CN208051899U - The operation dedicated foot hand platform peculiar to vessel that freezes - Google Patents

The operation dedicated foot hand platform peculiar to vessel that freezes Download PDF

Info

Publication number
CN208051899U
CN208051899U CN201820328928.6U CN201820328928U CN208051899U CN 208051899 U CN208051899 U CN 208051899U CN 201820328928 U CN201820328928 U CN 201820328928U CN 208051899 U CN208051899 U CN 208051899U
Authority
CN
China
Prior art keywords
vessel
freezes
riser
railing
foot hand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820328928.6U
Other languages
Chinese (zh)
Inventor
张理燕
王梁
张文杰
张海甬
谢立荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201820328928.6U priority Critical patent/CN208051899U/en
Application granted granted Critical
Publication of CN208051899U publication Critical patent/CN208051899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of operation dedicated foot hand platforms peculiar to vessel that freezes comprising:Multiple support modules, multiple support module interval settings, support module include:Installing arm, one end of installing arm and the floor of hull are detachably connected;One end of braced frame, braced frame is connect with installing arm, and is extended in the horizontal direction to the direction far from installing arm;Scaffold board, scaffold board are sequentially connected with multiple braced frames, and positioned at the top of multiple braced frames.The utility model enables the operation dedicated foot hand platform peculiar to vessel that freezes vacantly to be directly mounted at floor, need not build scaffold from floor by the setting of multiple support modules and scaffold board;The support module of the utility model need to be only directly mounted on the mounting plate of floor to scene, substantially increased installation effectiveness, reduced the working time freezed needed for operation;The greatly reducing to freeze of the utility model builds the cost of material of scaffold needed for operation.

Description

The operation dedicated foot hand platform peculiar to vessel that freezes
Technical field
The utility model is related to a kind of operation dedicated foot hand platforms peculiar to vessel that freezes.
Background technology
Currently, in shipbuilding industry, in order to which the operation of freezing in region is closed up in the segmentation and deck that carry out hull, typically exist Scaffolding is expired to below deck in scene from floor, in this way, the operation that makes to freeze is time-consuming, and scaffold is built in waste Material.
Utility model content
The technical problems to be solved in the utility model be in order to overcome in the prior art scene expire scaffolding from floor To underdeck mode, have that the operation that makes to freeze is time-consuming and waste build scaffold material defect, one kind is provided The operation dedicated foot hand platform peculiar to vessel that freezes.
The utility model is to solve above-mentioned technical problem by following technical proposals:
A kind of operation dedicated foot hand platform peculiar to vessel that freezes, feature are comprising:
Multiple support modules, multiple support module interval settings, the support module include:
Installing arm, one end of the installing arm and the floor of hull are detachably connected;
Braced frame, one end of the braced frame are connect with the installing arm, and in the horizontal direction to far from the peace The direction for filling arm extends;
The braced frame of scaffold board, the scaffold board and multiple support modules is sequentially connected, and positioned at multiple described The top of braced frame.
Preferably, the installing arm includes the riser and transverse slat being mutually connected vertically, the riser is close to the floor One end is equipped at intervals with multiple mounting holes, and the braced frame is connect with the transverse slat, and positioned at the lower section of the transverse slat.
In the technical scheme, by the way that the concrete structure of installing arm is arranged, make the connection of installing arm and braced frame more Stablize.
With the operation dedicated foot hand platform that freezes further include fixing piece and fastener preferably, described, the fixing piece is worn Mounting plate on the mounting hole and the floor, and locked the installing arm and the mounting plate by the fastener Tightly.
Preferably, the installing arm further includes the first railing mounting base and the second railing mounting base, the first railing peace Dress seat is arranged in the one end of the transverse slat far from the mounting hole, and is located at side of the riser towards the scaffold board, institute It states the second railing mounting base and is connected to one end that the riser is equipped with the mounting hole, and relative to the first railing mounting base Positioned at the other side of the riser.
In the technical scheme, by the way that the specific location of the first railing mounting base and the second railing mounting base is arranged, ensure Support module after installing railing is maintained to whole balance.
Preferably, the first railing mounting base is welded with the transverse slat, the second railing mounting base and the riser Welding.
In the technical scheme, by the way that the connection type of welding is arranged, the first railing mounting base is made to be installed with the second railing Seat is firmly and respectively connected to transverse slat and riser.
Preferably, the operation dedicated foot hand platform peculiar to vessel that freezes further includes railing, the railing includes vertically disposed Montant and cross bar, the montant are vertically inserted in the first railing mounting base or the second railing mounting base.
Preferably, the support module further includes reinforcing plate, one end of the reinforcing plate is connect with the riser, the other end Vertically extend to the direction far from the riser, and the reinforcing plate is located at one of the riser equipped with the mounting hole End.
In the technical scheme, by the way that reinforcing plate is arranged, the riser is made to be equipped with the bearing capacity of one end of the mounting hole More preferably.
Preferably, the braced frame includes the first support arm and the second support arm being oppositely arranged, and it is connected to institute The third support arm between the first support arm and the second support arm is stated, first support arm, second support arm are corresponding One end connect with the installing arm, and first support arm, second support arm and the equal position of third support arm In same plane.
In the technical scheme, by the way that the structure of braced frame is arranged, keep the structure of braced frame more stable.
Preferably, the upper surface of the scaffold board is equipped with skid resistant course.
In the technical scheme, skid resistant course is arranged by the upper surface of scaffold board, better assures that staff in foot Safety on palm when operation.
The positive effect of the utility model is:
The utility model enables the operation dedicated foot hand platform peculiar to vessel that freezes by the setting of multiple support modules and scaffold board It is enough to be vacantly directly mounted at floor, scaffold need not be built from floor;The support module of the utility model is to before scene It has completed to manufacture, need to be only directly mounted on the mounting plate of floor to scene, substantially increase installation effectiveness, reduce and freeze Working time needed for operation;The greatly reducing of the utility model freeze built needed for operation the raw material of scaffold at This.
Description of the drawings
Fig. 1 is the main structure diagram of the operation dedicated foot hand platform peculiar to vessel that freezes of the utility model preferred embodiment.
Fig. 2 is that the right side of the operation dedicated foot hand platform peculiar to vessel that freezes of the utility model preferred embodiment regards structural representation Figure.
Fig. 3 is that the support module of the utility model preferred embodiment is fixed on the overlooking structure diagram of floor.
Fig. 4 is the main structure diagram of the support module of the utility model preferred embodiment.
Fig. 5 is the sectional view in the directions A-A in Fig. 4.
Fig. 6 is the overlooking structure diagram of the support module of the utility model preferred embodiment.
Fig. 7 is the sectional view in the directions B-B in Fig. 6.
Reference sign
Support module 10
Scaffold board 20
Montant 31
Earhole 311
Cross bar 32
Floor 40
Mounting plate 41
Installing arm 50
Riser 51
Transverse slat 52
First railing mounting base 53
Second railing mounting base 54
Braced frame 60
First support 61
Second support arm 62
Third support arm 63
Reinforcing plate 70
Mounting hole 80
Specific implementation mode
The utility model is further illustrated below by the mode of embodiment, but is not therefore limited in the utility model Scope of embodiments among.
Understood incorporated by reference to Fig. 1-Fig. 7, the implementation case provides a kind of operation dedicated foot hand platform peculiar to vessel that freezes, packet It includes:Multiple support modules 10, scaffold board 20 and railing.The setting of multiple intervals of support module 10, support module 10 include:Installing arm 50 and braced frame 60.One end of installing arm 50 and the floor 40 of hull are detachably connected.One end of braced frame 60 and installation Arm 50 connects, and extends in the horizontal direction to the direction far from installing arm 50.Scaffold board 20 connects successively with multiple braced frames 60 It connects, and positioned at the top of multiple braced frames 60.In this way, by the setting of multiple support modules 10 and scaffold board 20, make peculiar to vessel The operation dedicated foot hand platform that freezes can vacantly be directly mounted at floor 40 by installing arm 50, need not be from floor to deck Build scaffold in lower section.
In the present embodiment, installing arm 50 includes riser 51, transverse slat 52, the first railing mounting base 53 and the installation of the second railing Seat 54.Riser 51 and transverse slat 52 are mutually connected vertically.Riser 51 is equipped at intervals with multiple mounting holes 80 close to one end of floor 40, branch Support frame frame 60 is connect with transverse slat 52, and positioned at the lower section of transverse slat 52.In this way, the concrete structure by the way that installing arm 50 is arranged, makes peace It fills arm 50 and the connection of braced frame 60 is more stable.
First railing mounting base 53 is arranged in the one end of transverse slat 52 far from mounting hole 80, and positioned at riser 51 towards scaffold board 20 side, the second railing mounting base 54 is connected to one end that riser 51 is equipped with mounting hole 80, and is installed relative to the first railing Seat 53 is located at the other side of riser 51.In this way, by the way that the specific of the first railing mounting base 53 and the second railing mounting base 54 is arranged Position ensure that support module 10 is maintained to whole balance after installing railing.Preferably, the first railing mounting base 53 weld with transverse slat 52, and the second railing mounting base 54 is welded with riser 51.In this way, the connection type by the way that welding is arranged, makes the One railing mounting base 53 and the second railing mounting base 54 are firmly and respectively connected to transverse slat 52 and riser 51.
Braced frame 60 includes the first 61 arms of support and the second support arm 62 being oppositely arranged, and is connected to the first support Third support arm 63 between 61 arms and the second support arm 62, the first 61 arms of support, 62 corresponding one end of the second support arm are equal It is connect with installing arm 50, and the first 61 arms of support, the second support arm 62 are respectively positioned on same plane with third support arm 63.In this way, By the way that the structure of braced frame 60 is arranged, keep the structure of braced frame 60 more stable.
In the present embodiment, support module 10 further includes reinforcing plate 70, and one end of reinforcing plate 70 is connect with riser 51, another End vertically extends to the direction far from riser 51, and one end of mounting hole 80 is equipped with positioned at riser 51.In this way, by setting Reinforcing plate 70 is set, keeps the bearing capacity that riser 51 is equipped with one end of mounting hole 80 more preferable.In the present embodiment, it is also set in reinforcing plate 70 It is equipped with mounting hole 80.As the mode of more stable fixed support module 10, the mounting hole 80 on riser 51 can be passed through simultaneously And the mounting hole 80 in reinforcing plate 70 will support module 10 to be connect with support module 10.
Railing includes vertically disposed montant 31 and cross bar 32, and montant 31 is vertically inserted in the first railing mounting base 53 or the second railing mounting base 54.Montant 31 is vertically equipped at intervals with earhole 311, and cross bar 32 is by being arranged in earhole 311 It is detachably connected with montant 31.
Further include fixing piece (not indicated in figure) and fastener (not indicated in figure) with the operation dedicated foot hand platform that freezes, Gu Determine the mounting plate 41 that part is arranged on mounting hole 80 and floor 40, and is locked installing arm 50 and mounting plate 41 by fastener. Fixing piece can be bolt, and fastener can be nut, reach fastening effect by screw-thread fit.
In the present embodiment, the upper surface of scaffold board 20 is equipped with skid resistant course.The material of skid resistant course can be rubber, but unlimited Can be other materials with antiskid function in rubber.In this way, skid resistant course is arranged in the upper surface by scaffold board 20, more preferably Ground ensure that safety of the staff in operation on scaffold board 20.
Although the foregoing describe specific embodiment of the present utility model, it will be appreciated by those of skill in the art that These are merely examples, and the scope of protection of the utility model is defined by the appended claims.Those skilled in the art Member can make these embodiments numerous variations or repair under the premise of without departing substantially from the principles of the present invention and essence Change, but these change and modification each fall within the scope of protection of the utility model.

Claims (9)

1. a kind of operation dedicated foot hand platform peculiar to vessel that freezes, which is characterized in that it includes:
Multiple support modules, multiple support module interval settings, the support module include:
Installing arm, one end of the installing arm and the floor of hull are detachably connected;
Braced frame, one end of the braced frame are connect with the installing arm, and in the horizontal direction to far from the installing arm Direction extend;
The braced frame of scaffold board, the scaffold board and multiple support modules is sequentially connected, and is located at multiple supports The top of frame.
2. the operation dedicated foot hand platform peculiar to vessel that freezes as described in claim 1, which is characterized in that the installing arm includes mutual Riser and transverse slat connected vertically, the riser are equipped at intervals with multiple mounting holes, the support frame close to one end of the floor Frame is connect with the transverse slat, and positioned at the lower section of the transverse slat.
3. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 2, which is characterized in that described special with operation of freezing Foot hand platform further includes fixing piece and fastener, and the fixing piece is arranged in the mounting plate on the mounting hole and the floor, And the installing arm and the mounting plate are locked by the fastener.
4. the as claimed in claim 2 operation dedicated foot hand platform peculiar to vessel that freezes, which is characterized in that the installing arm further includes the One railing mounting base and the second railing mounting base, the first railing mounting base are arranged in the transverse slat far from the mounting hole One end, and it is located at side of the riser towards the scaffold board, the second railing mounting base is connected to the riser and is equipped with One end of the mounting hole, and it is located at relative to the first railing mounting base the other side of the riser.
5. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 4, which is characterized in that the first railing mounting base It is welded with the transverse slat, the second railing mounting base is welded with the riser.
6. the operation dedicated foot hand platform peculiar to vessel that freezes as claimed in claim 4, which is characterized in that the operation peculiar to vessel of freezing is special Further include railing with foot hand platform, the railing includes vertically disposed montant and cross bar, and the montant vertically plugs In the first railing mounting base or the second railing mounting base.
7. the as claimed in claim 2 operation dedicated foot hand platform peculiar to vessel that freezes, which is characterized in that the support module further includes Reinforcing plate, one end of the reinforcing plate are connect with the riser, and the other end vertically prolongs to the direction far from the riser It stretches, and the reinforcing plate is located at one end that the riser is equipped with the mounting hole.
8. the operation dedicated foot hand platform peculiar to vessel that freezes as described in claim 1, which is characterized in that the braced frame includes phase To the first support arm and the second support arm of setting, and the third that is connected between first support arm and the second support arm Support arm, first support arm, described corresponding one end of second support arm are connect with the installing arm.
9. the operation dedicated foot hand platform peculiar to vessel that freezes as described in any one of claim 1-8, which is characterized in that the foot The upper surface of palm is equipped with skid resistant course.
CN201820328928.6U 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes Active CN208051899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820328928.6U CN208051899U (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820328928.6U CN208051899U (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Publications (1)

Publication Number Publication Date
CN208051899U true CN208051899U (en) 2018-11-06

Family

ID=63992162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820328928.6U Active CN208051899U (en) 2018-03-09 2018-03-09 The operation dedicated foot hand platform peculiar to vessel that freezes

Country Status (1)

Country Link
CN (1) CN208051899U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108214440A (en) * 2018-03-09 2018-06-29 上海外高桥造船有限公司 The operation dedicated foot hand platform peculiar to vessel that freezes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108214440A (en) * 2018-03-09 2018-06-29 上海外高桥造船有限公司 The operation dedicated foot hand platform peculiar to vessel that freezes

Similar Documents

Publication Publication Date Title
CN204645623U (en) Aluminium alloys wafts window template system
CN201809959U (en) Full-door scaffold support system
US5351915A (en) Helicopter deck
CN101844612A (en) Fabricated scaffold and using method thereof
US20160281907A1 (en) Elevated equipment assemblies, equipment-supporting platforms, and related methods
CN208051899U (en) The operation dedicated foot hand platform peculiar to vessel that freezes
CN204753397U (en) Gallows is installed to steel case bridge temporarily
KR101388823B1 (en) Form device
CN107600361A (en) A kind of underslung scaffold peculiar to vessel
CN108214440A (en) The operation dedicated foot hand platform peculiar to vessel that freezes
CN210396053U (en) Scaffold frame that can install fast
CN207630236U (en) A kind of prefabricated beam column production mold
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN201685799U (en) Concrete pump truck and landing leg base plate structure thereof
CN113914196A (en) Locking device of bracket on triangular bracket
CN205778699U (en) The device of installation and removal gear mud umbrella
CN202031310U (en) Detachable structural steel unloading platform
CN107858925A (en) Platform structure for the operation of pier stud overhead connection
CN202787923U (en) Movable scaffold
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN110904745B (en) Turnout equipment supporting platform
CN207465202U (en) A kind of wallboard storage rack
CN206769338U (en) Convenient scaffold for building
CN218176397U (en) Steel structure stair for power plant building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant