CN108214440A - The operation dedicated foot hand platform peculiar to vessel that freezes - Google Patents

The operation dedicated foot hand platform peculiar to vessel that freezes Download PDF

Info

Publication number
CN108214440A
CN108214440A CN201810195605.9A CN201810195605A CN108214440A CN 108214440 A CN108214440 A CN 108214440A CN 201810195605 A CN201810195605 A CN 201810195605A CN 108214440 A CN108214440 A CN 108214440A
Authority
CN
China
Prior art keywords
vessel
freezes
riser
hand platform
railing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810195605.9A
Other languages
Chinese (zh)
Inventor
张理燕
王梁
张文杰
张海甬
谢立荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201810195605.9A priority Critical patent/CN108214440A/en
Publication of CN108214440A publication Critical patent/CN108214440A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H5/00Tool, instrument or work supports or storage means used in association with vehicles; Workers' supports, e.g. mechanics' creepers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Abstract

The invention discloses a kind of operation dedicated foot hand platform peculiar to vessel that freezes, including:Multiple support modules, multiple support modules are arranged at intervals, and support module includes:Installing arm, one end of installing arm and the floor of hull are detachably connected;Braced frame, one end of braced frame are connect with installing arm, and are extended in the horizontal direction to the direction far from installing arm;Scaffold board, scaffold board are sequentially connected with multiple braced frames, and positioned at the top of multiple braced frames.The present invention enables the operation dedicated foot hand platform peculiar to vessel that freezes vacantly to be directly mounted at floor, does not need to build scaffold from floor by the setting of multiple support modules and scaffold board;The support module of the present invention need to be only directly mounted on the installing plate of floor to scene, substantially increased installation effectiveness, reduced the working time freezed needed for operation;The present invention's greatly reduces to freeze the cost of material of scaffold is built needed for operation.

Description

The operation dedicated foot hand platform peculiar to vessel that freezes
Technical field
The present invention relates to a kind of operation dedicated foot hand platforms peculiar to vessel that freezes.
Background technology
At present, in shipbuilding industry, close up the operation of freezing in region with deck to carry out the segmentation of hull, typically exist Scaffolding is expired to below deck in scene from floor, in this way, the operation that makes to freeze is time-consuming, and scaffold is built in waste Material.
Invention content
The technical problem to be solved by the present invention is in order to overcome in the prior art scene expire scaffolding to first from floor Mode under plate, existing makes the defects of operation is time-consuming and the material of scaffold is built in waste of freezing, and provides a kind of peculiar to vessel Freeze operation dedicated foot hand platform.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of operation dedicated foot hand platform peculiar to vessel that freezes, feature be, including:
Multiple support modules, multiple support modules are arranged at intervals, and the support module includes:
Installing arm, one end of the installing arm and the floor of hull are detachably connected;
Braced frame, one end of the braced frame are connect with the installing arm, and in the horizontal direction to far from the peace Fill the direction extension of arm;
Scaffold board, the braced frame of the scaffold board and multiple support modules are sequentially connected, and positioned at multiple described The top of braced frame.
Preferably, the installing arm includes the riser and transverse slat that are mutually connected vertically, the riser is close to the floor One end is equipped at intervals with multiple mounting holes, and the braced frame is connect with the transverse slat, and positioned at the lower section of the transverse slat.
In the technical program, by setting the concrete structure of installing arm, make the connection of installing arm and braced frame more Stablize.
Preferably, described further include fixing piece and fastener with the operation dedicated foot hand platform that freezes, the fixing piece is worn Installing plate on the mounting hole and the floor, and locked the installing arm and the installing plate by the fastener Tightly.
Preferably, the installing arm further includes the first railing mounting base and the second railing mounting base, the first railing peace Dress seat is arranged in the one end of the transverse slat far from the mounting hole, and is located at the riser towards the side of the scaffold board, institute It states the second railing mounting base and is connected to one end that the riser is equipped with the mounting hole, and relative to the first railing mounting base Positioned at the opposite side of the riser.
In the technical program, by setting the specific location of the first railing mounting base and the second railing mounting base, ensure Support module after railing is installed is maintained to whole balance.
Preferably, the first railing mounting base is welded with the transverse slat, the second railing mounting base and the riser Welding.
In the technical program, by setting the connection mode of welding, the first railing mounting base is made to be installed with the second railing Seat is firmly and respectively connected to transverse slat and riser.
Preferably, the operation dedicated foot hand platform peculiar to vessel that freezes further includes railing, the railing includes vertically disposed Montant and cross bar, the montant are vertically inserted in the first railing mounting base or the second railing mounting base.
Preferably, the support module further includes reinforcing plate, one end of the reinforcing plate is connect with the riser, the other end Vertically extend to the direction far from the riser, and the reinforcing plate is located at one of the riser equipped with the mounting hole End.
In the technical program, by setting reinforcing plate, the riser is made to be equipped with the bearing capacity of one end of the mounting hole More preferably.
Preferably, the braced frame includes the first support arm being oppositely arranged and the second support arm and is connected to institute The third support arm between the first support arm and the second support arm is stated, first support arm, second support arm are corresponding One end connect with the installing arm, and first support arm, second support arm and the equal position of third support arm In same plane.
In the technical program, by setting the structure of braced frame, the structure for making braced frame is more stable.
Preferably, the upper surface of the scaffold board is equipped with skid resistant course.
In the technical program, skid resistant course is set by the upper surface of scaffold board, better assures that staff in foot Safety on palm during operation.
The positive effect of the present invention is:
The present invention enables the operation dedicated foot hand platform peculiar to vessel that freezes to hang by the setting of multiple support modules and scaffold board Sky is directly mounted at floor, does not need to build scaffold from floor;The support module of the present invention is to having completed before scene Manufacture need to only be directly mounted on the installing plate of floor to scene, substantially increase installation effectiveness, reduce and freeze needed for operation Working time;The present invention's greatly reduces to freeze the cost of material of scaffold is built needed for operation.
Description of the drawings
Fig. 1 is the main structure diagram of the operation dedicated foot hand platform peculiar to vessel that freezes of present pre-ferred embodiments.
Fig. 2 is the right side structure schematic view of the operation dedicated foot hand platform peculiar to vessel that freezes of present pre-ferred embodiments.
Fig. 3 is that the support module of present pre-ferred embodiments is fixed on the overlooking the structure diagram of floor.
Fig. 4 is the main structure diagram of the support module of present pre-ferred embodiments.
Fig. 5 is the sectional view in A-A directions in Fig. 4.
Fig. 6 is the overlooking the structure diagram of the support module of present pre-ferred embodiments.
Fig. 7 is the sectional view in B-B directions in Fig. 6.
Reference sign
Support module 10
Scaffold board 20
Montant 31
Earhole 311
Cross bar 32
Floor 40
Installing plate 41
Installing arm 50
Riser 51
Transverse slat 52
First railing mounting base 53
Second railing mounting base 54
Braced frame 60
First support 61
Second support arm 62
Third support arm 63
Reinforcing plate 70
Mounting hole 80
Specific embodiment
It is further illustrated the present invention below by the mode of embodiment, but the embodiment therefore not limited the present invention to Among range.
Understood incorporated by reference to Fig. 1-Fig. 7, the implementation case provides a kind of operation dedicated foot hand platform peculiar to vessel that freezes, packet It includes:Multiple support modules 10, scaffold board 20 and railing.Multiple support modules 10 are arranged at intervals, and support module 10 includes:Installing arm 50 and braced frame 60.One end of installing arm 50 and the floor 40 of hull are detachably connected.One end of braced frame 60 and installation Arm 50 connects, and extends in the horizontal direction to the direction far from installing arm 50.Scaffold board 20 connects successively with multiple braced frames 60 It connects, and positioned at the top of multiple braced frames 60.In this way, by multiple support modules 10 and the setting of scaffold board 20, make peculiar to vessel The operation dedicated foot hand platform that freezes can vacantly be directly mounted at floor 40 by installing arm 50, not need to from floor to deck Build scaffold in lower section.
In the present embodiment, installing arm 50 includes riser 51, transverse slat 52, the first railing mounting base 53 and the installation of the second railing Seat 54.Riser 51 and transverse slat 52 are mutually connected vertically.Riser 51 is equipped at intervals with multiple mounting holes 80 close to one end of floor 40, branch Support frame frame 60 is connect with transverse slat 52, and positioned at the lower section of transverse slat 52.In this way, the concrete structure by setting installing arm 50, makes peace It fills arm 50 and the connection of braced frame 60 is more stable.
First railing mounting base 53 is arranged in the one end of transverse slat 52 far from mounting hole 80, and is located at riser 51 towards scaffold board 20 side, the second railing mounting base 54 is connected to one end that riser 51 is equipped with mounting hole 80, and is installed relative to the first railing Seat 53 is located at the opposite side of riser 51.In this way, by setting the specific of the first railing mounting base 53 and the second railing mounting base 54 Position ensure that support module 10 is maintained to whole balance after railing is installed.Preferably, the first railing mounting base 53 weld with transverse slat 52, and the second railing mounting base 54 is welded with riser 51.In this way, the connection mode by setting welding, makes the One railing mounting base 53 and the second railing mounting base 54 are firmly and respectively connected to transverse slat 52 and riser 51.
Braced frame 60 includes the be oppositely arranged first support 61 arms and the second support arm 62 and is connected to the first support Third support arm 63 between 61 arms and the second support arm 62, the first 61 arms of support, 62 corresponding one end of the second support arm are equal It is connect with installing arm 50, and the first 61 arms of support, the second support arm 62 are respectively positioned on same plane with third support arm 63.In this way, By setting the structure of braced frame 60, the structure for making braced frame 60 is more stable.
In the present embodiment, support module 10 further includes reinforcing plate 70, and one end of reinforcing plate 70 is connect with riser 51, another End vertically extends to the direction far from riser 51, and one end of mounting hole 80 is equipped with positioned at riser 51.In this way, by setting Reinforcing plate 70 is put, makes the bearing capacity that riser 51 is equipped with one end of mounting hole 80 more preferable.In the present embodiment, it is also set in reinforcing plate 70 It is equipped with mounting hole 80.As the mode of more stable fixed support module 10, the mounting hole 80 on riser 51 can be passed through simultaneously And the mounting hole 80 in reinforcing plate 70 will support module 10 to be connect with support module 10.
Railing includes vertically disposed montant 31 and cross bar 32, and montant 31 is vertically inserted in the first railing mounting base 53 or the second railing mounting base 54.Montant 31 is vertically equipped at intervals with earhole 311, and cross bar 32 is by being arranged in earhole 311 It is detachably connected with montant 31.
With freezing, operation dedicated foot hand platform further includes fixing piece (not indicated in figure) and fastener (not indicated in figure), Gu Determine the installing plate 41 that part is arranged on mounting hole 80 and floor 40, and locked installing arm 50 and installing plate 41 by fastener. Fixing piece can be bolt, and fastener can be nut, reach fastening effect by thread fitting.
In the present embodiment, the upper surface of scaffold board 20 is equipped with skid resistant course.The material of skid resistant course can be rubber, but unlimited Can be other materials with antiskid function in rubber.In this way, the upper surface by scaffold board 20 sets skid resistant course, more preferably Ground ensure that safety of the staff in operation on scaffold board 20.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that these It is merely illustrative of, protection scope of the present invention is defined by the appended claims.Those skilled in the art is not carrying on the back Under the premise of from the principle and substance of the present invention, many changes and modifications may be made, but these are changed Protection scope of the present invention is each fallen with modification.

Claims (9)

1. a kind of operation dedicated foot hand platform peculiar to vessel that freezes, which is characterized in that it includes:
Multiple support modules, multiple support modules are arranged at intervals, and the support module includes:
Installing arm, one end of the installing arm and the floor of hull are detachably connected;
Braced frame, one end of the braced frame are connect with the installing arm, and in the horizontal direction to far from the installing arm Direction extension;
Scaffold board, the braced frame of the scaffold board and multiple support modules are sequentially connected, and positioned at multiple supports The top of frame.
2. the operation dedicated foot hand platform peculiar to vessel that freezes as described in claim 1, which is characterized in that the installing arm includes mutual Riser and transverse slat connected vertically, the riser are equipped at intervals with multiple mounting holes, the support frame close to one end of the floor Frame is connect with the transverse slat, and positioned at the lower section of the transverse slat.
3. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 2, which is characterized in that described special with operation of freezing Foot hand platform further includes fixing piece and fastener, and the fixing piece is arranged in the installing plate on the mounting hole and the floor, And the installing arm and the installing plate are locked by the fastener.
4. the as claimed in claim 2 operation dedicated foot hand platform peculiar to vessel that freezes, which is characterized in that the installing arm further includes the One railing mounting base and the second railing mounting base, the first railing mounting base are arranged in the transverse slat far from the mounting hole One end, and positioned at the riser towards the side of the scaffold board, the second railing mounting base is connected to the riser and is equipped with One end of the mounting hole, and it is located at relative to the first railing mounting base the opposite side of the riser.
5. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 4, which is characterized in that the first railing mounting base It is welded with the transverse slat, the second railing mounting base is welded with the riser.
6. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 4, which is characterized in that the operation peculiar to vessel of freezing is special Railing is further included with foot hand platform, the railing includes vertically disposed montant and cross bar, and the montant vertically plugs In the first railing mounting base or the second railing mounting base.
7. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 2, which is characterized in that the support module further includes Reinforcing plate, one end of the reinforcing plate are connect with the riser, and the other end vertically prolongs to the direction far from the riser It stretches, and the reinforcing plate is located at one end that the riser is equipped with the mounting hole.
8. the operation dedicated foot hand platform peculiar to vessel that freezes as described in claim 1, which is characterized in that the braced frame includes phase The first support arm and the second support arm to setting and the third being connected between first support arm and the second support arm Support arm, first support arm, described corresponding one end of second support arm are connect with the installing arm.
9. the operation dedicated foot hand platform peculiar to vessel that freezes as described in any one in claim 1-8, which is characterized in that the foot The upper surface of palm is equipped with skid resistant course.
CN201810195605.9A 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes Pending CN108214440A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810195605.9A CN108214440A (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810195605.9A CN108214440A (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Publications (1)

Publication Number Publication Date
CN108214440A true CN108214440A (en) 2018-06-29

Family

ID=62658787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810195605.9A Pending CN108214440A (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Country Status (1)

Country Link
CN (1) CN108214440A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1377584A (en) * 1972-01-13 1974-12-18 Ishikawajima Harima Heavy Ind Scaffolding unit for shipbuilding
WO1999050137A1 (en) * 1998-03-28 1999-10-07 William Kernaghan Scaffold support bracket
CN201092729Y (en) * 2007-09-05 2008-07-30 上海外高桥造船有限公司 Foot hand cross bar
CN201300972Y (en) * 2008-10-28 2009-09-02 广州文冲船厂有限责任公司 Marine scaffold structure
CN204713400U (en) * 2015-04-21 2015-10-21 南通蓝岛海洋工程有限公司 A kind of boat scaffold
CN105000153A (en) * 2015-06-25 2015-10-28 上海外高桥造船有限公司 Scaffold horse and scaffold building method
CN204822025U (en) * 2015-07-27 2015-12-02 上海江南长兴重工有限责任公司 Marine construction platform
CN206664894U (en) * 2016-12-13 2017-11-24 中船黄埔文冲船舶有限公司 One kind auxiliary hatch board middle hinge latch mounting operation platform
CN208051899U (en) * 2018-03-09 2018-11-06 上海外高桥造船有限公司 The operation dedicated foot hand platform peculiar to vessel that freezes

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1377584A (en) * 1972-01-13 1974-12-18 Ishikawajima Harima Heavy Ind Scaffolding unit for shipbuilding
WO1999050137A1 (en) * 1998-03-28 1999-10-07 William Kernaghan Scaffold support bracket
CN201092729Y (en) * 2007-09-05 2008-07-30 上海外高桥造船有限公司 Foot hand cross bar
CN201300972Y (en) * 2008-10-28 2009-09-02 广州文冲船厂有限责任公司 Marine scaffold structure
CN204713400U (en) * 2015-04-21 2015-10-21 南通蓝岛海洋工程有限公司 A kind of boat scaffold
CN105000153A (en) * 2015-06-25 2015-10-28 上海外高桥造船有限公司 Scaffold horse and scaffold building method
CN204822025U (en) * 2015-07-27 2015-12-02 上海江南长兴重工有限责任公司 Marine construction platform
CN206664894U (en) * 2016-12-13 2017-11-24 中船黄埔文冲船舶有限公司 One kind auxiliary hatch board middle hinge latch mounting operation platform
CN208051899U (en) * 2018-03-09 2018-11-06 上海外高桥造船有限公司 The operation dedicated foot hand platform peculiar to vessel that freezes

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
康宁等: "电解铝生产", vol. 1, 30 September 2015, 冶金工业出版社, pages: 389 - 390 *
张建荣,董静,陈志勇: "建筑施工操作工种实训", vol. 2, 31 January 2015, 同济大学出版社, pages: 71 - 74 *
王宇辉等: "脚手架施工与安全", vol. 1, 31 May 2008, 中国建材工业出版社, pages: 57 - 59 *

Similar Documents

Publication Publication Date Title
CN107419894B (en) Adhesion type lifting type aluminium alloy scaffold
KR100779059B1 (en) Check equipment for bridge of a deferred type and construction method thereof
CN108699847A (en) Side guard plate, the ceiling formwork system at least one this side guard plate and the method for setting up this side guard plate
CN208051899U (en) The operation dedicated foot hand platform peculiar to vessel that freezes
KR100595021B1 (en) Fixing jacket for checking bridge
CN108214440A (en) The operation dedicated foot hand platform peculiar to vessel that freezes
CN207543030U (en) A kind of support device for photovoltaic battery panel and a kind of photovoltaic building
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN111409765A (en) Balcony installation method for ship and ship
CN110593170A (en) Formwork supporting device of reinforced concrete guardrail and construction process thereof
CN205856949U (en) A kind of modularity steel structure viaduct
CN107858925A (en) Platform structure for the operation of pier stud overhead connection
CN113914196A (en) Locking device of bracket on triangular bracket
CN210598947U (en) Petroleum screen mesh for petroleum exploitation
CN209741677U (en) A assembled work platform for high mound construction
CN209704057U (en) A kind of construction safety structure
CN207465202U (en) A kind of wallboard storage rack
CN202031310U (en) Detachable structural steel unloading platform
CN206769338U (en) Convenient scaffold for building
CN216947937U (en) Motor train unit boarding platform convenient to assemble
CN207032047U (en) A kind of bridge guardrail base and dripping eaves construction formwork
CN218176397U (en) Steel structure stair for power plant building
CN216640226U (en) Locking device for bracket on triangular bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination