CN108224926A - A kind of Chinese medicine dehydration equipment - Google Patents

A kind of Chinese medicine dehydration equipment Download PDF

Info

Publication number
CN108224926A
CN108224926A CN201711489279.4A CN201711489279A CN108224926A CN 108224926 A CN108224926 A CN 108224926A CN 201711489279 A CN201711489279 A CN 201711489279A CN 108224926 A CN108224926 A CN 108224926A
Authority
CN
China
Prior art keywords
mounting bracket
fixed pulley
sliding rail
sliding block
bracing wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711489279.4A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711489279.4A priority Critical patent/CN108224926A/en
Publication of CN108224926A publication Critical patent/CN108224926A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B9/00Machines or apparatus for drying solid materials or objects at rest or with only local agitation; Domestic airing cupboards
    • F26B9/06Machines or apparatus for drying solid materials or objects at rest or with only local agitation; Domestic airing cupboards in stationary drums or chambers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
    • F26B21/001Drying-air generating units, e.g. movable, independent of drying enclosure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00
    • F26B25/02Applications of driving mechanisms, not covered by another subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00
    • F26B25/06Chambers, containers, or receptacles
    • F26B25/14Chambers, containers, receptacles of simple construction
    • F26B25/18Chambers, containers, receptacles of simple construction mainly open, e.g. dish, tray, pan, rack

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The present invention relates to a kind of moisture removal equipment more particularly to a kind of Chinese medicine dehydration equipments.The technical problem to be solved in the present invention is to provide a kind of moisture removal equipment that can quickly remove moisture removal and be hardly damaged Chinese medicine.In order to solve the above technical problem, the present invention provides such a Chinese medicine dehydration equipments, include mounting bracket etc.;Mounting bracket is equipped with drying unit, and the first lifting gear is equipped in the middle part of mounting bracket, and the first web plate is equipped between the first lifting gear inside upper part, the second web plate is equipped between the first lifting gear lower inside.The present invention dries Chinese medicine by being equipped with the first air-heater and the second air-heater, while by the way that pull rod is pulled to drive the first air-heater and the continuous side-to-side movement of the second air-heater so that drying rate is faster.

Description

A kind of Chinese medicine dehydration equipment
Technical field
The present invention relates to a kind of moisture removal equipment more particularly to a kind of Chinese medicine dehydration equipments.
Background technology
Chinese medicine is mainly made of autonomic drug, animal drugs and mineral drug.The Chinese medicine used all over China up to 5000 kinds or so, It is even more innumerable the prescription that various medicinal materials are compatible and formed.By the research of thousands of years, an independent section is formd Learn -- Herbal Textuals.Each medical colleges and schools of China has all opened up natural drug this subject now, and the content told about is exactly in being generally called Medicine.During Chinese medicine makes, need to air-dry in Chinese medicine so that the moisture removal in Chinese medicine.Physics is air-dried in removal at present The method of moisture is very time-consuming in medicine, thus, it would be desirable to research and develop a kind of equipment of moisture in special removal Chinese medicine to add Go the time of moisture removal.
To sum up, it needs to research and develop a kind of moisture removal equipment that can quickly remove moisture removal and be hardly damaged Chinese medicine at present, next gram Take the shortcomings that physics in the prior art air-dries moisture removal slowly and is easily damaged Chinese medicine.
Invention content
(1) technical problems to be solved
The present invention in order to overcome in the prior art physics air-dry moisture removal slowly and the shortcomings that be easily damaged Chinese medicine, this Technical problems to be solved by the inivention are to provide a kind of moisture removal equipment that can quickly remove moisture removal and be hardly damaged Chinese medicine.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a Chinese medicine dehydration equipments, include mounting bracket, dry Equipment for drying, the first lifting gear, the first web plate and the second web plate, mounting bracket are equipped with drying unit, and the is equipped in the middle part of mounting bracket One lifting gear is equipped with the first web plate between the first lifting gear inside upper part, is equipped between the first lifting gear lower inside Second web plate.
The present invention could also say that a kind of device for removing Chinese medicine moisture, and drying unit includes the first sliding rail, the first cunning Block, the first installing plate, the first air-heater, the first spring, the first fixed pulley, the second fixed pulley, the first bracing wire, the second sliding rail, Two sliding blocks, the second installing plate, the second air-heater, second spring, third fixed pulley, the second bracing wire, the 4th fixed pulley and pull rod, peace Interior bottom is shelved equipped with the first sliding rail, the first sliding rail top slide formula is connected with the first sliding block, and the first slider top is equipped with first Installing plate, the first installing plate top, which controls, is arranged with the first air-heater, under the first sliding block left upper portion and mounting bracket inner left wall It is connected with the first spring between portion, mounting bracket lower right side is equipped with the first fixed pulley, and mounting bracket right upper portion is from top to bottom successively Equipped with third fixed pulley, the 4th fixed pulley and the second fixed pulley, the first sliding block right side central is connected with the first bracing wire, the first bracing wire Across mounting bracket right wall lower part, successively around the first fixed pulley and the second fixed pulley, right end is connected with pull rod, mounting bracket inner top Equipped with the second sliding rail, the second sliding rail basal sliding formula is connected with the second sliding block, and the second slider bottom is equipped with the second installing plate, and second Installing plate bottom is symmetrical to be equipped with the second air-heater, is connected between the second sliding block left lower and mounting bracket inner left wall top Second spring, the second sliding block right side central are connected with the second bracing wire, and second is drawstring through mounting bracket right wall top, successively around Three fixed pulleys and the 4th fixed pulley, right end are connect with pull rod left upper portion, pull rod left upper portion and the 4th fixed pulley right contact, Pull rod left lower and the second fixed pulley right contact.
The present invention could also say that a kind of device of Quick-air-drying Chinese medicine, and the first lifting gear includes third sliding rail, Three sliding blocks, the 5th fixed pulley, L-shaped snap-gauge, third bracing wire, ball and third spring, the interior left and right of mounting bracket two walls middle part are all provided with There is third sliding rail, third sliding rail inside slidingtype is connected with third sliding block, and third sliding block is connected with the first web plate between inside, the The second web plate is connected between three sliding rail lower insides, is all connected between the left and right sides and third slider bottom at the top of the second web plate There is a third spring, be equipped with the 5th fixed pulley in the mounting bracket below third sliding rail in the middle part of two walls of left and right, at left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge, and the first web plate bottom is symmetrical to be connected with third bracing wire, and third bracing wire is fixed around the 5th respectively Pulley, across two wall of mounting bracket or so middle part, end is connected with ball.
The present invention could also say that a kind of Chinese medicine apparatus for drying that can control drying rate, further include the second lifting dress It puts, the second lifting gear is equipped at the top of the first installing plate, the second lifting gear includes the 4th sliding rail, Four-slider, connecting rod, consolidates Determine block, the 5th sliding rail, the 5th sliding block, elastic string, electronic reel, the 4th bracing wire, trapezoid block and the 4th spring, the first installing plate Top is equipped with the 4th sliding rail, and the 4th sliding rail top slide formula is connected with Four-slider, and connecting rod, the first peace are equipped at the top of Four-slider Loading board left upper portion is equipped with fixed block, and the 5th sliding rail is equipped on the left of fixed block, and slidingtype is connected with the 5th cunning on the right side of the 5th sliding rail Block, is connected with elastic string between the 5th sliding rail lower right side and Four-slider left upper portion, the first installing plate right upper portion is equipped with Electronic reel, electronic reel are wound with the 4th bracing wire, and the 4th bracing wire left end is connect with Four-slider right upper portion, the first installation The left and right sides is connected with the 4th spring at the top of plate, and the 4th spring top is connected with trapezoid block, and left and right is arranged at the top of trapezoid block First air-heater, trapezoid block left side and the 5th sliding block right side are connect.
The present invention could also say that a kind of dehydration device for being hardly damaged Chinese medicine, it is preferable that further include the 5th bracing wire, card Block and plug, L-shaped snap-gauge front side are connected with the 5th bracing wire, and fixture block is arranged with before and after L-shaped snap-gauge bottom, and the 5th bracing wire bottom end connects Plug is connected to, plug is inserted in fixture block.
The present invention could also say that a kind of Chinese medicine dehydration equipment that can adjust drying temperature, it is preferable that L-shaped snap-gauge side is in It is inverted U-shaped.
The present invention could also say that a kind of Chinese medicine apparatus for drying that can protect herbal medicine efficacy, it is preferable that the front of trapezoid block It is in a rectangular trapezoid.
The present invention could also say that a kind of efficient Chinese medicine air-drying device, it is preferable that with the ladder being connect on the right side of the 5th sliding block Shape block left side is that area is minimum in trapezoid block cross section.
The present invention could also say that a kind of timesaving Chinese medicine dehydration equipment, it is preferable that rod material is stainless steel.
Preferably, trapezoidal block of material is Q235 steel.
Preferably, installation frame material is high-quality steel, and surface covers zinc coat.
Operation principle:The Chinese medicine for needing moisture removal is placed at the top of the second web plate, is driven by the first lifting gear First web plate, which moves downward, fixes the Chinese medicine being placed at the top of the second web plate, and then it is dried by drying unit It is dry, when the moisture in Chinese medicine all removes, stop drying it, the first web plate is driven to move upwards by the first lifting gear Initial position is returned to, then takes out the Chinese medicine of drying at the top of the second web plate.Chinese medicine is removed thus by equipped with drying unit Interior moisture has achieved the effect that moisture in quick removal Chinese medicine.
Because drying unit includes the first sliding rail, the first sliding block, the first installing plate, the first air-heater, the first spring, One fixed pulley, the second fixed pulley, the first bracing wire, the second sliding rail, the second sliding block, the second installing plate, the second air-heater, the second bullet Spring, third fixed pulley, the second bracing wire, the 4th fixed pulley and pull rod, bottom is equipped with the first sliding rail in mounting bracket, at the top of the first sliding rail Slidingtype is connected with the first sliding block, and the first slider top is equipped with the first installing plate, and left and right is arranged with the at the top of the first installing plate One air-heater is connected with the first spring, mounting bracket lower right side between the first sliding block left upper portion and mounting bracket inner left wall lower part Equipped with the first fixed pulley, it is fixed sliding that mounting bracket right upper portion is equipped with third fixed pulley, the 4th fixed pulley and second successively from top to bottom Wheel, the first sliding block right side central are connected with the first bracing wire, and first is drawstring through mounting bracket right wall lower part, fixed sliding around first successively Wheel and the second fixed pulley, right end are connected with pull rod, and mounting bracket inner top is equipped with the second sliding rail, the connection of the second sliding rail basal sliding formula There is the second sliding block, the second slider bottom is equipped with the second installing plate, and the second installing plate bottom is symmetrical to be equipped with the second air-heater, the Second spring is connected between two sliding block left lowers and mounting bracket inner left wall top, the second sliding block right side central is connected with second Bracing wire, second is drawstring through mounting bracket right wall top, successively around third fixed pulley and the 4th fixed pulley, right end on the left of pull rod Top connects, pull rod left upper portion and the 4th fixed pulley right contact, pull rod left lower and the second fixed pulley right contact, when When needing to carry out drying and processing to Chinese medicine, the first air-heater and the work of the second air-heater are controlled, pull rod is then pulled to the right, passes through First bracing wire and the second bracing wire drive the first sliding block and the second sliding block to move right so that the first spring and second spring respectively It is stretched, but also the first installing plate and the second installing plate move right, the first air-heater and the second air-heater is driven to transport to the right It is dynamic, when the first air-heater and the second air-heater will reach the right end of the first sliding rail and the second sliding rail, releasing lever, the first bullet Spring and second spring restore to the original state, and drive the first sliding block and thereon device and the second sliding block respectively and device is returned to left movement thereon To initial position, when the first sliding block and device and the second sliding block and after device returns to initial position thereon thereon, draw to the right again Dynamic pull rod, so repeatedly so that the first air-heater and the second hot wind persistently move left and right and the Chinese medicine on the second web plate carried out soon Speed drying after the moisture in the Chinese medicine on the second web plate all removes, stops drag pull rod, and controls the first air-heater and the Two air-heaters are stopped.Chinese medicine is dried thus by equipped with the first air-heater and the second air-heater, while passes through drawing Dynamic pull rod drives the first air-heater and the continuous side-to-side movement of the second air-heater so that and faster, drying effect is more preferable for drying rate, And Chinese medicine will not be caused partially carbonized because of hot-spot, reach protection Chinese medicine and be not easy impaired effect.
Because the first lifting gear include third sliding rail, third sliding block, the 5th fixed pulley, L-shaped snap-gauge, third bracing wire, Ball and third spring, the interior left and right of mounting bracket two walls middle part are equipped with third sliding rail, and slidingtype is connected on the inside of third sliding rail Third sliding block, third sliding block are connected with the first web plate between inside, the second web plate are connected between third sliding rail lower inside, the It is respectively connected with third spring at the top of two web plates between the left and right sides and third slider bottom, it is left in the mounting bracket below third sliding rail The 5th fixed pulley is equipped in the middle part of right two walls, middle part is arranged with L-shaped snap-gauge, the first web plate bottom or so at left and right sides of mounting bracket Third bracing wire is symmetrically connected with, third bracing wire is respectively around the 5th fixed pulley, across two wall of mounting bracket or so middle part, end connection There is ball, when needing to fix in the Chinese medicine being placed at the top of the second web plate, pull ball toward the mounting bracket left and right sides, lead to Crossing third bracing wire drives the first web plate to move downward, and third spring is compressed, when the first web plate will be placed at the top of the second web plate Chinese medicine fix after, ball is stuck at left and right sides of mounting bracket on the L-shaped snap-gauge at middle part, when the moisture in Chinese medicine all removes Afterwards, ball being taken out, and unclamp ball at left and right sides of mounting bracket on the L-shaped snap-gauge at middle part, third spring restores to the original state, The first web plate is driven to move upwards and returns to initial position, then the Chinese medicine of drying is taken out at the top of the second web plate.Thus by The first web plate is lifted equipped with the first lifting gear so that being placed on the Chinese medicine at the top of the second web plate can be fixed, and be dried The Chinese medicine being placed at the top of the second web plate during dry will not tamper.
Because having further included the second lifting gear, the second lifting gear, the second lifting gear are equipped at the top of the first installing plate Include the 4th sliding rail, Four-slider, connecting rod, fixed block, the 5th sliding rail, the 5th sliding block, elastic string, electronic reel, the 4th Bracing wire, trapezoid block and the 4th spring, the first installing plate top are equipped with the 4th sliding rail, and the 4th sliding rail top slide formula is connected with the 4th Sliding block, Four-slider top are equipped with connecting rod, and the first installing plate left upper portion is equipped with fixed block, the 5th cunning is equipped on the left of fixed block Rail, the 5th sliding rail right side slidingtype are connected with the 5th sliding block, connect between the 5th sliding rail lower right side and Four-slider left upper portion Elastic string is connected to, the first installing plate right upper portion is equipped with electronic reel, and electronic reel is wound with the 4th bracing wire, and the 4th bracing wire is left End is connect with Four-slider right upper portion, and the left and right sides is connected with the 4th spring at the top of the first installing plate, and the 4th spring top connects It is connected to trapezoid block, left and right is arranged with the first air-heater at the top of trapezoid block, with being connect on the right side of the 5th sliding block on the left of trapezoid block, when need to When accelerating the drying rate to Chinese medicine, electronic reel is controlled to be worked clockwise by the 4th bracing wire around rising, passes through the 4th bracing wire Four-slider is driven to move right so that elastic string is stretched, but also connecting rod moves right, so as to drive trapezoid block and thereon The first air-heater move upwards, the 4th spring is stretched, after the first air-heater moves upward to proper height, control it is electronic Reel is stopped.When needing to slow down the drying rate to Chinese medicine, electronic reel is controlled to rotate counterclockwise and is drawn the 4th Line is released, and elastic string restores to the original state, and drives Four-slider to left movement, and then drives connecting rod to left movement, the recovery of the 4th spring Original state drives trapezoid block and the first air-heater thereon to move downward, after the first air-heater is moved downwardly to proper height, control Electronic reel is made to be stopped.The first air-heater is lifted thus by equipped with the second lifting gear, is dried convenient for adjusting Dry temperature has achieved the effect that controllable drying rate and protection Chinese medicine.
Because having further included the 5th bracing wire, fixture block and plug, the 5th bracing wire, L-shaped snap-gauge bottom are connected on front side of L-shaped snap-gauge Front and rear to be arranged with fixture block, the 5th bracing wire bottom end is connected with plug, and plug is inserted in fixture block, when ball is stuck in installation by needs When at left and right sides of frame on the L-shaped snap-gauge at middle part, plug is extracted, ball is then stuck in the L at middle part at left and right sides of mounting bracket On shape snap-gauge, then plug is inserted into fixture block so that the ball being stuck at left and right sides of mounting bracket on the L-shaped snap-gauge of middle part will not It comes off, so as to cause unnecessary trouble, when needing to take out ball at left and right sides of the mounting bracket on the L-shaped snap-gauge at middle part When, it can be taken off after plug is extracted, after ball is taken out at left and right sides of mounting bracket on the L-shaped snap-gauge at middle part, again will Plug is inserted into fixture block.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
(3) advantageous effect
The present invention dries Chinese medicine by being equipped with the first air-heater and the second air-heater, while by pulling pull rod band Dynamic first air-heater and the continuous side-to-side movement of the second air-heater so that faster, drying effect is more preferable for drying rate, and will not be because Cause Chinese medicine partially carbonized for hot-spot, reached protection Chinese medicine and be not easy impaired effect.
Description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of drying unit of the present invention.
Fig. 3 is the main structure diagram of the first lifting gear of the invention.
Fig. 4 is the first right side structural representation of L-shaped snap-gauge of the present invention.
Fig. 5 is the first part main structure diagram of the present invention.
Fig. 6 is the main structure diagram of the second lifting gear of the invention.
Fig. 7 is second of right side structural representation of L-shaped snap-gauge of the present invention.
Label in attached drawing for:1- mounting brackets, 2- drying units, the first sliding rails of 21-, the first sliding blocks of 22-, 23- first pacify Loading board, the first air-heaters of 24-, the first springs of 25-, the first fixed pulleys of 26-, the second fixed pulleys of 27-, the first bracing wires of 28-, 29- Two sliding rails, the second sliding blocks of 210-, the second installing plates of 211-, the second air-heaters of 212-, 213- second springs, 214- thirds are slided surely Wheel, the second bracing wires of 215-, the 4th fixed pulleys of 216-, 217- pull rods, the first lifting gears of 3-, 31- third sliding rails, 32- thirds are slided Block, the 5th fixed pulleys of 33-, 34-L shape snap-gauges, 35- third bracing wires, 36- balls, 37- third springs, the first web plates of 4-, 5- Two web plates, the second lifting gears of 6-, the 4th sliding rails of 61-, 62- Four-sliders, 63- connecting rods, 64- fixed blocks, the 5th sliding rails of 65-, The 5th sliding blocks of 66-, 67- elastic strings, the electronic reels of 68-, the 4th bracing wires of 69-, 610- trapezoid blocks, the 4th springs of 611-, 7- Five bracing wires, 8- fixture blocks, 9- plugs.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Embodiment 2
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
Embodiment 3
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
First lifting gear 3 includes third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, third Bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, third sliding rail 31 Inside slidingtype is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, under 31 inside of third sliding rail The second web plate 5 is connected between portion, third bullet is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Spring 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33,1 left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, third bracing wire 35 rotating around The 5th fixed pulley 33 is crossed, across 1 or so two wall of mounting bracket middle part, end is connected with ball 36.
Embodiment 4
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
First lifting gear 3 includes third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, third Bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, third sliding rail 31 Inside slidingtype is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, under 31 inside of third sliding rail The second web plate 5 is connected between portion, third bullet is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Spring 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33,1 left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, third bracing wire 35 rotating around The 5th fixed pulley 33 is crossed, across 1 or so two wall of mounting bracket middle part, end is connected with ball 36.
The second lifting gear 6 is further included, 23 top of the first installing plate is equipped with the second lifting gear 6, the second lifting gear 6 Include the 4th sliding rail 61, Four-slider 62, connecting rod 63, fixed block 64, the 5th sliding rail 65, the 5th sliding block 66, elastic string 67, electricity Dynamic reel 68, the 4th bracing wire 69,610 and the 4th spring 611 of trapezoid block, 23 top of the first installing plate are equipped with the 4th sliding rail 61, 4th sliding rail, 61 top slide formula is connected with Four-slider 62, and 62 top of Four-slider is equipped with connecting rod 63, and the first installing plate 23 is left Upper lateral part is equipped with fixed block 64, and 64 left side of fixed block is equipped with the 5th sliding rail 65, and 65 right side slidingtype of the 5th sliding rail is connected with the 5th Sliding block 66 is connected with elastic string 67, the first installing plate 23 between 65 lower right side of the 5th sliding rail and 62 left upper portion of Four-slider Right upper portion is equipped with electronic reel 68, and electronic reel 68 is wound with the 4th bracing wire 69,69 left end of the 4th bracing wire and Four-slider 62 right upper portions connect, and the 23 top left and right sides of the first installing plate is connected with the 4th spring 611, the connection of 611 top of the 4th spring There is trapezoid block 610,610 top left and right of trapezoid block is arranged with the first air-heater 24, and 610 left side of trapezoid block and the 5th sliding block 66 are right Side connects.
Embodiment 5
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
First lifting gear 3 includes third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, third Bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, third sliding rail 31 Inside slidingtype is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, under 31 inside of third sliding rail The second web plate 5 is connected between portion, third bullet is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Spring 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33,1 left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, third bracing wire 35 rotating around The 5th fixed pulley 33 is crossed, across 1 or so two wall of mounting bracket middle part, end is connected with ball 36.
The second lifting gear 6 is further included, 23 top of the first installing plate is equipped with the second lifting gear 6, the second lifting gear 6 Include the 4th sliding rail 61, Four-slider 62, connecting rod 63, fixed block 64, the 5th sliding rail 65, the 5th sliding block 66, elastic string 67, electricity Dynamic reel 68, the 4th bracing wire 69,610 and the 4th spring 611 of trapezoid block, 23 top of the first installing plate are equipped with the 4th sliding rail 61, 4th sliding rail, 61 top slide formula is connected with Four-slider 62, and 62 top of Four-slider is equipped with connecting rod 63, and the first installing plate 23 is left Upper lateral part is equipped with fixed block 64, and 64 left side of fixed block is equipped with the 5th sliding rail 65, and 65 right side slidingtype of the 5th sliding rail is connected with the 5th Sliding block 66 is connected with elastic string 67, the first installing plate 23 between 65 lower right side of the 5th sliding rail and 62 left upper portion of Four-slider Right upper portion is equipped with electronic reel 68, and electronic reel 68 is wound with the 4th bracing wire 69,69 left end of the 4th bracing wire and Four-slider 62 right upper portions connect, and the 23 top left and right sides of the first installing plate is connected with the 4th spring 611, the connection of 611 top of the 4th spring There is trapezoid block 610,610 top left and right of trapezoid block is arranged with the first air-heater 24, and 610 left side of trapezoid block and the 5th sliding block 66 are right Side connects.
The 5th bracing wire 7, fixture block 8 and plug 9 are further included, 34 front side of L-shaped snap-gauge is connected with the 5th bracing wire 7, L-shaped snap-gauge 34 Fixture block 8 is arranged with before and after bottom, 7 bottom end of the 5th bracing wire is connected with plug 9, and plug 9 is inserted in fixture block 8.
Embodiment 6
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
First lifting gear 3 includes third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, third Bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, third sliding rail 31 Inside slidingtype is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, under 31 inside of third sliding rail The second web plate 5 is connected between portion, third bullet is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Spring 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33,1 left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, third bracing wire 35 rotating around The 5th fixed pulley 33 is crossed, across 1 or so two wall of mounting bracket middle part, end is connected with ball 36.
The second lifting gear 6 is further included, 23 top of the first installing plate is equipped with the second lifting gear 6, the second lifting gear 6 Include the 4th sliding rail 61, Four-slider 62, connecting rod 63, fixed block 64, the 5th sliding rail 65, the 5th sliding block 66, elastic string 67, electricity Dynamic reel 68, the 4th bracing wire 69,610 and the 4th spring 611 of trapezoid block, 23 top of the first installing plate are equipped with the 4th sliding rail 61, 4th sliding rail, 61 top slide formula is connected with Four-slider 62, and 62 top of Four-slider is equipped with connecting rod 63, and the first installing plate 23 is left Upper lateral part is equipped with fixed block 64, and 64 left side of fixed block is equipped with the 5th sliding rail 65, and 65 right side slidingtype of the 5th sliding rail is connected with the 5th Sliding block 66 is connected with elastic string 67, the first installing plate 23 between 65 lower right side of the 5th sliding rail and 62 left upper portion of Four-slider Right upper portion is equipped with electronic reel 68, and electronic reel 68 is wound with the 4th bracing wire 69,69 left end of the 4th bracing wire and Four-slider 62 right upper portions connect, and the 23 top left and right sides of the first installing plate is connected with the 4th spring 611, the connection of 611 top of the 4th spring There is trapezoid block 610,610 top left and right of trapezoid block is arranged with the first air-heater 24, and 610 left side of trapezoid block and the 5th sliding block 66 are right Side connects.
The 5th bracing wire 7, fixture block 8 and plug 9 are further included, 34 front side of L-shaped snap-gauge is connected with the 5th bracing wire 7, L-shaped snap-gauge 34 Fixture block 8 is arranged with before and after bottom, 7 bottom end of the 5th bracing wire is connected with plug 9, and plug 9 is inserted in fixture block 8.
34 side of L-shaped snap-gauge is inverted U shape.
The front of trapezoid block 610 is in a rectangular trapezoid.
610 left side of trapezoid block being connect with 66 right side of the 5th sliding block is that area is minimum in 610 cross section of trapezoid block.
Embodiment 7
A kind of Chinese medicine dehydration equipment as shown in figs. 1-7, includes mounting bracket 1, drying unit 2, the first lifting gear 3, One web plate 4 and the second web plate 5, mounting bracket 1 are equipped with drying unit 2, and the middle part of mounting bracket 1 is equipped with the first lifting gear 3, first liter The first web plate 4 is equipped between 3 inside upper part of falling unit, the second web plate 5 is equipped between 3 lower inside of the first lifting gear.
Drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, the first bullet Spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the second sliding block 210, the second installing plate 211st, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley.
First lifting gear 3 includes third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, third Bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, third sliding rail 31 Inside slidingtype is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, under 31 inside of third sliding rail The second web plate 5 is connected between portion, third bullet is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Spring 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33,1 left and right sides of mounting bracket Middle part is arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, third bracing wire 35 rotating around The 5th fixed pulley 33 is crossed, across 1 or so two wall of mounting bracket middle part, end is connected with ball 36.
The second lifting gear 6 is further included, 23 top of the first installing plate is equipped with the second lifting gear 6, the second lifting gear 6 Include the 4th sliding rail 61, Four-slider 62, connecting rod 63, fixed block 64, the 5th sliding rail 65, the 5th sliding block 66, elastic string 67, electricity Dynamic reel 68, the 4th bracing wire 69,610 and the 4th spring 611 of trapezoid block, 23 top of the first installing plate are equipped with the 4th sliding rail 61, 4th sliding rail, 61 top slide formula is connected with Four-slider 62, and 62 top of Four-slider is equipped with connecting rod 63, and the first installing plate 23 is left Upper lateral part is equipped with fixed block 64, and 64 left side of fixed block is equipped with the 5th sliding rail 65, and 65 right side slidingtype of the 5th sliding rail is connected with the 5th Sliding block 66 is connected with elastic string 67, the first installing plate 23 between 65 lower right side of the 5th sliding rail and 62 left upper portion of Four-slider Right upper portion is equipped with electronic reel 68, and electronic reel 68 is wound with the 4th bracing wire 69,69 left end of the 4th bracing wire and Four-slider 62 right upper portions connect, and the 23 top left and right sides of the first installing plate is connected with the 4th spring 611, the connection of 611 top of the 4th spring There is trapezoid block 610,610 top left and right of trapezoid block is arranged with the first air-heater 24, and 610 left side of trapezoid block and the 5th sliding block 66 are right Side connects.
The 5th bracing wire 7, fixture block 8 and plug 9 are further included, 34 front side of L-shaped snap-gauge is connected with the 5th bracing wire 7, L-shaped snap-gauge 34 Fixture block 8 is arranged with before and after bottom, 7 bottom end of the 5th bracing wire is connected with plug 9, and plug 9 is inserted in fixture block 8.
34 side of L-shaped snap-gauge is inverted U shape.
The front of trapezoid block 610 is in a rectangular trapezoid.
610 left side of trapezoid block being connect with 66 right side of the 5th sliding block is that area is minimum in 610 cross section of trapezoid block.
217 material of pull rod is stainless steel.
610 material of trapezoid block is Q235 steel.
1 material of mounting bracket is high-quality steel, and surface covers zinc coat.
Operation principle:The Chinese medicine for needing moisture removal is placed on 5 top of the second web plate, passes through 3 band of the first lifting gear Dynamic first web plate 4, which moves downward, fixes the Chinese medicine for being placed on 5 top of the second web plate, then by drying unit 2 to its into Row drying, when in Chinese medicine moisture all remove when, stop drying it, by the first lifting gear 3 drive the first web plate 4 to On move back into initial position, then the Chinese medicine of drying is taken out from the top of the second web plate 5.Thus by equipped with drying unit 2 The moisture in Chinese medicine is removed, has achieved the effect that moisture in quick removal Chinese medicine.
Because drying unit 2 includes the first sliding rail 21, the first sliding block 22, the first installing plate 23, the first air-heater 24, One spring 25, the first fixed pulley 26, the second fixed pulley 27, the first bracing wire 28, the second sliding rail 29, the installation of the second sliding block 210, second Plate 211, the second air-heater 212, second spring 213, third fixed pulley 214, the second bracing wire 215, the 4th fixed pulley 216 and pull rod 217, bottom is equipped with the first sliding rail 21 in mounting bracket 1, and 21 top slide formula of the first sliding rail is connected with the first sliding block 22, the first sliding block 22 tops are equipped with the first installing plate 23, and 23 top left and right of the first installing plate is arranged with the first air-heater 24, and the first sliding block 22 is left The first spring 25 is connected between 1 inner left wall lower part of upper lateral part and mounting bracket, 1 lower right side of mounting bracket is equipped with the first fixed pulley 26,1 right upper portion of mounting bracket is equipped with third fixed pulley 214, the 4th fixed pulley 216 and the second fixed pulley 27 successively from top to bottom, First sliding block, 22 right side central is connected with the first bracing wire 28, and the first bracing wire 28 passes through 1 right wall lower part of mounting bracket, successively around first 26 and second fixed pulley 27 of fixed pulley, right end are connected with pull rod 217, and 1 inner top of mounting bracket is equipped with the second sliding rail 29, the second sliding rail 29 basal sliding formulas are connected with the second sliding block 210, and 210 bottom of the second sliding block is equipped with the second installing plate 211, the second installing plate 211 Bottom is symmetrical to be equipped with the second air-heater 212, and 210 left lower of the second sliding block and mounting bracket connect between 1 inner left wall top There is second spring 213,210 right side central of the second sliding block is connected with the second bracing wire 215, and the second bracing wire 215 passes through 1 right wall of mounting bracket Top, successively around 214 and the 4th fixed pulley 216 of third fixed pulley, right end is connect with 217 left upper portion of pull rod, and pull rod 217 is left 216 right contact of upper lateral part and the 4th fixed pulley, 27 right contact of 217 left lower of pull rod and the second fixed pulley, when needs pair When Chinese medicine carries out drying and processing, the first air-heater 24 and the second air-heater 212 is controlled to work, then pull pull rod 217 to the right, led to The first bracing wire 28 and the second bracing wire 215 are crossed, the first sliding block 22 and the second sliding block 210 is driven to move right respectively so that the first bullet Spring 25 and second spring 213 are stretched, but also the first installing plate 23 and the second installing plate 211 move right, drive the first heat 24 and second air-heater 212 of wind turbine moves right, when the first air-heater 24 and the second air-heater 212 will reach the first sliding rail 21 During with the right end of the second sliding rail 29, releasing lever 217, the first spring 25 and second spring 213 restore to the original state, and drive first respectively Sliding block 22 and thereon device and the second sliding block 210 and device moves back into initial position to the left thereon, when the first sliding block 22 and its Upper device and the second sliding block 210 and after device returns to initial position thereon, pull to the right pull rod 217, so repeatedly again so that First air-heater 24 and the second hot wind are persistently moved left and right carries out flash baking to the Chinese medicine on the second web plate 5, when the second web plate 5 On Chinese medicine in moisture all after removal, stop drag pull rod 217, and control the first air-heater 24 and the second air-heater 212 It is stopped.Chinese medicine is dried thus by equipped with the first air-heater 24 and the second air-heater 212, while is drawn by pulling Bar 217 drive the 212 continuous side-to-side movement of the first air-heater 24 and the second air-heater so that drying rate faster, drying effect More preferably, and Chinese medicine will not be caused partially carbonized because of hot-spot, has reached protection Chinese medicine and be not easy impaired effect.
Because the first lifting gear 3 include third sliding rail 31, third sliding block 32, the 5th fixed pulley 33, L-shaped snap-gauge 34, Third bracing wire 35, ball 36 and third spring 37, the interior left and right of mounting bracket 1 two walls middle part are equipped with third sliding rail 31, and third is slided 31 inside slidingtype of rail is connected with third sliding block 32, is connected with the first web plate 4 between 32 inside of third sliding block, in third sliding rail 31 It is connected with the second web plate 5 between side lower part, the is respectively connected between the 5 top left and right sides of the second web plate and 32 bottom of third sliding block Three springs 37, the interior left and right of the mounting bracket 1 two walls middle part of 31 lower section of third sliding rail are equipped with the 5th fixed pulley 33, mounting bracket 1 or so Two middle side parts are arranged with L-shaped snap-gauge 34, and 4 bottom of the first web plate is symmetrical to be connected with third bracing wire 35, and third bracing wire 35 divides Not Rao Guo the 5th fixed pulley 33, across in the middle part of 1 or so two wall of mounting bracket, end is connected with ball 36, when needing will to be placed on When the Chinese medicine at the top of the second web plate 5 is fixed, ball 36 is pulled toward 1 left and right sides of mounting bracket, the is driven by third bracing wire 35 One web plate 4 moves downward, and third spring 37 is compressed, when the first web plate 4 fixes the Chinese medicine for being placed on 5 top of the second web plate Afterwards, ball 36 is stuck on the L-shaped snap-gauge 34 at 1 left and right sides middle part of mounting bracket, it, will after the moisture in Chinese medicine all removes Ball 36 is taken out, and unclamp ball 36 from the L-shaped snap-gauge 34 at 1 left and right sides middle part of mounting bracket, and third spring 37 restores Original state drives the first web plate 4 to move upwards and returns to initial position, and then the Chinese medicine of drying is taken out from 5 top of the second web plate.Such as This lifts the first web plate 4 by being equipped with the first lifting gear 3 so that the Chinese medicine for being placed on the top of the second web plate 5 can be with It is fixed, the Chinese medicine at 5 top of the second web plate is placed in drying course to be tampered.
Because having further included the second lifting gear 6,23 top of the first installing plate is equipped with the second lifting gear 6, the second lifting Device 6 includes the 4th sliding rail 61, Four-slider 62, connecting rod 63, fixed block 64, the 5th sliding rail 65, the 5th sliding block 66, elastic string 67th, electronic reel 68, the 4th bracing wire 69,610 and the 4th spring 611 of trapezoid block, 23 top of the first installing plate are equipped with the 4th and slide Rail 61,61 top slide formula of the 4th sliding rail are connected with Four-slider 62, and 62 top of Four-slider is equipped with connecting rod 63, the first installing plate 23 left upper portions are equipped with fixed block 64, and 64 left side of fixed block is equipped with the 5th sliding rail 65, and 65 right side slidingtype of the 5th sliding rail is connected with 5th sliding block 66 is connected with elastic string 67, the first installation between 65 lower right side of the 5th sliding rail and 62 left upper portion of Four-slider 23 right upper portion of plate is equipped with electronic reel 68, and electronic reel 68 is wound with the 4th bracing wire 69,69 left end of the 4th bracing wire and the 4th 62 right upper portion of sliding block connects, and the 23 top left and right sides of the first installing plate is connected with the 4th spring 611,611 top of the 4th spring Trapezoid block 610 is connected with, 610 top left and right of trapezoid block is arranged with the first air-heater 24,610 left side of trapezoid block and the 5th sliding block 66 right sides connect, and when needing to accelerate the drying rate to Chinese medicine, control the work clockwise of electronic reel 68 by the 4th bracing wire 69 around rise, by the 4th bracing wire 69 drive Four-slider 62 move right so that elastic string 67 is stretched, but also connecting rod 63 to Right movement, so as to which trapezoid block 610 and the first air-heater 24 thereon be driven to move upwards, the 4th spring 611 is stretched, when first After air-heater 24 moves upward to proper height, electronic reel 68 is controlled to be stopped.When needs slow down the drying to Chinese medicine During speed, electronic reel 68 is controlled to rotate counterclockwise and releases the 4th bracing wire 69, elastic string 67 restores to the original state, and drives the 4th to slide Block 62 drives connecting rod 63 the 4th spring 611 restores to the original state to left movement to left movement, drives trapezoid block 610 and thereon First air-heater 24 moves downward, and after the first air-heater 24 is moved downwardly to proper height, electronic reel 68 is controlled to stop Work.First air-heater 24 is lifted thus by equipped with the second lifting gear 6, convenient for adjusting drying temperature, is reached Controllable drying rate and the effect for protecting Chinese medicine.
Because having further included the 5th bracing wire 7, fixture block 8 and plug 9,34 front side of L-shaped snap-gauge is connected with the 5th bracing wire 7, L-shaped card Fixture block 8 is arranged with before and after 34 bottom of plate, 7 bottom end of the 5th bracing wire is connected with plug 9, and plug 9 is inserted in fixture block 8, when needing handle When ball 36 is stuck on the L-shaped snap-gauge 34 at 1 left and right sides middle part of mounting bracket, plug 9 is extracted, is then stuck in ball 36 On the L-shaped snap-gauge 34 at 1 left and right sides middle part of mounting bracket, then plug 9 is inserted into fixture block 8 so that be stuck in mounting bracket 1 or so two Ball 36 on middle side part L-shaped snap-gauge 34 will not fall off, so as to cause unnecessary trouble, when needing ball 36 from peace It shelves on the L-shaped snap-gauge 34 at 1 left and right sides middle part when taking out, can be taken off after plug 9 is extracted, when ball 36 is from mounting bracket After being taken out on the L-shaped snap-gauge 34 of 1 left and right sides middle part, plug 9 is inserted into fixture block 8 again.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (1)

1. a kind of Chinese medicine dehydration equipment, which is characterized in that include the mounting bracket, drying unit, the first lifting gear, first Web plate and the second web plate, mounting bracket of the present invention are equipped with drying unit, and the first lifting gear, the first lifting are equipped in the middle part of mounting bracket Device includes third sliding rail, third sliding block, the 5th fixed pulley, L-shaped snap-gauge, third bracing wire, ball and third spring, installation Third sliding rail is equipped in frame in the middle part of two walls of left and right, slidingtype is connected with third sliding block, third sliding block inside on the inside of third sliding rail Between be connected with the first web plate, on the inside of third sliding block between be connected with the first web plate, be connected between third sliding rail lower inside Second web plate is respectively connected with third spring, third sliding rail lower section between the second web plate top left and right sides and third slider bottom Mounting bracket in be equipped with the 5th fixed pulley in the middle part of two walls of left and right, middle part is arranged with L-shaped snap-gauge at left and right sides of mounting bracket, first Web plate bottom is symmetrical to be connected with third bracing wire, and third bracing wire is respectively around the 5th fixed pulley, across two wall of mounting bracket or so Middle part, end are connected with ball.
CN201711489279.4A 2017-12-29 2017-12-29 A kind of Chinese medicine dehydration equipment Withdrawn CN108224926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711489279.4A CN108224926A (en) 2017-12-29 2017-12-29 A kind of Chinese medicine dehydration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711489279.4A CN108224926A (en) 2017-12-29 2017-12-29 A kind of Chinese medicine dehydration equipment

Publications (1)

Publication Number Publication Date
CN108224926A true CN108224926A (en) 2018-06-29

Family

ID=62647492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711489279.4A Withdrawn CN108224926A (en) 2017-12-29 2017-12-29 A kind of Chinese medicine dehydration equipment

Country Status (1)

Country Link
CN (1) CN108224926A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5608121B2 (en) * 2011-03-28 2014-10-15 大阪瓦斯株式会社 Bathroom drying system
CN106839702A (en) * 2017-02-24 2017-06-13 湖州东方皮革有限公司 A kind of numb cotton preliminary working apparatus for drying
CN107144105A (en) * 2017-07-03 2017-09-08 宁波高瑞照明有限公司 A kind of lamp shade of ceiling lamp is made of apparatus for drying after raw material silk-screen
CN107255395A (en) * 2017-07-14 2017-10-17 刘芳 A kind of cloth drying plant

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5608121B2 (en) * 2011-03-28 2014-10-15 大阪瓦斯株式会社 Bathroom drying system
CN106839702A (en) * 2017-02-24 2017-06-13 湖州东方皮革有限公司 A kind of numb cotton preliminary working apparatus for drying
CN107144105A (en) * 2017-07-03 2017-09-08 宁波高瑞照明有限公司 A kind of lamp shade of ceiling lamp is made of apparatus for drying after raw material silk-screen
CN107255395A (en) * 2017-07-14 2017-10-17 刘芳 A kind of cloth drying plant

Similar Documents

Publication Publication Date Title
CN205404306U (en) Falling ball impact test device for glass
CN107940980A (en) A kind of device of Quick-air-drying Chinese medicine
CN106738374A (en) A kind of building brick head efficient cutting
CN207242974U (en) A kind of door-plate bunching device
CN106626518B (en) A kind of carton production paper shell punching machine
CN106956451A (en) A kind of tire makes and uses cord cutting apparatus
CN206670244U (en) A kind of quick drying plant of manufacturing writing brush nib
CN108195148A (en) A kind of dehydration device for being hardly damaged Chinese medicine
CN108195161A (en) A kind of Chinese medicine apparatus for drying that can control drying rate
CN207755600U (en) A kind of easy to operate infusion support
CN106940127A (en) A kind of manufacturing writing brush quick drying plant of nib
CN106585141B (en) Marking equipment is used in a kind of weaving of steady type
CN106839702B (en) Air drying equipment for preliminary processing of bast fiber cotton
CN206288560U (en) Dust removal machine with automatic film-taking in means
CN108224926A (en) A kind of Chinese medicine dehydration equipment
CN107545989A (en) A kind of transformer installs lifting apparatus
CN108224916A (en) A kind of device for removing Chinese medicine moisture
CN109247129A (en) A kind of pineapple picker
CN106829295A (en) A kind of laneway type fixes the fertility automatic upper and lower frames machine of frame
CN106241155A (en) Compact shelving thesaurus box taking machine tool hands
CN211510151U (en) Kelp is multiple spot seedling machine of pressing from both sides simultaneously
CN107499680A (en) A kind of plastic mould maintains record career card place apparatus
CN109645706B (en) Book taking device for library
CN206078549U (en) Automatic beef cattle draw gear of rope is hung in release
CN206766433U (en) A kind of automatic mounted box equipment for tropisetron citrate injection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180629