CN110348775A - Teams and groups, electric system base Warehouse Management System - Google Patents

Teams and groups, electric system base Warehouse Management System Download PDF

Info

Publication number
CN110348775A
CN110348775A CN201910437962.6A CN201910437962A CN110348775A CN 110348775 A CN110348775 A CN 110348775A CN 201910437962 A CN201910437962 A CN 201910437962A CN 110348775 A CN110348775 A CN 110348775A
Authority
CN
China
Prior art keywords
work order
module
work
warehouse
outbound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910437962.6A
Other languages
Chinese (zh)
Inventor
李剑
徐幽幽
章正锋
蒋祥
林卫敏
黄善忠
姚紫嫣
金倩倩
王林挺
谢宗耀
宣玉龙
汪津津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Seven Technology Co Ltd
Zhejiang Linghai Power Supply Co Ltd
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Linhai Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Hangzhou Seven Technology Co Ltd
Zhejiang Linghai Power Supply Co Ltd
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Seven Technology Co Ltd, Zhejiang Linghai Power Supply Co Ltd, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Hangzhou Seven Technology Co Ltd
Priority to CN201910437962.6A priority Critical patent/CN110348775A/en
Publication of CN110348775A publication Critical patent/CN110348775A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)

Abstract

The invention discloses a kind of teams and groups, electric system base Warehouse Management System, including server, intelligent terminal and warehouse Intelligent management module, the server is equipped with work order creation module, work order distributes module and data filing and display module, the intelligent terminal is equipped with work order and receives module, work order active module and defect declare module, electronic tag is pasted on the Work tool stored in warehouse, in Work tool outbound and storage, electronic tag reading apparatus identifies Work tool, Work tool verifying unit proofreads outbound and storage Work tool, prompting message is sent when outbound Work tool and work order information are not inconsistent to intelligent terminal and/or warning device, prompting message is sent when being put in storage Work tool and outbound information is not inconsistent to intelligent terminal and/or warning device.The present invention uses intelligent warehouse management, and storage is unattended out for goods and materials, liberates 24 hours watch systems, reasonable distribution human resources.

Description

Teams and groups, electric system base Warehouse Management System
Technical field
The present invention relates to power informatization technical fields.
Background technique
Management mode between teams and groups, base, traditional Work tool has following 5 points of deficiencies:
1, night is unattended, if night repairing occurs, operating personnel can not receive goods and materials in time, easily cause emergency repair time Delay.
2, it is cumbersome to receive formality for Work tool, needs to register and receives the time, receives people, material information etc..
3, relative recording data easily causes paper waste more.
4, small-scale material (such as: the standby redundancy of consumables) not manageability, easily occurs accidentally neck, more necks, if there is generation object Money can not find corresponding responsible person when losing.
5, goods and materials censored time needs artificial participation, concern when which goods and materials needs inspection to take.
Customer-centric is all the service goal of power supply enterprise all the time.It is closed from client's " at most running primary ", work order Ring service, the repairing of accurate lean etc., which are provided to constantly to promote enterprise, provides more quality services for client.
The generally existing personnel's aging of power supply station, base, the problems such as quality is not high, management level is limited, with cybertimes It continuing to develop, traditional operation mode cannot keep up with the paces of information age in time, so generally need technically to be promoted, " machine substitute human labor " is imperative, needs ubiquitous Internet of Things and intellectualized technology entering power industry, to share power supply station, base The operating pressure of personnel.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of teams and groups, electric system base Warehouse Management System, to object It provides out storage and carries out intelligent management, improve efficiency, reduce artificial.
In order to solve the above technical problems, the present invention adopts the following technical scheme: warehousing management system, teams and groups, electric system base System, including server, intelligent terminal and warehouse Intelligent management module, the server is equipped with work order creation module, work order is sent Module and data filing and display module are sent out, the intelligent terminal is equipped with work order and receives module, work order active module and lack It falls into and declares module;The work order creation module is from PMS import information and creates work order, and the work order distributes work of the module by creation It singly distributes to specified intelligent terminal, the defect declares module and declares operation for carrying out defect will lose in work order implementation procedure The Work tool Message Entry System for losing and damaging;The work order receives module and receives work order, the activation by receiving operation Module is receiving the laggard line activating operation of work order to activate work order;The warehouse Intelligent management module includes the self-service outbound dress of consumptive material It sets, Work tool verifying unit, warning device and the gate inhibition set on warehouse doorway, electronic tag reading apparatus, is activated in work order Afterwards, gate inhibition and the self-service outbound device of consumptive material are sent to the associated worker information of work order information, gate inhibition is in identification work Warehouse automatic door is automatically opened after personnel, the self-service outbound device of consumptive material, automatically will be related according to the consumable information listed in work order Consumptive material, which is delivered to, gets position, is pasted with electronic tag on the Work tool stored in warehouse, in Work tool outbound and storage, Electronic tag reading apparatus identifies Work tool, and Work tool verifying unit proofreads outbound and storage Work tool, in outbound work Prompting message is sent when utensil and work order information are not inconsistent to intelligent terminal and/or warning device, is believed in storage Work tool and outbound Prompting message is sent when breath is not inconsistent to intelligent terminal and/or warning device;The data filing and display module are in storage work device When tool is consistent with outbound information, or Work tool will be put in storage and carried out complete when the Work tool that defect is declared is consistent with outbound information At work order, and all data filings of work order are stored and are shown when calling.
Optionally, the warehouse Intelligent management module further includes the video monitoring apparatus for acquiring video in warehouse.
Optionally, the intelligent terminal is equipped with GPS positioning module, teams and groups, electric system base Warehouse Management System Equipped with work order tracking module, to track track after intelligent terminal outbound.
Optionally, further include work order goods and materials intelligent recommendation module, the common goods and materials of history task are recorded, when When there is identical task in next time again, the goods and materials list that may be received is automatically generated.
Optionally, further include Work tool service life monitoring module, Work tool information is stored when Work tool is put in storage for the first time And service life is set, it issues and reminds when close to service life.
Optionally, further include work order approval module, carry out review operation on intelligent terminal to examine work order;Only work order Examination & approval just can be carried out activation operation by rear active module.
Optionally, the work order, which receives module, has the function of work order modification and work order refusal, after work order is rejected, work Single creation module re-creates work order.
Optionally, the gate inhibition is that face identification device can automatically open warehouse automatic door after recognition of face.
Optionally, after the self-service outbound of goods and materials and after Work tool outbound, system record receives people, receives the time, receives object Money and Work tool information.
Optionally, the warehouse Intelligent management module further includes the nearest scheduling module of short goods and materials, the counterpart in warehouse When money is less than setting quantity, search is stored with the nearest warehouse of spare part, and recommends and receive people.
The present invention by adopting the above technical scheme, has the following beneficial effects:
1, using intelligent warehouse management, goods and materials go out to be put in storage unattended, 24 hours artificial watch systems of liberation, rationally Distribute human resources.
2, Use system is activated using work order, staff need to can carry out goods and materials under corresponding task state of activation It receives, and system can be recorded intelligently and receive people, receive the time, receive goods and materials relevant information.
2, whole paperless management, computer automatically record corresponding informance, and administrative staff can choose record as required at any time.
3, it is managed using one yard of an object, every goods and materials have corresponding message identification, will be constantly if occurring accidentally to lead more necks Report and submit informing to warehouse keeper.
4, management system is informed using inspection, when goods and materials need inspection or will cross use date, system will accuse in advance Show administrator.
5, for consumptive material, such as standby redundancy, using automatic withdrawing mode, the standby redundancy chosen according to staff from It is dynamic to send to neck material, it takes without one part of personnel.
The specific technical solution of the present invention and its advantages will carry out detailed in the following detailed description Explanation.
Specific embodiment
Even to this day, internet thinking and technology have pushed society to enter the age of Internet economy, with Internet of Things, new retail, Artificial intelligence, cloud computing, the emerging technology that big data is representative are changing each of us daily life.In this context " the intelligent space e-power supply station's Warehouse Management Platform " operating capability of power supply station, base, practicability and versatility can be effectively improved By force, the market demand is big, technologically advanced, meets the trend of ubiquitous Internet of Things, it is contemplated that future can be widely applied to electric power enterprise and send out defeated Become the production teams and store management at different levels such as adapted, has a extensive future.Power supply station as power grid enterprises' most service establishments, The height of its service level directly determines perceptibility of the client to grid service whether excellent.It is traditional between power supply station's Work tool Management mode require administrator 24 hours it is on duty await orders, expend a large amount of human and material resources and time, and smallclothes goods and materials often occur More necks or situations such as accidentally lead, and be easy to happen goods and materials loss and but can not find this and be responsible for by whom, in addition the service life of Work tool It needs constantly to pay close attention to, if the Work tool for using more than the detection time limit is easy to produce security risk, has seriously affected quick service.
For above problem, the present invention provides a kind of teams and groups, electric system base Warehouse Management System, including service Device, intelligent terminal and warehouse Intelligent management module, the server is equipped with work order creation module, work order distributes module and number According to filing and display module, the intelligent terminal receives module, work order active module and defect equipped with work order and declares module.
The work order creation module is from PMS import information and creates work order, and the work order distributes work order of the module by creation It distributes to specified intelligent terminal, the defect declares module and declares operation for carrying out defect will lose in work order implementation procedure And the Work tool Message Entry System of damage;The work order receives module and receives work order, the activation mould by receiving operation Block is receiving the laggard line activating operation of work order to activate work order;The warehouse Intelligent management module includes the self-service outbound dress of consumptive material It sets, Work tool verifying unit, warning device and the gate inhibition set on warehouse doorway, electronic tag reading apparatus, is activated in work order Afterwards, gate inhibition and the self-service outbound device of consumptive material are sent to the associated worker information of work order information, gate inhibition is in identification work Warehouse automatic door is automatically opened after personnel, the self-service outbound device of consumptive material, automatically will be related according to the consumable information listed in work order Consumptive material, which is delivered to, gets position, is pasted with electronic tag on the Work tool stored in warehouse, in Work tool outbound and storage, Electronic tag reading apparatus identifies Work tool, and Work tool verifying unit proofreads outbound and storage Work tool, in outbound work Prompting message is sent when utensil and work order information are not inconsistent to intelligent terminal and/or warning device, is believed in storage Work tool and outbound Prompting message is sent when breath is not inconsistent to intelligent terminal and/or warning device;The data filing and display module are in storage work device When tool is consistent with outbound information, or Work tool will be put in storage and carried out complete when the Work tool that defect is declared is consistent with outbound information At work order, and all data filings of work order are stored and are shown when calling.
The present invention uses intelligent warehouse management, and goods and materials go out to be put in storage unattended, 24 hours artificial watch systems of liberation, Reasonable distribution human resources.It being managed using one yard of an object, every goods and materials have corresponding message identification, if occurring accidentally to lead more necks, It will constantly report and submit informing to warehouse keeper.
What needs to be explained here is that goods and materials are divided into consumptive material and Work tool, wherein Work tool is used in the construction such as repairing Tool may be reused.Consumptive material is easy loss product, such as electric wire, screw or other standby redundancies, generally will not after use It is put in storage again, therefore uses different management modes.Since consumptive material is relative normalized, self-service outbound mode is used, it can To be realized using storage robot, it is automatically sent at neck material according to the standby redundancy that staff chooses, is not necessarily to one part of personnel It takes.And Work tool is received by related personnel's storage.Certainly, the warehouse Intelligent management module further includes video in acquisition warehouse Video monitoring apparatus, can to receive process carry out videograph.
Use system is activated using work order, staff need to can carry out goods and materials neck under corresponding task state of activation With.Further include work order approval module, carries out review operation on intelligent terminal to examine work order;Only work order examination & approval swash after passing through Flexible module just can be carried out activation operation.The work order, which receives module, has the function of work order modification and work order refusal, in work order quilt After refusal, work order creation module re-creates work order.
After the self-service outbound of goods and materials and after Work tool outbound, system record receives people, receives the time, receives goods and materials and work device Has information.Moreover, the intelligent terminal is equipped with GPS positioning module, teams and groups, electric system base Warehouse Management System is set There is work order tracking module, for tracking track after intelligent terminal outbound.Therefore, outbound storage and the equal full name record of pilot process Tracking, administrative staff can choose record as required at any time.
In addition, further including Work tool service life monitoring module, Work tool information is stored simultaneously when Work tool is put in storage for the first time Service life is set, issues and reminds when close to service life.
Further, further include work order goods and materials intelligent recommendation module, the common goods and materials of history task recorded, When having identical task again next time, the goods and materials list that may be received is automatically generated.
As an implementation, the gate inhibition is that face identification device can automatically open storehouse after recognition of face Library automatically-controlled door.Certainly, it will be appreciated by persons skilled in the art that fingerprint recognition or other common gate inhibitions can also be used.
The present invention constructs the business and management system of a set of closed loop, with work based on numerous mature, advanced technologies The information of the progress of industry, the various dimensions such as operating personnel, work order, monitoring, track is interleaved in together and efficiently uses, before playing The value not having.
The present invention and existing power supply station's management mode primary difference is that: using ubiquitous Internet of Things as guiding theory, pass through new skill The involvement of art, improve to greatest extent business precisely, specification, the level of safety, and realize the management that whole process removes blind spot Target, these are all that conventional management models are also unconsummated.The present invention based on mainstream big data artificial intelligence framework, in conjunction with Practical business demand optimization architecture, must platform suitability, stability, in terms of reach ultimate attainment balance.Platform Have certain learning ability, is deployed nearby in work order goods and materials intelligent recommendation, short goods and materials, is multiple in library material stock suggestion etc. Basic artificial intelligence is realized in module.
Benefit of the invention is mainly reflected in three aspects:
1, economic benefit
By Internet technology, the with no paper operation flow of high availability is completely newly made, realizes the whole process of handling of goods and materials It is information-based.The simplification for receiving process simultaneously shortens average expected cost, reduces enterprise, user's economic attrition.Estimated average Emergency repair time is shorten to 25 minutes, is reduced power off time ratio and is accounted for about the 20% of original mode, according to 5178592 kilowatt hour of last year Failure electric quantity loss calculate, repairing work is instructed using the mode, it is possible to reduce 5178592 kilowatt hour × 20% =103.6 ten thousand kilowatt hours.
For intra-company, is calculated according to last year 0.756 yuan/kilowatt hour of company average electricity price, power selling income can be increased The about power selling income of 103.6 ten thousand kilowatt hour × 0.756 yuan/kilowatt hour=78.3 ten thousand yuan.
Social direct economy is influenced: generating 8 yuan of economic benefits by 1 kilowatt hour to calculate, about 103.6 ten thousand can be increased The economic results in society of kilowatt hour × 8 yuan/kilowatt hour=8,300,000 yuan.
2, management benefit
Personal management: by automatic management, realize 24 hours nobody garrison, be conducive to reasonable personnel assignment, mention High working efficiency, while night repairing scene remotely places an order, and greatly improves first-aid repair efficiency, shortens the electric power accident rush-repairing time.
Prevention clean government's risk: 24 hour record Work tools go out warehouse situation, reduce human intervention, prevent false claiming, more necks;Draw Enter pms2.0 system, set big data calculates goods and materials usage amount, and specification reports quantity, prevents to handle the feelings such as clout, profiteering privately Condition occurs.
Handling of goods and materials: introducing new retail concept, and the middle smallclothes goods and materials more for quantity, small in size, fallibility is difficult to govern are realized standby The self-service new management mode got of part.Utilize one yard of way to manage of an object, it then follows whose responsible system management who receives, it is ensured that Each goods and materials have borrow to record, it is ensured that lose, damage the situation that nobody is responsible for and will not occur.
Under real work and the accumulation of data, material requirements needed for corresponding work can be drafted, realization information guiding, Evolution of the decision assistant to comprehensive artificial intelligence.Such as: work order goods and materials intelligent recommendation, goods and materials deploy nearby, material stock suggestion Deng.
3, social benefit
Raise speed fault handling time, further speeds up and reports processing speed for repairment, shortens average expected cost, efficiently completes repairing Work;It improves customer satisfaction, the effective benefit for reducing client's loss improves power supply reliability.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, is familiar with The those skilled in the art should be understood that the present invention includes but is not limited to content described in specific embodiment above.It is any Modification without departing from function and structure principle of the invention is intended to be included in the range of claims.

Claims (10)

1. teams and groups, electric system base Warehouse Management System, it is characterised in that: including server, intelligent terminal and warehouse intelligence Management module, the server is equipped with work order creation module, work order distributes module and data filing and display module, the intelligence Energy terminal receives module, work order active module and defect equipped with work order and declares module;The work order creation module is imported from PMS Information simultaneously creates work order, and the work order distributes module and distributes the work order of creation to specified intelligent terminal, and the defect declares mould Block is used to carry out the Work tool Message Entry System that defect declares operation will lose in work order implementation procedure and damage;It is described Work order receives module and receives work order by receiving operation, and the active module is receiving the laggard line activating operation of work order to activate work It is single;The warehouse Intelligent management module includes the self-service outbound device of consumptive material, Work tool verifying unit, warning device and is set to storehouse The gate inhibition on library doorway, electronic tag reading apparatus are sent to after work order activation with the associated worker information of work order information Gate inhibition and the self-service outbound device of consumptive material, gate inhibition automatically open warehouse automatic door, the self-service outbound of consumptive material after identifying staff Consumables associated therewith is delivered to automatically according to the consumable information listed in work order and gets position by device, the work device stored in warehouse Electronic tag is pasted on tool, in Work tool outbound and storage, electronic tag reading apparatus identifies Work tool, Work tool check and correction Device proofreads outbound and storage Work tool, and prompting message is sent when outbound Work tool and work order information are not inconsistent to intelligence Terminal and/or warning device send prompting message when being put in storage Work tool and outbound information is not inconsistent to intelligent terminal and/or alarm Device;The data filing and display module when being put in storage Work tool and being consistent with outbound information, or will be put in storage Work tool and It carries out completing work order when the Work tool that defect is declared is consistent with outbound information, and all data filings of work order is stored and adjusted Used time is shown.
2. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: the warehouse intelligence Management module further includes the video monitoring apparatus for acquiring video in warehouse.
3. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: the intelligent terminal GPS positioning module is installed, teams and groups, electric system base Warehouse Management System is equipped with work order tracking module, to track intelligence Track after terminal outbound.
4. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: further include work order object Intelligent recommendation module is provided, the common goods and materials of history task are recorded, when having identical task again next time, from The goods and materials list that movable property life may be received.
5. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: further include Work tool Service life monitoring module stores Work tool information when Work tool is put in storage for the first time and sets service life, close to validity period It issues and reminds in limited time.
6. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: further include that work order is examined Module is criticized, carries out review operation on intelligent terminal to examine work order;Only work order examination & approval just can be carried out by rear active module Activation operation.
7. teams and groups, electric system base according to claim 6 Warehouse Management System, it is characterised in that: the work order is received Module has the function of work order modification and work order refusal, and after work order is rejected, work order creation module re-creates work order.
8. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: the gate inhibition behaves Face identification device can automatically open warehouse automatic door after recognition of face.
9. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: the self-service outbound of goods and materials Afterwards and after Work tool outbound, system record receives people, receives the time, receives goods and materials and Work tool information.
10. teams and groups, electric system base according to claim 1 Warehouse Management System, it is characterised in that: the warehouse intelligence Energy management module further includes the nearest scheduling module of short goods and materials, when corresponding to goods and materials in warehouse less than setting quantity, search storage There is the nearest warehouse of spare part, and recommends and receive people.
CN201910437962.6A 2019-05-24 2019-05-24 Teams and groups, electric system base Warehouse Management System Pending CN110348775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910437962.6A CN110348775A (en) 2019-05-24 2019-05-24 Teams and groups, electric system base Warehouse Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910437962.6A CN110348775A (en) 2019-05-24 2019-05-24 Teams and groups, electric system base Warehouse Management System

Publications (1)

Publication Number Publication Date
CN110348775A true CN110348775A (en) 2019-10-18

Family

ID=68174290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910437962.6A Pending CN110348775A (en) 2019-05-24 2019-05-24 Teams and groups, electric system base Warehouse Management System

Country Status (1)

Country Link
CN (1) CN110348775A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110851404A (en) * 2019-10-31 2020-02-28 大唐贵州发耳发电有限公司 Team construction hyperlink management system
CN111399456A (en) * 2020-03-26 2020-07-10 深圳市鑫疆基业科技有限责任公司 Intelligent warehouse control method and system, intelligent warehouse and storage medium
CN111653024A (en) * 2020-06-10 2020-09-11 创新奇智(成都)科技有限公司 Warehouse management system, identification method, camera and readable storage medium
CN112016870A (en) * 2020-08-28 2020-12-01 云南电网有限责任公司电力科学研究院 Intelligent warehousing system
CN113450021A (en) * 2021-07-20 2021-09-28 国网浙江省电力有限公司检修分公司 Unmanned aerial vehicle storehouse system and warehouse entry and exit management method and device thereof
CN113537711A (en) * 2021-06-10 2021-10-22 国网河北省电力有限公司灵寿县供电分公司 Intelligent goods and materials storage rack
CN117787326A (en) * 2024-02-28 2024-03-29 山东通广电子股份有限公司 Tool and instrument warehouse management method
US12081294B2 (en) 2020-08-05 2024-09-03 Apple Inc. NR MIMO operation enhancement

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
CN105117855A (en) * 2015-09-09 2015-12-02 国网福建晋江市供电有限公司 Power supply station safety apparatus cabinet warehouse intelligent management system and method
CN105160748A (en) * 2015-10-26 2015-12-16 国网福建晋江市供电有限公司 Intelligent power supply station storeroom management system and method based on internet of things
CN204965491U (en) * 2015-09-09 2016-01-13 国网福建晋江市供电有限公司 Safety tool of power supply station cabinet storehouse intelligent management system
CN106096734A (en) * 2016-05-23 2016-11-09 国家电网公司 Power distribution rush-repair integral intelligent management system and method thereof
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN107180319A (en) * 2016-03-10 2017-09-19 上海浩斌信息科技有限公司 A kind of unattended WMS based on RFID technique
CN108256722A (en) * 2017-11-16 2018-07-06 国网河北省电力有限公司信息通信分公司 A kind of communicating for power information worksheet processing handheld terminal
CN108734383A (en) * 2018-04-16 2018-11-02 国网辽宁省电力有限公司鞍山供电公司 A kind of power grid enterprises' tool management system and method based on cloud platform
CN108764619A (en) * 2018-04-16 2018-11-06 国网安徽省电力有限公司芜湖供电公司 It is a kind of to match the intelligent allocation method for robbing resource for electric system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
CN105117855A (en) * 2015-09-09 2015-12-02 国网福建晋江市供电有限公司 Power supply station safety apparatus cabinet warehouse intelligent management system and method
CN204965491U (en) * 2015-09-09 2016-01-13 国网福建晋江市供电有限公司 Safety tool of power supply station cabinet storehouse intelligent management system
CN105160748A (en) * 2015-10-26 2015-12-16 国网福建晋江市供电有限公司 Intelligent power supply station storeroom management system and method based on internet of things
CN107180319A (en) * 2016-03-10 2017-09-19 上海浩斌信息科技有限公司 A kind of unattended WMS based on RFID technique
CN106096734A (en) * 2016-05-23 2016-11-09 国家电网公司 Power distribution rush-repair integral intelligent management system and method thereof
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN108256722A (en) * 2017-11-16 2018-07-06 国网河北省电力有限公司信息通信分公司 A kind of communicating for power information worksheet processing handheld terminal
CN108734383A (en) * 2018-04-16 2018-11-02 国网辽宁省电力有限公司鞍山供电公司 A kind of power grid enterprises' tool management system and method based on cloud platform
CN108764619A (en) * 2018-04-16 2018-11-06 国网安徽省电力有限公司芜湖供电公司 It is a kind of to match the intelligent allocation method for robbing resource for electric system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨晓静 等: "基于电力企业的智慧仓储管理系统", 物联网技术, vol. 7, no. 7, pages 103 - 105 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110851404A (en) * 2019-10-31 2020-02-28 大唐贵州发耳发电有限公司 Team construction hyperlink management system
CN111399456A (en) * 2020-03-26 2020-07-10 深圳市鑫疆基业科技有限责任公司 Intelligent warehouse control method and system, intelligent warehouse and storage medium
CN111653024A (en) * 2020-06-10 2020-09-11 创新奇智(成都)科技有限公司 Warehouse management system, identification method, camera and readable storage medium
CN111653024B (en) * 2020-06-10 2022-06-28 创新奇智(成都)科技有限公司 Warehouse management system, identification method, camera and readable storage medium
US12081294B2 (en) 2020-08-05 2024-09-03 Apple Inc. NR MIMO operation enhancement
CN112016870A (en) * 2020-08-28 2020-12-01 云南电网有限责任公司电力科学研究院 Intelligent warehousing system
CN113537711A (en) * 2021-06-10 2021-10-22 国网河北省电力有限公司灵寿县供电分公司 Intelligent goods and materials storage rack
CN113450021A (en) * 2021-07-20 2021-09-28 国网浙江省电力有限公司检修分公司 Unmanned aerial vehicle storehouse system and warehouse entry and exit management method and device thereof
CN117787326A (en) * 2024-02-28 2024-03-29 山东通广电子股份有限公司 Tool and instrument warehouse management method

Similar Documents

Publication Publication Date Title
CN110348775A (en) Teams and groups, electric system base Warehouse Management System
CN108292375A (en) Method, system, mobile device and software product for the automatic data processing in the maintenance of engine or communication tool system
CN111210108B (en) Performance management and control model of electric power material supply chain
Bradford et al. Innovation and improvement for Telstra's Australian energy and cooling systems: A ten year case study
CN111081361A (en) Intelligent logistics platform management system
Rakar et al. Assessment of production performance by means of KPI
CN108280532A (en) A kind of improved power equipment asset management system and method
CN106447157A (en) Product testing and supervision method and monitoring system thereof
CN110046722A (en) Community's equipment maintenance method and device and system and storage medium based on OCR technique
CN112232651A (en) Wisdom coking plant management system
CN109409660A (en) Business delivery management system and method
CN107832962A (en) A kind of enterprise asset management and its management method
TWI380226B (en) System and method of prognostic analysis and resource planning for apparatu
CN111080262A (en) Intelligent logistics platform management method
Harits et al. Capability Level Measurement Using COBIT 5 Framework (Case Study: PT. Jasa Cendekia Indonesia)
Treuner et al. A survey of disruptions in aviation and aerospace supply chains and recommendations for increasing resilience
CN104778562A (en) Safety eye monitoring platform system on construction site
CN109063853A (en) Cigarette machine management system and method based on five trap ring maintenance systems
KR100584903B1 (en) System for real time controlling driving data of power plant
Nwadinobi et al. Review of maintenance scheduling and optimization models
Kratchman et al. Management's decision to discontinue a product
Putri et al. A literature review of research between supply chain constraits issues and decree of the government of Indonesia during Covid-19
CN206696880U (en) Product test management system
Zuo et al. Competition strategy of crowdsourcing logistics service quality based on big data technology
Croucamp Lean implementation for maintenance optimization: A south african rail approach

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination