JP2000073569A - Splice plate holding jig for connecting beam - Google Patents

Splice plate holding jig for connecting beam

Info

Publication number
JP2000073569A
JP2000073569A JP10245882A JP24588298A JP2000073569A JP 2000073569 A JP2000073569 A JP 2000073569A JP 10245882 A JP10245882 A JP 10245882A JP 24588298 A JP24588298 A JP 24588298A JP 2000073569 A JP2000073569 A JP 2000073569A
Authority
JP
Japan
Prior art keywords
web
splice plate
plate
jig
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10245882A
Other languages
Japanese (ja)
Inventor
Takeshi Fujikawa
武 藤川
Tomonori Komaki
知紀 小牧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOMAI TEKKO Inc
Original Assignee
KOMAI TEKKO Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOMAI TEKKO Inc filed Critical KOMAI TEKKO Inc
Priority to JP10245882A priority Critical patent/JP2000073569A/en
Publication of JP2000073569A publication Critical patent/JP2000073569A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a splice plate holding jig for a connecting beam which is simple in composition and small in the number of parts, and can easily attach to and detach from each beam and can reuse, and can temporally fixedly hold many splice plates, and can easily and safely attach and detach the jig in a building field. SOLUTION: In the case where the end of a beam 5 formed of I-steel butts against the joint 12 of a column or the like, and both the above parts are bolt- fastened through a splice plate 6 spreading over their butt part, the splice plate 6 is temporally fixedly held until both the fades of a web of the beam 5 are positioned to the joint 12. These splice plate holding jigs 1 are separatedly arranged at a space corresponding to a pair of bolt attaching holes 7 which are previously drilled correspondingly to the web 5b of the beam 5 and the splice plate 6 and arranged vertically, and has a pair of parallel rods 2 which are slidably inserted through each bolt attaching hole 7 and bend at the same curvature; a connecting part for unitedly connecting the ends of both these parallel rods 2; and nuts 4 which are severally threadedly engaged on each other end side of the parallel rod 2 to hold the splice plate 6 on the web 5b of the beam 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば建築用鉄骨
の組立てに際し、I型鋼からなる梁のウェブを柱仕口等
に接続ためのウェブ接続用の添接板を接続位置まで仮止
め保持するために使用する梁接続用添接板保持治具に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to, for example, when assembling a steel frame for construction, temporarily attaches and holds a web connecting plate for connecting a beam web made of I-beam to a column connection or the like to a connection position. For holding a beam-attached attachment plate used for this purpose.

【0002】[0002]

【従来の技術】近年、例えばビル建築分野において、
低,中,高等の各層のビルの鉄骨構造として、断面四角
形状のボックス柱等からなる鉄骨柱と、I型鋼からなる
梁との組合せによるものが多く適用されている。この場
合、柱と梁の接続(大梁と小梁の接続を含む)には、一
般にボルト締結が行われるが、施工効率向上等のために
通常では柱仕口の溶接加工や、仕口と梁へのボルト取付
け孔の形成加工等については予め工場段階で行われ、建
築現場においては主に柱の立設および梁の揚重ならびに
両者のボルト接続等の作業が行われる。
2. Description of the Related Art In recent years, for example, in the building construction field,
2. Description of the Related Art As a steel structure of a building having low, medium and high layers, a combination of a steel column including a box column having a rectangular cross section and a beam including an I-shaped steel is often used. In this case, the connection between the column and the beam (including the connection between the large beam and the small beam) is generally carried out by bolting. However, in order to improve construction efficiency, welding of the column connection or the connection between the column and the beam is usually performed. The formation of the bolt mounting holes in the holes is performed in advance at the factory stage, and in the construction site, operations such as erection of columns, lifting of beams, and bolt connection between the two are mainly performed.

【0003】このような柱と梁との接続は、柱仕口に梁
の端部を突合せ、その両者の突合せ部分に亘る添接板を
I型梁のウェブ両面および上下フランジ両面に添装し、
その添接板を柱仕口および梁の両者にボルト締めするこ
とによって行われる。このために、柱仕口、梁のウェブ
およびフランジ、ならびに各添接板には共通な上下配置
の孔が例えば複数列形成される。この添接板のうち、特
に梁のウェブ両面を挟持する添接板は板面が垂直で荷重
負担の主体となる部分であるため、最初のボルト締結箇
所として適用される。つまり、上下フランジ両面を挟持
する添接板は板面が水平で荷重負担の程度が低く、この
部分のボルト接続はフランジ締結後で十分である。
[0003] In order to connect the column and the beam, the ends of the beam are abutted to the column connection, and the attachment plates extending over the abutting portion of both are attached to both sides of the web and upper and lower flanges of the I-shaped beam. ,
This is done by bolting the attachment plate to both the column connection and the beam. For this purpose, for example, a plurality of rows of common vertical arrangement are formed in the column connections, the webs and flanges of the beams, and the respective attachment plates. Among the contact plates, the contact plate that sandwiches both sides of the web of the beam is a portion where the plate surface is vertical and mainly bears the load, and thus is used as a first bolt fastening portion. In other words, the contact plate sandwiching the upper and lower flanges on both sides has a flat plate surface and a low load burden, and the bolt connection at this portion is sufficient after the flange is fastened.

【0004】ところで、梁を地上から上階に相当する高
所まで揚重した後に、その梁にフランジ用添接板をその
ような高所で人手によって装着することは、作業能率お
よび安全性等からみて好ましくないため、一般的に梁の
揚重前に予めフランジ用添接板を装着している。この場
合に問題となるのが、梁に対する添接板の装着状態であ
る。即ち、梁の柱に対する組立て状態ではその両者に対
して添接板が亘る必要があることから、その添装板は梁
の先端から突出する状態となる。しかし、予めこの状態
で梁の先端に添接板を装着すると、その添接板を含めた
梁の全体長さが大きくなり、揚重途中に他部材と接触し
たり、柱仕口の高さ位置までの導入が困難となったりす
る。そこで梁の揚重に際しては、添接板が梁の先端から
突出しない状態に仮止めしておき、接続位置まで揚重し
た後に仮止め状態を解除し、その状態で初めて梁から添
接板を柱仕口との間に亘る突出状態とする必要がある。
[0004] Incidentally, after the beam is lifted from the ground to a high place corresponding to the upper floor, it is necessary to manually attach a flange attachment plate to the beam at such a high place because of the work efficiency and safety. Generally, a flange contact plate is mounted before lifting the beam because it is not preferable from the viewpoint of the beam. In this case, what is problematic is how the attachment plate is attached to the beam. That is, in the assembled state of the beam to the pillar, the attachment plate needs to extend over both of them, so that the attachment plate projects from the tip of the beam. However, if an attachment plate is attached to the tip of the beam in this state in advance, the entire length of the beam including the attachment plate will increase, and the beam will come into contact with other members during lifting or the height of the column connection It may be difficult to introduce to the position. Therefore, when lifting the beam, temporarily fix the attachment plate so that it does not protrude from the tip of the beam, release the temporary fixation state after lifting to the connection position, and then remove the attachment plate from the beam for the first time. It is necessary to make it protrude between the pillar connection.

【0005】この作業が従前から問題となっていたとこ
ろであり、その解決策としてこれまでに開発された技術
の代表的な例として、梁のウェブ両面に各添接板を蝶番
的に軸を介して回動可能に装着する技術が知られてい
る。この技術では、初めに添接板を梁の先端から引込ん
だ状態としておき、この状態で揚重した後に、接続高さ
位置で位置決めをし、その後に添接板を開回動させて柱
仕口に亘る状態とするものである。
[0005] This work has been a problem for some time, and as a typical example of the technique developed so far, each splicing plate is hinged on both sides of the web of the beam via a shaft. 2. Description of the Related Art There is known a technique of mounting the camera such that it can be rotated. In this technique, first, the contact plate is retracted from the tip of the beam, and after lifting in this state, positioning is performed at the connection height position, and then the contact plate is opened and pivoted to open the column. This is a state across the connection.

【0006】[0006]

【発明が解決しようとする課題】ところが上述した従来
技術では、蝶番式の回動支持構造とするための軸あるい
は軸受や羽根が必要であり、構成が複雑で部品数が多
く、コスト高であるとともに製造にも手間がかかる等の
問題がある。また、各梁毎に支持構造が必要となり、し
かも軸支持部分は梁のフランジに溶接等によって固着さ
れるため、それらは梁を柱に接合した後の状態で容易に
離脱することができず、その離脱作業に余分な労力や時
間を費やし、場合によっては危険性も含む。逆に装着状
態のまま残存させておくことは、資材の無駄を招く。さ
らに、回動支持構造の付設は建築現場等で行い難いため
工場での加工後、梁に付けた状態で現場まで搬送するこ
ととなるが、その途中での振動や接触等によって回動状
態必要に不具合が生じる可能性があり、それを防ぐため
には搬送に余計な注意を必要とする。
However, in the above-mentioned prior art, a shaft, a bearing, and a blade are required for a hinge-type rotating support structure, and the structure is complicated, the number of parts is large, and the cost is high. In addition, there is a problem that it takes time to manufacture. Also, a support structure is required for each beam, and since the shaft support portion is fixed to the flange of the beam by welding or the like, they cannot be easily detached after the beam is joined to the column, Extra work and time are spent on the detachment work, and in some cases, danger is involved. Conversely, leaving the device in the mounted state causes waste of materials. Furthermore, it is difficult to attach the rotation support structure at the construction site, etc., so after processing at the factory, it will be transported to the site with it attached to the beam, but the rotation state is required due to vibration and contact etc. in the middle May cause problems, and extra care must be taken in transporting to prevent such problems.

【0007】本発明はこのような事情に鑑みてなされた
ものであり、その目的は、構成が簡単で部品数が少な
く、低コスト化が図れるとともに製造が容易に行え、か
つ各梁に対して容易に着脱できて梁接合の後には再使用
が可能であり、少数のもので多数の添接板の仮止め保持
を行うことができて資材の有効活用が図れ、しかも建築
現場にて容易かつ安全に着脱が行え工場での装着や装着
状態での搬送等が不要で、従来の搬送に伴う不具合の発
生や余分な注意を掛ける必要を排除することができる梁
接続用添接板保持治具を提供することにある。
The present invention has been made in view of such circumstances, and has as its object the purpose of having a simple structure, a small number of parts, low cost, and easy manufacture, and It can be easily attached and detached, and can be reused after beam joining, and a small number can temporarily hold a large number of attachment plates, making effective use of materials possible. It can be safely attached and detached, does not require installation at the factory or transport in the mounted state, and eliminates the occurrence of problems associated with conventional transport and the necessity of giving extra care to beam attachment jigs for beam connection Is to provide.

【0008】[0008]

【課題を解決するための手段】前記の目的を達成するた
めに、本発明では、I型鋼からなる梁の端部を柱等の仕
口に突合せ、その両者の突合せ部分に亘る添接板を介し
てボルト締結する場合、前記添接板を前記梁のウェブ両
面に前記仕口への位置決めまで仮止め保持する梁接続用
添接板保持治具であって、前記梁のウェブと前記添接板
とに対応して予め穿設されている上下配置の1対のボル
ト取付け孔に対応する間隔で離間配置され、かつ前記各
ボルト取付け孔に摺動可能に挿通される同一曲率で湾曲
する1対の平行ロッド部と、この両平行ロッド部の一端
部同士を一体に連結する連結部と、前記平行ロッド部の
各他端側にそれぞれ螺合され、前記添接板を前記梁のウ
ェブに保持するナットとを備えてなることを特徴とする
梁接続用添接板保持治具を提供する。
In order to achieve the above-mentioned object, according to the present invention, an end of a beam made of I-beam is abutted to a connection such as a column, and an attachment plate extending over the abutting portion of both is joined. A beam connecting splice holding jig for temporarily holding the splicing plate on both sides of the web until the positioning of the splicing plate to the connection, wherein the jig is connected to the web of the beam by the bolt. A pair of bolt mounting holes, which are previously drilled corresponding to the plate, are spaced apart at intervals corresponding to a pair of vertically arranged bolt mounting holes, and are bent at the same curvature slidably inserted into the respective bolt mounting holes. A pair of parallel rod portions, a connecting portion for integrally connecting one end portions of the two parallel rod portions, and each of the parallel rod portions are screwed to the other end sides of the parallel rod portions, and the contact plate is attached to the web of the beam. And a retaining nut for retaining the beam. To provide a jig.

【0009】[0009]

【発明の実施の形態】以下、本発明に係る梁接続用添接
板保持治具の一実施形態について、図面を参照して説明
する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a jig for holding an attachment plate for beam connection according to the present invention.

【0010】図1〜図3は梁接続用添接板保持治具の構
成を示し、図4〜図7は使用状態を示している。
FIGS. 1 to 3 show the construction of a beam connecting attachment plate holding jig, and FIGS. 4 to 7 show a used state.

【0011】図1〜図3に示すように、本実施形態の梁
接続用添接板保持治具1は、一定間隔をあけて離間する
とともに同一曲率で湾曲する円弧状の1対の平行ロッド
部2と、この両平行ロッド部2の一端部同士を一体に連
結する連結部としての連結ロッド部3とを有する。これ
らの平行ロッド部2と連結ロッド部3とは、一定径の丸
棒鋼材を折曲形成することにより一体に構成したもので
ある。そして、各平行ロッド部2の他端側には、それぞ
れ雄ねじ2aが形成してあり、これらの各雄ねじ2aに
ナット4がそれぞれ螺合できるようにしてある。
As shown in FIGS. 1 to 3, a jig 1 for holding an attached plate for beam connection according to the present embodiment is a pair of arc-shaped parallel rods which are separated at a predetermined interval and are curved at the same curvature. And a connecting rod portion 3 as a connecting portion for integrally connecting one end portions of the two parallel rod portions 2 to each other. The parallel rod portion 2 and the connecting rod portion 3 are integrally formed by bending a round steel bar having a constant diameter. On the other end side of each parallel rod portion 2, a male screw 2a is formed, and a nut 4 can be screwed into each of these male screws 2a.

【0012】平行ロッド部2の径および曲率は、図4等
に示したI型鋼からなる梁5のウェブ5aおよび添接板
6に穿設されたボルト取付け孔7,8に挿通し得ると同
時に、それらのボルト取付け孔7,8に摺動可能となる
値に設定してある。つまり、平板状で一定肉厚の1枚の
ウェブ5aおよびその両面側に添装される2枚の添接板
6に、高力ボルト挿入のために形成される直線状のボル
ト取付け孔7,8に対し、湾曲した平行ロッド部2が摺
動可能に挿通できる値にその径および曲率が設定にして
ある。
The diameter and the curvature of the parallel rod portion 2 can be passed through the web 5a of the beam 5 made of I-beam and the bolt mounting holes 7 and 8 formed in the attachment plate 6 as shown in FIG. , Are set to values that allow sliding in the bolt mounting holes 7 and 8. In other words, one flat web-shaped web 5a having a constant thickness and two attached plates 6 attached to both sides of the web 5a are provided with linear bolt mounting holes 7, 8, the diameter and the curvature are set to values at which the curved parallel rod portion 2 can be slidably inserted.

【0013】また、平行ロッド部2同士の間隔は、ウェ
ブ5aおよび添接板6に上下配置で複数個が例えば等間
隔で配置された複数列のボルト取付け孔7,8に対し、
自由に選択して挿入できるように設定してある。
The interval between the parallel rod portions 2 is determined by the number of bolt mounting holes 7 and 8 in a plurality of rows vertically arranged on the web 5a and the attachment plate 6, for example, at equal intervals.
It is set so that it can be freely selected and inserted.

【0014】さらに、各平行ロッド部2の長さは、ウェ
ブ5aおよび添接板6を十分に貫通することができる長
さに設定され、また各平行ロッド部2の曲率は、各添接
板6がウェブ5aの両面側で円滑に回動できる曲率に設
定されている。即ち、各平行ロッド部2をガイドとし
て、各添接板6が左右に一定範囲できる設定となってい
る。この各添接板6の回動範囲としては、最終的な柱仕
口への挟持状態となるように、ウェブ5aの先端から並
列状態で突出する状態(図5の実線の状態)と、ウェブ
5aの先端よりも各添接板6の先端が後退した位置まで
開く状態(図5の仮想線の状態)までの範囲が、少なく
とも設定されている。
Further, the length of each parallel rod portion 2 is set to a length that can sufficiently penetrate the web 5a and the attachment plate 6, and the curvature of each parallel rod portion 2 is 6 is set to have a curvature that allows smooth rotation on both sides of the web 5a. In other words, the setting is such that the respective attachment plates 6 can be fixed to the left and right by using the parallel rod portions 2 as guides. The rotation range of each attachment plate 6 includes a state in which the web 5a protrudes in a parallel state from the end of the web 5a so as to be finally sandwiched between the column connections (a state shown by a solid line in FIG. 5), At least a range is set up to a state where the tip of each attachment plate 6 is opened to a position where the tip of each attachment plate 6 is retracted from the tip of 5a (the state of the phantom line in FIG. 5).

【0015】次に作用を説明する。Next, the operation will be described.

【0016】図6(A)〜(D)は梁5の建築現場への
搬入状態から、本実施形態の梁接続用添接板保持治具1
をセットして揚重し、柱仕口に仮止めするまでの工程を
示している。
FIGS. 6 (A) to 6 (D) show a beam connecting jig 1 for holding a beam 5 according to the present embodiment from a state in which the beam 5 is carried into a building site.
Is set and lifted, and the process from temporary fixing to the pillar connection is shown.

【0017】図6(A)に示すように、工場から搬入さ
れる梁5には、そのウェブ5aの両側面に添接板6が仮
ボルト9によって止められている。なお、梁5の上側の
フランジ5bの上面には、上側添接板10が固定してあ
る。この上側添接板10の有無は任意である。
As shown in FIG. 6 (A), the beam 5 carried in from the factory has attachment plates 6 fixed to both sides of the web 5a by temporary bolts 9. An upper attachment plate 10 is fixed to the upper surface of the upper flange 5 b of the beam 5. The presence or absence of the upper attachment plate 10 is optional.

【0018】次に、図6(B)および図4に示すよう
に、仮ボルト9を外すとともに、梁接続用添接板保持治
具1の各平行ロッド部2の雄ねじ2a側の先端を、ウェ
ブ5aおよび両添接板6のボルト取付け孔7,8に挿通
した後、雄ねじ2aにナット4を螺合して脱落防止状態
とする。そして、平行ロッド部2をガイドとして各添接
板6をそれぞれウェブ5aの外面側に開回動して、前述
した図5の仮想線の状態とする。
Next, as shown in FIGS. 6 (B) and 4, the temporary bolt 9 is removed, and the tip of the parallel rod portion 2 of the beam connecting attachment plate holding jig 1 on the male screw 2a side is removed. After being inserted into the bolt mounting holes 7 and 8 of the web 5a and the attachment plates 6, the nut 4 is screwed onto the male screw 2a to prevent the nut from falling off. Then, using the parallel rod portion 2 as a guide, each attachment plate 6 is opened and rotated toward the outer surface side of the web 5a, and the state shown by the imaginary line in FIG.

【0019】この状態から、図6(C)に示すように、
揚重機のワイヤ10等によって梁5を吊り上げ、柱11
の所定の高さにある、梁5と同一断面の仕口(柱仕口)
12に対し、梁5を先端同士突合う状態で対向させる。
この場合、梁5の上側のフランジ5b上面の上側添接板
10を柱仕口12のフランジ12b上面に搭載すること
で、容易に上下方向の位置決めを行うことができる。
From this state, as shown in FIG.
The beam 5 is lifted by the wire 10 or the like of the crane,
Of the same cross-section as the beam 5 at a given height (column connection)
The beam 5 is opposed to 12 in a state where the beams abut each other.
In this case, by mounting the upper contact plate 10 on the upper surface of the flange 5b on the upper side of the beam 5 on the upper surface of the flange 12b of the pillar connection 12, positioning in the vertical direction can be easily performed.

【0020】そして、平行ロッド部2をガイドとして各
添接板6をそれぞれウェブ5aの先端側に向けて閉回動
し(図5の実線の状態)、各添接板6を柱仕口12のウ
ェブ12a両面に対して挟持状態とする。この状態で、
仮ボルト13を添接板6のボルト取付け孔8から、梁5
のウェブ5aのボルト取付け孔7および柱仕口12のウ
ェブ12aのボルト取付け孔14に挿通して締結する。
また、梁接続用添接板保持治具1の平行ロッド部2から
ナット4を外し、その平行ロッド部2を梁5のウェブ5
aから抜き出して、梁接続用添接板保持治具1を取り外
す。
Then, using the parallel rod portion 2 as a guide, each attachment plate 6 is closed and rotated toward the tip end of the web 5a (the state shown by the solid line in FIG. 5), and each attachment plate 6 is connected to the column connection 12. Of the web 12a. In this state,
The temporary bolt 13 is inserted through the bolt mounting hole 8 of the attachment plate 6 into the beam 5.
Of the web 5a of the web 5a and the bolt mounting hole 14 of the web 12a of the column connection 12 for fastening.
Further, the nut 4 is removed from the parallel rod portion 2 of the jig 1 for attaching a connecting plate for beam connection, and the parallel rod portion 2 is connected to the web 5 of the beam 5.
Then, the jig 1 for holding the beam is attached and removed.

【0021】その後、図6(D)および図7に示すよう
に、高力ボルト15を梁5、柱仕口12および添接板6
の各ボルト取付け孔7,8,14の全てに通し、これら
を強力に締結する。これによって梁5の荷重が十分に柱
11側に支持されるので、その後各フランジ5b,12
bも他のフランジ用添接板16を介して高力ボルト15
で締結する。なお、取り外した梁接続用添接板保持治具
1は、再び図6(B)に示すように、別の梁5に取付
け、上記の操作を繰り返すことによって、後の組立てに
使用することができる。
Thereafter, as shown in FIGS. 6D and 7, the high-strength bolt 15 is connected to the beam 5, the column connection 12 and the attachment plate 6.
Through all of the bolt mounting holes 7, 8, and 14 and strongly tighten them. As a result, the load of the beam 5 is sufficiently supported on the column 11 side.
b also has a high-strength bolt 15
To conclude. The jig 1 for holding the attached splice plate for beam connection, as shown in FIG. 6 (B), is attached to another beam 5 again, and can be used for later assembly by repeating the above operation. it can.

【0022】以上の実施形態によれば、梁接続用添接板
保持治具1は1対の平行ロッド部2、連結ロッド部3お
よびナット4からなる簡単な構成であり、しかも部品数
が少ないので、製造が容易で低コスト化が図れる。そし
て、使用に際しては、建築現場において平行ロッド部2
を梁5のウェブ5aのボルト取付け孔7および添接板6
のボルト取付け孔8を任意に使用して容易かつ迅速に装
着することができ、装着時の作業性を向上することがで
きる。また、装着した梁接続用添接板保持治具1は、梁
5の接続状態で、例えば仮ボルト9による締着状態で取
外すことができるので、その後の高力ボルトによる締結
の邪魔にならず、その締結作業を容易かつ確実に、かつ
能率よく行うことができる。この場合において、梁接続
用添接板保持治具1の取外しについても、ナット4を緩
めて取外した後、平行ロッド部2を引抜く操作で容易に
行えるので、高所作業であるにも拘らずに安全かつ能率
よく行える。そして、このようにして梁接続用添接板保
持治具1を梁から容易に取外すことができる結果、従来
例と異なり梁5に何等の余分な物も残留せず、資材の無
駄も生じない。しかも、取外した梁接続用添接板保持治
具1は、再び別の梁に装着して繰り返し使用することが
できるので、梁に対する治具の数が従来例に比して大幅
に減少できるとともに、複数回の使用により経済性を格
段に向上することができる。さらに、建築現場において
容易かつ安全に着脱が行える結果、工場での装着が不要
となって工場における作業工数の低減が図れるととも
に、梁への装着状態で搬送することも不要であるから、
従来例と異なり搬送に伴う不具合の発生や余分な注意を
掛ける必要も排除することができる。
According to the above embodiment, the jig 1 for holding an attached plate for connecting beams has a simple structure including a pair of parallel rods 2, a connecting rod 3 and a nut 4, and has a small number of parts. Therefore, the production is easy and the cost can be reduced. In use, the parallel rod 2
Of the beam 5 of the beam 5 and the attachment plate 6
The bolt mounting hole 8 can be used arbitrarily and quickly and easily, and workability at the time of mounting can be improved. In addition, the attached beam connecting attachment plate holding jig 1 can be removed in a connected state of the beam 5, for example, in a state of being fastened by the temporary bolt 9, so that it does not hinder subsequent fastening by the high-strength bolt. The fastening operation can be performed easily, reliably, and efficiently. In this case, the attachment jig 1 for the beam connecting plate can be easily removed by loosening the nut 4 and then pulling out the parallel rod portion 2. It can be performed safely and efficiently without using. As a result, the beam connecting jig 1 can be easily removed from the beam in this manner, so that no extra matter remains in the beam 5 and no waste of material occurs unlike the conventional example. . In addition, since the removed jig 1 for attaching a beam is attached to another beam again and can be used repeatedly, the number of jigs for the beam can be greatly reduced as compared with the conventional example. In addition, the economical efficiency can be remarkably improved by a plurality of uses. Furthermore, as it can be easily and safely attached and detached at the construction site, installation at the factory is not required, reducing the number of work steps at the factory, and it is not necessary to transport while mounted on the beam,
Unlike the conventional example, it is possible to eliminate the occurrence of troubles due to the conveyance and the necessity of giving extra attention.

【0023】[0023]

【発明の効果】以上で詳述したように、本発明の梁接続
用添接板保持治具によれば、構成が簡単で部品数が少な
く、低コスト化が図れるとともに製造が容易に行え、か
つ各梁に対して容易に着脱できて梁接合の後には再使用
が可能であり、少数のもので多数の添接板の仮止め保持
を行うことができて資材の有効活用が図れ、しかも建築
現場にて容易かつ安全に着脱が行え工場での装着や装着
状態での搬送等が不要で、従来の搬送に伴う不具合の発
生や余分な注意を掛ける必要を排除することができ、製
造面、搬送面、使用面等での総合的検知から安全性、能
率性、経済性等が従来に比して大幅に向上し、梁の接続
を伴う実際の鉄骨建築上において多大な効果を奏するこ
とができる。
As described above in detail, according to the jig for holding an attachment plate for beam connection of the present invention, the structure is simple, the number of parts is small, the cost can be reduced, and the manufacturing can be easily performed. Also, it can be easily attached to and detached from each beam, and can be reused after beam joining, and a small number can temporarily hold a large number of attachment plates, making effective use of materials possible. It can be easily and safely attached and detached at the construction site and does not need to be mounted in the factory or transported in the mounted state, eliminating the occurrence of problems associated with conventional transport and the need for extra care, and Safety, efficiency, economic efficiency, etc. are greatly improved from the comprehensive detection on the transport side, use side, etc. compared with the conventional, and it has a great effect on the actual steel building with beam connection Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る梁接続用添接板保持治具の一実施
形態を示す構成図。
FIG. 1 is a configuration diagram showing an embodiment of a beam connecting attachment plate holding jig according to the present invention.

【図2】図1の平面視図。FIG. 2 is a plan view of FIG. 1;

【図3】図1の側面視図。FIG. 3 is a side view of FIG. 1;

【図4】前記実施形態の作用説明図で装着前の状態を示
す図。
FIG. 4 is a diagram illustrating a state before mounting in the operation explanatory view of the embodiment.

【図5】同じく作用説明図で、装着途中の状態を示す
図。
FIG. 5 is a view for explaining the operation, showing a state in the middle of mounting.

【図6】(A)〜(D)は梁接続時の使用状態を順次に
示す工程図。
FIGS. 6A to 6D are process diagrams sequentially showing a use state at the time of beam connection.

【図7】梁接続状態を示す図。FIG. 7 is a diagram showing a beam connection state.

【符号の説明】[Explanation of symbols]

1 梁接続用添接板保持治具 2 平行ロッド部 2a 雄ねじ 3 連結ロッド部 4 ナット 5 梁 5a ウェブ 5b フランジ 6 (ウェブ用)添接板 7,8 ボルト取付け孔 9 仮ボルト 10 ワイヤ 11 柱 12 柱仕口 12a ウェブ 12a フランジ 13 仮ボルト 14 ボルト取付け孔 15 高力ボルト 16 フランジ用添接板 DESCRIPTION OF SYMBOLS 1 Jig for holding connection plate for beam connection 2 Parallel rod portion 2a Male thread 3 Connecting rod portion 4 Nut 5 Beam 5a Web 5b Flange 6 (For web) Connection plate 7,8 Bolt mounting hole 9 Temporary bolt 10 Wire 11 Column 12 Column connection 12a Web 12a Flange 13 Temporary bolt 14 Bolt mounting hole 15 High strength bolt 16 Flange attachment plate

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 I型鋼からなる梁の端部を柱等の仕口に
突合せ、その両者の突合せ部分に亘る添接板を介してボ
ルト締結する場合、前記添接板を前記梁のウェブ両面に
前記仕口への位置決めまで仮止め保持する梁接続用添接
板保持治具であって、前記梁のウェブと前記添接板とに
対応して予め穿設されている上下配置の1対のボルト取
付け孔に対応する間隔で離間配置され、かつ前記各ボル
ト取付け孔に摺動可能に挿通される同一曲率で湾曲する
1対の平行ロッド部と、この両平行ロッド部の一端部同
士を一体に連結する連結部と、前記平行ロッド部の各他
端側にそれぞれ螺合され、前記添接板を前記梁のウェブ
に保持するナットとを備えてなることを特徴とする梁接
続用添接板保持治具。
When an end of a beam made of an I-beam is abutted to a connection such as a column, and bolted via an abutment plate extending between both abutting portions, the abutment plate is connected to both sides of the web of the beam. A jig for holding a beam connecting plate for temporarily holding until positioning to said connection, wherein a pair of upper and lower arrangements previously drilled corresponding to the web of said beam and said plate. A pair of parallel rod portions, which are arranged at intervals corresponding to the bolt mounting holes and are slidably inserted into the respective bolt mounting holes and are curved at the same curvature, and one end of each of the two parallel rod portions is connected to each other. A connecting portion for integrally connecting, and a nut screwed to each other end of the parallel rod portion to hold the contact plate on the web of the beam. Contact plate holding jig.
JP10245882A 1998-08-31 1998-08-31 Splice plate holding jig for connecting beam Pending JP2000073569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10245882A JP2000073569A (en) 1998-08-31 1998-08-31 Splice plate holding jig for connecting beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10245882A JP2000073569A (en) 1998-08-31 1998-08-31 Splice plate holding jig for connecting beam

Publications (1)

Publication Number Publication Date
JP2000073569A true JP2000073569A (en) 2000-03-07

Family

ID=17140217

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10245882A Pending JP2000073569A (en) 1998-08-31 1998-08-31 Splice plate holding jig for connecting beam

Country Status (1)

Country Link
JP (1) JP2000073569A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285015A (en) * 2015-05-28 2017-01-04 五冶集团上海有限公司 Steel structural roof beam method for rapidly mounting based on location-plate
CN106499061A (en) * 2016-10-21 2017-03-15 刘振华 A kind of aerial laterally para-position attachment means of steel construction
CN108222989A (en) * 2018-02-02 2018-06-29 中交三航局第三工程有限公司 A kind of constructing tunnel anchor pole securing device and its installation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285015A (en) * 2015-05-28 2017-01-04 五冶集团上海有限公司 Steel structural roof beam method for rapidly mounting based on location-plate
CN106499061A (en) * 2016-10-21 2017-03-15 刘振华 A kind of aerial laterally para-position attachment means of steel construction
CN108222989A (en) * 2018-02-02 2018-06-29 中交三航局第三工程有限公司 A kind of constructing tunnel anchor pole securing device and its installation method
CN108222989B (en) * 2018-02-02 2024-03-22 中交三航局第三工程有限公司 Anchor rod stabilizing device for tunnel construction and mounting method thereof

Similar Documents

Publication Publication Date Title
JP2000073569A (en) Splice plate holding jig for connecting beam
JP6432786B2 (en) Beam material load bearing structure and beam material repair method
JP2006265976A (en) Corrugated steel-plate web u component bridge and its construction method
JP2838760B2 (en) How to relocate a suspended scaffold
CN111364677B (en) Assembling and disassembling method for assembled steel structure main beam
JP2924659B2 (en) Construction method of assembling scaffold
JPH08144368A (en) Structure and method for connecting end plate type steel frame structure
JPH09242188A (en) Damping member attaching structure in brace
CN218540997U (en) Steel column hoisting connection structure
JP3436928B2 (en) Steel web joining aid and steel web joining method
JP3934015B2 (en) High strength bolt joint structure and nut holder
JP2012229539A (en) Splice plate mounting bracket and splice plate mounting structure
JP2749491B2 (en) Temporary beam mounting structure of building unit
JPH11131423A (en) Positioning method of steel pipe
JP3028045B2 (en) Column / beam joint structure
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP3018179U (en) Mounting member for joining rectangular steel pipe columns and beams for construction
JP3948884B2 (en) Method for forming a wooden structure
JP7194532B2 (en) Steel member reinforcement structure and steel member reinforcement method
JPH10317684A (en) Fixing method of earthquake-resisting reinforcing brace
JP2736576B2 (en) Construction method of steel frame structure and column used for it.
JP2005002777A (en) Unit building
JPH03290565A (en) Erection method of beam
JP3232486B2 (en) Unit truss construction method
JPH0771112A (en) Piping unit