CN110424971A - The method for handling jacked piles with small section landslide - Google Patents
The method for handling jacked piles with small section landslide Download PDFInfo
- Publication number
- CN110424971A CN110424971A CN201910768423.0A CN201910768423A CN110424971A CN 110424971 A CN110424971 A CN 110424971A CN 201910768423 A CN201910768423 A CN 201910768423A CN 110424971 A CN110424971 A CN 110424971A
- Authority
- CN
- China
- Prior art keywords
- drilling
- ductule
- landslide
- small section
- processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 239000002893 slag Substances 0.000 claims abstract description 35
- 238000012545 processing Methods 0.000 claims abstract description 25
- 239000011435 rock Substances 0.000 claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 16
- 239000002689 soil Substances 0.000 claims abstract description 13
- 239000004568 cement Substances 0.000 claims abstract description 9
- 230000008093 supporting effect Effects 0.000 claims abstract description 9
- 238000009412 basement excavation Methods 0.000 claims abstract description 7
- 235000019994 cava Nutrition 0.000 claims abstract description 5
- 238000005553 drilling Methods 0.000 claims description 91
- 238000007569 slipcasting Methods 0.000 claims description 31
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 239000002002 slurry Substances 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 10
- 210000005239 tubule Anatomy 0.000 claims description 8
- 229920002472 Starch Polymers 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 6
- 235000019698 starch Nutrition 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 5
- 238000004873 anchoring Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 210000004911 serous fluid Anatomy 0.000 claims description 3
- 239000011378 shotcrete Substances 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000010079 rubber tapping Methods 0.000 abstract description 2
- 238000007596 consolidation process Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- 206010060708 Induration Diseases 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000013213 extrapolation Methods 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 241000208202 Linaceae Species 0.000 description 1
- 235000004431 Linum usitatissimum Nutrition 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000001727 in vivo Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 238000009955 starching Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/152—Laggings made of grids or nettings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a kind of methods of processing jacked piles with small section landslide, it is related to technical field of tunnel construction, purpose is to provide technically simple one kind, strong operability, low cost and effective advanced support method compared with landslip for processing jacked piles with small section weak broken wall rock hole section.The technical solution adopted by the present invention is that: the method for processing jacked piles with small section landslide is reinforced by the loose slag body to the body that caves in hole, more than spring line, ductule and injecting cement paste is made to become whole, is formed the shell of effectively support top loose rock mass;Preconsolidation is carried out to the body that caves in below spring line, the method that remaining core soil in advance is taken in tapping process carries out excavation supporting, and then safely and fast passes through landslide section.The present invention compared with landslip and can not continue the case where slagging tap for jacked piles with small section weak broken wall rock hole section suitable for processing face and top, and the technology of the present invention is simple, strong operability and effective, can accelerate construction progress, and reduce construction safety risk.
Description
Technical field
It is specifically a kind of to be suitable for jacked piles with small section weak broken wall rock hole the present invention relates to technical field of tunnel construction
The method that the landslide that section occurs is handled.
Background technique
After cave in accident occurs in jacked piles with small section weak broken wall rock hole section, current common processing method mainly has following
Three kinds: method one: slip casting anchors method.This method is the slip casting anchor based on " non-casing pipe hole forming technology " and " middle-high pressure grouting "
Gu method sump remedy scheme.Method two: steel tube shed grouting advance support method, also known as small pilot tunnel method.This method mainly uses slip casting
Steel tube shed is aided with slip casting ductule, carries out pre support to landslide body, using short drilling depth, stage by stage excavates, the supporting to landslide body
Accomplish with digging with branch.Method three: single per-fore pouring liquid with small pipe preconsolidation method.This method using advanced tubule to landslide body into
Row preconsolidation, make to cave in body and slip casting ductule form combination, and enhancing resists tunnel top and collapses load and impact load
Ability.
It is the key that scheme success or failure that slip casting, which anchors " the non-casing pipe hole forming technology " that method uses, in ravelly ground, is especially existed
Landslide be easy to cause collapse hole in vivo, and the scheme of often leading to can not be successfully implementation.Steel tube shed starches advance support and uses slip casting steel tube shed
It is aided with slip casting ductule, is suitable for processing big cross section landslip hole section, technology is complex, higher cost.
For loose crushing and landslide body is along the biggish hole section of hole axis direction development range, single per-fore pouring liquid with small pipe
Preconsolidation method has some limitations: if first, the advanced tubule elevation angle is smaller, more than spring line cave in body grouting reinforcement
Finite thickness can not form certain thickness induration as top and provide enough bearing capacities;Wherein, grouting reinforcement depth is got over
Shallowly, consolidation body thickness is smaller.If second, the advanced tubule elevation angle is larger, though it can consolidating in spring line adequate thickness formed above
Knot body, but in view of the operability of construction, the elevation angle is larger in jacked piles with small section just will limit drilling depth, may cause nothing
Method selects the problem of advanced tubule of appropriate length.Meanwhile in the case that the advanced tubule elevation angle is big, excavated not in landslide body
Break during promoting, with being continuously increased for cutting depth, ductule and the design hole digging line deviation of hole top are bigger, will increase out
Difficulty is dug, and there is also the indurations below ductule without effective support due to causes the possibility of secondary landslide.
Summary of the invention
For deficiency existing for the above technology, the present invention carries out on the basis of single per-fore pouring liquid with small pipe preconsolidation method
It improves, is processing jacked piles with small section weak broken wall rock hole section compared with landslip, a kind of technically simple, strong operability, cost are provided
Low and effective advanced support method.
The present invention realize above-mentioned purpose the technical solution adopted is that: the method for processing jacked piles with small section landslide, including it is following
Step:
S1, installation support frame Tunnel Reinforcement
Have the position of execution conditions at new face slag body rear, first removes footing dross, then be supported frame supporting
Construction;
Specific: in step S1, support frame is bracing members frame or steel grating, the supporting surface and tunnel of bracing members frame and steel grating
Hole median perpendicular, up and down deviation are within ± 5cm, gradient is less than ± 2 °, by beating lock foot anchoring stock after the positioning of bracing members frame
Equiblibrium mass distribution.
S2, closing landslide body
The slag dignity of entire new face exposure is closed using pneumatically placed concrete mode;
It is specific: in step S2, concrete marked as C20, thickness of shotcrete 20cm.
S3, advanced tubule pore-creating
Spring line (i.e. excavation contour line) is drawn in new face, the label drilling hole location more than spring line, then drill, it bores
Hole direction obliquely, pass through landslide body and enter not disturbed rock mass;It marks and drills at new face (i.e. below spring line)
Hole location, and drilling is drilled with into slag body, drilling passes through slag body and enters the not disturbed rock mass on front side of former face;
Further, the drilling horizontal of new face is arranged in step S3, it is horizontal drilling.
Further, boring two rounds, respectively the first row hole drilling and the second gang drill more than spring line in step S3
Hole, wherein the elevation angle of the first row hole drilling is greater than the elevation angle of the second row hole drilling, the depth of the second row hole drilling is greater than the second row hole drilling
Depth.
Specific: in step S3, the elevation angle of the first row hole drilling is 20 °, and the elevation angle of the second row hole drilling is 5 °.
It is specific: in step S3, using YT28 pusher leg drill pore-creating, to draw spring line in new face;Drilling
The diameter of drill bit is 50mm, and the spacing of the drilling hole location on spring line is 20~30cm, and when drilling utilizes drilling machine generalIt bores
Bar bandDrill bit squeezes into projected depth.
S4, ductule production and installation
The front end processing of ductule is tapered and bores injected hole, and the tube wall bit pressure of ductule starches hole, and the tail portion of ductule is pre-
Stay the only slurry section not drilled;Ductule is squeezed into or heads into each drilling, ductule tail portion is fixedly connected with support frame;
Specific: in step S4, ductule heads into drilling by hammer driven or drilling machine, and ductule is not deeply disturbed
Rock mass 1.5m or more;Ductule is made of the hot rolled seamless steel tube of wall thickness 3.5mm, outer diameter 42mm, the aperture in mud jacking hole
Pitch of holes 20cm simultaneously arranges that the length for only starching section is not less than 30cm, and the tail portion of ductule is welded in blossom typeIt puts more energy into hoop;
After ductule installation, with high-pressure blast to cleaning in pipe, and aperture and surrounding crack are blocked.
S5, slip casting
Slip casting is carried out to ductule more than spring line, ductule and injecting cement paste become whole, form effectively support top
The arch shell of loose rock mass;Slip casting is carried out to the ductule in the drilling of new face, is formed " remaining core soil in advance ";
Specific: in step S5, grouting serous fluid concentration from thin to thick, converts step by step;Accelerator is added in slurries, slip casting is suitable
Sequence use is carried out to the sequence for having the location water Duo Shui from bottom to top, from the location of anhydrous few water.
S6, it slags tap
It slags tap and carries out by several times, slag tap first remove the slag body at " remaining core soil in advance " two sides and top every time, then install newly
Support frame, then remove intermediate " remaining core soil in advance ".
Specific: in step S6, drilling depth of slagging tap every time is 50cm.
The beneficial effects of the present invention are: the method for processing jacked piles with small section landslide is directed to jacked piles with small section weak broken wall rock
Hole section, compared with landslip and can not continue the case where slagging tap suitable for processing face and top, take that " grouting with small pipe is pre- solid
The treatment measures of knot+remaining core soil in advance " are reinforced the loose slag body for the body that caves in hole, are carried out to the above slag body of spring line
Slip casting makes ductule and injecting cement paste become whole, forms the shell of effectively support top loose rock mass;To new face landslide body
Preconsolidation is carried out, the method that remaining core soil in advance is taken in tapping process carries out excavation supporting, and then safely and fast passes through landslide section.
The technology of the present invention is simple, strong operability and effective, is particularly suitable for jacked piles with small section weak broken wall rock and seriously caves in section;
And cost is relatively low, saves construction investment;Also it can accelerate construction progress safely and fast by landslide section and reduce construction safety wind
Danger.
More than spring line bore two rounds, respectively the first row hole drilling and the second row hole drilling, the ductule master of the first row hole drilling
The induration that adequate thickness is formed at the top of the body that makes for slip casting preconsolidation to cave in is acted on, the ductule of the second row hole drilling is mainly made
With for Auxiliary support top cave in body, and hole push up design hole dig line at play the role of segmentation, to be conducive to excavated section
Slag body in range is purged.
Detailed description of the invention
Fig. 1 is the vertical section schematic diagram of the method for present invention processing jacked piles with small section landslide.
Fig. 2 is the cross-sectional view of the method for present invention processing jacked piles with small section landslide.
Components, position and number in figure: support frame 1, new face 2, landslide body 3, former face 4, horizontal drilling 5,
First row hole drilling 6, the second row hole drilling 7.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
Referring to fig. 1 and fig. 2, in jacked piles with small section weak broken wall rock hole section, landslide body 3 blocks former face 4, and
Form new face 2, the method that the present invention handles jacked piles with small section landslide, comprising the following steps:
S1, installation 1 Tunnel Reinforcement of support frame
Support frame 1 is used to reinforce the tunnel close to landslide position, and provides safe construction location.In new 2 slag of face
Body rear has the position of execution conditions, first removes footing dross, then be supported 1 supporting construction of frame.1 bracing members of support frame
Frame, the arch springing of bracing members frame has certain buried depth, and falls on firm base.The supporting surface and tunnel centre line of bracing members frame
Vertically, within ± 5cm, gradient is less than ± 2 ° for deviation control up and down, and lock foot anchoring stock, equilibrium point are played after the positioning of bracing members frame
Cloth.In addition, support frame 1 is it is also an option that steel grating.
S2, closing landslide body 3
Because landslide 3 slag body of body is loose, direct slip casting will appear slurries and lose along slag body surface surface current, the feelings such as internal slurries leakiness
Condition, therefore closing landslide body 3 is needed before slip casting.Spray C20 concrete can be used to seal the slag dignity of the entire new exposure of face 2
It closes, thickness of shotcrete 20cm, so that it is guaranteed that subsequent preconsolidation slip casting effect.
S3, advanced tubule pore-creating
Excavation contour line, i.e. spring line are drawn in new face 2, the label drilling hole location more than spring line, then drill, it bores
Hole direction obliquely, pass through landslide body 3 and enter not disturbed rock mass;Drilling hole location is marked in new face 2, i.e., in arch camber
The hole location of label drilling below line, and drilling is drilled with into slag body, drilling passes through slag body and enters not disturbed for former 4 front side of face
Dynamic rock mass.For example, selecting the pore-creating of YT28 pusher leg drill, initial survey team is drawn according to design size in new face 2
Spring line out, and drilling hole location is made by the spacing of wells of design more than spring line, the spacing of wells is generally 20~30cm, and
Mark the boring direction of each drilling hole location.When drilling, using common drilling rod, drill bit uses diameter of phi 50mm drill bit.Drilling is answered
Strictly carried out by the hole location made, it is ensured that bore position it is accurate;Drilling rod direction and extrapolation angle are observed in drilling process in time,
It should give adjustment when finding direction and larger extrapolation angular displacement.To guarantee that drilling is completed by design requirement, ductule is enable to rise
To expected supporting effect.
In view of drilling machine operating condition and actual pore-forming difficulty, and it is possible that the problem of, first is that landslide section slag body
Loosely it is not easy pore-forming;If second is that crept into using hand air drill directly band seamless steel pipe, the limitation of hand air drill operating condition be difficult to meet 4m with
On drilling depth.Based on the above two o'clock, in such cases, can be incited somebody to action first with drilling machineDrilling rod bandDrill bit is beaten
Enter projected depth, then willDuctule set drilling rod is installed to projected depth.
The purpose of the drilling of new face 2 is grouting reinforcement excavation contour line slag body below, i.e., consolidation spring line with
Under slag body, therefore the drilling best level arrangement of new face 2 is horizontal drilling 5.
The purpose of drilling more than spring line is that ductule and injecting cement paste is made to become entirety, formation effectively support top
The shell of loose rock mass.For example, slag body more than spring line bores two rounds, respectively the first row hole drilling 6 and the second row hole drilling 7,
Wherein the elevation angle of the first row hole drilling 6 is greater than the elevation angle of the second row hole drilling 7, and the depth of the second row hole drilling 7 is greater than the second row hole drilling 7
Depth.Specifically, the elevation angle of the first row hole drilling 6 is 20 °, the elevation angle of the second row hole drilling 7 is 5 °.According to sin20 °/sin5 °=
3.92 calculated result, it can be seen that elevation angle size, which has consolidated thickness, to be significantly affected.In view of the operability of construction
And Auxiliary support of more than spring line the second row hole drilling 7 after slip casting acts on, it is more than spring line that the depth of the first row hole drilling 6 is big
In the depth of the second row hole drilling 7, so that ductule has sufficient length to go deep into not disturbed front rock mass, it is enough to provide
Bearing capacity.
S4, ductule production and installation
The front end processing of ductule is tapered and bores injected hole, and the tube wall bit pressure of ductule starches hole, and the tail portion of ductule is pre-
Stay the only slurry section not drilled;Ductule is squeezed into or heads into each drilling, ductule tail portion is fixedly connected with support frame 1.For example, small
Conduit is made of the hot rolled seamless steel tube of wall thickness 3.5mm, outer diameter 42mm.
Injected hole is bored in ductule front, and tail portion is burn-onIt puts more energy into hoop, tube wall surrounding hole diameterMud jacking
Hole, pitch of holes 20cm arrange that front end processing is tapered, one section of work that do not drill that tail portion stays length to be not less than 30cm in blossom type
Until starch section.The processing of ductule is completed in steel bar meter field, and length determines according to field condition, it is desirable that undisturbed rock mass 1.5m
More than.Ductule is headed by hammer driven or drilling machine, and ductule tail portion and the weldering of bracing members frame connect.After ductule installation, in time
The sandstone in pipe is blown clean with high-pressure blast, and blocks aperture and surrounding crack with plastic materials such as flax silk or Anchor Agents.
S5, slip casting
Slip casting is mainly divided to two positions to be implemented, first is that it is more than spring line ductule carry out slip casting, ductule with
Injecting cement paste becomes whole, for the purpose of consolidating cavern top, generate camber effect, forms the arch of effectively support top loose rock mass
Shape shell.Second is that carrying out slip casting to the ductule in the drilling of new face 2, formed " remaining core soil in advance ", " remaining core soil in advance "
Support is provided for top landslide body, is conducive to subsequent hole excavation construction operation.Slip casting should refer to consolidation grouting job specfication, slip casting
Concentration of slurry from thin to thick, converts step by step.
(1) cement slurry
Grouting with small pipe uses cement grout, and just be set to 0.5:1,1:1,2:1 (weight ratio) three compares grade to grout coordinate ratio.
Accelerator is added in slurries, tentatively drafts 5% that volume is cement consumption.Grouting liquid is played to be selected than grade according to field test.
(2) grouting pressure
The grouting pressure tentatively drafted is 0.5Mpa, and when construction should be adjusted according to practical slip casting situation.
(3) slurries are converted than grade
Grouting serous fluid should refer to consolidation grouting job specfication than grade and require to convert step by step from thin to thick.During slip casting in case of
Grouting pressure does not rise always, the nondecreasing situation of flow rate of grouting, Ying Gaiwei underflow injection, or take " interval slip casting " mode into
Row construction.
(4) slip casting ending standard
Under the pressure of 1.0Mpa, when injection rate is not more than 0.4L/min, continue that 5min is perfused, grouting can terminate.
(5) grouting sequence
Grouting sequence is carried out from the location of anhydrous few water to having from the more water of water using from bottom to top.
S6, it slags tap
It slags tap after slurries reach some strength, slags tap and carry out by several times, such as drilling depth of slagging tap every time is 50cm.Every time
First mechanical engagement of slagging tap manually removes " remaining core soil in advance " two sides and then the slag body at top is installed so as to the installation of bracing members
New support frame after support frame is installed, then removes intermediate " remaining core soil in advance ".
Claims (10)
1. the method for handling jacked piles with small section landslide, it is characterised in that: the following steps are included:
S1, installation support frame (1) Tunnel Reinforcement
Have the position of execution conditions at new face (2) slag body rear, first remove footing dross, then is supported frame (1) branch
Shield construction;
S2, closing landslide body (3)
The slag dignity of entirely new face (2) exposure is closed using pneumatically placed concrete mode;
S3, advanced tubule pore-creating
Draw spring line in new face (2), label drilling hole location, then drills more than spring line, boring direction obliquely, wear
It more caves in body (3) and enters not disturbed rock mass;
Drilling hole location is marked in new face (2), and is drilled with drilling into slag body, drilling passes through slag body and enters former face
(4) the not disturbed rock mass on front side of;
S4, ductule production and installation
The front end processing of ductule is tapered and bores injected hole, and the tube wall bit pressure of ductule starches hole, and the tail portion of ductule is reserved not
The only slurry section of drilling;Ductule is squeezed into or heads into each drilling, ductule tail portion is fixedly connected with support frame (1);
S5, slip casting
Slip casting is carried out to ductule more than spring line, ductule and injecting cement paste become whole, and it is loose to form effectively support top
The arch shell of rock mass;Slip casting is carried out to the ductule in the drilling of new face (2), is formed " remaining core soil in advance ";
S6, it slags tap
It slags tap and carries out by several times, slag tap first remove the slag body at " remaining core soil in advance " two sides and top every time, then new support is installed
Frame, then remove intermediate " remaining core soil in advance ".
2. the method for processing jacked piles with small section landslide as described in claim 1, it is characterised in that: in step S1, support frame (1)
For bracing members frame or or steel grating, the supporting surface of bracing members frame and steel grating is vertical with tunnel centre line, up and down deviation ±
Within 5cm, gradient be less than ± 2 °, bracing members frame positioning after by breaking lock foot anchoring stock equiblibrium mass distribution.
3. the method for processing jacked piles with small section landslide as described in claim 1, it is characterised in that: in step S2, concrete
Marked as C20, thickness of shotcrete 20cm.
4. the method for processing jacked piles with small section landslide as described in claim 1, it is characterised in that: in step S3, new face
(2) drilling horizontal arrangement, for horizontal drilling (5).
5. the method for the processing jacked piles with small section landslide as described in Claims 1 to 4 any claim, it is characterised in that: step
In rapid S3, two rounds, respectively the first row hole drilling (6) and the second row hole drilling (7) are bored more than spring line, wherein the first row hole drilling
(6) the elevation angle is greater than the elevation angle of the second row hole drilling (7), and the depth of the second row hole drilling (7) is greater than the depth of the second row hole drilling (7).
6. the method for processing jacked piles with small section landslide as claimed in claim 4, it is characterised in that: in step S3, the first gang drill
The elevation angle in hole (6) is 20 °, and the elevation angle of the second row hole drilling (7) is 5 °.
7. the method for processing jacked piles with small section landslide as claimed in claim 6, it is characterised in that: in step S3, using YT28
Pusher leg drill pore-creating draws spring line in new face (2);The diameter of the drill bit of drilling is 50mm, on excavation contour line
The spacing of drilling hole location be 20~30cm, will using drilling machine when drillingDrilling rod bandIt is deep that drill bit squeezes into design
Degree.
8. the method for processing jacked piles with small section landslide as claimed in claim 5, it is characterised in that: in step S4, ductule is logical
It crosses hammer driven or drilling machine heads into drilling, ductule gos deep into not disturbed rock mass 1.5m or more;Ductule by wall thickness 3.5mm,
The hot rolled seamless steel tube of outer diameter 42mm is made, the aperture in mud jacking holePitch of holes 20cm is simultaneously arranged in blossom type, only starches section
Length be not less than 30cm, the tail portion of ductule is weldedIt puts more energy into hoop;After ductule installation, carried out with high-pressure blast in pipe
It cleans, and blocks aperture and surrounding crack.
9. the method for processing jacked piles with small section landslide as claimed in claim 5, it is characterised in that: in step S5, grouting serous fluid
Concentration from thin to thick, converts step by step;Add accelerator in slurries, grouting sequence using from bottom to top, from the location of anhydrous few water
The sequence in the location Xiang Youshui Duo Shui carries out.
10. the method for processing jacked piles with small section landslide as claimed in claim 5, it is characterised in that: in step S6, slag tap every time
Drilling depth is 50cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768423.0A CN110424971A (en) | 2019-08-20 | 2019-08-20 | The method for handling jacked piles with small section landslide |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768423.0A CN110424971A (en) | 2019-08-20 | 2019-08-20 | The method for handling jacked piles with small section landslide |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110424971A true CN110424971A (en) | 2019-11-08 |
Family
ID=68417044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910768423.0A Pending CN110424971A (en) | 2019-08-20 | 2019-08-20 | The method for handling jacked piles with small section landslide |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110424971A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112228082A (en) * | 2020-10-29 | 2021-01-15 | 中铁一局集团有限公司 | Tunnel collapse treatment method by combined grouting of pipe shed and advanced small guide pipe |
CN114251107A (en) * | 2021-12-16 | 2022-03-29 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel collapse treatment method |
CN114991818A (en) * | 2022-05-17 | 2022-09-02 | 中国矿业大学(北京) | Advanced grouting construction method for tunnel penetrating active fault |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6043516A (en) * | 1983-08-18 | 1985-03-08 | Tokai Rubber Ind Ltd | Solidifying rockbed |
JP2001032671A (en) * | 1999-07-16 | 2001-02-06 | Okumura Corp | Tunnel prelining construction method |
JP2001234690A (en) * | 2000-02-24 | 2001-08-31 | Bridgestone Corp | Natural ground consolidation method |
CN101196118A (en) * | 2008-01-07 | 2008-06-11 | 北京市政建设集团有限责任公司 | Advanced double rows slip casting ductule construction technique |
JP2008248528A (en) * | 2007-03-29 | 2008-10-16 | Nippo Kk | All-ground-fasten tunneling method |
CN101408106A (en) * | 2007-10-12 | 2009-04-15 | 中煤第三建设(集团)有限责任公司 | Small tube shed pre-grouting method |
CN102562099A (en) * | 2012-03-15 | 2012-07-11 | 中铁二十三局集团第四工程有限公司 | Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits |
CN103089275A (en) * | 2013-01-16 | 2013-05-08 | 山东大学 | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
CN107165652A (en) * | 2017-06-02 | 2017-09-15 | 大唐林州热电有限责任公司 | A kind of tunnel monoblock type collapse after construction method |
KR20170127172A (en) * | 2016-05-11 | 2017-11-21 | 강릉건설 주식회사 | Ground reinforcement method of messer shield tunnel |
CN108035736A (en) * | 2017-12-05 | 2018-05-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of quick method and structure for solving tunnel and collapsing |
CN108180018A (en) * | 2017-10-24 | 2018-06-19 | 济南城建集团有限公司 | A kind of shallow embedding collapsible loess tunnel Core Soil and glass bolt anchorage construction method |
CN109854255A (en) * | 2018-11-30 | 2019-06-07 | 中国电建集团成都勘测设计研究院有限公司 | The processing method of type landslide is not restrained in tunnel |
-
2019
- 2019-08-20 CN CN201910768423.0A patent/CN110424971A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6043516A (en) * | 1983-08-18 | 1985-03-08 | Tokai Rubber Ind Ltd | Solidifying rockbed |
JP2001032671A (en) * | 1999-07-16 | 2001-02-06 | Okumura Corp | Tunnel prelining construction method |
JP2001234690A (en) * | 2000-02-24 | 2001-08-31 | Bridgestone Corp | Natural ground consolidation method |
JP2008248528A (en) * | 2007-03-29 | 2008-10-16 | Nippo Kk | All-ground-fasten tunneling method |
CN101408106A (en) * | 2007-10-12 | 2009-04-15 | 中煤第三建设(集团)有限责任公司 | Small tube shed pre-grouting method |
CN101196118A (en) * | 2008-01-07 | 2008-06-11 | 北京市政建设集团有限责任公司 | Advanced double rows slip casting ductule construction technique |
CN102562099A (en) * | 2012-03-15 | 2012-07-11 | 中铁二十三局集团第四工程有限公司 | Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits |
CN103089275A (en) * | 2013-01-16 | 2013-05-08 | 山东大学 | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
KR20170127172A (en) * | 2016-05-11 | 2017-11-21 | 강릉건설 주식회사 | Ground reinforcement method of messer shield tunnel |
CN107165652A (en) * | 2017-06-02 | 2017-09-15 | 大唐林州热电有限责任公司 | A kind of tunnel monoblock type collapse after construction method |
CN108180018A (en) * | 2017-10-24 | 2018-06-19 | 济南城建集团有限公司 | A kind of shallow embedding collapsible loess tunnel Core Soil and glass bolt anchorage construction method |
CN108035736A (en) * | 2017-12-05 | 2018-05-15 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of quick method and structure for solving tunnel and collapsing |
CN109854255A (en) * | 2018-11-30 | 2019-06-07 | 中国电建集团成都勘测设计研究院有限公司 | The processing method of type landslide is not restrained in tunnel |
Non-Patent Citations (2)
Title |
---|
申国奎: "《CD法结合双排注浆小导管在处理公路隧道塌方中的应用》", 《隧道与地下工程》 * |
高巍等: "《小断面软岩隧道塌陷式塌方处理》", 《黑龙江水利》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112228082A (en) * | 2020-10-29 | 2021-01-15 | 中铁一局集团有限公司 | Tunnel collapse treatment method by combined grouting of pipe shed and advanced small guide pipe |
CN112228082B (en) * | 2020-10-29 | 2022-03-04 | 中铁一局集团有限公司 | Tunnel collapse treatment method by combined grouting of pipe shed and advanced small guide pipe |
CN114251107A (en) * | 2021-12-16 | 2022-03-29 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel collapse treatment method |
CN114991818A (en) * | 2022-05-17 | 2022-09-02 | 中国矿业大学(北京) | Advanced grouting construction method for tunnel penetrating active fault |
CN114991818B (en) * | 2022-05-17 | 2023-09-08 | 中国矿业大学(北京) | Advanced grouting construction method for tunnel penetrating fault |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102134998B (en) | Construction method for wind-blown sand tunnel | |
CN108915736A (en) | The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water | |
CN105863648B (en) | A kind of tunneling is shallow to cover large-section tunnel construction method | |
CN110424971A (en) | The method for handling jacked piles with small section landslide | |
CN108798702B (en) | Supporting method for large-section soft rock large-deformation tunnel | |
CN106917627B (en) | The advanced support method of pilot tunnel under a kind of water rich strata boring construction | |
CN106437726A (en) | Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation | |
CN206174963U (en) | Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone | |
CN106869969A (en) | A kind of excavation supporting construction method of soft rock large section tunnel | |
CN107060774A (en) | A kind of anti-tunnel portal wall damage device and construction method | |
CN110043264A (en) | A kind of construction method of jacking prefabricated rectangle shaft structure pattern | |
CN105350988B (en) | Tunnel Base reinforcement means | |
CN107023300A (en) | A kind of use canopy, which is defended the doctrine, builds the construction method of subway station | |
CN107965325B (en) | A kind of small interval shallow tunnel just branch arch replacement construction method | |
CN104632249A (en) | Tunnel system supporting technology used in loose and soft broken surrounding rock | |
CN109538216A (en) | Pass through mined out and subsidence area constructing tunnel technique | |
CN110284885A (en) | Shield inspection-pit construction method | |
CN110318772A (en) | Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method | |
CN109209443A (en) | A kind of construction method of breaking surrounding rock tunnel structure | |
CN104141500A (en) | Hardened sand gravel stratum cavern construction method | |
CN109057802A (en) | Shallow tunnel with big cross-section underpass of freeways construction method | |
CN206888992U (en) | A kind of water-bed mine shield tunnel combination docking structure form | |
CN109184742B (en) | Advanced pre-grouting method for high-pressure water-rich soft surrounding rock mountain tunnel | |
CN101358529A (en) | Short tube and short tube sand consolidation agent strengthening construction process | |
CN207513614U (en) | Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |