CN108035373A - A kind of foundation structure of garden log cabin - Google Patents
A kind of foundation structure of garden log cabin Download PDFInfo
- Publication number
- CN108035373A CN108035373A CN201711415477.6A CN201711415477A CN108035373A CN 108035373 A CN108035373 A CN 108035373A CN 201711415477 A CN201711415477 A CN 201711415477A CN 108035373 A CN108035373 A CN 108035373A
- Authority
- CN
- China
- Prior art keywords
- pedestal
- log cabin
- several
- garden
- installation cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of foundation structure of garden log cabin, it pours the grade slab built up including cement(1), set up on the ground;Several first pedestals(211), in rows arranged on the grade slab(1)Side;Several second pedestals(212), in rows arranged on the grade slab(1)Side, positioned at first pedestal(211)Opposite side, and each second pedestal(212)With first pedestal(211)It is symmetrical arranged one by one in left and right;Several the 3rd pedestals(213), in rows arranged on the grade slab(1)Rear side;Wherein, the first pedestal(211), the second pedestal(212)With the 3rd pedestal(213)For installing floor and the wallboard of log cabin.It is an advantage of the invention that principal rod pier nose operation can be completed first in batches, form that integrally-built process is relatively simple, and efficiency of assembling is higher.
Description
Technical field
The present invention relates to a kind of foundation structure of garden log cabin.
Background technology
Log cabin refers to the room made with wood.Timber buildings divide from structure type, are generally divided into light-duty wood knot
Structure and heavy timber construction, using Pseudobulbus Bletillae (Rhizoma Bletillae) as foundation, primary structural member uses solid wood products.
Existing log cabin, existing shortcoming are embodied in, its Foundation Part is due to using wood structure, being easily subject to outer
The disturbing factor on boundary, causes the stability of overall log cabin structure not high.
The content of the invention
The technical problem to be solved in the present invention is, there is provided a kind of foundation structure of garden log cabin, its foundation structure are stablized
It is good, the corrosion of extraneous factor is not easily susceptible to, while can achieve the purpose that fast construction log cabin.
In order to solve the above technical problems, technical solution provided by the invention is:A kind of foundation structure of garden log cabin, it
The grade slab built up is poured including cement, is set up on the ground;Several first pedestals, in rows arranged on the one of the grade slab
Side;Several second pedestals, in rows arranged on the side of the grade slab, positioned at the opposite side of first pedestal, and it is each
Second pedestal is symmetrical arranged one by one with first pedestal in left and right;Several the 3rd pedestals, in rows arranged on described
The rear side of substrate;Several the first installation cavitys, accordingly on first pedestal;Several the second installation cavitys, it is right
Answer ground to be arranged on second pedestal, and corresponded with the described first installation cavity, one described first installs cavity and an institute
State and be used for the floor for setting up log cabin between the second installation cavity;Several first slots, accordingly on first pedestal,
First slot is used for the wallboard for being inserted into log cabin;Several second slots, accordingly on second pedestal, described
Two slots are used for the wallboard for being inserted into log cabin;And several the 3rd slots, accordingly on the 3rd pedestal, the described 3rd
Slot is used for the wallboard for being inserted into log cabin.
As a preferred embodiment, first pedestal, the second pedestal and the 3rd pedestal are the structures poured using cement
Body.
As a preferred embodiment, the width of first slot is more than the width of the first installation cavity.
As a preferred embodiment, the width of second slot is more than the width of the second installation cavity.
As a preferred embodiment, there is the axis hole of connection bolt, the axis hole edge on the bottom of chamber of the first installation cavity
The width for the first installation cavity is spaced apart.
As a preferred embodiment, there is the axis hole of connection bolt, the axis hole edge on the bottom of chamber of the second installation cavity
The width for the second installation cavity is spaced apart.
After above structure, compared with prior art, the present invention haing the following advantages:Its primary structure includes cement
The grade slab built up is poured, is set up on the ground;Several first pedestals, in rows arranged on the side of the grade slab;Several
Second pedestal, in rows arranged on the side of the grade slab, positioned at the opposite side of first pedestal, and each described second
Body is symmetrical arranged one by one with first pedestal in left and right;Several the 3rd pedestals, in rows arranged on the rear side of the grade slab;
Several the first installation cavitys, accordingly on first pedestal;Several the second installation cavitys, are accordingly arranged on described
On second pedestal, and corresponded with the described first installation cavity, a first installation cavity and second installation are recessed
It is used for the floor for setting up log cabin between chamber;Several first slots, accordingly on first pedestal, first slot
For being inserted into the wallboard of log cabin;Several second slots, accordingly on second pedestal, second slot is used to insert
Enter the wallboard of log cabin;And several the 3rd slots, accordingly on the 3rd pedestal, the 3rd slot is used to be inserted into
The wallboard of log cabin.The ground of said structure, the grade slab built up by setting cement to pour, which reaches, is not easily susceptible to extraneous factor corrosion
Purpose, secondly, by several first pedestals and several second pedestals, and several first pedestals with several the
Several supporting the first installation cavitys that two pedestals are set, several the second installation cavitys, the first slot and the second slot,
Achieve the purpose that fast construction log cabin by way of inserting.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Fig. 2 is the direction view of Fig. 1 C-C.
Shown in figure:1st, grade slab;211st, the first pedestal;212nd, the second pedestal;213rd, the 3rd pedestal;311st, the first installation
Cavity;312nd, the second installation cavity;411st, the first slot;412nd, the second slot;413rd, the 3rd slot.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Technical scheme is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation
Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill
Personnel's all other embodiments obtained without making creative work, belong to the scope of protection of the invention.
In the description of the present invention, it is necessary to which the orientation of the instruction such as explanation, term " on ", " under " or position relationship are base
In orientation shown in the drawings or position relationship, description description of the invention and simplified, rather than instruction or hint are for only for ease of
Signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this
The limitation of invention.In addition, term " first ", " second ", " the 3rd " and " the 4th " is only used for description purpose, and it is not intended that referring to
Show or imply relative importance.
In the description of the present invention, it is necessary to which explanation, unless otherwise clearly defined and limited, term " connection " should be done
It broadly understood, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can mechanically connect,
Can also be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be inside two elements
Connection.For the ordinary skill in the art, it can understand that above-mentioned term in the present invention specific contains with concrete condition
Justice.
Referring to Figures 1 and 2, the invention discloses a kind of foundation structure of garden log cabin, it pours what is built up including cement
Grade slab 1, sets up on the ground;Several first pedestals 211, in rows arranged on the side of the grade slab 1;Several second
Pedestal 212, in rows arranged on the side of the grade slab 1, positioned at the opposite side of first pedestal 211, and each described
Two pedestals 212 are symmetrical arranged one by one with first pedestal 211 in left and right;Several the 3rd pedestals 213, are arranged on described in rows
The rear side of grade slab 1;Several the first installation cavitys 311, accordingly on first pedestal 211;Several second peaces
Cavity 312 is filled, accordingly on second pedestal 212, and is corresponded with the described first installation cavity 311, described in one
It is used for the floor for setting up log cabin between the first installation installation cavity 312 of cavity 311 and one described second;Several first slots
411, accordingly on first pedestal 211, first slot 411 is used for the wallboard for being inserted into log cabin;Several second
Slot 412, accordingly on second pedestal 212, second slot 412 is used for the wallboard for being inserted into log cabin;And if
Dry the 3rd slot 413, accordingly on the 3rd pedestal 213, the 3rd slot 413 is used for the wall for being inserted into log cabin
Plate.Wherein, the first pedestal 211, the second pedestal 212 and the 3rd pedestal 213 achieve the purpose that floor and the wallboard for installing log cabin,
That is the first pedestal 211, the second pedestal 212 and the 3rd pedestal 213 are used for floor and the wallboard for installing log cabin, wherein, log cabin is used
Wallboard indicated with reference to A in Fig. 1, it is that the floor of log cabin is indicated with reference to B in Fig. 1 or B is indicated in Fig. 2.
Wait in the specific implementation, as the preferred solution of the foundation structure of garden log cabin, first pedestal 211,
Two pedestals 212 and the 3rd pedestal 213 are the structures poured using cement.Above structure setting helps to improve First
The structural strength of body 211, the second pedestal 212 and the 3rd pedestal 213.
Wait in the specific implementation, as the preferred solution of the foundation structure of garden log cabin, the width of first slot 411
Degree be more than first installation cavity 311 width, meanwhile, wait in the specific implementation, as garden log cabin foundation structure it is excellent
Scheme is selected, the width of second slot 412 is more than the width of the second installation cavity 312.Above structure setting helps to pass through
Suitable wallboard is selected, achievees the purpose that to reduce wallboard quantity.
Wait in the specific implementation, as the preferred solution of the foundation structure of garden log cabin, the first installation cavity 311
Bottom of chamber on have connection bolt axis hole, the axis hole along first installation cavity 311 width be spaced apart, together
When, wait in the specific implementation, as the preferred solution of the foundation structure of garden log cabin, the chamber of the second installation cavity 312
There is the axis hole of connection bolt, the axis hole is spaced apart along the width of the second installation cavity 312 on bottom.Tie above
Structure sets the floor for helping to achieve the purpose that firm installation log cabin.
Only highly preferred embodiment of the present invention is described above, but is not to be construed as limiting the scope of the invention.This
Invention is not limited only to above example, and various changes made within the protection scope of the independent claims of the invention are at this
In the protection domain of invention.
Claims (6)
1. a kind of foundation structure of garden log cabin, it is characterised in that it includes
Cement pours the grade slab built up(1), set up on the ground;
Several first pedestals(211), in rows arranged on the grade slab(1)Side;
Several second pedestals(212), in rows arranged on the grade slab(1)Side, positioned at first pedestal(211)'s
Opposite side, and each second pedestal(212)With first pedestal(211)It is symmetrical arranged one by one in left and right;
Several the 3rd pedestals(213), in rows arranged on the grade slab(1)Rear side;
Several the first installation cavitys(311), accordingly arranged on first pedestal(211)On;
Several the second installation cavitys(312), accordingly arranged on second pedestal(212)On, and it is recessed with the described first installation
Chamber(311)Correspond, the first installation cavity(311)With the second installation cavity(312)Between be used for set up
The floor of log cabin;
Several first slots(411), accordingly arranged on first pedestal(211)On, first slot(411)For inserting
Enter the wallboard of log cabin;
Several second slots(412), accordingly arranged on second pedestal(212)On, second slot(412)For inserting
Enter the wallboard of log cabin;
And several the 3rd slots(413), accordingly arranged on the 3rd pedestal(213)On, the 3rd slot(413)With
In the wallboard of insertion log cabin.
A kind of 2. foundation structure of garden log cabin according to claim 1, it is characterised in that first pedestal
(211), the second pedestal(212)With the 3rd pedestal(213)It is the structure poured using cement.
A kind of 3. foundation structure of garden log cabin according to claim 1, it is characterised in that first slot
(411)Width be more than first installation cavity(311)Width.
A kind of 4. foundation structure of garden log cabin according to claim 1, it is characterised in that second slot
(412)Width be more than second installation cavity(312)Width.
A kind of 5. foundation structure of garden log cabin according to claim 1, it is characterised in that the first installation cavity
(311)Bottom of chamber on have connection bolt axis hole, the axis hole along first installation cavity(311)Width interval
Distribution.
A kind of 6. foundation structure of garden log cabin according to claim 1, it is characterised in that the second installation cavity
(312)Bottom of chamber on have connection bolt axis hole, the axis hole along second installation cavity(312)Width interval
Distribution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711415477.6A CN108035373B (en) | 2017-12-25 | 2017-12-25 | Foundation structure for garden wooden house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711415477.6A CN108035373B (en) | 2017-12-25 | 2017-12-25 | Foundation structure for garden wooden house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108035373A true CN108035373A (en) | 2018-05-15 |
CN108035373B CN108035373B (en) | 2020-03-27 |
Family
ID=62100757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711415477.6A Expired - Fee Related CN108035373B (en) | 2017-12-25 | 2017-12-25 | Foundation structure for garden wooden house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108035373B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202247926U (en) * | 2011-09-15 | 2012-05-30 | 上海航天汽车机电股份有限公司 | Integrated foundation base for base station of wind-solar hybrid tower room |
CN203145408U (en) * | 2013-04-15 | 2013-08-21 | 吴国平 | Building floor |
CN203347011U (en) * | 2013-06-17 | 2013-12-18 | 河南天丰节能板材科技股份有限公司 | Fast assembling type modular integrated house |
CN104131658A (en) * | 2013-06-24 | 2014-11-05 | 河南天丰节能板材科技股份有限公司 | Roof edge beam, connecting structure of wall plate and roof plate, and modularized integrated house |
CN104471158A (en) * | 2012-05-14 | 2015-03-25 | Nev-X系统有限公司 | Building foundation |
CN204781329U (en) * | 2015-03-16 | 2015-11-18 | 中国建筑第四工程局有限公司 | Pin -connected panel standard turnover room |
CN106032696A (en) * | 2015-03-18 | 2016-10-19 | 杨凤玲 | Splicing floor |
CN106149880A (en) * | 2015-03-20 | 2016-11-23 | 万平华 | Use the assembling room of new architecture |
CN205875404U (en) * | 2016-07-19 | 2017-01-11 | 天津准美佳岳科技有限公司 | Log cabin group that dismantles log cabin of storing and have it is built in easy installation |
CN206646652U (en) * | 2017-03-27 | 2017-11-17 | 青岛矢车菊设计有限公司 | A kind of assembled room cabinet system component |
-
2017
- 2017-12-25 CN CN201711415477.6A patent/CN108035373B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202247926U (en) * | 2011-09-15 | 2012-05-30 | 上海航天汽车机电股份有限公司 | Integrated foundation base for base station of wind-solar hybrid tower room |
CN104471158A (en) * | 2012-05-14 | 2015-03-25 | Nev-X系统有限公司 | Building foundation |
CN203145408U (en) * | 2013-04-15 | 2013-08-21 | 吴国平 | Building floor |
CN203347011U (en) * | 2013-06-17 | 2013-12-18 | 河南天丰节能板材科技股份有限公司 | Fast assembling type modular integrated house |
CN104131658A (en) * | 2013-06-24 | 2014-11-05 | 河南天丰节能板材科技股份有限公司 | Roof edge beam, connecting structure of wall plate and roof plate, and modularized integrated house |
CN204781329U (en) * | 2015-03-16 | 2015-11-18 | 中国建筑第四工程局有限公司 | Pin -connected panel standard turnover room |
CN106032696A (en) * | 2015-03-18 | 2016-10-19 | 杨凤玲 | Splicing floor |
CN106149880A (en) * | 2015-03-20 | 2016-11-23 | 万平华 | Use the assembling room of new architecture |
CN205875404U (en) * | 2016-07-19 | 2017-01-11 | 天津准美佳岳科技有限公司 | Log cabin group that dismantles log cabin of storing and have it is built in easy installation |
CN206646652U (en) * | 2017-03-27 | 2017-11-17 | 青岛矢车菊设计有限公司 | A kind of assembled room cabinet system component |
Also Published As
Publication number | Publication date |
---|---|
CN108035373B (en) | 2020-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108755978A (en) | Dry and wet Hybrid connections node and its construction method | |
CN105971277A (en) | Novel aluminum wood mixed template | |
KR101599811B1 (en) | Joint structure for corrugated steel plate and construction method thereof | |
CN105421614B (en) | The construction method of precast shear wall dry type vertical connection nodes | |
CN106193389A (en) | One is exempted to tear building template assembly open | |
CN108343029A (en) | A kind of prefabricated panel and preparation method thereof | |
CN103696491A (en) | Novel mounting structure of building and house using mounting structure | |
CN108035373A (en) | A kind of foundation structure of garden log cabin | |
KR102079964B1 (en) | the improved brick support structure | |
CN106193581A (en) | A kind of building template assembly | |
CN106939616B (en) | Construction method of assembled soil nail wall steel plate structure | |
CN205637241U (en) | Composite wall panel and mounting structure thereof | |
CN107119824B (en) | A kind of precast concrete shear wall wall connected using bolt steel plate | |
CN214738999U (en) | Precast concrete wall | |
CN211113729U (en) | Retaining wall for hydraulic engineering | |
CN211447356U (en) | Ceramsite concrete partition wall mounting structure | |
CN210685049U (en) | Assembled building board mixes formula wallboard | |
CN209011374U (en) | A kind of fast disassembly type light weight hollow is laid bricks and fast disassembly type wall body structure | |
CN203669091U (en) | Novel installation structure of building and house with same used | |
CN208056729U (en) | A kind of novel fabricated power distribution room | |
CN215483629U (en) | Asymmetric double-clip type embedded part convenient to install | |
CN212559218U (en) | Tower crane for constructional engineering | |
CN207499205U (en) | Prefabricated panel and prefabricated foundation connection structure | |
CN208738781U (en) | A kind of double terminal box of high intensity cross connection type | |
CN211548240U (en) | Mounting and fixing structure of building wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |