CN210947630U - Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble - Google Patents

Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble Download PDF

Info

Publication number
CN210947630U
CN210947630U CN201921186207.7U CN201921186207U CN210947630U CN 210947630 U CN210947630 U CN 210947630U CN 201921186207 U CN201921186207 U CN 201921186207U CN 210947630 U CN210947630 U CN 210947630U
Authority
CN
China
Prior art keywords
rod
vertical
rods
scaffold
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921186207.7U
Other languages
Chinese (zh)
Inventor
魏林
许如安
高增领
赵伟海
管兴亮
王政鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xingsha Construction Engineering Group Co ltd
Original Assignee
Jiangsu Xingsha Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xingsha Construction Engineering Group Co ltd filed Critical Jiangsu Xingsha Construction Engineering Group Co ltd
Priority to CN201921186207.7U priority Critical patent/CN210947630U/en
Application granted granted Critical
Publication of CN210947630U publication Critical patent/CN210947630U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a scaffold for outer wall dry-hanging marble construction with hard isolation structure, which comprises a scaffold body, wherein one side of the scaffold body facing to the outer wall is provided with a plurality of layers of triangular supports, each layer of triangular support comprises a plurality of triangular supports with equal height, the tail end of each triangular support is horizontally provided with a tail end rod, and the tail end rod is close to the surface of the outer wall; and a bearing plate or a bearing rod is paved on the upper surface of the triangular support frame on each layer, and a bearing plate is paved on the upper surface of the tail end rod on each layer. The utility model discloses when providing good construction space, ensure construction safety, and in high altitude construction, realized quick detach, letter and torn open, save time reduces intensity of labour.

Description

Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
Technical Field
The utility model relates to an outer wall hangs marble construction futilely and uses scaffold frame with hard isolation structure belongs to construction technical field.
Background
The scaffold frame is mainly used in some places of outer wall construction on the building site, interior decoration, and the kind of scaffold frame is various in the present stage, and the support body structure is complicated, and frame rack structure just links up the wall body, and there is the danger that debris dropped during high altitude construction, and in addition, scaffold frame equipment and dismantlement difficulty, especially the scaffold frame dismouting of hanging marble construction usefulness futilely is hard, and intensity of labour is big, has increased the use risk.
Disclosure of Invention
In order to solve the technical problem, the utility model provides an outer wall hangs marble construction futilely and uses scaffold frame with hard isolation structure, its concrete technical scheme as follows:
a scaffold with a hard isolation structure for dry-hanging marble on an outer wall comprises a scaffold body, wherein a plurality of layers of triangular supports are arranged on one side of the scaffold body facing the outer wall, each layer of triangular support comprises a plurality of triangular supports with the same height, the tail end of each triangular support is horizontally provided with a tail end rod, and the tail end rods are close to the surface of the outer wall;
and a bearing plate or a bearing rod is paved on the upper surface of the triangular support frame on each layer, and a bearing plate is paved on the upper surface of the tail end rod on each layer.
The triangular support mechanism comprises an external cross rod and an inclined strut, the external cross rod is horizontally arranged and is perpendicular to both the outer wall and the upright rod, and the inclined strut is obliquely arranged between the external cross rod and the upright rod and is positioned below the corresponding external cross rod;
the scaffold body comprises two rows of vertical rods, each row of vertical rods comprises a plurality of vertical rods, each vertical rod comprises vertical rod sections which are connected end to end in the vertical direction, and the bottoms of the vertical rods are fixed with the ground; the pole setting is selected for use and is buckled the pole setting, and upper and lower adjacent pole setting festival is buckled through the dish and is connected.
Furthermore, adjacent vertical rods in each row of vertical rods are connected through a plurality of layers of parallel horizontal rods, each layer of horizontal rod comprises a plurality of horizontal rods, and two ends of each horizontal rod are connected with the vertical rods at the corresponding ends;
two rows of upright bars are arranged on the outer side of the outer wall in parallel, wherein one row of upright bars is close to the outer wall and is called as inner upright bars, and the other row of upright bars is called as outer upright bars;
a plurality of layers of cross rods are arranged between the two rows of upright rods, each layer of cross rod comprises a plurality of cross rods, and two ends of each cross rod are connected with the corresponding end upright rods.
Furthermore, a plurality of rows of guard rails are horizontally arranged between the upper and lower adjacent horizontal rods of the outer side vertical rod.
Furthermore, the vertical rod is vertical to the horizontal rod, the vertical rod is vertical to the cross rod, and the joint of the vertical rod, the horizontal rod and the cross rod is in a three-dimensional coordinate axis state;
the connecting end of the external cross rod and the vertical rod is provided with a connecting head, a bolt is inserted into the connecting head, and the horizontal rod, the cross rod and the external cross rod are all connected with the fastening bolt of the vertical rod.
Furthermore, the upper end of the diagonal rod is fixedly welded with the external cross rod, the lower end of the diagonal rod is fixedly welded with a bottom support, the bottom support is vertically arranged, and the bottom support and the vertical rod are fixedly welded;
the bearing plate or the bearing rod is laid on the external connection cross rod.
Further, the relative one end of external horizontal pole and terminal pole all welded fastening has the disc, and two disc circumferences have evenly seted up more than 3 screw holes, and the position of screw hole is corresponding, and two discs pass through the screw hole through the bolt and connect.
Further, a disk is welded at the tail end of the tail end rod, and the tail end rod is perpendicular to the center of the disk.
The utility model discloses a theory of operation is:
the utility model discloses during the use, install in the building outer wall outside, two rows of pole settings all are parallel with the outer wall, and every layer of horizontal pole upper berth is equipped with many connecting rods side by side or the board of many tiling for put article or pedestrian pass through.
When the surface construction of outer wall, constructor stands on the triangular supports frame, and the end pole is close to the outer wall, and the board is accepted in what lay on the end pole is used for accepting the outer strong work progress, and the debris that drop prevents to pound the constructor of lower floor, also prevents that debris striking from pounding the equipment of job site.
The utility model discloses, in the use, after the basic construction of outer wall is accomplished, when needing to hang the marble futilely, from the top down successive layer construction, when needs stand on the one deck horizontal pole construction, constructor hangs the marble futilely towards its outer wall that faces, demolishs the adjacent top of this layer horizontal pole and the triangular supports frame and the terminal rod of below, and constructor stands and operates on the horizontal pole, provides abundant distance for the construction marble. Meanwhile, the triangular support frame and the tail end rod of the next layer provide life guarantee for constructors and receive falling wall sundries or marble.
The utility model has the advantages that:
the utility model discloses, for can dismantling the connection between tip pole and the triangular supports frame, for dismantling the connection between triangular supports foot and the pole setting, the scaffold is built the in-process, and from the bottom up successive layer is built, when the outer wall construction, can demolish tip pole and triangular supports frame by the successive layer as required, when providing good construction space, ensures construction safety, and in high altitude construction, has realized quick detach, simple dismantlement, saves time, reduces intensity of labour.
Drawings
Figure 1 is a schematic view of the overall structure of the utility model,
figure 2 is a schematic view of the triangular support frame and the hard isolation structure of the utility model,
in the figure: 1-vertical rod, 2-vertical rod joint, 3-horizontal rod, 4-cross rod, 5-coil buckle, 6-diagonal rod, 7-tail end rod, 8-external cross rod and 9-connecting buckle head.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic drawings and illustrate the basic structure of the present invention only in a schematic manner, and thus show only the components related to the present invention.
As shown in fig. 1 and 2, the utility model discloses a marble construction is hung futilely to outer wall with hard isolation structure uses scaffold, including the scaffold body, the scaffold body is provided with a plurality of layers of triangular supports frame towards one side of outer wall, and every layer of triangular supports frame all includes the triangular supports frame of a plurality of wait height, and the equal level in end of every triangular supports frame is provided with terminal rod 7, and terminal rod 7 is close to the outer wall surface, every layer bearing plate or bearing bar have all been laid to the triangular supports frame upper surface, and the board is accepted all to having laid to every layer of terminal rod 7 upper surface. The hand rack body comprises two rows of vertical rods, each row of vertical rods comprises a plurality of vertical rods 1, each vertical rod 1 comprises vertical rod sections 2 which are connected end to end in the vertical direction, the bottoms of the vertical rods 1 are fixed with the ground, adjacent vertical rods 1 in each row of vertical rods 1 are connected through a plurality of layers of parallel horizontal rods 3, each layer of horizontal rods 3 comprises a plurality of horizontal rods 3, and two ends of each horizontal rod 3 are connected with the vertical rods 1 at corresponding ends; two rows of vertical rods 1 are arranged on the outer side of the outer wall in parallel, one row of vertical rods is close to the outer wall and is called inner side vertical rods, the other row of vertical rods is called outer side vertical rods, a plurality of layers of cross rods 4 are arranged between the two rows of vertical rods 1, each layer of cross rods 4 comprises a plurality of cross rods 4, and two ends of each cross rod 4 are connected with corresponding end vertical rods 1. The outside pole setting is still the level between its adjacent horizon bar 3 from top to bottom and is provided with a plurality of rows of guardrail bar, and the pole setting is chooseed the pole setting for use to the dish, and adjacent pole setting festival 2 is detained 5 through the dish and is connected from top to bottom, and pole setting 1 is perpendicular with horizon bar 3, and pole setting 1 is perpendicular with horizontal pole 4, and pole setting 1, horizon bar 3 and horizontal pole 4 handing-over junction are three-dimensional coordinate axis state. The triangular support mechanism comprises an external cross rod 8 and an inclined strut 6, the connecting end of the external cross rod 8 and the connecting end of the vertical rod 1 is provided with a joint buckle 9, a bolt is inserted in the joint buckle 9, the horizontal rod 3, the horizontal rod 4 and the external cross rod 8 are all buckled with a disc of the vertical rod 1 to form 5 bolt connections, the external cross rod 8 is horizontally arranged to be perpendicular to the outer wall and the vertical rod 1, the inclined strut 6 is obliquely arranged between the external cross rod 8 and the vertical rod 1 and located below the corresponding external cross rod 8, the upper end of the inclined strut 6 is welded and fixed with the external cross rod 8, the lower end of the inclined strut is welded and fixed with a bottom support, the bottom support is vertically arranged, the bottom support and the vertical rod 1 are welded and fixed, discs are welded and fixed to the opposite ends of the external cross rod 8 and the tail end rod 7, more than 3 threaded.
The utility model discloses during the use, install in the building outer wall outside, two rows of pole settings all are parallel with the outer wall, and every layer of horizontal pole upper berth is equipped with many connecting rods side by side or the board of many tiling for put article or pedestrian pass through. When the surface construction of outer wall, constructor stands on the triangular supports frame, and the end pole is close to the outer wall, and the board is accepted in what lay on the end pole is used for accepting the outer strong work progress, and the debris that drop prevents to pound the constructor of lower floor, also prevents that debris striking from pounding the equipment of job site. After the basic construction of outer wall is accomplished, when needing to hang the marble futilely, from the top down the successive layer construction, when needs stand the construction on one deck horizontal pole, constructor hangs the marble futilely towards its outer wall that faces, demolishs the adjacent top of this layer horizontal pole and the triangular supports frame and the terminal pole of below, and constructor stands and operates on the horizontal pole, provides abundant distance for the construction marble. Meanwhile, the triangular support frame and the tail end rod of the next layer provide life guarantee for constructors and receive falling wall sundries or marble.
The utility model discloses, for can dismantling the connection between tip pole and the triangular supports frame, for dismantling the connection between triangular supports foot and the pole setting, the scaffold is built the in-process, and from the bottom up successive layer is built, when the outer wall construction, can demolish tip pole and triangular supports frame by the successive layer as required, when providing good construction space, ensures construction safety, and in high altitude construction, has realized quick detach, simple dismantlement, saves time, reduces intensity of labour.
It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
The meaning of "and/or" as used herein is intended to include both the individual components or both.
The term "connected" as used herein may mean either a direct connection between components or an indirect connection between components via other components.
In light of the foregoing, it will be apparent to those skilled in the art from this disclosure that various changes and modifications can be made without departing from the spirit and scope of the invention. The technical scope of the present invention is not limited to the content of the specification, and must be determined according to the scope of the claims.

Claims (7)

1. The utility model provides an outer wall hangs marble construction futilely and uses scaffold frame with hard isolation structure which characterized in that: the scaffold comprises a scaffold body, wherein a plurality of layers of triangular supports are arranged on one side of the scaffold body facing an outer wall, each layer of triangular support comprises a plurality of triangular supports with equal height, the tail end of each triangular support is horizontally provided with a tail end rod (7), and the tail end rods (7) are close to the surface of the outer wall;
a bearing plate or a bearing rod is paved on the upper surface of each layer of the triangular support frame, and a bearing plate is paved on the upper surface of each layer of the tail end rod (7);
the triangular support mechanism comprises an external cross rod (8) and an inclined strut (6), the external cross rod (8) is horizontally arranged and is perpendicular to both the outer wall and the upright stanchion (1), and the inclined strut (6) is obliquely arranged between the external cross rod (8) and the upright stanchion (1) and is positioned below the corresponding external cross rod (8);
the scaffold body comprises two rows of vertical rods, each row of vertical rods comprises a plurality of vertical rods (1), each vertical rod (1) comprises vertical rod sections (2) which are connected end to end in the vertical direction, and the bottoms of the vertical rods (1) are fixed with the ground; the vertical rod is a disc buckle type vertical rod, and the vertical rod sections (2) which are adjacent from top to bottom are connected through disc buckles (5).
2. The scaffold for construction of marble for exterior wall dry hanging having a hard insulation construction according to claim 1, wherein: adjacent vertical rods (1) in each row of vertical rods (1) are connected through a plurality of layers of parallel horizontal rods (3), each layer of horizontal rod (3) comprises a plurality of horizontal rods (3), and two ends of each horizontal rod (3) are connected with the vertical rods (1) at corresponding ends;
two rows of upright bars (1) are arranged on the outer side of the outer wall in parallel, wherein one row is close to the outer wall and is called as an inner upright bar, and the other row is called as an outer upright bar;
a plurality of layers of cross rods (4) are arranged between the two rows of upright rods (1), each layer of cross rod (4) comprises a plurality of cross rods (4), and two ends of each cross rod (4) are connected with the corresponding end upright rods (1).
3. The scaffold for construction of marble for exterior wall dry hanging having a hard insulation construction according to claim 2, wherein: and a plurality of rows of guard rails are horizontally arranged between the upper and lower adjacent horizontal rods (3) of the outer side vertical rod.
4. The scaffold for construction of marble for exterior wall dry hanging having a hard insulation construction according to claim 2, wherein: the vertical rod (1) is vertical to the horizontal rod (3), the vertical rod (1) is vertical to the cross rod (4), and the joint of the vertical rod (1), the horizontal rod (3) and the cross rod (4) is in a three-dimensional coordinate axis state;
the connecting end of the external cross rod (8) and the vertical rod (1) is provided with a connecting buckle head (9), a bolt is inserted into the connecting buckle head (9), and the horizontal rod (3), the cross rod (4) and the external cross rod (8) are all connected with a disc buckle (5) of the vertical rod (1) through the bolt.
5. The scaffold for construction of marble for exterior wall dry hanging having a hard insulation construction according to claim 1, wherein: the upper end of the inclined support rod (6) is fixedly welded with the external cross rod (8), the lower end of the inclined support rod is fixedly welded with a bottom support, the bottom support is vertically arranged, and the bottom support is fixedly welded with the vertical rod (1);
the bearing plate or the bearing rod is laid on the external cross rod (8).
6. The scaffold for exterior wall dry-hang marble construction having a hard insulation construction of claim 5, wherein: the relative one end of external horizontal pole (8) and terminal pole (7) all welded fastening has the disc, and threaded hole more than 3 is evenly seted up to two disc circumferences, and the position of threaded hole is corresponding, and two discs pass through the threaded hole through bolt and connect.
7. The scaffold for exterior wall dry-hang marble construction having a hard insulation construction of claim 6, wherein: the tail end of the tail end rod (7) is welded with a disc, and the tail end rod (7) is perpendicular to the center of the disc.
CN201921186207.7U 2019-07-26 2019-07-26 Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble Expired - Fee Related CN210947630U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921186207.7U CN210947630U (en) 2019-07-26 2019-07-26 Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921186207.7U CN210947630U (en) 2019-07-26 2019-07-26 Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble

Publications (1)

Publication Number Publication Date
CN210947630U true CN210947630U (en) 2020-07-07

Family

ID=71375469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921186207.7U Expired - Fee Related CN210947630U (en) 2019-07-26 2019-07-26 Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble

Country Status (1)

Country Link
CN (1) CN210947630U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction
CN116397864B (en) * 2023-06-07 2023-08-18 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Similar Documents

Publication Publication Date Title
CN102383588A (en) Lifting platform for protecting safety of high-level construction
CN110670867B (en) Construction method of scaffold for improving outer vertical surface of existing building
CN106499202B (en) The portable edge protection column of box-type for safety management in construction site
CN103206074A (en) Elevator shaft template construction method, platform and support
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN201786036U (en) Temporary protective barrier for building construction
CN213626572U (en) Tool type external cantilever operation platform
CN110565928B (en) Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN202401775U (en) Safety protection platform for elevator shaft
CN110565929B (en) Scaffold for construction of large-specification wall paving piece of building outer wall
CN212897455U (en) Prevent portable scaffold frame that topples
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN208949829U (en) A kind of truss-like cantilever form
CN211058272U (en) Flower basket type overhanging scaffold
CN210947825U (en) Protective bracket for building construction
CN106760468A (en) The suspension platform that a kind of construction site uses
CN203257080U (en) Adjustable overhang supporting device for building construction
CN206873494U (en) A kind of operating platform for narrow space on the outside of barricade
CN210947631U (en) Scaffold for construction of marble is hung futilely to outer wall of being convenient for
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN213297074U (en) Portable outer wall handling frame of encorbelmenting
CN219138362U (en) Formwork system of high-altitude suspended beam
CN205502549U (en) Split type scaffold of hanging
CN213774374U (en) Support for installing reinforcing steel bars

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707

Termination date: 20210726

CF01 Termination of patent right due to non-payment of annual fee