CN108166513A CN201810001381.3A CN201810001381A CN108166513A CN 108166513 A CN108166513 A CN 108166513A CN 201810001381 A CN201810001381 A CN 201810001381A CN 108166513 A CN108166513 A CN 108166513A
Authority
CN
China
Prior art keywords
bolt body
hollow bolt
hole
drainpipe
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810001381.3A
Other languages
Chinese (zh)
Other versions
CN108166513B (en
Inventor
吴志斌
汪磊
肖林超
曾江波
吴飞飞
张世华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Geotechnical Investigation & Surveying Institute Group Co ltd
Original Assignee
Shenzhen Geotechnical Investigation & Surveying Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Geotechnical Investigation & Surveying Institute Co Ltd filed Critical Shenzhen Geotechnical Investigation & Surveying Institute Co Ltd
Priority to CN201810001381.3A priority Critical patent/CN108166513B/en
Publication of CN108166513A publication Critical patent/CN108166513A/en
Application granted granted Critical
Publication of CN108166513B publication Critical patent/CN108166513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Abstract

The present invention relates to the protection technology fields of side slope, refer in particular to anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope, pierce hollow bolt body in determining position by the use of slewing drilling machine as power, hollow bolt body is transferred to designed depth;It needs to carry out soil digging and deslagging when hollow bolt body drills;Ensure that the inside of hollow bolt body and outside drill after being unobstructed, carry out the fixation of hollow bolt body and the installation of drainpipe in corresponding position respectively;The forming hole method in dual-purpose hole improves construction efficiency and reduces construction cost, improves construction quality.

Description

Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope
Technical field
The present invention relates to the protection technology field of side slope, refer in particular in a kind of dregs side slope anchor hole and the dual-purpose hole of osculum into Hole technique.
Background technology
With the development of urban construction, a large amount of remaining body refuse mound product easily forms welding with filler wire.Welding with filler wire is as one Kind is artificial to form mixture side slope, is that will banket to roll the physico-mechanical properties piled up, banketed step by step in forming process Difference, therefore accumulate the welding with filler wire and unstable formed, therefore need to take welding with filler wire and reinforce prevention and control measure and administer, and Anchor pole is a kind of common prevention and control reinforcement measure in slope treatment;Additionally due to the short texture and water penetration of welding with filler wire are strong, Rainfall and the presence of underground water, the possibility that landslide or mud-stone flow disaster occur to inducing welding with filler wire increase, it is therefore desirable to To welding with filler wire carry out drainage sunk well, except fill slope slope table lay gutter in addition to, additionally should in welding with filler wire slopes cloth If In-pit water drainage hole.
Since the dregs mixture in welding with filler wire is loose, so when anchor pole and osculum are constructed, i.e., anchor hole and In the pore forming process of In-pit water drainage hole, larger using conventional forming hole method difficulty, collapse hole, bit freezing easily occur for weak loose earth Etc. accidents.
For the anchor hole pore-forming technique in Loose Slope, the patent for having related fields is studied, and includes construction When take casing retaining wall and the methods of using self-feeding anchor pile drilling, it is contemplated that it is practical during welding with filler wire row's bolthole construction On also need to carry out the construction of osculum, in based on analysis welding with filler wire on the basis of soil mass property, to reduce construction cost And construction efficiency is improved, therefore the present invention has invented a kind of slag for the hole creating technology of anchor hole and osculum in welding with filler wire Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in native side slope.
Invention content
In view of the defects and deficiencies of the prior art, the present invention intends to provide anchor hole and drainings in a kind of dregs side slope The pore-forming technique in the dual-purpose hole in hole.
To achieve the above object, the technical solution adopted by the present invention is:
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum, include the following steps in a kind of dregs side slope of the present invention:
A, according to analyzing the internal structure of dregs body, position and the depth of hollow bolt body and drainpipe are determined Degree;
B, pierce hollow bolt body in the position that step a is determined by the use of slewing drilling machine as power, hollow bolt body be transferred to Designed depth in step a;It needs to carry out soil digging and deslagging when hollow bolt body drills;
C, it after the completion of step b, is checked, the inside and outside drilling for ensureing hollow bolt body are unobstructed;
D, ensure hollow bolt body inside and outside drilling be unobstructed after, according to step a respectively corresponding position into The fixation of row hollow bolt body and the installation of drainpipe.
Further, the fixation of the hollow bolt body, includes the following steps:
1a, slip casting is carried out to the inside of hollow bolt body by Grouting Pipe;
The aperture of anchor hole is blocked after the completion of 1b, slip casting with accelerated cement.
Further, the installation of the drainpipe, includes the following steps:
2a, drainpipe are inserted into the inner cavity of hollow bolt body;
2b, hollow bolt body take out out of hole;
2c, the gap between drainpipe and the wall of a borehole is closed with mortar;
2d, the whether unimpeded of drainpipe checked.
Further, when there is collapse hole in spare anchor body of rod boring procedure in stepb, hollow bolt body stops creeping into and moving back Go out;Using grouting for braced wall method handle collapse hole;Cleaning drilling is carried out after grouting initial set;Continue profit after drilling cleaning It is drilled with hollow bolt body into step a designed depth.
Further, the hollow bolt body includes hollow tube and hollow boring bit;The hollow boring bit is fixed on hollow The front end of pipe;External screw thread is provided on the lateral wall of the hollow tube.
Further, 3a, basis analyze the internal structure of dregs body, determine the position of hollow bolt body and drainpipe It puts and depth;Annotated mark is made in corresponding position;
3b, slewing drilling machine are loaded onto at the position determined after hollow bolt body in step a, field technician's angulometer tune Whole good hollow bolt body be transferred to angle after, hollow bolt body is pierced in dregs body;Needed when hollow bolt body drills into Row soil digging and deslagging, in drilling process, soil digging work need to be carried out by often creeping into certain process, and deslagging is carried out using air compressor machine wind, During to being not easy the wet soil discharged, drilling process should be reduced and carry out deslagging, it is clean unobstructed in hole to ensure;Hollow bolt body is transferred to When there is collapse hole and stop creeping into and exit drilling rod, collapse hole processing is carried out by grouting for braced wall method, injected hole is inserted in the hole To collapse hole, injection quick-setting mortar blocks collapse hole hole wall, and slip casting is completed a period of time, after the completion of mortar initial setting time, passes through pneumatics Machine carries out borehole cleaning;It then proceedes to drill until the hollow boring bit on hollow bolt body is transferred into step a designed depth;
After the completion of 3c, step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body are unobstructed;
3d, the inside for ensuring hollow bolt body and outside drilling be unobstructed after, according to step a respectively corresponding position into The fixation of row hollow bolt body and the installation of drainpipe;During the fixation of hollow bolt body, include the following steps:A, pass through Grouting Pipe Slip casting is carried out to the inside of hollow bolt body, when grout absorption is more than theoretical grout absorption, Starch Level reaches design requirement and no longer inhales After slurry, it is believed that slip casting process reaches requirement and stops slip casting;Grouting soil is frozen into after slip casting and is wrapped on hollow bolt In vitro;B, concrete pedestal seals aperture after the completion of slip casting, and concrete pedestal is added in hollow bolt body with bearing plate Gu;The installation of drainpipe, includes the following steps:A, drainpipe is inserted into the inner cavity of hollow bolt body, the material of drainpipe here Matter is usually PVC;B, hollow bolt body takes out out of hole;C, gap between drainpipe and the wall of a borehole is closed with mortar, and bored Concrete fixed body is formed at the aperture in hole;D, the whether unimpeded of drainpipe checked.
Compared with the prior art, the invention has the advantages that:
(1) forming hole method in dual-purpose hole is devised, improve construction efficiency and reduces construction cost;
(2) in anchor bolt construction, the slip casting between hole wall works, and the bonding for enhancing self-drilling hollow anchor bars and the soil body is strong Degree, so as to strengthen the anchoring effect of anchor pole, improves construction quality;
(3) when osculum is constructed, by the protective effect of self-drilling hollow anchor bars, the generation of collapse hole phenomenon is avoided;
(4) drainpipe is recycled self-drilling hollow anchor bars, so as to reduce construction cost after installation is complete.
(5) slip casting has also been carried out during draining pipe construction between hole wall, the adhesion strength of drainpipe and the soil body has been enhanced, also carries High construction quality.
Description of the drawings
Fig. 1 is the flow chart of dual-purpose hole pore-forming technique;
Fig. 2 is the structure diagram of self-drilling hollow anchor bars;
Fig. 3 is the anchor pole layout stracture schematic diagram in present invention process;
Fig. 4 is the osculum layout stracture schematic diagram in present invention process;
Reference sign:
1st, external screw thread;2nd, concrete fixed body;3rd, hollow tube;4th, hollow boring bit;5th, dregs body;
6th, hollow bolt body;7th, bearing plate;8th, concrete pedestal;9th, collapse hole;
10th, grouting soil;11st, drainpipe.
Specific embodiment
As shown in Figs 1-4, with reference to specific embodiment, the present invention will be described in detail, and following embodiments and explanation are only For explaining the present invention, but it is not as a limitation of the invention.
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum, include the following steps in a kind of dregs side slope:
A, according to analyzing the internal structure of dregs body 5, determine hollow bolt body 6 and drainpipe 11 position and Depth;Annotated mark is made in corresponding position;
B, slewing drilling machine is loaded onto at the position determined after hollow bolt body 6 in step a, field technician's angulometer tune Whole good hollow bolt body 6 be transferred to angle after, hollow bolt body 6 is pierced in dregs body 5;It is needed when hollow bolt body 6 drills Soil digging and deslagging are carried out, in drilling process, soil digging work need to be carried out by often creeping into certain process, be arranged using air compressor machine wind Slag during to being not easy the wet soil discharged, should reduce drilling process and carry out deslagging, clean unobstructed in hole to ensure;Hollow bolt body 6 Occur collapse hole 9 when being transferred to stop creeping into and exiting drilling rod, carrying out collapse hole 9 by grouting for braced wall method is handled, and injected hole is inserted Enter at collapse hole 9 in hole, injection quick-setting mortar blocks collapse hole hole wall, and slip casting is completed a period of time, after the completion of mortar initial setting time, leads to It crosses air compressor machine and carries out borehole cleaning;Then proceed to drill until the hollow boring bit 4 on hollow bolt body 6 be transferred into step a it is designed Depth;
C, after the completion of step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body 6 are unobstructed;
D, ensure hollow bolt body 6 inside and outside drilling be unobstructed after, according to step a respectively corresponding position into The fixation of row hollow bolt body 6 and the installation of drainpipe 11;During the fixation of hollow bolt body 6, include the following steps:A, pass through note It starches pipe and carries out slip casting to the inside of hollow bolt body 6, when grout absorption is more than theoretical grout absorption, Starch Level reaches design requirement and not Again after midge, it is believed that slip casting process reaches requirement and stops slip casting;It is frozen into after slip casting during grouting soil 10 is wrapped on Outside the spare anchor body of rod 6;B, concrete pedestal 8 seals aperture after the completion of slip casting, and tenses hollow bolt body 6 with bearing plate 7, makes pressure-bearing Plate 7 tenses hollow bolt body 6, is in hollow bolt body 6 and meets under tension state, hollow bolt body 6 is locked on bottom;Drainpipe 11 installation, includes the following steps:A, drainpipe 11 is inserted into the inner cavity of hollow bolt body 6, the material of drainpipe 11 here Usually PVC;B, hollow bolt body 6 takes out out of hole;C, gap between drainpipe 11 and the wall of a borehole is closed with mortar, and bored Concrete fixed body 2 is formed at the aperture in hole;D, the whether unimpeded of drainpipe 11 checked.
Compared with the prior art, the invention has the advantages that:
(1) a kind of forming hole method in the dual-purpose hole in welding with filler wire is devised, construction efficiency is improved and reduces Construction cost;
(2) in anchor bolt construction, the slip casting between hole wall works, and the bonding for enhancing self-drilling hollow anchor bars and the soil body is strong Degree, so as to strengthen the anchoring effect of anchor pole, improves construction quality;
(3) when osculum is constructed, by the protective effect of self-drilling hollow anchor bars, the generation of collapse hole phenomenon is avoided;
(4) drainpipe is recycled self-drilling hollow anchor bars, so as to reduce construction cost after installation is complete.
(5) slip casting has also been carried out during draining pipe construction between hole wall, the adhesion strength of drainpipe and the soil body has been enhanced, also carries High construction quality.
The above only illustrates the present invention to facilitate, and is not departing from the scope of the invention created, is being familiar with this skill What those skilled in the art of art was done various simple should in a disguised form belong to the scope of protection of the present invention with modification.

Claims (6)

1. anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope, which is characterized in that include the following steps:
A, according to analyzing the internal structure of dregs body (5), determine the position of hollow bolt body (6) and drainpipe (11) with And depth;
B, hollow bolt body (6) is pierced in the position that step a is determined by the use of slewing drilling machine as power, hollow bolt body (6) is transferred to The designed depth into step a;It needs to carry out soil digging and deslagging when hollow bolt body (6) drills;
C, it after the completion of step b, is checked, the inside and outside drilling for ensureing hollow bolt body (6) are unobstructed;
D, ensure that the inside of hollow bolt body (6) and outside drill after being unobstructed, carried out respectively in corresponding position according to step a The fixation of hollow bolt body (6) and the installation of drainpipe (11).
2. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1 In:The fixation of the hollow bolt body (6), includes the following steps:
1a, slip casting is carried out to the inside of hollow bolt body (6) by Grouting Pipe;
The aperture of anchor hole is blocked after the completion of 1b, slip casting with accelerated cement.
3. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1 In:The installation of the drainpipe (11), includes the following steps:
2a, drainpipe (11) are inserted into the inner cavity of hollow bolt body (6);
2b, hollow bolt body (6) take out out of hole;
2c, the gap with mortar closing drainpipe (11) between the wall of a borehole;
2d, the whether unimpeded of drainpipe (11) checked.
4. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1 In:When there are collapse hole (9) in the spare anchor body of rod (6) boring procedure in stepb, hollow bolt body (6) stops creeping into and exiting;It adopts With grouting for braced wall method handle collapse hole (9);Cleaning drilling is carried out after grouting initial set;It is continued with after drilling cleaning Hollow bolt body (6) drills into step a designed depth.
5. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1 In:The hollow bolt body (6) includes hollow tube (3) and hollow boring bit (4);The hollow boring bit (4) is fixed on hollow tube (3) front end;External screw thread (1) is provided on the lateral wall of the hollow tube (3).
6. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1 In:Include the following steps:
3a, basis analyze the internal structure of dregs body (5), determine the position of hollow bolt body (6) and drainpipe (11) And depth;Annotated mark is made in corresponding position;
3b, slewing drilling machine are loaded onto at the position determined after hollow bolt body (6) in step a, field technician's angulometer tune Whole good hollow bolt body (6) be transferred to angle after, pierce hollow bolt body (6) in the dregs body (5);In hollow bolt body (6) It needs to carry out soil digging and deslagging during drilling, in drilling process, soil digging work need to be carried out by often creeping into certain process, using air compressor machine Wind carries out deslagging, during to being not easy the wet soil discharged, should reduce drilling process and carrying out deslagging, clean unobstructed in hole to ensure;In Collapse hole (9) occurs in the spare anchor body of rod (6) when being transferred to stops creeping into and exiting drilling rod, and collapse hole (9) is carried out by grouting for braced wall method Processing, injected hole is inserted in the hole to collapse hole (9), and injection quick-setting mortar blocks collapse hole hole wall, and a period of time, sand are completed in slip casting After the completion of starching initial setting time, borehole cleaning is carried out by air compressor machine;Drilling is then proceeded to until the hollow boring bit on hollow bolt body (6) (4) designed depth is transferred into step a;
After the completion of 3c, step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body (6) are unobstructed;
3d, the inside for ensuring hollow bolt body (6) and outside drilling be unobstructed after, according to step a respectively corresponding position into The fixation of row hollow bolt body (6) and the installation of drainpipe (11);During the fixation of hollow bolt body (6), include the following steps:a、 Slip casting is carried out to the inside of hollow bolt body (6) by Grouting Pipe, when grout absorption is more than theoretical grout absorption, Starch Level reaches design It is required that and no longer after midge, it is believed that slip casting process reaches requirement and stops slip casting;Grouting soil (10) packet is frozen into after slip casting It wraps up in and is fixed on hollow bolt body (6) outside;B, concrete pedestal (10) seals aperture after the completion of slip casting, and is tensed with bearing plate (7) Hollow bolt body (6) is reinforced;The installation of drainpipe (11), includes the following steps:A, drainpipe (11) is inserted into middle spare anchor The inner cavity of the body of rod (6), the material of drainpipe (11) here is usually PVC;B, hollow bolt body (6) takes out out of hole;C, it uses Gap of the mortar closing drainpipe (11) between the wall of a borehole, and concrete fixed body (2) is formed at the aperture of drilling;D, it checks Drainpipe (11) it is whether unimpeded.
CN201810001381.3A 2018-01-02 2018-01-02 Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope Active CN108166513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810001381.3A CN108166513B (en) 2018-01-02 2018-01-02 Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810001381.3A CN108166513B (en) 2018-01-02 2018-01-02 Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope

Publications (2)

Publication Number Publication Date
CN108166513A true CN108166513A (en) 2018-06-15
CN108166513B CN108166513B (en) 2020-11-17

Family

ID=62517194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810001381.3A Active CN108166513B (en) 2018-01-02 2018-01-02 Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope

Country Status (1)

Country Link
CN (1) CN108166513B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305887A (en) * 2020-05-08 2020-06-19 中国矿业大学(北京) Shear-resistant anchor pipe cable supporting structure and construction method
CN111945757A (en) * 2020-08-14 2020-11-17 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN112016224A (en) * 2020-07-28 2020-12-01 西南大学 SPH-based soil slope landslide analysis and determination method, system, terminal and medium
CN112627198A (en) * 2021-01-20 2021-04-09 中国建筑第八工程局有限公司 Foundation pit supporting system with drainage function and construction method thereof
CN114032931A (en) * 2021-12-13 2022-02-11 四川路桥建设集团交通工程有限公司 Fixing structure and method for protecting slope vegetation by using plant fiber blanket
CN115478779A (en) * 2022-08-30 2022-12-16 福建亿钻机械有限公司 Side slope drilling machine for geological disaster treatment and pipe insertion construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101012654A (en) * 2006-11-10 2007-08-08 姚攀峰 Self-draining reinforced pipe supporting structure and construction method thereof
CN102155016A (en) * 2011-05-10 2011-08-17 中铁二院工程集团有限责任公司 Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method
CN202810879U (en) * 2012-08-10 2013-03-20 淮北凯特精工机械电子科技有限公司 Wind-driven spiral anchor rod recovery device
CN203891018U (en) * 2014-06-16 2014-10-22 谢时雳 Self-drilling type drainage anchoring soil nail
CN204024684U (en) * 2014-09-02 2014-12-17 安徽理工大学 A kind of self-drilling slip casting recoverable anchor rod
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN105603892A (en) * 2016-03-04 2016-05-25 中南大学 Water nail drainage system for railway roadbed slope and construction method of system
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe
CN107246008A (en) * 2017-06-30 2017-10-13 浙江大学 A kind of side slope protection from draining anchor cable system and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101012654A (en) * 2006-11-10 2007-08-08 姚攀峰 Self-draining reinforced pipe supporting structure and construction method thereof
CN102155016A (en) * 2011-05-10 2011-08-17 中铁二院工程集团有限责任公司 Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method
CN202810879U (en) * 2012-08-10 2013-03-20 淮北凯特精工机械电子科技有限公司 Wind-driven spiral anchor rod recovery device
CN203891018U (en) * 2014-06-16 2014-10-22 谢时雳 Self-drilling type drainage anchoring soil nail
CN204024684U (en) * 2014-09-02 2014-12-17 安徽理工大学 A kind of self-drilling slip casting recoverable anchor rod
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN105603892A (en) * 2016-03-04 2016-05-25 中南大学 Water nail drainage system for railway roadbed slope and construction method of system
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe
CN107246008A (en) * 2017-06-30 2017-10-13 浙江大学 A kind of side slope protection from draining anchor cable system and its construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305887A (en) * 2020-05-08 2020-06-19 中国矿业大学(北京) Shear-resistant anchor pipe cable supporting structure and construction method
CN112016224A (en) * 2020-07-28 2020-12-01 西南大学 SPH-based soil slope landslide analysis and determination method, system, terminal and medium
CN112016224B (en) * 2020-07-28 2022-11-18 西南大学 SPH-based soil slope landslide analysis and determination method, system, terminal and medium
CN111945757A (en) * 2020-08-14 2020-11-17 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN111945757B (en) * 2020-08-14 2022-03-11 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN112627198A (en) * 2021-01-20 2021-04-09 中国建筑第八工程局有限公司 Foundation pit supporting system with drainage function and construction method thereof
CN114032931A (en) * 2021-12-13 2022-02-11 四川路桥建设集团交通工程有限公司 Fixing structure and method for protecting slope vegetation by using plant fiber blanket
CN115478779A (en) * 2022-08-30 2022-12-16 福建亿钻机械有限公司 Side slope drilling machine for geological disaster treatment and pipe insertion construction method
CN115478779B (en) * 2022-08-30 2023-10-24 福建亿钻机械有限公司 Slope drilling machine for geological disaster management and intubation construction method

Also Published As

Publication number Publication date
CN108166513B (en) 2020-11-17

Similar Documents

Publication Publication Date Title
CN108166513A (en) Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope
CN105155550B (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
KR100919821B1 (en) Ground enhansing apparatus with anchor rod and method thereof
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN106193032B (en) A kind of anti-float anchor rod construction method
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN105951749B (en) The construction method of the steel pipe pile reinforced processing of soft damage in a kind of restricted clearance
CN207878460U (en) A kind of high-pressure rotary-spray reamed end anchor pole
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN102926409B (en) A kind of construction method prevented erosion
CN105525619A (en) Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN104695458A (en) Construction method of deep stirring and jet grouting compound pile waterproof curtain
CN207111118U (en) Pre-buried drilled grout hole is guide locating device provided on a kind of needle beam trolley
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN102877470A (en) Combined soil nailing construction method
CN110424971A (en) The method for handling jacked piles with small section landslide
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure
CN208201874U (en) A kind of open-cell cloth bag grouting structure
KR200352267Y1 (en) Slope-reinforcing structure for soil nailing having function of drainage
CN101358529A (en) Short tube and short tube sand consolidation agent strengthening construction process
CN107447755A (en) A kind of anchor pole equipment and armature boring construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 No. 1043 Shangbu Middle Road, Futian District, Shenzhen City, Guangdong Province

Patentee after: SHENZHEN GEOTECHNICAL INVESTIGATION & SURVEYING INSTITUTE (Group) Co.,Ltd.

Address before: 518000 No. 1043 Shangbu Middle Road, Futian District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN GEOTECHNICAL INVESTIGATION & SURVEYING INSTITUTE Co.,Ltd.

CP01 Change in the name or title of a patent holder