CN108221703B - 一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 - Google Patents
一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 Download PDFInfo
- Publication number
- CN108221703B CN108221703B CN201810234591.7A CN201810234591A CN108221703B CN 108221703 B CN108221703 B CN 108221703B CN 201810234591 A CN201810234591 A CN 201810234591A CN 108221703 B CN108221703 B CN 108221703B
- Authority
- CN
- China
- Prior art keywords
- section
- flange plate
- bending moment
- formula
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002131 composite material Substances 0.000 title claims abstract description 110
- 238000010276 construction Methods 0.000 title claims abstract description 60
- 238000005452 bending Methods 0.000 claims abstract description 156
- 238000010586 diagram Methods 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 30
- 238000012545 processing Methods 0.000 claims abstract description 24
- 230000007704 transition Effects 0.000 claims description 69
- 229910000831 Steel Inorganic materials 0.000 claims description 34
- 239000010959 steel Substances 0.000 claims description 34
- 239000000463 material Substances 0.000 claims description 13
- 238000013461 design Methods 0.000 claims description 9
- 230000007935 neutral effect Effects 0.000 claims description 9
- 238000003672 processing method Methods 0.000 claims description 3
- 238000003754 machining Methods 0.000 claims 5
- 238000010008 shearing Methods 0.000 claims 1
- 230000008569 process Effects 0.000 abstract description 17
- 238000009415 formwork Methods 0.000 abstract description 7
- 230000011218 segmentation Effects 0.000 abstract description 2
- 238000005266 casting Methods 0.000 description 5
- 238000009417 prefabrication Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810234591.7A CN108221703B (zh) | 2018-03-21 | 2018-03-21 | 一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810234591.7A CN108221703B (zh) | 2018-03-21 | 2018-03-21 | 一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108221703A CN108221703A (zh) | 2018-06-29 |
| CN108221703B true CN108221703B (zh) | 2023-05-12 |
Family
ID=62659812
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810234591.7A Active CN108221703B (zh) | 2018-03-21 | 2018-03-21 | 一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108221703B (zh) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101100877A (zh) * | 2007-07-31 | 2008-01-09 | 北京工业大学 | 梁端削弱置换式钢框架梁柱抗震节点 |
| CN103643765A (zh) * | 2013-08-23 | 2014-03-19 | 清华大学 | 一种波形腹板箱形截面钢-混凝土组合拱 |
| CN204059752U (zh) * | 2014-09-18 | 2014-12-31 | 江西省辉煌建设集团有限公司 | 一种加强式波纹腹板h型钢 |
| CN105672568A (zh) * | 2016-03-29 | 2016-06-15 | 杭州江润科技有限公司 | 超大截面劲性混凝土转换梁分层浇筑施工方法 |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11148110A (ja) * | 1997-11-14 | 1999-06-02 | Ishikawajima Harima Heavy Ind Co Ltd | 連続桁橋 |
| KR100457961B1 (ko) * | 2000-07-04 | 2004-11-18 | (주)스틸엔콘크리트 | 경간 분할점을 연결하는 프리스트레스트 연속 합성보구조물 및 그 시공방법 |
| KR100882341B1 (ko) * | 2008-04-22 | 2009-02-12 | (주)리튼브릿지 | 단면강성이 보강된 강재빔을 이용한 합성빔의 제작방법 및 단면강성이 보강된 강재빔을 이용한 합성빔을 이용한 라멘교 시공방법 |
| KR20150129399A (ko) * | 2014-05-12 | 2015-11-20 | 우경기술주식회사 | Psc u거더 세그먼트 연결구조 및 방법 |
| CN104131652A (zh) * | 2014-07-17 | 2014-11-05 | 湖南大学 | 装配式rpc-钢-混凝土混合梁结构 |
| CN204570445U (zh) * | 2015-03-17 | 2015-08-19 | 广西交通科学研究院 | 下翼缘设置钢管混凝土的双组合连续梁 |
| CN105002816B (zh) * | 2015-07-29 | 2017-03-08 | 广西交通科学研究院 | 预制拼装的鱼腹工字型预应力钢混组合连续梁桥及施工方法 |
| CN205100082U (zh) * | 2015-11-03 | 2016-03-23 | 苏交科集团股份有限公司 | 一种预制组装型钢混组合梁桥 |
| CN105839510B (zh) * | 2016-05-23 | 2017-10-10 | 西安公路研究院 | 一种钢‑超高性能混凝土组合连续梁桥结构及其施工方法 |
| CN206109961U (zh) * | 2016-09-29 | 2017-04-19 | 石家庄铁道大学 | 钢‑混凝土组合与叠合双重作用连续箱梁桥 |
| CN106638254B (zh) * | 2016-12-30 | 2018-06-29 | 湖南省交通规划勘察设计院 | 一种采用预制组合桥面板的少主梁组合梁桥及其施工方法 |
| CN107034988A (zh) * | 2017-04-27 | 2017-08-11 | 重庆大学 | 一种采用热轧不等厚u形钢组合梁的装配式框架体系 |
| CN207749427U (zh) * | 2018-03-21 | 2018-08-21 | 西安公路研究院 | 一种桥梁用双梁式工字钢-混凝土组合梁 |
-
2018
- 2018-03-21 CN CN201810234591.7A patent/CN108221703B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101100877A (zh) * | 2007-07-31 | 2008-01-09 | 北京工业大学 | 梁端削弱置换式钢框架梁柱抗震节点 |
| CN103643765A (zh) * | 2013-08-23 | 2014-03-19 | 清华大学 | 一种波形腹板箱形截面钢-混凝土组合拱 |
| CN204059752U (zh) * | 2014-09-18 | 2014-12-31 | 江西省辉煌建设集团有限公司 | 一种加强式波纹腹板h型钢 |
| CN105672568A (zh) * | 2016-03-29 | 2016-06-15 | 杭州江润科技有限公司 | 超大截面劲性混凝土转换梁分层浇筑施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108221703A (zh) | 2018-06-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109082998B (zh) | 整体预制钢板组合梁结构及施工方法 | |
| CN204715224U (zh) | 一种基于工字钢横隔梁的箱梁加固构造 | |
| CN106869316A (zh) | 梁柱翼缘为钢管混凝土的组合框架体系及施工方法 | |
| CN108824162A (zh) | 一种采用平钢板与波形钢板混合腹板的钢-混凝土组合连续梁及其施工方法 | |
| CN105256713A (zh) | 半装配式钢混凝土组合梁及其建造方法 | |
| CN113638304B (zh) | 混凝土梁式桥隐盖梁结构体系及其施工方法 | |
| CN106223183A (zh) | 装配式矩形钢管混凝土组合桁梁桥及施工方法 | |
| CN110863417A (zh) | 一种快速化安装的钢-混凝土组合梁桥及其施工方法 | |
| CN207973983U (zh) | 可快速拼装式预制桥梁 | |
| CN108222480B (zh) | 一种高空悬挑主桁架式钢模架施工平台 | |
| CN111254800A (zh) | 一种适用于城市桥梁的组合梁及其施工方法 | |
| CN110230268B (zh) | 先连续后简支的钢桁组合梁桥施工方法 | |
| CN106677051A (zh) | 一种适用于山区条件的钢箱板梁混合梁桥 | |
| CN108221704B (zh) | 一种桥梁用四梁式工字钢-混凝土组合梁及施工方法 | |
| CN106835930B (zh) | 一种螺栓连接式钢砼组合梁 | |
| CN208183539U (zh) | 一种桥梁用四梁式工字钢-混凝土组合梁 | |
| CN107268417A (zh) | 一种基于装配化的公路钢混组合梁结构 | |
| CN207749427U (zh) | 一种桥梁用双梁式工字钢-混凝土组合梁 | |
| CN108978432A (zh) | 一种中等跨度装配式钢空腹夹层板桥及制作方法 | |
| CN108221703B (zh) | 一种桥梁用双梁式工字钢-混凝土组合梁及施工方法 | |
| CN210596966U (zh) | 一种大跨径钢混组合桥梁结构 | |
| CN219671054U (zh) | 一种整体吊装预制的钢混组合小箱梁 | |
| CN218436595U (zh) | 一种钢混组合梁现浇板施工结构 | |
| CN111254799A (zh) | 一种装配式组合结构桥梁及施工方法 | |
| CN114717944B (zh) | 一种倒梯形截面钢桁梁桥的架设方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 710065 No.60, Gaoxin 6th Road, high tech Zone, Xi'an City, Shaanxi Province Applicant after: Xi'an Highway Research Institute Co.,Ltd. Address before: 710065 No.60, Gaoxin 6th Road, high tech Zone, Xi'an City, Shaanxi Province Applicant before: XI'AN HIGHWAY INSTITUTE |
|
| CB02 | Change of applicant information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Miao Jianbao Inventor after: Zhao Ting Inventor after: Ke Liangliang Inventor after: Shi Xiongwei Inventor after: Lei Dan Inventor after: Yuan Zhuoya Inventor after: Xu Bing Inventor after: Feng Wei Inventor before: Shi Xiongwei Inventor before: Yuan Zhuoya Inventor before: Miao Jianbao Inventor before: Xu Bing Inventor before: Feng Wei Inventor before: Lei Dan Inventor before: Zhao Ting Inventor before: Ke Liangliang |
|
| CB03 | Change of inventor or designer information | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |