CN204476429U - A kind of novel tunnel construction steel liner structure - Google Patents

A kind of novel tunnel construction steel liner structure Download PDF

Info

Publication number
CN204476429U
CN204476429U CN201520009887.0U CN201520009887U CN204476429U CN 204476429 U CN204476429 U CN 204476429U CN 201520009887 U CN201520009887 U CN 201520009887U CN 204476429 U CN204476429 U CN 204476429U
Authority
CN
China
Prior art keywords
steel lining
arc
framework
steel
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520009887.0U
Other languages
Chinese (zh)
Inventor
杨伯娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Textile Technology Center Wujiang Co Ltd
Original Assignee
Textile Technology Center Wujiang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Textile Technology Center Wujiang Co Ltd filed Critical Textile Technology Center Wujiang Co Ltd
Priority to CN201520009887.0U priority Critical patent/CN204476429U/en
Application granted granted Critical
Publication of CN204476429U publication Critical patent/CN204476429U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of novel tunnel construction steel liner structure, comprise steel lining assembly.Multiple steel lining assembly headtotail forms the steel lining structure of cylindrical shape.Described steel lining assembly comprises framework, curved plate.Described framework surrounds arc edges of plate, and two long limits along framework are provided with arc-shaped partition, and two minor faces along framework are provided with end bulkheads, connects and closed arc dividing plate and end bulkheads.Described arc-shaped partition arranges multiple circular hole, and two complete steel lining assemblies connect through described circular hole by bolt, and fix with nut.The basal surface of curved plate arranges the intermediate structure supporting steel lining cutting assembly of multiple tubulose.The junction of lining cutting assembly and another steel lining assembly is provided with weather strip.The utility model structure is simple, easy for installation, coordinates the tunnel machines such as shield machine to use, and compared with concrete slab and wooden frame, sealing and water proofing property better, and form smooth plane reaction force in tunnel machine.

Description

A kind of novel tunnel construction steel liner structure
Technical field
The utility model relates to constructing tunnel field, what be specifically related to is a kind of novel tunnel construction steel liner structure.
Background technology
In constructing tunnel process, the earth of tunnel surface is removed the rear to tunnel machine by tunnel machine, and constantly pushes ahead.The preliminary bracing that the tunnel inner walls such as the wooden frame of rear erection steel arch-shelf, steel plate or the concrete slab support of development machine or enforcement sprayed mortar, anchor pole, steel arch-shelf are closely connected, prevents tunnel deformation from caving in.Compared with wooden frame or concrete slab, steel plate is more prone to install, and water resistance is better.Have steel plate punched to cut into curved surface at present, then with Flange joint and be fixedly mounted on tunnel inner wall support tunnel.But the junction of this braced structures cannot be fully formed level and smooth connecting surface due to the inadequate natural endowment of technique own, cause the sealing of this liner structure and water proofing property poor.In addition because steel plate cannot form flat surface, so this braced structures gives the reaction force that development machine advances fast, thus affect constructing tunnel efficiency.
Utility model content
For the problems referred to above, the purpose of this utility model is to provide a kind of novel tunnel construction steel liner structure, tunnel excavator is coordinated to use together, can realize excavating and set up liner structure and synchronously carry out, use different waterproof methods, solve the technical problem of the general complete waterproof of firm liner structure, the plane simultaneously forming complete and smooth applies reaction force and promotes tunnel machine advance.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is, a kind of novel tunnel construction steel liner structure, comprises the steel lining assembly of arc.
Multiple steel lining assembly forms the steel lining structure of a complete cylindrical shape around central axis headtotail, and the number of steel lining assembly and size determined according to the diameter in site operation tunnel.For the tunnel that diameter is less, the steel lining component count of use may be 3,4; For the tunnel that diameter is larger, then the steel lining component count used may reach 6,8,10 or more.
Described steel lining assembly comprises framework, curved plate, and described framework surrounds arc edges of plate.Two long limits along framework are respectively equipped with arc-shaped partition, and two minor faces along framework are respectively equipped with end bulkheads, and connection arc-shaped partition and end bulkheads form the braced structures of steel lining assembly in a welding manner.Junction between arc-shaped partition and end bulkheads is completely closed, prevents the moisture in soil from infiltrating tunnel.Described arc-shaped partition arranges multiple circular hole, and two steel lining assemblies connect through circular hole by bolt, and fix with nut.
The basal surface of curved plate arranges the intermediate structure of multiple tubulose, the two ends of described intermediate structure connect two arc-shaped partitions respectively in the mode of continuous welding, there is provided horizontal support force to steel lining assembly, make steel lining structure side form complete even curface simultaneously, evenly bear the active force that tunnel machine applies.The particular location that intermediate structure is arranged and number are determined according to the design of steel lining structural entity.
The junction of steel lining assembly and adjacent steel lining cutting assembly is provided with weather strip, and described weather strip is made up of compressible elastomeric material, closes the gap of steel lining inter-module, improves the water proofing property of steel lining structure.
General tunnel machine comprises excavating gear, conveyer belt, hydraulic lifting apparatus.In constructing tunnel process, tunnel machine is pushed ahead, the earth that excavating gear is excavated transports to the rear of tunnel machine through conveyer belt, steel lining assembling components is formed steel lining structure by hydraulic lifting apparatus on tunnel, the existing steel lining structure of steel lining anatomical connectivity of new composition, and be fixedly connected with screw bolt and nut.
As preferably, the width of described arc-shaped partition is 0.6cm ~ 1.2cm.The width of end bulkheads is 0.6cm ~ 1.2cm.
As preferably, the mode by continuous welding between framework with curved plate is connected, and without any gap and space between curved plate and framework, ensures the water proofing property of steel lining structure.
The utility model structure is simple, and easy for installation, the tunnel machines such as shield machine can be coordinated to use together, and compared with traditional concrete slab and wooden frame, sealing and water proofing property are more excellent, and forms a smooth plane and apply reaction force in tunnel machine.
Accompanying drawing explanation
Fig. 1 is a kind of novel tunnel construction steel liner structure axonometric drawing.
Wherein: 20, steel lining assembly, 22, framework, 24, curved plate, 26, arc-shaped partition, 28, end bulkheads, 32, intermediate structure, 38, circular hole.
Fig. 2 is a kind of novel tunnel construction steel liner structure exploded perspective view.
Wherein: 20, steel lining assembly, 22, framework, 24, curved plate, 26, arc-shaped partition, 28, end bulkheads, 32, intermediate structure, 38, circular hole, 40, weather strip, 62, bolt, 64, nut.
Structural representation when Fig. 3 is the installation of a kind of novel tunnel construction steel liner structure.
Wherein: 20, steel lining assembly, 24, curved plate, 26, arc-shaped partition, 28, end bulkheads, 32, intermediate structure, 50, tunnel machine, 52, excavating gear, 54, conveyer belt, 60, hydraulic lifting apparatus.
Fig. 4 is a kind of another example structure exploded perspective view of novel tunnel construction steel liner structure.
Wherein: 20A, steel lining assembly, 28A, end bulkheads.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in further detail.
Embodiment one
A kind of novel tunnel construction steel liner structure, comprises the steel lining assembly 20 of arc.
In the present embodiment, the direction, tunnel that design is excavated is 180 ° with direction, the tunnel angulation excavated.
6 steel lining assemblies 20 form the steel lining structure of cylindrical shape around central axis headtotail.Described steel lining assembly 20 comprises framework 22, curved plate 24, and described framework 22 surrounds the edge of curved plate 24.Two long limits along framework 22 are respectively equipped with arc-shaped partition 26, and two minor faces along framework 22 are respectively equipped with end bulkheads 28, and connection arc-shaped partition 26 and end bulkheads 28 form the braced structures of steel lining assembly 20 in a welding manner.Length along two arc-shaped partitions 24 on framework 22 two long limits is identical.Length along two end bulkheads 28 of framework 22 two minor faces is identical.Junction between arc-shaped partition 26 and end bulkheads 28 is completely closed, prevents the moisture in soil from infiltrating tunnel.Described arc-shaped partition 26 arranges multiple circular hole 38, and two steel lining assemblies 20 connect through circular hole 38 by bolt 62, and fix with nut 64.
The inner surface of curved plate 24 arranges the intermediate structure 32 of multiple tubulose, the two ends of described intermediate structure 32 connect two arc-shaped partitions 26 respectively in the mode of continuous welding, there is provided horizontal support force to steel lining assembly 20, make steel lining structure side form complete even curface simultaneously, evenly bear the active force that tunnel machine 50 applies.
Steel lining assembly 20 is provided with weather strip 40 with the junction of adjacent steel lining cutting assembly 20, and described sealing 40 is made up of compressible elastomeric material, closes the gap between steel lining assembly 20, improves the water proofing property of steel lining structure.
General tunnel machine 50 comprises excavating gear 52, conveyer belt 54, hydraulic lifting apparatus 60.In constructing tunnel process, tunnel machine 50 is pushed ahead, the earth that excavating gear 52 is excavated transports to the rear of tunnel machine 50 through conveyer belt 54, steel lining assembly promotes and is assembled on tunnel and forms steel lining structure by hydraulic lifting apparatus 60, and the steel lining structure of new composition connects existing steel lining structure by circular hole, bolt, nut.
In concrete enforcement, steel lining structure arranges an intermediate structure 32 at interval of 15 °.
In concrete enforcement, the mode by continuous welding between framework 22 with curved plate 24 is connected, and without any gap and space between curved plate 24 and framework 22, ensures the water proofing property of steel lining structure.
In concrete enforcement, the width of described arc-shaped partition 26 and end bulkheads 28 is 0.6cm.
Embodiment two
In the present embodiment, the direction, tunnel that design is excavated is less than 180 ° with direction, the tunnel angulation excavated.Two end bulkheads 28A length of steel lining assembly 20A are not identical.Described steel lining assembly 20A narrows between another end bulkheads 28A gradually from an end bulkheads 28A, makes the steel lining structure formed can follow tunnel conversion direction.
All the other are with embodiment one.

Claims (2)

1. a novel tunnel construction steel liner structure, it is characterized in that the steel lining assembly comprising arc, multiple steel lining assembly forms the steel lining structure of a complete cylindrical shape around central axis headtotail, described steel lining assembly comprises framework, curved plate, described framework surrounds arc edges of plate, two long limits along framework are respectively equipped with arc-shaped partition, two minor faces along framework are respectively equipped with end bulkheads, connect arc-shaped partition and end bulkheads also closed gap between the two in a welding manner; Described arc-shaped partition arranges multiple circular hole, and two steel lining assemblies are interconnected by the bolt that described circular hole is arranged, and fix with nut; The inner surface of curved plate arranges the intermediate structure of multiple tubulose, and the two ends of described intermediate structure connect two arc-shaped partitions respectively in the mode of continuous welding; The junction of steel lining assembly and adjacent steel lining cutting assembly is provided with the weather strip be made up of compressible elastomeric material.
2. a kind of novel tunnel construction steel liner structure according to claim 1, it is characterized in that the width of described arc-shaped partition is 0.6cm ~ 1.2cm, the width of end bulkheads is 0.6cm ~ 1.2cm.
CN201520009887.0U 2015-01-05 2015-01-05 A kind of novel tunnel construction steel liner structure Expired - Fee Related CN204476429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520009887.0U CN204476429U (en) 2015-01-05 2015-01-05 A kind of novel tunnel construction steel liner structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520009887.0U CN204476429U (en) 2015-01-05 2015-01-05 A kind of novel tunnel construction steel liner structure

Publications (1)

Publication Number Publication Date
CN204476429U true CN204476429U (en) 2015-07-15

Family

ID=53632231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520009887.0U Expired - Fee Related CN204476429U (en) 2015-01-05 2015-01-05 A kind of novel tunnel construction steel liner structure

Country Status (1)

Country Link
CN (1) CN204476429U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372557A (en) * 2018-11-21 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine tunneling arc plate and its method for protecting support
CN110952990A (en) * 2020-02-26 2020-04-03 中铁五局集团第一工程有限责任公司 Construction method for unfavorable geology in high-altitude area tunnel engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372557A (en) * 2018-11-21 2019-02-22 中铁工程装备集团有限公司 A kind of rock tunnel(ling) machine tunneling arc plate and its method for protecting support
CN110952990A (en) * 2020-02-26 2020-04-03 中铁五局集团第一工程有限责任公司 Construction method for unfavorable geology in high-altitude area tunnel engineering

Similar Documents

Publication Publication Date Title
CN103243838B (en) Connection structure of integrally assembled concrete frame and shear wall
CN103161224A (en) Rectangular concrete filled steel tubular column - steel beam connection node and construction methods thereof
CN204476429U (en) A kind of novel tunnel construction steel liner structure
CN103469905A (en) Heat-insulating wall
CN202139545U (en) Steel-structure culvert opening
CN207160068U (en) A kind of disjunctor corrugated steel piping lane
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN202416324U (en) Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project
CN205188936U (en) Novel manual work of combination formula is dug hole rectangle friction pile and is protected concrete wall
CN203129357U (en) Anti-cracking inserting strip for connection of wall bodies
CN204139175U (en) A kind of foundation pit supporting construction
CN103556822B (en) The large-scale hollow-out word construction method of a kind of cast-in-place concrete wall
CN203452103U (en) Waterstop
CN108035380A (en) A kind of suspension and support fastener inserts and its pre-buried construction method of installation
CN212153394U (en) Recoverable scalable device that props that trades of subway station deep basal pit
CN204681039U (en) A kind of steel ground cable channel
CN209162798U (en) The anti-by-pass means of underground continuous wall connector
CN204457075U (en) Prefabricated enclosure wall
CN207775931U (en) A kind of suspension and support fastener inserts
CN203856083U (en) Connection structure of wall of electric power plant
CN203787919U (en) Composite cable trench
CN204940685U (en) A kind of assembling internal partition wall wallboard
CN204959980U (en) Simple to operate's floor connection structure
CN204457073U (en) Foundation-free construction temporary construction fence
CN207211131U (en) A kind of underground continuous wall connector processing unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20160105