CN108166513A - Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope - Google Patents
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope Download PDFInfo
- Publication number
- CN108166513A CN108166513A CN201810001381.3A CN201810001381A CN108166513A CN 108166513 A CN108166513 A CN 108166513A CN 201810001381 A CN201810001381 A CN 201810001381A CN 108166513 A CN108166513 A CN 108166513A
- Authority
- CN
- China
- Prior art keywords
- bolt body
- hollow bolt
- hole
- drainpipe
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Abstract
The present invention relates to the protection technology fields of side slope, refer in particular to anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope, pierce hollow bolt body in determining position by the use of slewing drilling machine as power, hollow bolt body is transferred to designed depth;It needs to carry out soil digging and deslagging when hollow bolt body drills;Ensure that the inside of hollow bolt body and outside drill after being unobstructed, carry out the fixation of hollow bolt body and the installation of drainpipe in corresponding position respectively;The forming hole method in dual-purpose hole improves construction efficiency and reduces construction cost, improves construction quality.
Description
Technical field
The present invention relates to the protection technology field of side slope, refer in particular in a kind of dregs side slope anchor hole and the dual-purpose hole of osculum into
Hole technique.
Background technology
With the development of urban construction, a large amount of remaining body refuse mound product easily forms welding with filler wire.Welding with filler wire is as one
Kind is artificial to form mixture side slope, is that will banket to roll the physico-mechanical properties piled up, banketed step by step in forming process
Difference, therefore accumulate the welding with filler wire and unstable formed, therefore need to take welding with filler wire and reinforce prevention and control measure and administer, and
Anchor pole is a kind of common prevention and control reinforcement measure in slope treatment;Additionally due to the short texture and water penetration of welding with filler wire are strong,
Rainfall and the presence of underground water, the possibility that landslide or mud-stone flow disaster occur to inducing welding with filler wire increase, it is therefore desirable to
To welding with filler wire carry out drainage sunk well, except fill slope slope table lay gutter in addition to, additionally should in welding with filler wire slopes cloth
If In-pit water drainage hole.
Since the dregs mixture in welding with filler wire is loose, so when anchor pole and osculum are constructed, i.e., anchor hole and
In the pore forming process of In-pit water drainage hole, larger using conventional forming hole method difficulty, collapse hole, bit freezing easily occur for weak loose earth
Etc. accidents.
For the anchor hole pore-forming technique in Loose Slope, the patent for having related fields is studied, and includes construction
When take casing retaining wall and the methods of using self-feeding anchor pile drilling, it is contemplated that it is practical during welding with filler wire row's bolthole construction
On also need to carry out the construction of osculum, in based on analysis welding with filler wire on the basis of soil mass property, to reduce construction cost
And construction efficiency is improved, therefore the present invention has invented a kind of slag for the hole creating technology of anchor hole and osculum in welding with filler wire
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in native side slope.
Invention content
In view of the defects and deficiencies of the prior art, the present invention intends to provide anchor hole and drainings in a kind of dregs side slope
The pore-forming technique in the dual-purpose hole in hole.
To achieve the above object, the technical solution adopted by the present invention is:
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum, include the following steps in a kind of dregs side slope of the present invention:
A, according to analyzing the internal structure of dregs body, position and the depth of hollow bolt body and drainpipe are determined
Degree;
B, pierce hollow bolt body in the position that step a is determined by the use of slewing drilling machine as power, hollow bolt body be transferred to
Designed depth in step a;It needs to carry out soil digging and deslagging when hollow bolt body drills;
C, it after the completion of step b, is checked, the inside and outside drilling for ensureing hollow bolt body are unobstructed;
D, ensure hollow bolt body inside and outside drilling be unobstructed after, according to step a respectively corresponding position into
The fixation of row hollow bolt body and the installation of drainpipe.
Further, the fixation of the hollow bolt body, includes the following steps:
1a, slip casting is carried out to the inside of hollow bolt body by Grouting Pipe;
The aperture of anchor hole is blocked after the completion of 1b, slip casting with accelerated cement.
Further, the installation of the drainpipe, includes the following steps:
2a, drainpipe are inserted into the inner cavity of hollow bolt body;
2b, hollow bolt body take out out of hole;
2c, the gap between drainpipe and the wall of a borehole is closed with mortar;
2d, the whether unimpeded of drainpipe checked.
Further, when there is collapse hole in spare anchor body of rod boring procedure in stepb, hollow bolt body stops creeping into and moving back
Go out;Using grouting for braced wall method handle collapse hole;Cleaning drilling is carried out after grouting initial set;Continue profit after drilling cleaning
It is drilled with hollow bolt body into step a designed depth.
Further, the hollow bolt body includes hollow tube and hollow boring bit;The hollow boring bit is fixed on hollow
The front end of pipe;External screw thread is provided on the lateral wall of the hollow tube.
Further, 3a, basis analyze the internal structure of dregs body, determine the position of hollow bolt body and drainpipe
It puts and depth;Annotated mark is made in corresponding position;
3b, slewing drilling machine are loaded onto at the position determined after hollow bolt body in step a, field technician's angulometer tune
Whole good hollow bolt body be transferred to angle after, hollow bolt body is pierced in dregs body;Needed when hollow bolt body drills into
Row soil digging and deslagging, in drilling process, soil digging work need to be carried out by often creeping into certain process, and deslagging is carried out using air compressor machine wind,
During to being not easy the wet soil discharged, drilling process should be reduced and carry out deslagging, it is clean unobstructed in hole to ensure;Hollow bolt body is transferred to
When there is collapse hole and stop creeping into and exit drilling rod, collapse hole processing is carried out by grouting for braced wall method, injected hole is inserted in the hole
To collapse hole, injection quick-setting mortar blocks collapse hole hole wall, and slip casting is completed a period of time, after the completion of mortar initial setting time, passes through pneumatics
Machine carries out borehole cleaning;It then proceedes to drill until the hollow boring bit on hollow bolt body is transferred into step a designed depth;
After the completion of 3c, step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body are unobstructed;
3d, the inside for ensuring hollow bolt body and outside drilling be unobstructed after, according to step a respectively corresponding position into
The fixation of row hollow bolt body and the installation of drainpipe;During the fixation of hollow bolt body, include the following steps:A, pass through Grouting Pipe
Slip casting is carried out to the inside of hollow bolt body, when grout absorption is more than theoretical grout absorption, Starch Level reaches design requirement and no longer inhales
After slurry, it is believed that slip casting process reaches requirement and stops slip casting;Grouting soil is frozen into after slip casting and is wrapped on hollow bolt
In vitro;B, concrete pedestal seals aperture after the completion of slip casting, and concrete pedestal is added in hollow bolt body with bearing plate
Gu;The installation of drainpipe, includes the following steps:A, drainpipe is inserted into the inner cavity of hollow bolt body, the material of drainpipe here
Matter is usually PVC;B, hollow bolt body takes out out of hole;C, gap between drainpipe and the wall of a borehole is closed with mortar, and bored
Concrete fixed body is formed at the aperture in hole;D, the whether unimpeded of drainpipe checked.
Compared with the prior art, the invention has the advantages that:
(1) forming hole method in dual-purpose hole is devised, improve construction efficiency and reduces construction cost;
(2) in anchor bolt construction, the slip casting between hole wall works, and the bonding for enhancing self-drilling hollow anchor bars and the soil body is strong
Degree, so as to strengthen the anchoring effect of anchor pole, improves construction quality;
(3) when osculum is constructed, by the protective effect of self-drilling hollow anchor bars, the generation of collapse hole phenomenon is avoided;
(4) drainpipe is recycled self-drilling hollow anchor bars, so as to reduce construction cost after installation is complete.
(5) slip casting has also been carried out during draining pipe construction between hole wall, the adhesion strength of drainpipe and the soil body has been enhanced, also carries
High construction quality.
Description of the drawings
Fig. 1 is the flow chart of dual-purpose hole pore-forming technique;
Fig. 2 is the structure diagram of self-drilling hollow anchor bars;
Fig. 3 is the anchor pole layout stracture schematic diagram in present invention process;
Fig. 4 is the osculum layout stracture schematic diagram in present invention process;
Reference sign:
1st, external screw thread;2nd, concrete fixed body;3rd, hollow tube;4th, hollow boring bit;5th, dregs body;
6th, hollow bolt body;7th, bearing plate;8th, concrete pedestal;9th, collapse hole;
10th, grouting soil;11st, drainpipe.
Specific embodiment
As shown in Figs 1-4, with reference to specific embodiment, the present invention will be described in detail, and following embodiments and explanation are only
For explaining the present invention, but it is not as a limitation of the invention.
Anchor hole and the pore-forming technique in the dual-purpose hole of osculum, include the following steps in a kind of dregs side slope:
A, according to analyzing the internal structure of dregs body 5, determine hollow bolt body 6 and drainpipe 11 position and
Depth;Annotated mark is made in corresponding position;
B, slewing drilling machine is loaded onto at the position determined after hollow bolt body 6 in step a, field technician's angulometer tune
Whole good hollow bolt body 6 be transferred to angle after, hollow bolt body 6 is pierced in dregs body 5;It is needed when hollow bolt body 6 drills
Soil digging and deslagging are carried out, in drilling process, soil digging work need to be carried out by often creeping into certain process, be arranged using air compressor machine wind
Slag during to being not easy the wet soil discharged, should reduce drilling process and carry out deslagging, clean unobstructed in hole to ensure;Hollow bolt body 6
Occur collapse hole 9 when being transferred to stop creeping into and exiting drilling rod, carrying out collapse hole 9 by grouting for braced wall method is handled, and injected hole is inserted
Enter at collapse hole 9 in hole, injection quick-setting mortar blocks collapse hole hole wall, and slip casting is completed a period of time, after the completion of mortar initial setting time, leads to
It crosses air compressor machine and carries out borehole cleaning;Then proceed to drill until the hollow boring bit 4 on hollow bolt body 6 be transferred into step a it is designed
Depth;
C, after the completion of step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body 6 are unobstructed;
D, ensure hollow bolt body 6 inside and outside drilling be unobstructed after, according to step a respectively corresponding position into
The fixation of row hollow bolt body 6 and the installation of drainpipe 11;During the fixation of hollow bolt body 6, include the following steps:A, pass through note
It starches pipe and carries out slip casting to the inside of hollow bolt body 6, when grout absorption is more than theoretical grout absorption, Starch Level reaches design requirement and not
Again after midge, it is believed that slip casting process reaches requirement and stops slip casting;It is frozen into after slip casting during grouting soil 10 is wrapped on
Outside the spare anchor body of rod 6;B, concrete pedestal 8 seals aperture after the completion of slip casting, and tenses hollow bolt body 6 with bearing plate 7, makes pressure-bearing
Plate 7 tenses hollow bolt body 6, is in hollow bolt body 6 and meets under tension state, hollow bolt body 6 is locked on bottom;Drainpipe
11 installation, includes the following steps:A, drainpipe 11 is inserted into the inner cavity of hollow bolt body 6, the material of drainpipe 11 here
Usually PVC;B, hollow bolt body 6 takes out out of hole;C, gap between drainpipe 11 and the wall of a borehole is closed with mortar, and bored
Concrete fixed body 2 is formed at the aperture in hole;D, the whether unimpeded of drainpipe 11 checked.
Compared with the prior art, the invention has the advantages that:
(1) a kind of forming hole method in the dual-purpose hole in welding with filler wire is devised, construction efficiency is improved and reduces
Construction cost;
(2) in anchor bolt construction, the slip casting between hole wall works, and the bonding for enhancing self-drilling hollow anchor bars and the soil body is strong
Degree, so as to strengthen the anchoring effect of anchor pole, improves construction quality;
(3) when osculum is constructed, by the protective effect of self-drilling hollow anchor bars, the generation of collapse hole phenomenon is avoided;
(4) drainpipe is recycled self-drilling hollow anchor bars, so as to reduce construction cost after installation is complete.
(5) slip casting has also been carried out during draining pipe construction between hole wall, the adhesion strength of drainpipe and the soil body has been enhanced, also carries
High construction quality.
The above only illustrates the present invention to facilitate, and is not departing from the scope of the invention created, is being familiar with this skill
What those skilled in the art of art was done various simple should in a disguised form belong to the scope of protection of the present invention with modification.
Claims (6)
1. anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope, which is characterized in that include the following steps:
A, according to analyzing the internal structure of dregs body (5), determine the position of hollow bolt body (6) and drainpipe (11) with
And depth;
B, hollow bolt body (6) is pierced in the position that step a is determined by the use of slewing drilling machine as power, hollow bolt body (6) is transferred to
The designed depth into step a;It needs to carry out soil digging and deslagging when hollow bolt body (6) drills;
C, it after the completion of step b, is checked, the inside and outside drilling for ensureing hollow bolt body (6) are unobstructed;
D, ensure that the inside of hollow bolt body (6) and outside drill after being unobstructed, carried out respectively in corresponding position according to step a
The fixation of hollow bolt body (6) and the installation of drainpipe (11).
2. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1
In:The fixation of the hollow bolt body (6), includes the following steps:
1a, slip casting is carried out to the inside of hollow bolt body (6) by Grouting Pipe;
The aperture of anchor hole is blocked after the completion of 1b, slip casting with accelerated cement.
3. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1
In:The installation of the drainpipe (11), includes the following steps:
2a, drainpipe (11) are inserted into the inner cavity of hollow bolt body (6);
2b, hollow bolt body (6) take out out of hole;
2c, the gap with mortar closing drainpipe (11) between the wall of a borehole;
2d, the whether unimpeded of drainpipe (11) checked.
4. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1
In:When there are collapse hole (9) in the spare anchor body of rod (6) boring procedure in stepb, hollow bolt body (6) stops creeping into and exiting;It adopts
With grouting for braced wall method handle collapse hole (9);Cleaning drilling is carried out after grouting initial set;It is continued with after drilling cleaning
Hollow bolt body (6) drills into step a designed depth.
5. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1
In:The hollow bolt body (6) includes hollow tube (3) and hollow boring bit (4);The hollow boring bit (4) is fixed on hollow tube
(3) front end;External screw thread (1) is provided on the lateral wall of the hollow tube (3).
6. anchor hole and the pore-forming technique in the dual-purpose hole of osculum, feature exist in a kind of dregs side slope according to claim 1
In:Include the following steps:
3a, basis analyze the internal structure of dregs body (5), determine the position of hollow bolt body (6) and drainpipe (11)
And depth;Annotated mark is made in corresponding position;
3b, slewing drilling machine are loaded onto at the position determined after hollow bolt body (6) in step a, field technician's angulometer tune
Whole good hollow bolt body (6) be transferred to angle after, pierce hollow bolt body (6) in the dregs body (5);In hollow bolt body (6)
It needs to carry out soil digging and deslagging during drilling, in drilling process, soil digging work need to be carried out by often creeping into certain process, using air compressor machine
Wind carries out deslagging, during to being not easy the wet soil discharged, should reduce drilling process and carrying out deslagging, clean unobstructed in hole to ensure;In
Collapse hole (9) occurs in the spare anchor body of rod (6) when being transferred to stops creeping into and exiting drilling rod, and collapse hole (9) is carried out by grouting for braced wall method
Processing, injected hole is inserted in the hole to collapse hole (9), and injection quick-setting mortar blocks collapse hole hole wall, and a period of time, sand are completed in slip casting
After the completion of starching initial setting time, borehole cleaning is carried out by air compressor machine;Drilling is then proceeded to until the hollow boring bit on hollow bolt body (6)
(4) designed depth is transferred into step a;
After the completion of 3c, step b, high wind is checked, the inside and outside drilling for ensureing hollow bolt body (6) are unobstructed;
3d, the inside for ensuring hollow bolt body (6) and outside drilling be unobstructed after, according to step a respectively corresponding position into
The fixation of row hollow bolt body (6) and the installation of drainpipe (11);During the fixation of hollow bolt body (6), include the following steps:a、
Slip casting is carried out to the inside of hollow bolt body (6) by Grouting Pipe, when grout absorption is more than theoretical grout absorption, Starch Level reaches design
It is required that and no longer after midge, it is believed that slip casting process reaches requirement and stops slip casting;Grouting soil (10) packet is frozen into after slip casting
It wraps up in and is fixed on hollow bolt body (6) outside;B, concrete pedestal (10) seals aperture after the completion of slip casting, and is tensed with bearing plate (7)
Hollow bolt body (6) is reinforced;The installation of drainpipe (11), includes the following steps:A, drainpipe (11) is inserted into middle spare anchor
The inner cavity of the body of rod (6), the material of drainpipe (11) here is usually PVC;B, hollow bolt body (6) takes out out of hole;C, it uses
Gap of the mortar closing drainpipe (11) between the wall of a borehole, and concrete fixed body (2) is formed at the aperture of drilling;D, it checks
Drainpipe (11) it is whether unimpeded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810001381.3A CN108166513B (en) | 2018-01-02 | 2018-01-02 | Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810001381.3A CN108166513B (en) | 2018-01-02 | 2018-01-02 | Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108166513A true CN108166513A (en) | 2018-06-15 |
CN108166513B CN108166513B (en) | 2020-11-17 |
Family
ID=62517194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810001381.3A Active CN108166513B (en) | 2018-01-02 | 2018-01-02 | Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108166513B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305887A (en) * | 2020-05-08 | 2020-06-19 | 中国矿业大学(北京) | Shear-resistant anchor pipe cable supporting structure and construction method |
CN111945757A (en) * | 2020-08-14 | 2020-11-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Upward-inclined self-advancing type slope drainage steel pipe structure and construction method |
CN112016224A (en) * | 2020-07-28 | 2020-12-01 | 西南大学 | SPH-based soil slope landslide analysis and determination method, system, terminal and medium |
CN112627198A (en) * | 2021-01-20 | 2021-04-09 | 中国建筑第八工程局有限公司 | Foundation pit supporting system with drainage function and construction method thereof |
CN114032931A (en) * | 2021-12-13 | 2022-02-11 | 四川路桥建设集团交通工程有限公司 | Fixing structure and method for protecting slope vegetation by using plant fiber blanket |
CN115478779A (en) * | 2022-08-30 | 2022-12-16 | 福建亿钻机械有限公司 | Side slope drilling machine for geological disaster treatment and pipe insertion construction method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101012654A (en) * | 2006-11-10 | 2007-08-08 | 姚攀峰 | Self-draining reinforced pipe supporting structure and construction method thereof |
CN102155016A (en) * | 2011-05-10 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method |
CN202810879U (en) * | 2012-08-10 | 2013-03-20 | 淮北凯特精工机械电子科技有限公司 | Wind-driven spiral anchor rod recovery device |
CN203891018U (en) * | 2014-06-16 | 2014-10-22 | 谢时雳 | Self-drilling type drainage anchoring soil nail |
CN204024684U (en) * | 2014-09-02 | 2014-12-17 | 安徽理工大学 | A kind of self-drilling slip casting recoverable anchor rod |
CN104727319A (en) * | 2015-04-07 | 2015-06-24 | 兰州理工大学 | Slope self-drainage anchor rod and construction method |
CN105603892A (en) * | 2016-03-04 | 2016-05-25 | 中南大学 | Water nail drainage system for railway roadbed slope and construction method of system |
CN107142923A (en) * | 2017-05-25 | 2017-09-08 | 湖南科鑫电力设计有限公司 | Drainpipe and the method that side slope downslide is handled using the drainpipe |
CN107246008A (en) * | 2017-06-30 | 2017-10-13 | 浙江大学 | A kind of side slope protection from draining anchor cable system and its construction method |
-
2018
- 2018-01-02 CN CN201810001381.3A patent/CN108166513B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101012654A (en) * | 2006-11-10 | 2007-08-08 | 姚攀峰 | Self-draining reinforced pipe supporting structure and construction method thereof |
CN102155016A (en) * | 2011-05-10 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method |
CN202810879U (en) * | 2012-08-10 | 2013-03-20 | 淮北凯特精工机械电子科技有限公司 | Wind-driven spiral anchor rod recovery device |
CN203891018U (en) * | 2014-06-16 | 2014-10-22 | 谢时雳 | Self-drilling type drainage anchoring soil nail |
CN204024684U (en) * | 2014-09-02 | 2014-12-17 | 安徽理工大学 | A kind of self-drilling slip casting recoverable anchor rod |
CN104727319A (en) * | 2015-04-07 | 2015-06-24 | 兰州理工大学 | Slope self-drainage anchor rod and construction method |
CN105603892A (en) * | 2016-03-04 | 2016-05-25 | 中南大学 | Water nail drainage system for railway roadbed slope and construction method of system |
CN107142923A (en) * | 2017-05-25 | 2017-09-08 | 湖南科鑫电力设计有限公司 | Drainpipe and the method that side slope downslide is handled using the drainpipe |
CN107246008A (en) * | 2017-06-30 | 2017-10-13 | 浙江大学 | A kind of side slope protection from draining anchor cable system and its construction method |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305887A (en) * | 2020-05-08 | 2020-06-19 | 中国矿业大学(北京) | Shear-resistant anchor pipe cable supporting structure and construction method |
CN112016224A (en) * | 2020-07-28 | 2020-12-01 | 西南大学 | SPH-based soil slope landslide analysis and determination method, system, terminal and medium |
CN112016224B (en) * | 2020-07-28 | 2022-11-18 | 西南大学 | SPH-based soil slope landslide analysis and determination method, system, terminal and medium |
CN111945757A (en) * | 2020-08-14 | 2020-11-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Upward-inclined self-advancing type slope drainage steel pipe structure and construction method |
CN111945757B (en) * | 2020-08-14 | 2022-03-11 | 中国电建集团贵阳勘测设计研究院有限公司 | Upward-inclined self-advancing type slope drainage steel pipe structure and construction method |
CN112627198A (en) * | 2021-01-20 | 2021-04-09 | 中国建筑第八工程局有限公司 | Foundation pit supporting system with drainage function and construction method thereof |
CN114032931A (en) * | 2021-12-13 | 2022-02-11 | 四川路桥建设集团交通工程有限公司 | Fixing structure and method for protecting slope vegetation by using plant fiber blanket |
CN115478779A (en) * | 2022-08-30 | 2022-12-16 | 福建亿钻机械有限公司 | Side slope drilling machine for geological disaster treatment and pipe insertion construction method |
CN115478779B (en) * | 2022-08-30 | 2023-10-24 | 福建亿钻机械有限公司 | Slope drilling machine for geological disaster management and intubation construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108166513B (en) | 2020-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108166513A (en) | Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope | |
CN105155550B (en) | Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode | |
KR100919821B1 (en) | Ground enhansing apparatus with anchor rod and method thereof | |
CN102691296A (en) | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof | |
CN106759297A (en) | A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits | |
CN106917627B (en) | The advanced support method of pilot tunnel under a kind of water rich strata boring construction | |
CN106193032B (en) | A kind of anti-float anchor rod construction method | |
CN106437726A (en) | Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation | |
CN105951749B (en) | The construction method of the steel pipe pile reinforced processing of soft damage in a kind of restricted clearance | |
CN207878460U (en) | A kind of high-pressure rotary-spray reamed end anchor pole | |
CN104895073B (en) | Can being dismounted for multiple times anchor cable construction system and its construction method | |
WO2020259059A1 (en) | Tbm parallel heading tunnel trunk construction method | |
CN102926409B (en) | A kind of construction method prevented erosion | |
CN105525619A (en) | Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain | |
CN105484266B (en) | The grouting equipment and its construction method of a kind of multifunctional information | |
CN104695458A (en) | Construction method of deep stirring and jet grouting compound pile waterproof curtain | |
CN207111118U (en) | Pre-buried drilled grout hole is guide locating device provided on a kind of needle beam trolley | |
CN206721870U (en) | A kind of long auger guncreting pile steel reinforcement cage | |
CN102877470A (en) | Combined soil nailing construction method | |
CN110424971A (en) | The method for handling jacked piles with small section landslide | |
CN208605162U (en) | A kind of shield tunnel geological prospecting borehole hole sealing structure | |
CN208201874U (en) | A kind of open-cell cloth bag grouting structure | |
KR200352267Y1 (en) | Slope-reinforcing structure for soil nailing having function of drainage | |
CN101358529A (en) | Short tube and short tube sand consolidation agent strengthening construction process | |
CN107447755A (en) | A kind of anchor pole equipment and armature boring construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 518000 No. 1043 Shangbu Middle Road, Futian District, Shenzhen City, Guangdong Province Patentee after: SHENZHEN GEOTECHNICAL INVESTIGATION & SURVEYING INSTITUTE (Group) Co.,Ltd. Address before: 518000 No. 1043 Shangbu Middle Road, Futian District, Shenzhen City, Guangdong Province Patentee before: SHENZHEN GEOTECHNICAL INVESTIGATION & SURVEYING INSTITUTE Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |