |
CN202103486U (en) | Two-stage electric-network dispatch-network topology system | |
CN202651894U (en) | Electric power system distribution network energy management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |
|
RJ01 | Rejection of invention patent application after publication |