CN108222989A CN201810107967.8A CN201810107967A CN108222989A CN 108222989 A CN108222989 A CN 108222989A CN 201810107967 A CN201810107967 A CN 201810107967A CN 108222989 A CN108222989 A CN 108222989A
Authority
CN
China
Prior art keywords
plate
anchor pole
component
firm
firm component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810107967.8A
Other languages
Chinese (zh)
Other versions
CN108222989B (en
Inventor
李龙喜
郭文波
唐和青
王树英
阳军生
杨鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Original Assignee
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH, CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd filed Critical CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Priority to CN201810107967.8A priority Critical patent/CN108222989B/en
Publication of CN108222989A publication Critical patent/CN108222989A/en
Application granted granted Critical
Publication of CN108222989B publication Critical patent/CN108222989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/183Supporting means for arch members, not provided for in E21D11/22
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of constructing tunnel anchor pole securing device, including:Firm component one and firm component two.Firm component one and firm component two include:Horizontal splice plate, vertical plate and bottom connecting plate, tail portion and the vertical plate top of horizontal splice plate are vertically connected, and head and the vertical plate bottom end of bottom connecting plate are vertically connected, and the extending direction of horizontal splice plate is opposite with the extending direction of bottom connecting plate.Anchor pole location hole is set on horizontal splice plate;Bolt hole is set on bottom connecting plate.The present invention needs the circumferentially prepared screw-bolt hole at a certain distance on the steelframe edge of a wing before implementing, can improve the phenomenon that system anchor bolt layout is chaotic under the prior art, the globality of lifting system suspension roof support in tunnel longer-range by the position for arranging bolt hole.

Description

A kind of constructing tunnel anchor pole securing device and its installation method
Technical field
The present invention relates to engineering support apparatus fields, and in particular to a kind of constructing tunnel anchor pole securing device and its installation Method.
Background technology
In recent years, with China's double track railway, Railway Tunnel and two tracks, three lanes, four lane road tunnel It builds, large cross-section tunnel and Complicated Geologic Condition are also more and more.In soft stratum(IV, V, VI grades of country rocks)Under the conditions of, tunnel Initial stage is mainly formed using some supports combined measures such as steelframe, gunite concrete, bar-mat reinforcement, system anchor bolts.And wherein by spraying Concrete is penetrated just to be applied widely early in 20 70 ~ eighties of century with the combined bolting and shotcrete that anchor pole forms, it can be seen that, anchor pole Supporting is always in occupation of critical role in Tunnel system.
In tunnel support parameter designing, often in the system anchor bolt radially squeezed into of tunnel cross-section design certain amount, use To reinforce country rock.However in practice of construction, the setting of radial system anchor pole often more arbitrarily, is mainly reflected in:It squeezes into Angle is random, even deviates from radially larger angle sometimes;It is random to squeeze into position, it is difficult to accurately be arranged among two Pin steelframes.Cause This, since scene lacks for the effective normalized construction device of system anchor bolt and means at present, leads to the construction of system anchor bolt It is difficult to meet design requirement, while its support action played is also caused to be had a greatly reduced quality.
Invention content
The purpose of the present invention is to solve the problem of radial direction system anchor bolt construction effect is bad in current constructing tunnel, carry Integrated device can be simultaneously formed with steelframe for improving tunnel system suspension roof support performance for a kind of, can not only make system anchor bolt Support action be not fully exerted, can also with steelframe formed integer support system, so as to improve initial stage branch in weak surrounding rock The bearing capacity of shield.
The invention is realized by the following technical scheme:
A kind of constructing tunnel anchor pole securing device, including:Firm component one and firm component two;The firm component one and steady Gu component two includes:Horizontal splice plate, vertical plate and bottom connecting plate, tail portion and the vertical plate top of the horizontal splice plate Be vertically connected, head and the vertical plate bottom end of the bottom connecting plate are vertically connected, the extending direction of the horizontal splice plate with The extending direction of bottom connecting plate is opposite;Anchor pole location hole is set on the horizontal splice plate;It is set on the bottom connecting plate Bolt hole;The bottom surface of the horizontal splice plate of firm component one is recessed into slab section and thin plate section upwards, consolidates the level of component two The top surface of splice plate recessed down is in slab section and thin plate section;The slab section is connect with vertical plate, and anchor pole is set in thin plate section Location hole.
Further, the slab section of the horizontal splice plate of the firm component one and the horizontal splice plate of firm component two The thickness of slab section is identical;The recess of the horizontal splice plate of the firm component one and the horizontal splice plate of firm component two Recess matches, and consolidates the sum of the thickness of one thin plate section of component and the thickness of firm two thin plate section of component and is equal to firm component one Horizontal splice plate slab section thickness.The splice plate of i.e. firm component one can engage with the splice plate of firm component two.
Further, the anchor pole location hole of the firm component one and firm component two is arranged at its thin plate segment length At half.
Further, the horizontal splice plate, vertical plate and bottom connecting plate three are fixedly connected by welding.
Further, the thickness of two thin plate section of the firm component one and firm component is the one of its slab section thickness Half.
In addition the present invention also provides a kind of constructing tunnel anchor pole securing device and its installation method of installation method, including Following steps:
The first step, tunnel excavation face and the substantially smooth rear positioning for carrying out steelframe of tunnel contour, installation, the steelframe is I-shaped Steelframe;
Second step sets longitudinally connected muscle and bar-mat reinforcement on tunnel surrounding, sets the bolt in advance on the edge of a wing of steelframe Hole;
Third walks, and the horizontal splice plate of firm component one and firm component two is withstood under country rock, and anchor pole thereon is positioned Hole centering squeezes into position to scheduled anchor pole, and firm component one and two mirror of firm component are to being arranged in steelframe both sides;
By the bolt hole centering on the bolt hole and steelframe on bottom connecting plate, fixation is bolted in 4th step;
5th step squeezes into anchor pole towards in anchor pole location hole, and installs stop grouting plug and roof bolt plate, blending bolt on anchor pole successively Fastening.
The beneficial effects of the present invention are:
(1)The present invention provides a kind of tunnel radial system anchor pole scene specification from the angle of system anchor bolt location and installation Change the method for construction, be conducive to give full play to the support action of system anchor bolt.
(2)Bottom connecting plate is bolted on the edge of a wing of front and rear steelframe in the present invention, make system anchor bolt with it is front and rear Steelframe forms integer support system, is conducive to reduce the sedimentation of steel arch-shelf.
(3)The present invention needs the circumferentially prepared screw-bolt hole at a certain distance on the steelframe edge of a wing before implementing, by arranging bolt The position in hole can improve the phenomenon that system anchor bolt layout is chaotic under the prior art, the lifting system anchor pole branch in tunnel longer-range The globality of shield.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is mounting structure schematic diagram of the present invention.
In figure:1st, component one is consolidated;2nd, component two is consolidated;3rd, horizontal splice plate;4th, vertical plate;5th, bottom connecting plate;6、 Anchor pole location hole;7th, bolt hole;8th, slab section;9th, thin plate section;10th, steelframe;11st, country rock;12nd, anchor pole;13rd, stop grouting plug;14th, anchor Bar backing plate.
Specific embodiment
In order to clearly illustrate the above objects, features and advantages of the present invention, below in conjunction with the accompanying drawings and it is embodied The example technical solution that the present invention will be described in detail provides.Other than each embodiment described in this part, the present invention also is able to Implemented by other different modes, those skilled in the art can be correspondingly improved, deform and replace, therefore the present invention It is not limited by specific embodiment disclosed in the part.
A kind of constructing tunnel anchor pole securing device as shown in Figure 1, including:Firm component 1 and firm component 22.Surely Gu component 1 and firm component 22 include:Horizontal splice plate 3, vertical plate 4 and bottom connecting plate 5, the tail of horizontal splice plate 3 Portion is fixed with 4 top vertical welding of vertical plate, and head and 4 bottom end of vertical plate of bottom connecting plate 5 are vertically connected, horizontal splice plate 3 extending direction is opposite with the extending direction of bottom connecting plate 5.
Horizontal splice plate 3 is process by a block length 58cm, the steel plate of thick 2cm, sets 12 location hole 6 of anchor pole thereon;Bottom Portion's connecting plate 5 is a block length 50cm, and the steel plate of thick 1cm sets bolt hole 7 thereon.The horizontal splice plate 3 of firm component 1 Bottom surface is recessed 1cm upwards, is divided into slab section 8 and thin plate section 9, and the top surface for consolidating the horizontal splice plate 3 of component 22 is recessed down 1cm is divided into slab section 8 and thin plate section 9.Slab section 8 is connect with vertical plate 4, and anchor pole location hole 6 is set in thin plate section 9;Firm structure The recess of the horizontal splice plate 3 of part 1 and the recess of the horizontal splice plate 3 of firm component 22 match, i.e., firm component The thin plate section 9 of one 1 horizontal splice plate 3 and the horizontal splice plate 3 of firm component 22 can be mutually clamped.
The anchor pole location hole 6 of firm component 1 and firm component 22 is arranged at the half of its 9 length of thin plate section Place, 6 diameter of anchor pole location hole are more than bolt diameter.
As shown in Fig. 2, after the completion of firm component 1 and firm component 22 are prefabricated, installed, installed at country rock 11 Specifically include following steps:
The first step, tunnel excavation face and the substantially smooth rear positioning for carrying out steelframe 10 of tunnel contour, installation, the steelframe 10 is work Font steelframe 10;
Second step sets longitudinally connected muscle and bar-mat reinforcement on tunnel surrounding 11, on the edge of a wing of steelframe 10 described in setting in advance Bolt hole 7;
Third walks, and the horizontal splice plate 3 of firm component 1 and firm component 22 is withstood under country rock 11, and by anchor pole thereon 6 centering of location hole squeezes into position to scheduled anchor pole 12, consolidates component 1 and 22 mirror-image arrangement of firm component in 10 liang of steelframe Side;
By 7 centering of bolt hole on the bolt hole 7 on bottom connecting plate 5 and steelframe 10, fixation is bolted in 4th step;
5th step squeezes into anchor pole 12 towards in anchor pole location hole 6, specifically sets means depending on practical 11 situation of country rock:If country rock 11 conditions are poor(V, VI grades of country rocks 11), such as loosely and without self-stability, anchor pole 12 then directly can be pierced country rock 11 by difficult pore-forming; Such as 11 conditions permit of country rock, also can first pore-forming anchor pole 12 is installed again.Stop grouting plug 13 and anchor pole are finally installed on anchor pole 12 successively Backing plate 14, blending bolt fastening.

Claims (6)

1. a kind of constructing tunnel anchor pole securing device, which is characterized in that including:Firm component one and firm component two;It is described Firm component one and firm component two include:Horizontal splice plate, vertical plate and bottom connecting plate, the tail of the horizontal splice plate Portion is vertically connected with vertical plate top, and head and the vertical plate bottom end of the bottom connecting plate are vertically connected, the horizontal splicing The extending direction of plate is opposite with the extending direction of bottom connecting plate;Anchor pole location hole is set on the horizontal splice plate;The bottom The bottom surface of horizontal splice plate for bolt hole being set to consolidate component one on portion's connecting plate is recessed into slab section and thin plate section upwards, consolidates The top surface of the horizontal splice plate of component two is recessed down into slab section and thin plate section;The slab section is connect with vertical plate, thin plate Anchor pole location hole is set in section.
2. a kind of constructing tunnel anchor pole securing device as described in claim 1, which is characterized in that the firm component one The slab section of horizontal splice plate is identical with the thickness of the slab section of the horizontal splice plate of firm component two;The firm component one The recess of horizontal splice plate and the recess of the horizontal splice plate of firm component two match, and consolidate the thickness of one thin plate section of component The sum of degree and the thickness of firm two thin plate section of component are equal to the slab section thickness of the horizontal splice plate of firm component one.
A kind of 3. constructing tunnel anchor pole securing device as described in claim 1, which is characterized in that firm one He of component The anchor pole location hole of firm component two is arranged at the half of its thin plate segment length.
4. a kind of constructing tunnel anchor pole securing device as described in claim 1, which is characterized in that the horizontal splice plate, Vertical plate and bottom connecting plate three are fixedly connected by welding.
A kind of 5. constructing tunnel anchor pole securing device as described in claim 1, which is characterized in that firm one He of component The thickness of two thin plate section of firm component is the half of its slab section thickness.
6. the installation method of a kind of constructing tunnel anchor pole securing device as described in claim 1, which is characterized in that including such as Lower step:
The first step, tunnel excavation face and the substantially smooth rear positioning for carrying out steelframe of tunnel contour, installation, the steelframe is I-shaped Steelframe;
Second step sets longitudinally connected muscle and bar-mat reinforcement on tunnel surrounding, and bolt hole is set in advance on the edge of a wing of steelframe;
Third walks, and the horizontal splice plate of firm component one and firm component two is withstood under country rock, and anchor pole thereon is positioned Hole centering squeezes into position to scheduled anchor pole, and firm component one and two mirror of firm component are to being arranged in steelframe both sides;
By the bolt hole centering on the bolt hole and steelframe on bottom connecting plate, fixation is bolted in 4th step;
5th step squeezes into anchor pole towards in anchor pole location hole, and installs stop grouting plug and roof bolt plate, blending bolt on anchor pole successively Fastening.
CN201810107967.8A 2018-02-02 2018-02-02 Anchor rod stabilizing device for tunnel construction and mounting method thereof Active CN108222989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810107967.8A CN108222989B (en) 2018-02-02 2018-02-02 Anchor rod stabilizing device for tunnel construction and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810107967.8A CN108222989B (en) 2018-02-02 2018-02-02 Anchor rod stabilizing device for tunnel construction and mounting method thereof

Publications (2)

Publication Number Publication Date
CN108222989A true CN108222989A (en) 2018-06-29
CN108222989B CN108222989B (en) 2024-03-22

Family

ID=62669374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810107967.8A Active CN108222989B (en) 2018-02-02 2018-02-02 Anchor rod stabilizing device for tunnel construction and mounting method thereof

Country Status (1)

Country Link
CN (1) CN108222989B (en)

Citations (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1381040A (en) * 1971-11-12 1975-01-22 Fmc Corp Heat sealing head
DE2443442A1 (en) * 1973-09-11 1975-04-17 Taihei Overseas K K CASTING DEVICE FOR MANUFACTURING A BOX-SHAPED CONCRETE BODY
FR2360777A1 (en) * 1976-07-23 1978-03-03 Huillier Andre L Corrugated asbestos cement sheet overlapping joint - has upper and lower clips concealing screw head secured to support frame
GB1527250A (en) * 1975-11-17 1978-10-04 Bovis Spraycon Ltd Building constructions
DE3712618A1 (en) * 1987-04-14 1988-11-03 Hans Lechtenboehmer Fence and fastening strap intended therefor
JP2000073569A (en) * 1998-08-31 2000-03-07 Komai Tekko Inc Splice plate holding jig for connecting beam
US20020062612A1 (en) * 2000-11-30 2002-05-30 Heady Timothy P. Apparatus and method for straightening and supporting a damaged wall
CN200946520Y (en) * 2006-06-27 2007-09-12 孔祥清 Down-hole suspension device for coal mine
FR2922237A1 (en) * 2007-10-12 2009-04-17 Pieces Et Accessoires Ind P A Fastener for suspending panel of suspended ceiling to ceiling wall, has plate hooked in suspension to lower free flange of I-shaped beam for anchoring board in metallic suspension section so that section is maintained in suspension at beam
US20100181447A1 (en) * 2009-01-20 2010-07-22 Arlington Industries, Inc. Support bracket with small profile base for supporting an electrical junction box
CN202991079U (en) * 2013-01-09 2013-06-12 中铁十二局集团第四工程有限公司 Base plate type connection device of anchor rod or anchor pipe and structural steel frame
CN203796285U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Tunnel supporting structure with steel frames
CN104074279A (en) * 2014-07-25 2014-10-01 浙江乔兴建设集团有限公司 Connecting structure applicable to connection of I-shaped steel bars and T-shaped steel bars
CN204677168U (en) * 2015-06-03 2015-09-30 任斌 A kind of anti-theft device of oil production equipment
CN204783048U (en) * 2015-07-08 2015-11-18 汤晓辉 Concatenation reinforcing apparatus of tunnel steel shotcrete
CN204984460U (en) * 2015-09-15 2016-01-20 王亚杰 High supporting performance anchor rope or stock steel band girder system are all
CN205778936U (en) * 2016-05-11 2016-12-07 长沙理工大学 A kind of support bracket and supporting construction
CN106401614A (en) * 2016-10-17 2017-02-15 中铁五局集团第五工程有限责任公司 Supporting structure for large-section weak surrounding rock tunnel construction and construction method thereof
RU2611661C1 (en) * 2016-02-09 2017-02-28 Владимир Алексеевич Виноградов Metal frame of monolithic reinforced concrete slab
WO2017045425A1 (en) * 2015-09-18 2017-03-23 南京联众建设工程技术有限公司 Steel-concrete composite tunnel lining support structure and manufacturing and construction method thereof
KR101731244B1 (en) * 2015-12-22 2017-05-02 한국건설기술연구원 Connecting plate-attach type bended reinforcement truss deck plate and manufacturing method thereof
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN206220978U (en) * 2016-08-25 2017-06-06 河北工业大学 Vcehicular tunnel first lined steel bow member supporting construction integrated with prestressed anchor
CN206245216U (en) * 2016-12-06 2017-06-13 山东科技大学 A kind of steel and wood composite bridge deck structure for garden landscape bridge
CN106907165A (en) * 2017-05-03 2017-06-30 云南建投基础工程有限责任公司 A kind of tunnel lock foot anchoring stock and supporting steelframe connecting elements
CN206571515U (en) * 2017-03-17 2017-10-20 中铁二院昆明勘察设计研究院有限责任公司 Assembled tunnel lock foot anchoring stock and supporting steelframe connecting elements
CN207905849U (en) * 2018-02-02 2018-09-25 中交三航局第三工程有限公司 A kind of constructing tunnel anchor pole securing device

Patent Citations (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1381040A (en) * 1971-11-12 1975-01-22 Fmc Corp Heat sealing head
DE2443442A1 (en) * 1973-09-11 1975-04-17 Taihei Overseas K K CASTING DEVICE FOR MANUFACTURING A BOX-SHAPED CONCRETE BODY
GB1527250A (en) * 1975-11-17 1978-10-04 Bovis Spraycon Ltd Building constructions
FR2360777A1 (en) * 1976-07-23 1978-03-03 Huillier Andre L Corrugated asbestos cement sheet overlapping joint - has upper and lower clips concealing screw head secured to support frame
DE3712618A1 (en) * 1987-04-14 1988-11-03 Hans Lechtenboehmer Fence and fastening strap intended therefor
JP2000073569A (en) * 1998-08-31 2000-03-07 Komai Tekko Inc Splice plate holding jig for connecting beam
US20020062612A1 (en) * 2000-11-30 2002-05-30 Heady Timothy P. Apparatus and method for straightening and supporting a damaged wall
CN200946520Y (en) * 2006-06-27 2007-09-12 孔祥清 Down-hole suspension device for coal mine
FR2922237A1 (en) * 2007-10-12 2009-04-17 Pieces Et Accessoires Ind P A Fastener for suspending panel of suspended ceiling to ceiling wall, has plate hooked in suspension to lower free flange of I-shaped beam for anchoring board in metallic suspension section so that section is maintained in suspension at beam
US20100181447A1 (en) * 2009-01-20 2010-07-22 Arlington Industries, Inc. Support bracket with small profile base for supporting an electrical junction box
CN202991079U (en) * 2013-01-09 2013-06-12 中铁十二局集团第四工程有限公司 Base plate type connection device of anchor rod or anchor pipe and structural steel frame
CN203796285U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Tunnel supporting structure with steel frames
CN104074279A (en) * 2014-07-25 2014-10-01 浙江乔兴建设集团有限公司 Connecting structure applicable to connection of I-shaped steel bars and T-shaped steel bars
CN204677168U (en) * 2015-06-03 2015-09-30 任斌 A kind of anti-theft device of oil production equipment
CN204783048U (en) * 2015-07-08 2015-11-18 汤晓辉 Concatenation reinforcing apparatus of tunnel steel shotcrete
CN204984460U (en) * 2015-09-15 2016-01-20 王亚杰 High supporting performance anchor rope or stock steel band girder system are all
WO2017045425A1 (en) * 2015-09-18 2017-03-23 南京联众建设工程技术有限公司 Steel-concrete composite tunnel lining support structure and manufacturing and construction method thereof
KR101731244B1 (en) * 2015-12-22 2017-05-02 한국건설기술연구원 Connecting plate-attach type bended reinforcement truss deck plate and manufacturing method thereof
RU2611661C1 (en) * 2016-02-09 2017-02-28 Владимир Алексеевич Виноградов Metal frame of monolithic reinforced concrete slab
CN205778936U (en) * 2016-05-11 2016-12-07 长沙理工大学 A kind of support bracket and supporting construction
CN206220978U (en) * 2016-08-25 2017-06-06 河北工业大学 Vcehicular tunnel first lined steel bow member supporting construction integrated with prestressed anchor
CN106401614A (en) * 2016-10-17 2017-02-15 中铁五局集团第五工程有限责任公司 Supporting structure for large-section weak surrounding rock tunnel construction and construction method thereof
CN206245216U (en) * 2016-12-06 2017-06-13 山东科技大学 A kind of steel and wood composite bridge deck structure for garden landscape bridge
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN206571515U (en) * 2017-03-17 2017-10-20 中铁二院昆明勘察设计研究院有限责任公司 Assembled tunnel lock foot anchoring stock and supporting steelframe connecting elements
CN106907165A (en) * 2017-05-03 2017-06-30 云南建投基础工程有限责任公司 A kind of tunnel lock foot anchoring stock and supporting steelframe connecting elements
CN207905849U (en) * 2018-02-02 2018-09-25 中交三航局第三工程有限公司 A kind of constructing tunnel anchor pole securing device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姚向荣;石必明;宋玉;: "深部"三软"煤层巷道长锚杆支护工艺参数优化及应用", 矿业安全与环保, no. 02, 10 April 2009 (2009-04-10) *
李顺波;: "W型钢带在长大隧道缓倾岩层初期支护中的应用", 石家庄铁路职业技术学院学报, no. 04 *
王晓峰;: "隧道锚喷支护设计浅谈", 天然气与石油, no. 04 *

Also Published As

Publication number Publication date
CN108222989B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN105756685B (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN104947603B (en) A kind of rc beam bridge girder reinforcing construction and reinforcement means
CN104832200A (en) Self-adaptive feet-lock bolt integrated device and application method thereof
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN104652242A (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN102587933A (en) Gob-side entry retaining method using prefabricated walls
CN109797659A (en) A kind of mobile asynchronous construction method of bracket of Wavelike steel webplate continuous bridge
CN103850708A (en) Method for performing gob-side entry retaining through concrete filling body
CN206608198U (en) A kind of canopy formula with gang drill is taken a step sectional shelf-unit
CN207905849U (en) A kind of constructing tunnel anchor pole securing device
CN210134353U (en) Bracket type hoop bracket for bent cap construction
CN205689216U (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN206668287U (en) A kind of combined steel pipe concrete bow member for supporting
CN210440048U (en) Die carrier suitable for curved well wall construction of multiple arch tunnel is used
CN108222989A (en) A kind of constructing tunnel anchor pole securing device and its installation method
CN106499420A (en) A kind of mechanical type constant-resistance individual prop installation method and erection method
CN207293981U (en) The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
CN103498573B (en) Set up the existing frame strengthening method of band frame bracing members
CN216892013U (en) Support counter-force pre-pressing system suitable for water area cable-stayed bridge super-large zero block
CN209162662U (en) A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform
CN101892844B (en) Method for excavating tunnels undergoing advanced bolting by using CRD
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN205349372U (en) For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only
CN210507799U (en) Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam
CN113944479A (en) Unfavorable geological tunnel three-fork construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Longxi

Inventor after: Jia Yingkai

Inventor after: Guo Wenbo

Inventor after: Tang Heqing

Inventor after: Wang Shuying

Inventor after: Yang Junsheng

Inventor after: Yang Peng

Inventor before: Li Longxi

Inventor before: Guo Wenbo

Inventor before: Tang Heqing

Inventor before: Wang Shuying

Inventor before: Yang Junsheng

Inventor before: Yang Peng

GR01 Patent grant