CN108755978A - Dry and wet Hybrid connections node and its construction method - Google Patents

Dry and wet Hybrid connections node and its construction method Download PDF

Info

Publication number
CN108755978A
CN108755978A CN201810603811.9A CN201810603811A CN108755978A CN 108755978 A CN108755978 A CN 108755978A CN 201810603811 A CN201810603811 A CN 201810603811A CN 108755978 A CN108755978 A CN 108755978A
Authority
CN
China
Prior art keywords
concrete slab
guide groove
connector
concrete
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810603811.9A
Other languages
Chinese (zh)
Other versions
CN108755978B (en
Inventor
张骞
李天耕
吴玉磊
陈本旺
侯丽丽
李剑芝
胡指南
高阳
徐飞
李浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
Original Assignee
Shijiazhuang Tiedao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University filed Critical Shijiazhuang Tiedao University
Priority to CN201810603811.9A priority Critical patent/CN108755978B/en
Publication of CN108755978A publication Critical patent/CN108755978A/en
Application granted granted Critical
Publication of CN108755978B publication Critical patent/CN108755978B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/6116Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by locking means on lateral surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention provides a kind of dry and wet Hybrid connections node and its construction methods, the dry and wet Hybrid connections node includes the horizontal connector being set between the first concrete slab and the second concrete slab, the mating surface of first concrete slab and the second concrete slab is equipped with guide groove, the guiding trench bottom of first concrete slab is equipped with spring, the guide groove side of first concrete slab vertically through the first pin hole, connecting pin pass through the first pin hole and connector by spring-compressed the first concrete slab guiding trench bottom;The guide groove side of second concrete slab is vertically through the second pin hole, extract connecting pin, connector is sprung into the guide groove of the second concrete slab under the action of the spring along the guide groove of the first concrete slab, the length of connector is more than the length of guide groove in the second concrete slab, connecting pin is inserted into the second pin hole and connector, the cast-in-place concrete into the first pin hole and guide groove of the first concrete slab.The present invention is provided simultaneously with involvement and connects and the advantages of wet connection.

Description

Dry and wet Hybrid connections node and its construction method
Technical field
The invention belongs to building structure interconnection technique fields, are to be related to a kind of dry and wet Hybrid connections node more specifically And its construction method.
Background technology
Currently, with the fast development of building industrialization, precast reinforced concrete structure is the weight of building structure development One of direction is wanted, is linked and packed by precast concrete, compared with cast-in-situ construction method, assembled PC (for The english abbreviation of precast concrete, means precast concrete) structure is conducive to green construction, and it can more meet green and apply Saving land, is energy saving, saving the requirements such as material, water-saving and environmental protection for work, reduces the negative effect to environment, including reduces noise, prevents Only airborne dust, reduce environmental pollution, clean transport, reduce place interference, save water, electricity, resources and the energy such as material, it then follows can hold The principle of supervention exhibition, it is energy saving to improve production efficiency, develops Green environmental-protection building, and is conducive to improve and guarantee is built Build construction quality.Therefore, the application of prefabricated assembled concrete structure is more and more universal.
The node connection of prefabricated assembled concrete structure is broadly divided into involvement and connects and wet connection two major classes.Wet connection is pre- Commonly used in structure processed connection and convenient connection type, integrality performance of the structure closer to cast-in-place concrete, wet connection be divided into for Several classes below:
1. live directly concrete perfusion node
2. using the node of plain bolt connection
3. using the bolt joint of prestressing force fastening
Since the wet connection in above-mentioned connection type needs higher concrete construction technology, it is primarily present following defect: Connecting node ductility is poor, by when geological process cannot dissipation energy well, construction is complicated, power transmission not directly, be not easy to construct, Cost is higher, the requirement that hardly possible satisfaction is heavily loaded, cracking resistance and globality are strong.
Involvement connects, be by being implanted into steel plate or other steel parts in the component of connection, being bolted or weld, To achieve the purpose that connection, although having the characteristics that construction is convenient, involvement, which connects, makes integrality performance of the structure seem more loose It dissipates, causes larger with cast-in-place assembling frame structure gap, it is difficult to prevent the destruction generated under seismic loading.
Invention content
The purpose of the present invention is to provide a kind of dry and wet Hybrid connections node and its construction methods, to solve in the prior art Existing wet connection construction is cumbersome, construction is complicated, power transmission is not direct, construction cost is higher, and hardly possible meets heavy duty, cracking resistance and globality By force, connecting node ductility is poor, earthquake when cannot well dissipation energy the technical issues of and dry connection structure because of globality Can loosely it cause larger with cast-in-place assembling frame structure gap, it is difficult to prevent the destruction generated under seismic loading Technical problem.
To achieve the above object, the technical solution adopted by the present invention is:A kind of dry and wet Hybrid connections node, including water are provided The flat connector being set between two adjacent concrete slabs, adjacent two concrete slabs be respectively the first concrete slab and Second concrete slab, the connector are connected and fixed by connecting pin and the second concrete slab;First concrete slab and The mating surface of second concrete slab is equipped with the horizontal guide slot for accommodating the connector, and first concrete slab is led To trench bottom it is equipped with spring, the guide groove side of first concrete slab with the connecting pin vertically through for coordinating First pin hole, the guide groove side of second concrete slab is vertically through the second pin for coordinating with the connecting pin Hole;The length of the connector is more than the length of guide groove in second concrete slab;The guiding of first concrete slab Cast-in-place concrete in slot and the first pin hole.
Further, set side by side on the connector there are two for the first positioning hole that coordinates with the connecting pin and Second location hole;Before first concrete slab and the connection of the second concrete slab, first pin hole is opposite with the first positioning hole It answers;After first concrete slab and the connection of the second concrete slab, second pin hole is corresponding with the second location hole, the company Second location hole setting of the outbound nail on second pin hole and connector.
Further, the middle part of the connector is equipped with limiting stand, and the first positioning hole is set to the limiting stand Left side large-diameter portion, the second location hole are set to the right side small diameter portion of the limiting stand, are oriented in first concrete slab The open end of slot is equipped with the step coordinated with the limiting stand, the guide groove opening diameter and second of first concrete slab The diameter of guide groove is identical as the right side small diameter portion diameter of the connector in concrete slab.
Further, the second location hole is less than or equal to second pin hole at a distance from the connector right end face It is oriented at a distance from trench bottom in second concrete slab.
Further, the guiding trench bottom of first concrete slab is equipped with for pacifying spring-loaded blind hole, the spring One end be fixed on the blind via bottom.
Further, first pin hole is set to above the guide groove in first concrete slab.
Further, second pin hole runs through second concrete slab and is arranged from top to bottom.
The present invention also provides a kind of construction methods of dry and wet Hybrid connections node, include the following steps:
Connector is placed in the guiding trench bottom of first concrete slab, connecting pin is passed through into the first concrete slab First pin hole and connector, by spring-compressed the first concrete slab guiding trench bottom;
After the first concrete slab and the second concrete slab dock, connecting pin is extracted, connector is under the action of the spring It is sprung into along the guide groove of the first concrete slab in the guide groove of the second concrete slab;
Connecting pin is inserted into the second pin hole and its guide groove interconnecting piece of the second concrete slab, by connector and the Two concrete slabs are connected and fixed;
Using the first pin hole of the first concrete slab as sprue gate, coagulation is poured into a mould into the guide groove of the first concrete slab First concrete slab and the second concrete slab are connected as one by soil after concrete setting.
Further, the movable end of the spring is fixed on the left end of connector, and connector is made to slide to the second concrete After in the guide groove of plate, spring has certain decrement.
The advantageous effect of dry and wet Hybrid connections node provided by the invention and its construction method is:With prior art phase Involvement is provided simultaneously with than, dry and wet Hybrid connections node of the present invention to connect and the characteristics of wet connection, simple in structure easy to operate, construction party Method has the advantages that construction technology simple, convenient, of low cost, cracking resistance of constructing and globality are strong, and when geological process can be fine Ground dissipation energy, connecting node ductility are preferable.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some Embodiment for those of ordinary skill in the art without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is that dry and wet Hybrid connections node provided in an embodiment of the present invention connects in the first concrete slab and the second concrete slab Structural schematic diagram after connecing;
Fig. 2 is that dry and wet Hybrid connections node provided in an embodiment of the present invention connects in the first concrete slab and the second concrete slab Structural schematic diagram before connecing;
Wherein, each reference numeral in figure:
The first concrete slabs of 1-, the second concrete slabs of 2-, 3- connecting pins, 4- first positioning holes, 5- second location holes, 6- Guide groove, 7- springs, the first pin holes of 8-, the second pin holes of 9-, 10- connectors, 100- limiting stands, 101- large-diameter portions, 102- paths Portion;11- steps.
Specific implementation mode
In order to make technical problems, technical solutions and advantages to be solved be more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another On one element or it is connected on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on ... shown in the drawings or position are closed System, is merely for convenience of description of the present invention and simplification of the description, not indicating or implying the indicated device or element must have Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.
Also referring to Fig. 1 and Fig. 2, now dry and wet Hybrid connections node provided by the invention is illustrated.The dry and wet Hybrid connections node, including the connector 10 that is horizontally placed between two adjacent concrete slabs, adjacent two concrete Plate is respectively the first concrete slab 1 and the second concrete slab 2, and the connector 10 passes through connecting pin 3 and the second concrete slab 2 It is connected and fixed;The mating surface of first concrete slab, 1 and second concrete slab 2 is equipped with for accommodating the connector 10 6 bottom of guide groove of horizontal guide slot 6, first concrete slab 1 is equipped with spring 7, the guide groove of first concrete slab 1 6 sides are vertically through the first pin hole 8 for coordinating with the connecting pin 3,6 side of guide groove of second concrete slab 2 Face is vertically through the second pin hole 9 for coordinating with the connecting pin 3;It is mixed that the length of the connector 10 is more than described second The length of guide groove 6 in concrete board 2, it is ensured that the both ends of connector are in the guide groove of the first concrete slab and the second concrete slab It is interior;The cast-in-place concrete of filling in the guide groove 6 of first concrete slab 1 and the first pin hole 8.Utilize connecting pin and connection First concrete slab and the second concrete slab are connected and fixed by part and cast-in-place concrete, form the connection section of dry and wet mixing Point can overcome the defect that involvement connects the technological deficiency with the connecting node of wet connection, improve the entirety of prefabricated concrete structure Intensity.
Dry and wet Hybrid connections node provided by the invention is provided simultaneously with involvement and connects and wet connection compared with prior art Feature has the advantages that simple in structure, convenient, of low cost, cracking resistance of constructing and globality are strong, and when geological process can be well Dissipation energy, connecting node ductility are preferable.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention Formula, sets that there are two the first positioning holes 4 and second location hole for coordinating with the connecting pin 3 on the connector 10 side by side 5;Before first concrete slab 1 and the connection of the second concrete slab 2, first pin hole 8 is corresponding with the first positioning hole 4;The After one concrete slab 1 and the connection of the second concrete slab 2, second pin hole 9 is corresponding with the second location hole 5, the company Second location hole 5 of the outbound nail 3 on second pin hole 9 and connector 10 is arranged.It is positioned by connecting pin and first The cooperation of hole and second location hole can easily realize company of the connector respectively with the first concrete slab and the second concrete slab It connects.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention The middle part of formula, the connector 10 is equipped with limiting stand 100, and the left side that the first positioning hole 4 is set to the limiting stand 100 is big Diameter portion 101, the second location hole 5 are set to the right side small diameter portion 102 of the limiting stand 100, in first concrete slab 1 The open end of guide groove 6 is equipped with the step 11 coordinated with the limiting stand 100, and the guide groove 6 of first concrete slab 1 is open Locate diameter and the diameter of guide groove 6 in the second concrete slab 2 is identical as 102 diameter of right side small diameter portion of the connector 10.It adopts The effective connection that can realize the first concrete slab and the second concrete slab by connector with this structure, avoids the bullet of connector In the guide groove for fully entering the second concrete slab under spring effect.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention Formula, the second location hole 5 are less than or equal to second pin hole 9 and described second at a distance from 10 right end face of the connector The distance of 6 bottom of guide groove in concrete slab 2, it is ensured that the both ends of connector are in the first concrete slab and the second concrete slab In guide groove, effective connection of the connector between the first concrete slab and the second concrete slab is realized.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention Formula, 6 bottom of guide groove of first concrete slab 1 are equipped with the blind hole for installing spring 7, and one end of the spring 7 is fixed In the blind via bottom.Spring can be reduced using blind hole and occupies space in guide groove, to spring while facilitating spring to install Also function to guiding role.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention Formula, first pin hole 8 are set to 6 top of guide groove in first concrete slab 1.Connecting pin is only from the first concrete The first positioning hole of the first pin hole and connector is inserted into the top of plate, and this structure facilitates the first concrete slab and second to mix After concrete board connection, cast concrete is carried out to the guide groove in the first concrete slab.
Further, please refer to Fig.1,2, a kind of specific embodiment party as dry and wet Hybrid connections node provided by the invention Formula, second pin hole 9 run through second concrete slab 2 and are arranged from top to bottom.Second pin hole the second concrete up and down Plate is facilitated and is connected and fixed connector and the second concrete slab using connecting pin, and connectivity robustness is enhanced.
The present invention also provides a kind of construction methods of dry and wet Hybrid connections node, include the following steps:
(1) connector 10 is placed in 6 bottom of guide groove of first concrete slab 1 in advance, connecting pin 3 is passed through Spring 7 is compressed in 6 bottom of guide groove of the first concrete slab 1, such as by the first pin hole 8 and connector 10 of the first concrete slab 1 Shown in Fig. 2;
The movable end of spring is fixed on to the left end of connector, it is ensured that slide to the guide groove of the second concrete slab in connector After interior, spring also has certain decrement.
(2) after the first concrete slab 1 and the second concrete slab 2 dock, connecting pin 3 is extracted, connector 10 is in spring It is sprung into the guide groove 6 of the second concrete slab 2 along the guide groove 6 of the first concrete slab 1 under the action of 7;
(3) connecting pin 3 is inserted into 6 interconnecting piece 10 of the second pin hole 9 and its guide groove of the second concrete slab 2, it will Connector 10 is connected and fixed with the second concrete slab 1, as shown in Figure 1;
(4) it using the first pin hole 8 of the first concrete slab 1 as sprue gate, is poured into the guide groove 6 of the first concrete slab 1 Concrete is noted, is connected as one the first concrete slab 1 and the second concrete slab 2 after concrete setting.
Dry and wet Hybrid connections joint construction method provided by the invention, compared with prior art, be provided simultaneously with involvement connect and The construction characteristic of wet connection, simple for process, convenient, of low cost, obtained dry and wet Hybrid connections node cracking resistance and entirety of constructing Property it is strong, dissipation energy, connecting node ductility are preferable well for solidification when geological process.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (9)

1. dry and wet Hybrid connections node, it is characterised in that:Including the connection being horizontally placed between two adjacent concrete slabs Part, adjacent two concrete slabs are respectively the first concrete slab and the second concrete slab, and the connector passes through connecting pin It is connected and fixed with the second concrete slab;The mating surface of first concrete slab and the second concrete slab is equipped with for accommodating The horizontal guide slot of connector is stated, the guiding trench bottom of first concrete slab is equipped with spring, first concrete slab Guide groove side is vertically through the first pin hole for coordinating with the connecting pin, the guide groove side of second concrete slab Face is vertically through the second pin hole for coordinating with the connecting pin;The length of the connector is more than second concrete The length of guide groove in plate;Cast-in-place concrete in the guide groove and the first pin hole of first concrete slab.
2. dry and wet Hybrid connections node as described in claim 1, it is characterised in that:It is used there are two being set side by side on the connector In the first positioning hole and second location hole that coordinate with the connecting pin;First concrete slab and the connection of the second concrete slab Before, first pin hole is corresponding with the first positioning hole;After first concrete slab and the connection of the second concrete slab, described the Two pin holes are corresponding with the second location hole, second positioning of the connecting pin on second pin hole and connector Hole is arranged.
3. dry and wet Hybrid connections node as claimed in claim 2, it is characterised in that:The middle part of the connector is equipped with limit Platform, the first positioning hole are set to the left side large-diameter portion of the limiting stand, and the second location hole is set to the limiting stand Right side small diameter portion, the open end of guide groove is equipped with the step coordinated with the limiting stand in first concrete slab, described The right side of the diameter and the connector of guide groove in the guide groove opening diameter and the second concrete slab of first concrete slab Small diameter portion diameter is identical.
4. dry and wet Hybrid connections node as claimed in claim 3, it is characterised in that:The second location hole and the connector The distance of right end face is less than or equal to second pin hole and is oriented at a distance from trench bottom in second concrete slab.
5. dry and wet Hybrid connections node as described in claim 1, it is characterised in that:The guide groove bottom of first concrete slab Portion is equipped with for pacifying spring-loaded blind hole, and the blind via bottom is fixed in one end of the spring.
6. dry and wet Hybrid connections node as described in claim 1, it is characterised in that:First pin hole is set to described first Above guide groove in concrete slab.
7. dry and wet Hybrid connections node as described in claim 1, it is characterised in that:Second pin hole runs through institute from top to bottom State the setting of the second concrete slab.
8. such as the construction method of claim 1-7 any one of them dry and wet Hybrid connections nodes, which is characterized in that including following Step:
Connector is placed in the guiding trench bottom of first concrete slab, connecting pin is passed through the first of the first concrete slab Pin hole and connector, by spring-compressed the first concrete slab guiding trench bottom;
After the first concrete slab and the second concrete slab dock, extract connecting pin, connector under the action of the spring along The guide groove of first concrete slab is sprung into the guide groove of the second concrete slab;
Connecting pin is inserted into the second pin hole and its guide groove interconnecting piece of the second concrete slab, connector and second are mixed Concrete board is connected and fixed;
Using the first pin hole of the first concrete slab as sprue gate, concrete is poured into a mould into the guide groove of the first concrete slab, is mixed The first concrete slab and the second concrete slab are connected as one after solidifying soil solidification.
9. the construction method of dry and wet Hybrid connections node as claimed in claim 8, which is characterized in that the movable end of the spring It is fixed on the left end of connector, and after so that connector is slided in the guide groove of the second concrete slab, spring has certain compression Amount.
CN201810603811.9A 2018-06-12 2018-06-12 Dry-wet mixed connection node and construction method thereof Active CN108755978B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810603811.9A CN108755978B (en) 2018-06-12 2018-06-12 Dry-wet mixed connection node and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810603811.9A CN108755978B (en) 2018-06-12 2018-06-12 Dry-wet mixed connection node and construction method thereof

Publications (2)

Publication Number Publication Date
CN108755978A true CN108755978A (en) 2018-11-06
CN108755978B CN108755978B (en) 2020-09-22

Family

ID=64021015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810603811.9A Active CN108755978B (en) 2018-06-12 2018-06-12 Dry-wet mixed connection node and construction method thereof

Country Status (1)

Country Link
CN (1) CN108755978B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555251A (en) * 2018-11-17 2019-04-02 万正河 It is a kind of to build prefabricated plate and its construction installation method
CN110485577A (en) * 2019-07-25 2019-11-22 天一建设发展有限公司 Precast wall body mounting structure
CN111677184A (en) * 2020-06-25 2020-09-18 丁西彦 Assembly wallboard convenient to connect and fix for assembly type building and installation method of assembly wallboard
CN111733980A (en) * 2020-06-16 2020-10-02 曾暖春 Assembled building that heat insulating ability is good
CN112252519A (en) * 2020-11-06 2021-01-22 绍兴宝城建筑工业化制造有限公司 Connecting structure and construction method of prefabricated wall panel
CN113215915A (en) * 2021-05-25 2021-08-06 山东高速齐鲁建设集团有限公司 Contact method between assembly type cement concrete pavement slab and plate in logistics park
CN113338448A (en) * 2021-06-22 2021-09-03 厦门穗卉泽贸易有限公司 Construction method for rapid connection of precast concrete components
USD987117S1 (en) 2020-10-14 2023-05-23 MillerKnoll, Inc. Wall
US11814839B2 (en) 2020-10-28 2023-11-14 MillerKnoll, Inc. Mobile wall including an alignment mechanism

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004340353A (en) * 2003-05-14 2004-12-02 Toshihiro Kamiyama Brace pin
CN204876811U (en) * 2015-07-23 2015-12-16 柳州铁道职业技术学院 Many function modularization temporary works rail
CN105350640A (en) * 2015-11-19 2016-02-24 李全民 A machinery connecting device between assembly type concrete prefabricated units and an operation method
CN206308897U (en) * 2016-12-23 2017-07-07 重庆房地产职业学院 A kind of structural sheeting
CN107724543A (en) * 2017-12-02 2018-02-23 成都魔童童工业设计有限公司 A kind of assembled type concrete prefabricated part

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004340353A (en) * 2003-05-14 2004-12-02 Toshihiro Kamiyama Brace pin
CN204876811U (en) * 2015-07-23 2015-12-16 柳州铁道职业技术学院 Many function modularization temporary works rail
CN105350640A (en) * 2015-11-19 2016-02-24 李全民 A machinery connecting device between assembly type concrete prefabricated units and an operation method
CN206308897U (en) * 2016-12-23 2017-07-07 重庆房地产职业学院 A kind of structural sheeting
CN107724543A (en) * 2017-12-02 2018-02-23 成都魔童童工业设计有限公司 A kind of assembled type concrete prefabricated part

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555251A (en) * 2018-11-17 2019-04-02 万正河 It is a kind of to build prefabricated plate and its construction installation method
CN109555251B (en) * 2018-11-17 2020-07-24 郴州市长信住工科技有限公司 Building assembled prefabricated slab and construction and installation method thereof
CN110485577A (en) * 2019-07-25 2019-11-22 天一建设发展有限公司 Precast wall body mounting structure
CN111733980A (en) * 2020-06-16 2020-10-02 曾暖春 Assembled building that heat insulating ability is good
CN111677184A (en) * 2020-06-25 2020-09-18 丁西彦 Assembly wallboard convenient to connect and fix for assembly type building and installation method of assembly wallboard
CN111677184B (en) * 2020-06-25 2022-02-18 淳安县良诚建设有限公司 Assembly wallboard convenient to connect and fix for assembly type building and installation method of assembly wallboard
USD987117S1 (en) 2020-10-14 2023-05-23 MillerKnoll, Inc. Wall
US11814839B2 (en) 2020-10-28 2023-11-14 MillerKnoll, Inc. Mobile wall including an alignment mechanism
CN112252519A (en) * 2020-11-06 2021-01-22 绍兴宝城建筑工业化制造有限公司 Connecting structure and construction method of prefabricated wall panel
CN113215915A (en) * 2021-05-25 2021-08-06 山东高速齐鲁建设集团有限公司 Contact method between assembly type cement concrete pavement slab and plate in logistics park
CN113338448A (en) * 2021-06-22 2021-09-03 厦门穗卉泽贸易有限公司 Construction method for rapid connection of precast concrete components

Also Published As

Publication number Publication date
CN108755978B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN108755978A (en) Dry and wet Hybrid connections node and its construction method
CN209384444U (en) A kind of fabricated shear wall vertical connection structure
CN207934022U (en) A kind of assembled underground continuous wall
CN103835374B (en) Quadrate steel pipe column-H-type steel beam splicing housing cartridge type connection method
CN108086341A (en) Assembled is adjustable basis
CN208072706U (en) A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation
CN205668317U (en) Isolated gate mixes earth column mould
CN207988212U (en) A kind of precast shear wall horizontal connection structure with W-shaped seam
CN104032850A (en) Prefabricated shear wall dry type vertical connecting node and construction method
CN108755762A (en) Assemble type concrete slab construction method
CN207934248U (en) A kind of more limb precast shear wall structures of parallel connection
CN204476429U (en) A kind of novel tunnel construction steel liner structure
CN207525779U (en) A kind of assembly type pipe gallery pattern foundation pit supporting structure of recycling and structure external mold composite structure
CN210395374U (en) Insertion type steel for construction method pile
CN204023430U (en) Prefabricated box culvert and prefabricated box culvert system
CN208815778U (en) Biting connecions steel-concrete coupled column and column connected node
CN108468339B (en) Skeleton type foundation pit supporting and basement exterior wall assembly structure and construction method thereof
CN210767854U (en) Pouring template with good sealing performance
CN209425801U (en) The die assembly of big cross section tube coupling
CN209083045U (en) A kind of assembled-type house building structure
CN106480875B (en) For constructing the rectangular concrete pile of piping lane side wall
CN205776315U (en) Reinforced concrete plate assembly and concrete pole foundation
CN206376404U (en) A kind of convenient attachment means of flat board wall
CN115030326B (en) Fully-prefabricated assembled house structure
CN107740510A (en) Assembled for skyscraper fills wall and assembly method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant