CN108179761A - A kind of construction steel structure pedestal - Google Patents

A kind of construction steel structure pedestal Download PDF

Info

Publication number
CN108179761A
CN108179761A CN201810179161.XA CN201810179161A CN108179761A CN 108179761 A CN108179761 A CN 108179761A CN 201810179161 A CN201810179161 A CN 201810179161A CN 108179761 A CN108179761 A CN 108179761A
Authority
CN
China
Prior art keywords
wall
plate
sleeve
fixing sleeve
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810179161.XA
Other languages
Chinese (zh)
Other versions
CN108179761B (en
Inventor
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Weili Steel Structure Co ltd
Original Assignee
Huzhou Cheng Cheng Comfort Home Engineering Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhou Cheng Cheng Comfort Home Engineering Equipment Co Ltd filed Critical Huzhou Cheng Cheng Comfort Home Engineering Equipment Co Ltd
Priority to CN201810179161.XA priority Critical patent/CN108179761B/en
Publication of CN108179761A publication Critical patent/CN108179761A/en
Application granted granted Critical
Publication of CN108179761B publication Critical patent/CN108179761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of construction steel structure pedestals, including concrete base layer, the upper surface of the concrete base layer is equipped with bottom plate, the lower surface of the bottom plate is connected with the upper surface of concrete base layer, stabilizer blade is mounted at left and right sides of the bottom plate outer wall, the inner wall of the stabilizer blade is connected with the outer wall of bottom plate.Pass through casing, pillar, cooperation between inner sleeve and fixing sleeve, under the action of cover board, pillar is fixed in casing by casing, pull rod is made to be fixed on the inside of sheath, and then by the gap sealing between pillar and sheath, prevent sheath from shaking, under the action of fixed block, the connection that clamping plate is covered with side is made more to stablize, and then it avoids side set and shakes, under the action of cushion block, gap between cover board and fixing sleeve is sealed by cushion block, so as to overcome traditional architecture steel construction pedestal, easily there is a situation where permeable or freezing ups, extend the service life of pillar, it is suitble to promote and apply.

Description

A kind of construction steel structure pedestal
Technical field
The present invention relates to steel construction processing technique field, specially a kind of construction steel structure pedestal.
Background technology
The Design of Construction Organization of Steel Structure Installation should briefly describe project profile, all-round statistics quantities, accurately select to apply Work equipment and construction method, fair layout erection sequence specifically work out main mounting technique measure, stringent formulation installation quality ruler Degree and security dimension, take seriously establishment progress chart, Workforce Planning and material supply projection, in the prior art, steel knot It builds the support column holder built to be placed on bottom surface, be then fixed by bolt or screw, the steel construction of this kind of structure The stability of strutting system of the pillar of building is poor, and the general stability for leading to entire steel building is poor, in the prior art, example Such as application No. is 201620072995.7 patent of invention include external frame, the external frame be rectangle, the external frame There are four the reinforcing plates of L-shaped for setting on the outer surface of frame, and screw is combined between the reinforcing plate and the external frame, described The first screw is combined between reinforcing plate and ground, branch column sleeve, institute are provided at the medium position of the inside of the external frame It states and cross-brace piece and longitudinal splitter is combined between branch column sleeve and the external frame, the cross-brace piece, longitudinal direction branch Blade, branch column sleeve and the external frame are an integral structure, and the top of the external frame is symmetrical arranged that there are four connection bottoms The connecting hole in face, the invention is although simple in structure, but there are many deficiencies and defect, in existing equipment, branch column sleeve Existing defects are designed, branch column sleeve and the connection of cross-brace piece and longitudinal splitter are unstable, and support column is in branch column sleeve, root It easily shakes, and lacks anticollision device, collision-prevention device, for these situations, to avoid above-mentioned technical problem, it is necessory to provide one kind Construction steel structure pedestal is to overcome the defect of the prior art.
Invention content
The purpose of the present invention is to provide a kind of construction steel structure pedestal, to solve mentioned above in the background art ask Topic.
To achieve the above object, the present invention provides following technical solution:A kind of construction steel structure pedestal, including concrete Base, the upper surface of the concrete base layer are equipped with bottom plate, the lower surface of the bottom plate and the upper surface phase of concrete base layer Even, stabilizer blade is mounted at left and right sides of the bottom plate outer wall, the inner wall of the stabilizer blade is connected with the outer wall of bottom plate, the bottom plate Upper surface be equipped with and trap, the lower surface trapped is connected with the upper surface of bottom plate, and the inner wall trapped is equipped with pillar, The inner wall trapped is equipped with middle set, and the outer wall of the middle set is connected with the inner wall trapped, the upper surface installation trapped Have upper set, the lower surface of the upper set is connected with the upper surface trapped, and the inner wall of the upper set is equipped with middle set, the middle set it is interior Wall is connected with the outer wall of pillar, and the top of the upper set is equipped with fixing sleeve, and the fixing sleeve outer wall is connected with the inner wall of upper set, The inner wall of the fixing sleeve is equipped with inner sleeve, and the outer wall of the inner sleeve is connected with the inner wall of fixing sleeve, the inner wall of the fixing sleeve Fixing bolt is installed, the outer wall of the fixing bolt is connected with the inner wall of fixing sleeve, and the top of the fixing sleeve is equipped with lid Plate, the lower surface of the cover board are connected with the upper surface of fixing sleeve, and the outer right wall of the fixing sleeve is equipped with support plate, the branch The inner wall of plate is connected with the outer wall of fixing sleeve, and the inner wall of the middle set is covered equipped with side, the inner wall of the outer wall and middle set of the side set It is connected, the lower surface of the side set is equipped with sheath, and the upper surface of the sheath is connected with side set lower surface, and the side covers interior Wall is equipped with jacking block, and the outer wall of the jacking block is connected with the inner wall that side covers, and the upper surface of the jacking block is equipped with pressing plate, the pressure The lower surface of plate is connected with the upper surface of jacking block, and the lower surface of the inner sleeve is equipped with clamping plate, the upper surface of the clamping plate with it is interior The lower surface of set is connected, and the inner wall of the clamping plate is equipped with pull rod, and the outer wall of the pull rod is connected with the inner wall of clamping plate, the drawing The lower surface of bar is equipped with transverse slat, and the outer wall of the transverse slat is connected with the inner wall of pull rod, and the outer wall of the pull rod is equipped with rubber cushion, institute The outer wall for stating rubber cushion is connected with the inner wall of pull rod.
Preferably, the upper surface of the bottom plate is equipped with plane buried plate, the lower surface of the plane buried plate and pedestal it is upper Surface is connected, and the upper surface of the plane buried plate is equipped with triangular plate, the lower surface of the triangular plate and the upper surface phase of pedestal Even, the inner wall of the triangular plate is equipped with casing, and the outer wall of described sleeve pipe is connected with the inner wall of triangular plate, the inner wall of described sleeve pipe Pillar is installed, the outer wall of the pillar is connected with the inner wall of casing, and the upper surface of the plane buried plate is equipped with gasket, described The lower surface of gasket is connected with the upper surface of plane buried plate, and the inner wall of the gasket is equipped with hex bolts, the hex bolts Outer wall be connected with the inner wall of gasket.
Preferably, the inner wall of the middle set is equipped with connection bolt, the inner wall phase of the outer wall and middle set of the connection bolt Even.
Preferably, the inner wall of the fixing sleeve is equipped with adhesive tape, and the outer wall of the adhesive tape is connected with the inner wall of fixing sleeve.
Preferably, the inner wall of the cover board is equipped with cushion block, and the outer wall of the cushion block is connected with the inner wall of cover board.
Preferably, the inner wall of the jacking block is equipped with fixed block, and the outer wall of the fixed block is connected with the inner wall of jacking block.
Preferably, the inner wall of the pull rod is equipped with side plate, and the outer wall of the side plate is connected with the inner wall of pull rod.
Preferably, the top outer wall of the pull rod is equipped with block, and the inner wall of the block is connected with the outer wall of pull rod.
Compared with prior art, the beneficial effects of the invention are as follows:
1. patent of the present invention, by the cooperation between concrete base layer, bottom plate and stabilizer blade, under the action of plane buried plate, Concrete base layer makes the connection of plane buried plate and casing more secured, and the connection for pillar and casing provides stable environment, Concrete base layer make plane buried plate and ground tightly be connected and fixed to form an entirety, obtain the intensity of plane buried plate Promotion has been arrived, and then has made the connection of casing more secured, stent can be such that bottom plate is fixed with concrete base layer, make stent, coagulation Soil matrix layer and plane buried plate link together, and form an entirety, so as to make the connection of casing and triangular plate more secured, overcome Traditional architecture with steel construction pedestal bottom plate connect the shortcomings that unstable with concrete base layer.
2. patent of the present invention, by concrete base layer, stabilizer blade and the cooperation between trapping, in the effect of triangular plate and gasket Under, the connection of plane buried plate and concrete base layer makes the connection tightly of pedestal and concrete base layer and fixation, triangular plate and plane Casing is reinforced in the connection of buried plate, and casing is made not shake, trap can by fixed sleeving in the inside trapped, Make to trap and more stablize, and there is anticollision with the connection of plane buried plate, and then to the connection of casing and plane buried plate It is protected, so as to overcome the connection of traditional architecture steel construction susceptor posts set and cross-brace piece and longitudinal splitter Unstable, in branch column sleeve, root easily shakes support column, and the shortcomings that lack anticollision device, collision-prevention device, is suitble to promote and apply.
3. patent of the present invention passes through the cooperation between casing, pillar, inner sleeve and fixing sleeve, under the action of cover board, casing Pillar is fixed in casing, protective action is played to pillar, pillar installation set inner casing tube clamps pillar, avoids set Pipe shakes or connects unstable shortcoming, fixes upper set and middle set connection under the action of bolt is connected, improves Firmness between upper set and middle set, under the action of adhesive tape, adhesive tape prevents the gap sealing between cover board and fixing sleeve There is foreign matter to enter in upper set, avoid occurring situations such as permeable or freezing up occurs in set, by the effect of side plate, consolidate pull rod It is scheduled on the inside of sheath, and then by the gap sealing between pillar and sheath, prevents sheath from shaking, in the effect of fixed block Under, the connection that clamping plate is covered with side is made more to stablize, and then avoid side set and shake, under the action of cushion block, cushion block will cover Gap between plate and fixing sleeve is sealed, and permeable or freezing up easily occurs so as to overcome traditional architecture steel construction pedestal Situation, extend the service life of pillar, be suitble to promote and apply.
4. patent of the present invention is covered, the cooperation between sheath, side plate and pressing plate by side, under the action of transverse slat, side set is Stainless steel for connecting and consolidating centring sleeve, forms a fixed entirety, sheath seals the bottom that side covers with middle set Pillar is clamped while closing, and close, Boards wall is made clamping plate hold out against side set by pull rod, while side is covered reinforcing And then reinforce pillar, so as to improve the stability of integrated connection, by the cooperation between pressing plate and fixing bolt, by pressing plate It is connected and fixed with clamping plate, so as to be reinforced to the stage casing of pillar, avoids traditional architecture steel construction pedestal branch The shortcomings that stage casing of column lacks bracing means, avoids pillar and is broken from stage casing.
5. patent of the present invention, by bottom plate, concrete base layer, stabilizer blade and the cooperation between trapping, in upper set and middle set Under effect, triangular plate is fixed on casing by cover board and fixing sleeve, bottom plate, and casing makes the support of pillar more for fixing pillar Add secured and stablize, prevent pillar from trembling and shaking, connect into a fixed entirety with concrete base layer, trap, middle set A closed entirety is formed with upper set, and there is cavity in inside, when a crash occurs, can effectively protect pillar and then right Main body plays protective action, the shortcomings that being not provided with protective device with steel construction pedestal so as to avoid traditional architecture, extends The service life of the construction steel structure pedestal.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the elevation cross-sectional view of inner sleeve of the present invention;
Fig. 3 is the structure diagram of casing of the present invention.
In figure:1st, concrete base layer, 2, stabilizer blade, 3, bottom plate, 4, trap, 5, pillar, 6, middle set, 7, connection bolt, 8, interior Set, 9, upper set, 10, fixing bolt, 11, fixing sleeve, 12, adhesive tape, 13, cover board, 14, cushion block, 15, support plate, 16, side set, 17, shield Set, 18, side plate, 19, plane buried plate, 20, pressing plate, 21, rubber cushion, 22, block, 23, fixed block, 24, clamping plate, 25, transverse slat, 26, Jacking block, 27, pull rod, 28, triangular plate, 29, gasket, 30, hex bolts, 31, casing.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of construction steel structure pedestal, including coagulation soil matrix Layer 1, for fixing bracket 2, the upper surface of concrete base layer 1 is equipped with bottom plate 3, and bottom plate 3 is stainless steel, for installing simultaneously Fixed pan buried plate 19, the upper surface of bottom plate 3 are equipped with plane buried plate 19, and plane buried plate 19 is stainless steel, for installing Casing 31, the lower surface of plane buried plate 19 are connected with the upper surface of pedestal 3, and the upper surface of plane buried plate 19 is equipped with triangular plate 28, triangular plate 28 is stainless steel, and for fixed sleeving 31, the lower surface of triangular plate 28 is connected with the upper surface of pedestal 3, three The inner wall of cornual plate 28 is equipped with casing 31, and casing 31 is stainless steel, for fixing pillar 5, the outer wall and triangle of casing 31 The inner wall of piece 28 is connected, and the inner wall of casing 31 is equipped with pillar 5, and pillar 5 is stainless steel, for installing fixed building master Body, the outer wall of pillar 5 are connected with the inner wall of casing 31, and the upper surface of plane buried plate 19 is equipped with gasket 29, and gasket 29 is stainless Steel material, for fixed pan buried plate 19, the lower surface of gasket 29 is connected with the upper surface of plane buried plate 19, the inner wall of gasket 29 Hex bolts 30 is installed, for fixed pan buried plate 19, the outer wall of hex bolts 30 is connected with the inner wall of gasket 29, bottom plate 3 Lower surface be connected with the upper surface of concrete base layer 1, be mounted on stabilizer blade 2 at left and right sides of 3 outer wall of bottom plate, stent 2 is not It becomes rusty steel material, for fixing bottom plate 3, the inner wall of stabilizer blade 2 is connected with the outer wall of bottom plate 3, and the upper surface of bottom plate 3, which is equipped with, traps 4, 4 are trapped as stainless steel, for installing and fixing pillar 5,4 lower surface of trapping is connected with the upper surface of bottom plate 3, traps Inner wall is equipped with pillar 5, and pillar 5 is stainless steel, is used to support main body, and 4 inner wall of trapping is equipped with middle set 6, and middle set 6 is not Rust steel material, for fixing pillar 5, the inner wall of middle set 6 is equipped with connection bolt 7, and the outer wall of connection bolt 7 is interior with middle set 6 Wall is connected, and the outer wall of middle set 6 and 4 inner wall of trapping are connected, and 4 upper surface of trapping is equipped with set 9, and upper set 9 is stainless steel Matter, for solid centring sleeve 6, the lower surface of upper set 9 and 4 upper surface of trapping are connected, and the inner wall of upper set 9 is equipped with middle set 8, middle to cover 8 For stainless steel, for affixed side set 16, the inner wall of middle set 8 is connected with the outer wall of pillar 5, and the top of upper set 9 is equipped with admittedly Surely 11 are covered, fixing sleeve 11 is stainless steel, and for fixing inner sleeve 8, the inner wall of fixing sleeve 11 is equipped with adhesive tape 12, for sealing Cover board 13, the outer wall of adhesive tape 12 are connected with the inner wall of fixing sleeve 11, and 11 outer wall of fixing sleeve is connected with the inner wall of upper set 9, fixing sleeve 11 inner wall is equipped with inner sleeve 8, and inner sleeve 8 is for fixing pillar 5, and the outer wall of inner sleeve 8 is connected with the inner wall of fixing sleeve 11, fixing sleeve 11 inner wall is equipped with fixing bolt 10, and for fixing cover board 13, the outer wall of fixing bolt 10 is connected with the inner wall of fixing sleeve 11, The top of fixing sleeve 11 is equipped with cover board 13, and cover board 13 is stainless steel, for sealing upper set 9, the inner wall installation of cover board 13 There is cushion block 14, the outer wall of cushion block 14 is connected with the inner wall of cover board 13, and the lower surface of cover board 13 is connected with the upper surface of fixing sleeve 11, The outer right wall of fixing sleeve 11 is equipped with support plate 15, and support plate 15 is stainless steel, for connecting main body, the inner wall of support plate 15 with The outer wall of fixing sleeve 11 is connected, and the inner wall of middle set 6 is equipped with side and covers 16, and side set 16 is stainless steel, for connecting fixed pillar 5, the outer wall of side set 16 is connected with the inner wall of middle set 6, and the lower surface of side set 16 is equipped with sheath 17, and sheath 17 is stainless steel Matter, for affixed side set 16, upper surface and the side of sheath 17 cover 16 lower surfaces and are connected, and the inner wall of side set 16 is equipped with jacking block 26, Jacking block 26 is stainless steel, and for fixation clip 20, the outer wall of jacking block 26 is connected with the inner wall of side set 16, the upper table of jacking block 26 Face is equipped with pressing plate 20, and pressing plate 20 is stainless steel, for connection fixing clamp plate 24, lower surface and the jacking block 26 of pressing plate 20 Upper surface is connected, and the lower surface of inner sleeve 8 is equipped with clamping plate 24, and clamping plate 24 is used for steady brace 27, the upper surface of clamping plate 24 with it is interior The lower surface of set 8 is connected, and the inner wall of clamping plate 24 is equipped with pull rod 27, and pull rod 27 is stainless steel, for 22 He of fixed stop Fixed block 23, the inner wall of pull rod 27 are equipped with side plate 18, and side plate 18 is used for steady brace 27, outer wall and the pull rod 27 of side plate 18 Inner wall is connected, and the top outer wall of pull rod 27 is equipped with block 22, and block 22 is used to make pull rod 27 and the connection of clamping plate 24 more steady Fixed, the inner wall of block 22 is connected with the outer wall of pull rod 27, and the outer wall of pull rod 27 is connected with the inner wall of clamping plate 24, the following table of pull rod 27 Face is equipped with transverse slat 25, and transverse slat 25 is used for fixed sheath 17, and the outer wall of transverse slat 25 is connected with the inner wall of pull rod 27, for making transverse slat 25 connection is more stablized, and the outer wall of pull rod 27 is equipped with rubber cushion 26, and rubber cushion 26 is used for fixation clip 20, and the inner wall of jacking block 26 is installed There is fixed block 23, fixed block 23 is more secured with the connection of pressing plate 20 for making side set 16, outer wall and the jacking block 26 of fixed block 23 Inner wall be connected, for making the connection of fixed block 23 more secured, the outer wall of rubber cushion 26 is connected with the inner wall of pull rod 27, for making The connection of rubber cushion 26 is more secured.
A kind of construction steel structure pedestal, the construction steel structure pedestal by concrete base layer 1, stabilizer blade 2, bottom plate 3, trap 4th, pillar 5, it is middle set 6, connection bolt 7, inner sleeve 8, it is upper set 9, fixing bolt 10, fixing sleeve 11, adhesive tape 12, cover board 13, cushion block 14, Stent 15, side set 16, sheath 17, side plate 18, plane buried plate 19, pressing plate 20, rubber cushion 21, block 22, fixed block 23, clamping plate 24, Transverse slat 25 and 26 grade parts of jacking block composition, the main fit dimension of reply parts and components, is particularly interference fitted size before assembling And phase closing precision is checked, when Same Part is fastened with more than one piece screw (bolt), each screw (bolt) needs to intersect, is symmetrical, by Step, uniformly tighten, using angle grinder to stabilizer blade 2, bottom plate 3,4, pillar 5 of trapping, it is middle set 6, connection bolt 7, inner sleeve 8, it is upper cover 9, Fixing bolt 10, fixing sleeve 11, adhesive tape 12, cover board 13, cushion block 14, stent 15, side set 16, sheath 17, side plate 18, plane buried plate 19th, pressing plate 20, rubber cushion 21, block 22, fixed block 23, clamping plate 24, transverse slat 25 and the burr of 26 surface of jacking block and junction, then Antirust paint is smeared on its surface and junction, after drying, plane buried plate 19 is fixed on bottom plate 3, then stabilizer blade 2 is fixed on The both sides of bottom plate 3 cover 6 in 4 trapping in installation, and the installation side set 16 in middle set 6 is sealed the bottom of side set 16 using sheath 17 It closes, in side, the inner wall of set 16 installs clamping plate 24, and clamping plate 24 is made to fix pull rod 27, is covering pressing plate 20, including 24 sets of clamping plate In set 8, will trap 4 outer walls for being fixed on middle set 6, and middle set 6 is fixed, upper set 9 is mounted on and is trapped on 4, makes set 9 by inner sleeve 8 fix, and inner sleeve 8 is fixed and clamped with fixing sleeve 11, has changed cover board 13, and pillar 5 is mounted in middle set 8, inserts its root Enter casing 31, complete the assembly working of the construction steel structure pedestal.
In the description of the present invention, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " middle part ", " other end ", " on ", " side ", " top ", " interior ", " forepart ", " center ", the orientation of the instructions such as " both ends " or position relationship be Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description rather than instruction or dark Show that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that right The limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ", Terms such as " being screwed on " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral;It can be with It is mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, can be two The interaction relationship of connection or two elements inside a element, unless otherwise restricted clearly, for the common of this field For technical staff, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of construction steel structure pedestal, including concrete base layer (1), it is characterised in that:The concrete base layer (1) it is upper Surface is equipped with bottom plate (3), and the lower surface of the bottom plate (3) is connected with the upper surface of concrete base layer (1), the bottom plate (3) Stabilizer blade (2) is mounted at left and right sides of outer wall, the inner wall of the stabilizer blade (2) is connected with the outer wall of bottom plate (3), the bottom plate (3) upper surface is equipped with trap (4), the lower surface for trapping (4) is connected with the upper surface of bottom plate (3), described to trap Inner wall is equipped with pillar (5), and the inner wall for trapping (4) is equipped with middle set (6), the outer wall of the middle set (6) and the interior of (4) of trapping Wall is connected, and the upper surface for trapping (4) is equipped with set (9), the lower surface of the upper set (9) and the upper surface of (4) of trapping Be connected, it is described it is upper set (9) inner wall be equipped with it is middle set (8), it is described it is middle set (8) inner wall be connected with the outer wall of pillar (5), it is described on The top of set (9) is equipped with fixing sleeve (11), and fixing sleeve (11) outer wall is connected with the inner wall of upper set (9), the fixing sleeve (11) inner wall is equipped with inner sleeve (8), and the outer wall of the inner sleeve (8) is connected with the inner wall of fixing sleeve (11), the fixing sleeve (11) inner wall is equipped with fixing bolt (10), and the outer wall of the fixing bolt (10) is connected with the inner wall of fixing sleeve (11), institute The top for stating fixing sleeve (11) is equipped with cover board (13), the lower surface of the cover board (13) and the upper surface phase of fixing sleeve (11) Even, the outer right wall of the fixing sleeve (11) is equipped with support plate (15), and the inner wall of the support plate (15) is outer with fixing sleeve (11) Wall is connected, and the inner wall of the middle set (6) is equipped with side and covers (16), and the outer wall of the side set (16) is connected with the inner wall of middle set (6), institute The lower surface for stating side set (16) is equipped with sheath (17), and the upper surface of the sheath (17) is connected with side set (16) lower surface, institute The inner wall for stating side set (16) is equipped with jacking block (26), and the outer wall of the jacking block (26) is connected with the inner wall of side set (16), the top The upper surface of block (26) is equipped with pressing plate (20), and the lower surface of the pressing plate (20) is connected with the upper surface of jacking block (26), described The lower surface of inner sleeve (8) is equipped with clamping plate (24), and the upper surface of the clamping plate (24) is connected with the lower surface of inner sleeve (8), described The inner wall of clamping plate (24) is equipped with pull rod (27), and the outer wall of the pull rod (27) is connected with the inner wall of clamping plate (24), the pull rod (27) lower surface is equipped with transverse slat (25), and the outer wall of the transverse slat (25) is connected with the inner wall of pull rod (27), the pull rod (27) outer wall is equipped with rubber cushion (26), and the outer wall of the rubber cushion (26) is connected with the inner wall of pull rod (27).
2. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The upper surface of the bottom plate (3) Plane buried plate (19) is installed, the lower surface of the plane buried plate (19) is connected with the upper surface of pedestal (3), the plane buried plate (19) upper surface is equipped with triangular plate (28), and the lower surface of the triangular plate (28) is connected with the upper surface of pedestal (3), described The inner wall of triangular plate (28) is equipped with casing (31), and the outer wall of described sleeve pipe (31) is connected with the inner wall of triangular plate (28), described The inner wall of casing (31) is equipped with pillar (5), and the outer wall of the pillar (5) is connected with the inner wall of casing (31), and the plane is buried The upper surface of plate (19) is equipped with gasket (29), and the lower surface of the gasket (29) is connected with the upper surface of plane buried plate (19), The inner wall of the gasket (29) is equipped with hex bolts (30), the inner wall phase of the outer wall and gasket (29) of the hex bolts (30) Even.
3. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The inner wall peace of the middle set (6) Equipped with connection bolt (7), the outer wall of the connection bolt (7) is connected with the inner wall of middle set (6).
4. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The inner wall of the fixing sleeve (11) Adhesive tape (12) is installed, the outer wall of the adhesive tape (12) is connected with the inner wall of fixing sleeve (11).
5. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The inner wall peace of the cover board (13) Equipped with cushion block (14), the outer wall of the cushion block (14) is connected with the inner wall of cover board (13).
6. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The inner wall peace of the jacking block (26) Equipped with fixed block (23), the outer wall of the fixed block (23) is connected with the inner wall of jacking block (26).
7. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:The inner wall peace of the pull rod (27) Equipped with side plate (18), the outer wall of the side plate (18) is connected with the inner wall of pull rod (27).
8. a kind of construction steel structure pedestal according to claim 1, it is characterised in that:Outside the top of the pull rod (27) Wall is equipped with block (22), and the inner wall of the block (22) is connected with the outer wall of pull rod (27).
9. a kind of construction steel structure method for supporting, it is characterised in that:Using angle grinder to stabilizer blade 2, bottom plate 3,4, pillar of trapping 5th, middle set 6, connection bolt 7, inner sleeve 8, upper set 9, fixing bolt 10, fixing sleeve 11, adhesive tape 12, cover board 13, cushion block 14, stent 15th, side set 16, sheath 17, side plate 18, plane buried plate 19, pressing plate 20, rubber cushion 21, block 22, fixed block 23, clamping plate 24, transverse slat 25 and the burr of 26 surface of jacking block and junction, antirust paint then is smeared on its surface and junction, after drying, plane is buried Plate 19 is fixed on bottom plate 3, then stabilizer blade 2 is fixed on to the both sides of bottom plate 3, is covered 6 in 4 interior installations of trapping, is installed in middle set 6 Side set 16, using sheath 17 by the bottom lock of side set 16, the inner wall that 16 are covered in side installs clamping plate 24, makes clamping plate 24 by pull rod 27 It is fixed, pressing plate 20 is being covered, clamping plate 24 is being sleeved in inner sleeve 8, will trap 4 outer walls for being fixed on middle set 6, and middle set 6 is fixed, will Above set 9, which is mounted on, traps on 4, and set 9 is made to fix inner sleeve 8, inner sleeve 8 is fixed and clamped with fixing sleeve 11, has changed cover board 13, Pillar 5 is mounted in middle set 8, makes its root plug-in-sleeve 31.
CN201810179161.XA 2018-03-05 2018-03-05 Steel construction base for building Active CN108179761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810179161.XA CN108179761B (en) 2018-03-05 2018-03-05 Steel construction base for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810179161.XA CN108179761B (en) 2018-03-05 2018-03-05 Steel construction base for building

Publications (2)

Publication Number Publication Date
CN108179761A true CN108179761A (en) 2018-06-19
CN108179761B CN108179761B (en) 2023-08-11

Family

ID=62553328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810179161.XA Active CN108179761B (en) 2018-03-05 2018-03-05 Steel construction base for building

Country Status (1)

Country Link
CN (1) CN108179761B (en)

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB995247A (en) * 1961-08-15 1965-06-16 Brockhouse Steel Structures Lt Improvements relating to stanchion assemblies in constructional distortable frameworks
EP0006984A1 (en) * 1978-07-13 1980-01-23 Vulkan Werk für Industrie- und Aussenbeleuchtung GmbH Signal or light pole for traffic areas
FR2535361A1 (en) * 1982-10-29 1984-05-04 Mousserolles Fonderies Atelier Base for signpost
JPH08151823A (en) * 1994-11-28 1996-06-11 Sekisui Jushi Co Ltd Mounting structure for lighting support column
JP2001073329A (en) * 1999-09-08 2001-03-21 Akira Omura Pole fixing construction
JP2003155754A (en) * 2001-11-20 2003-05-30 Mitsui Zosen Tekko Koji Kk Reinforcing structure of long pillar using photo-curable resin and reinforcing construction method
KR20040023022A (en) * 2002-09-10 2004-03-18 홍재철 expansion and contraction device for bottom slab form support
US20060104715A1 (en) * 2002-07-17 2006-05-18 Newton John R Post mounting arrangement
EP1857602A2 (en) * 2006-05-18 2007-11-21 Gerhard Krummel Device for attaching a concrete post to a foundation, in particular a concrete foundation
CN101105066A (en) * 2007-08-02 2008-01-16 广州大学 Enlargement type staying cross rib square/rectangle steel tube concrete column
EP1936071A1 (en) * 2006-12-18 2008-06-25 Transel etude de construction de lignes de transport d'energie electrique Method of replacing a post and installation comprising a post
KR100842061B1 (en) * 2007-02-21 2008-06-30 강신덕 Jack support
FR2924143A1 (en) * 2007-11-27 2009-05-29 Haemmerlin Sas Soc Par Actions Prop for shoring e.g. floor joist in building field, has reinforcement realized under form of element connected to base of post of prop in demountable manner, near ground support plate, and presented under form of two identical half-shells
CN101509280A (en) * 2008-12-19 2009-08-19 北京工业大学 Semi-imbed type anchorage node of piling bar pin-concrete cushion cap
CN202131600U (en) * 2011-03-29 2012-02-01 浙江华铁建筑安全科技股份有限公司 Dual cross fixing end
KR101255179B1 (en) * 2012-11-07 2013-04-23 (주)비에스 Streetlight pole for absorption of external vibration and shock
CN203307834U (en) * 2013-04-26 2013-11-27 中国水电顾问集团贵阳勘测设计研究院 Base of circular steel column footing
KR101418203B1 (en) * 2013-01-09 2014-08-06 안병준 The Streetlight support of combination structure unified ballast stabilizer
US9097014B1 (en) * 2014-07-24 2015-08-04 Felix L. Sorkin Cartridge for retaining a sheathing of a tendon within an anchor assembly
KR200480228Y1 (en) * 2015-03-12 2016-04-28 주식회사 넥스코 Protection block for gravel
CN205314606U (en) * 2016-01-26 2016-06-15 河南工业职业技术学院 Constructional steel structure base
CN107604938A (en) * 2017-10-30 2018-01-19 四川道勤信业科技有限公司 A kind of security device chassis attachment means

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB995247A (en) * 1961-08-15 1965-06-16 Brockhouse Steel Structures Lt Improvements relating to stanchion assemblies in constructional distortable frameworks
EP0006984A1 (en) * 1978-07-13 1980-01-23 Vulkan Werk für Industrie- und Aussenbeleuchtung GmbH Signal or light pole for traffic areas
FR2535361A1 (en) * 1982-10-29 1984-05-04 Mousserolles Fonderies Atelier Base for signpost
JPH08151823A (en) * 1994-11-28 1996-06-11 Sekisui Jushi Co Ltd Mounting structure for lighting support column
JP2001073329A (en) * 1999-09-08 2001-03-21 Akira Omura Pole fixing construction
JP2003155754A (en) * 2001-11-20 2003-05-30 Mitsui Zosen Tekko Koji Kk Reinforcing structure of long pillar using photo-curable resin and reinforcing construction method
US20060104715A1 (en) * 2002-07-17 2006-05-18 Newton John R Post mounting arrangement
KR20040023022A (en) * 2002-09-10 2004-03-18 홍재철 expansion and contraction device for bottom slab form support
EP1857602A2 (en) * 2006-05-18 2007-11-21 Gerhard Krummel Device for attaching a concrete post to a foundation, in particular a concrete foundation
EP1936071A1 (en) * 2006-12-18 2008-06-25 Transel etude de construction de lignes de transport d'energie electrique Method of replacing a post and installation comprising a post
KR100842061B1 (en) * 2007-02-21 2008-06-30 강신덕 Jack support
CN101105066A (en) * 2007-08-02 2008-01-16 广州大学 Enlargement type staying cross rib square/rectangle steel tube concrete column
FR2924143A1 (en) * 2007-11-27 2009-05-29 Haemmerlin Sas Soc Par Actions Prop for shoring e.g. floor joist in building field, has reinforcement realized under form of element connected to base of post of prop in demountable manner, near ground support plate, and presented under form of two identical half-shells
CN101509280A (en) * 2008-12-19 2009-08-19 北京工业大学 Semi-imbed type anchorage node of piling bar pin-concrete cushion cap
CN202131600U (en) * 2011-03-29 2012-02-01 浙江华铁建筑安全科技股份有限公司 Dual cross fixing end
KR101255179B1 (en) * 2012-11-07 2013-04-23 (주)비에스 Streetlight pole for absorption of external vibration and shock
KR101418203B1 (en) * 2013-01-09 2014-08-06 안병준 The Streetlight support of combination structure unified ballast stabilizer
CN203307834U (en) * 2013-04-26 2013-11-27 中国水电顾问集团贵阳勘测设计研究院 Base of circular steel column footing
US9097014B1 (en) * 2014-07-24 2015-08-04 Felix L. Sorkin Cartridge for retaining a sheathing of a tendon within an anchor assembly
KR200480228Y1 (en) * 2015-03-12 2016-04-28 주식회사 넥스코 Protection block for gravel
CN205314606U (en) * 2016-01-26 2016-06-15 河南工业职业技术学院 Constructional steel structure base
CN107604938A (en) * 2017-10-30 2018-01-19 四川道勤信业科技有限公司 A kind of security device chassis attachment means

Also Published As

Publication number Publication date
CN108179761B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN111691458B (en) Construction method of comprehensive pipe rack support
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN108179761A (en) A kind of construction steel structure pedestal
CN107965139A (en) The plate face drop readily removable combined type of plate difference of height hangs die body system and construction method
JP6032907B2 (en) Foundation structure for outdoor equipment installation
CN206736733U (en) Long-span steel pipe arch bridge assembling construction arch rib support
CN208486287U (en) A kind of construction steel structure pedestal
CN210597622U (en) Novel can dismantle simple and easy house structure
CN211037785U (en) Hanging flower basket is striden wall frame
CN207633750U (en) A kind of removable sliding form apparatus of monoblock type
CN207586003U (en) A kind of pulling method measures the special mating plate preparation facilities of plane anchoring strength of coating
CN106436977B (en) The mounting structure and installation method of out-hung panel
CN209413283U (en) A kind of novel indent aluminum alloy pattern plate
CN209323952U (en) Overhanging scaffold
CN206289789U (en) The mounting structure of out-hung panel
JP5281117B2 (en) Unit tile construction method
CN219548461U (en) Building structure auxiliary reinforcing device
CN209023528U (en) A kind of assembling jar for the big volume storage of mud
CN114607171B (en) Reinforcing device and reinforcing method for concrete column
CN112482748B (en) Single-sided punching-free formwork supporting device applied to assembled wall building
CN211898505U (en) Steel structure supporting column
JP3226415U (en) Torii assembly kit
CN221168297U (en) Indoor glass curtain wall integrated system
CN210013447U (en) Novel elevator shaft protection platform
CN108360815A (en) Board bottom has the assembled composite beam-plate connection support device and installation method of height difference

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230719

Address after: No. 303 Hangwen South Road, Danshan Village, Zeguo Town, Wenling City, Taizhou City, Zhejiang Province, 317523

Applicant after: Taizhou Weili Steel Structure Co.,Ltd.

Address before: Room 301, Building 1, No. 538, Yaotai Road, Wuxing District, Huzhou, Zhejiang Province 313000

Applicant before: HUZHOU JIACHENG SHUSHIJIA ENGINEERING EQUIPMENT CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant